SlideShare une entreprise Scribd logo
1  sur  27
oGCDP Quality - Capacity
Quality
Role of HOME ENTITY in GCDP
Strong EP
Preparation,
support with
matching and the
VISA Process
Alignment of
Expectations about
the JD between EP
and Host Entity
Regular
communication
with EP during
realization and post
realization period
EP Re-integration post Re
HOW?
STEP 1:
Plan for Capacity
for Quality
STEP 2:
Structure, JD and
KPI in different LC
Volumes in iGIP
GCDP Clustering for LC
oGCDP
Beginner 0-25 X RE
Intermediate 25-100 X RE
Advanced 100-200 X RE
Mature +200 X RE
Use the TM Planning tool to plan
oGCDP
STEP 1: Plan for Capacity for Summer
STEP 1: Plan for Capacity for Summer
Here enter
number of EPs
one member can
deliver Eg: 1
member – 3 EPs
oGIPoGCDP
That number from
slide 2 will multiply
with Re goal you enter
for the quarter so you
know how many
members are needed
for delivery in each
programme
oGCDP
STEP 1: Plan for Capacity for Summer
STEP 2: Create structures for quality delivery
Structures by
Volume of
Realizations the LC
does
Customize your
structures for the
fruit peak if needed
VP
Member Member Member
∞
Ra-Ma-Re
STEP 2: An LC that has planned between 0-25 Re in 2014
VP
Member Member Member
∞
Ra-Ma-Re
Key focus
• Start up initial issue-based oGCDP project for
local market
Team Duration: 3 months
Member JD
• Design issue-based oGCDP project
• Ra(Marketing)-Ma-Re-Reintegration process
management
• EP’s inner-outer journey(experience)
management
STEP 2: An LC that has planned between 0-25 Re in 2014
STEP 2: An LC that has planned between 0-25 Re in 2014
JD of members for delivery
• In start up LCs, every member is
working on Ra, Ma and Delivery
• Each member is managing
his/her Eps
• On an average each members
manages 3-4 EPs
• Project/issue based promotion to
attract EPs with the right
expectation setting
• Support with matching process
and visa information/documents
• Coordinating communication
between EP and host entity
• Continuous communication with
EP and re-integration post
internship
STEP 2: KPI within the structure
KPI 1:
For a single member - % of Promoters/Total Realizations of the member
For a Team - % of Promoters/Total Realizations of the team
KPI 2:
Reducing/Eliminating the largest detractor issue of the LC/MC
VP
TL TL TL
∞
Ra-Ma-Re
∞
Ra-Ma-Re
∞
Ra-Ma-Re
Key focus
• National project implementation, showcasing and
process standardization
Duration: 3 months
Member JD
• Localize national issue-based oGCDP project
• Ra(Marketing)-Ma-Re-Reintegration process
management
• EP’s inner-outer journey (experience) management
• Showcasing
STEP 2: An LC that has planned between 25-100 Re in 2014
STEP 2: An LC that has planned between 25-100 Re in 2014
JD of members for delivery
• Project/issue based promotion to
attract EPs with the right expectation
setting
• Support with matching process and
visa information/documents
• Coordinating communication between
EP and host entity
• Continuous communication with EP
and re-integration post internship
• Ensuring quick fire fighting on NPS
and high response rate
• Effective Synergy for Project/issue
based promotion with the Marketing
Team in the LC.
• Since these teams are working on
national project implementation,
aligning with the MC in terms of
expectation from host entity etc is
important
• Communicate with host entity during
the match stage about EP
Accommodation, EP Integration and
any other information the EP needs
• Involve host entity virtually in EP Prep
STEP 2: An LC that has planned between 25-100 Re in 2014
JD of members for delivery
Role of VP in ensuring quality delivery:
• Coordinating with MC about
expectations with host entity
• Coordination of EP Induction, support
through matching process and EP
Integration
Role of TL in ensuring quality delivery:
• Ensuring every TL is supporting
his/her Eps and his/her members Eps
• Synergy of TLs between each other to
ensure alignment of EP Induction,
support through matching and
realization process
STEP 2: KPI within the structure
KPI 1:
For a single member - % of Promoters/Total Realizations of the member
For a Team - % of Promoters/Total Realizations of the team
KPI 2:
Reducing/Eliminating the largest detractor issue of the LC/MC
STEP 2: An LC that has planned between 100-200 Re in 2014
VP
TL TL TL TL (Off-Peak)
∞
Ra-Ma-Re
∞
Ra-Ma-Re
∞
Ra-Ma-Re
∞
Ra-Ma-Re
Key focus
Product development, Product sales and delivery
Structure
Project based team: 2-4 National issue-based
project + 1-2 Local new project(off peak)
Member JD in each National Project Team
-Localize national issue-based oGCDP project
-Ra(Marketing)-Ma (IL S&D Mgt)-Re-Reintegration process
management
-EP’s inner-outer journey(experience) management: Event
management
-Showcasing
Member JD in Local New Project team
-Product development(Design and Packaging)
-Product marketing and sales
-Ra(Marketing)-Ma-Re-Reintegration process management
-EP’s inner-outer journey(experience) management: Event
management
STEP 2: An LC that has planned between 100-200 Re in 2014
JD of members for delivery
• Project/issue based promotion to
attract EPs with the right expectation
setting
• Support with matching process and
visa information/documents
• Coordinating communication between
EP and host entity
• Continuous communication with EP
and re-integration post internship
• Ensuring quick fire fighting on NPS
and high response rate
• Effective Synergy for Project/issue
based promotion with the Marketing
Team in the LC.
• Since these teams are working on
national project implementation,
aligning with the MC in terms of
expectation from host entity etc is
important
• Communicate with host entity during
the match stage about EP
Accommodation, EP Integration and
any other information the EP needs
• Involve host entity virtually in EP Prep
STEP 2: An LC that has planned between 100-200 Re in 2014
This LC has an off
peak team who is
starting to prep for
Raising for Aug-Oct
realizations
The other teams are
working on matching
and realization for
the summer
STEP 2: An LC that has planned between 100-200 Re in 2014
In this LC Type,
In each team there
can be specific
members for delivery
while the other
members are Ra and
Ma.
Sample Timeline for the summer
May
• Matching peak for peak teams
• Raising preparation for off peak
teams
• If there are specific members for
delivery, they work on EP Prep
June
• Work on realization support to Eps
and EP Preparation
• Off peak teams start raising and doing
partnerships for Aug-Sep-Oct
STEP 2: KPI within the structure
KPI 1:
For a single member - % of Promoters/Total Realizations of the member
For a Team - % of Promoters/Total Realizations of the team
KPI 2:
Reducing/Eliminating the largest detractor issue of the LC/MC
STEP 2: An LC that has planned 200+ oGCDP in 2014
VP
TL TL TL Stakehold. Mngr. Process Mngr.
∞
Ra-Ma-Re
∞
Ra-Ma-Re
∞
Ra-Ma-Re
∞
Ra-Ma-Re
Key focus
Project sales and delivery, Process optimization, EP
learning and service.
Member JD in issue-based Project Team
Project design, marketing and sales;
EP’s inner-outer journey(experience) management:
Event management
EP Education and Management on Exchange Process
Showcasing
Duration
3 months
JD of members for delivery
• Project/issue based promotion to
attract EPs with the right expectation
setting
• Support with matching process and
visa information/documents
• Coordinating communication between
EP and host entity
• Continuous communication with EP
and re-integration post internship
• Ensuring quick fire fighting on NPS
and high response rate
• Effective Synergy for Project/issue
based promotion with the Marketing
Team in the LC.
• Since these teams are working on
national project implementation,
aligning with the MC in terms of
expectation from host entity etc is
important
• Communicate with host entity during
the match stage about EP
Accommodation, EP Integration and
any other information the EP needs
• Involve host entity virtually in EP Prep
STEP 2: An LC that has planned 200+ oGCDP in 2014
This LC has an off
peak team too like
the 100-200 Re LC
working on Aug-Oct
realizations
There is a team for
process
management/Stake
holder mgmt who
works on details of
the delivery process
since there is a high
volume of EPs
STEP 2: An LC that has planned 200+ oGCDP in 2014
The other teams are
only raising and
matching FAST for
the summer
• The LCVP needs to ensure coordination
between the process management team,
stakeholder management team and the Raising
and matching teams
• The process management and stakeholder
management teams need to focus on peak and
off peak realizations (In May for delivery
support to peak teams and raise support to off
peak teams)
STEP 2: An LC that has planned 200+ oGCDP in 2014
STEP 2: KPI within the structure
KPI 1:
For a single member - % of Promoters/Total Realizations of the member
For a Team - % of Promoters/Total Realizations of the team
KPI 2:
Reducing/Eliminating the largest detractor issue of the LC/MC

Contenu connexe

Tendances

iGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projectsiGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projects
AIESEC
 
oGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DoGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&D
AIESEC
 
oGCDP Tier 1 Structures for university expansions
oGCDP Tier 1 Structures for university expansions oGCDP Tier 1 Structures for university expansions
oGCDP Tier 1 Structures for university expansions
AIESEC
 
Capacity for high quality experiences in iGIP
Capacity for high quality experiences in iGIPCapacity for high quality experiences in iGIP
Capacity for high quality experiences in iGIP
AIESEC
 
iGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&DiGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&D
AIESEC
 
oGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyoGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergy
AIESEC
 
Tier 1 IXP for oGIP
Tier 1 IXP for oGIPTier 1 IXP for oGIP
Tier 1 IXP for oGIP
AIESEC
 
Learning for high quality experience delivery
Learning for high quality experience deliveryLearning for high quality experience delivery
Learning for high quality experience delivery
AIESEC
 
oGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementoGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline Management
AIESEC
 
oGIP Tier 2 structures and L&D for increased LC performance
oGIP Tier 2 structures and L&D for increased LC performanceoGIP Tier 2 structures and L&D for increased LC performance
oGIP Tier 2 structures and L&D for increased LC performance
AIESEC
 
Balancing growth in both OGX programmes
Balancing growth in both OGX programmesBalancing growth in both OGX programmes
Balancing growth in both OGX programmes
AIESEC
 
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...
Christina Kelman
 
Tier 2 oGIP Marketing structures and JD
Tier 2 oGIP Marketing structures and JDTier 2 oGIP Marketing structures and JD
Tier 2 oGIP Marketing structures and JD
AIESEC
 
iGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationiGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementation
AIESEC
 
Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement
maggie4667
 
Optimized Learning and Development
Optimized Learning and Development Optimized Learning and Development
Optimized Learning and Development
AIESEC
 
iGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&DiGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&D
AIESEC
 

Tendances (20)

iGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projectsiGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projects
 
oGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DoGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&D
 
oGCDP Tier 1 Structures for university expansions
oGCDP Tier 1 Structures for university expansions oGCDP Tier 1 Structures for university expansions
oGCDP Tier 1 Structures for university expansions
 
Capacity for high quality experiences in iGIP
Capacity for high quality experiences in iGIPCapacity for high quality experiences in iGIP
Capacity for high quality experiences in iGIP
 
iGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&DiGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&D
 
oGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyoGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergy
 
Tier 1 IXP for oGIP
Tier 1 IXP for oGIPTier 1 IXP for oGIP
Tier 1 IXP for oGIP
 
Learning for high quality experience delivery
Learning for high quality experience deliveryLearning for high quality experience delivery
Learning for high quality experience delivery
 
oGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementoGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline Management
 
oGIP Tier 2 structures and L&D for increased LC performance
oGIP Tier 2 structures and L&D for increased LC performanceoGIP Tier 2 structures and L&D for increased LC performance
oGIP Tier 2 structures and L&D for increased LC performance
 
Balancing growth in both OGX programmes
Balancing growth in both OGX programmesBalancing growth in both OGX programmes
Balancing growth in both OGX programmes
 
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...
 
Tier 2 oGIP Marketing structures and JD
Tier 2 oGIP Marketing structures and JDTier 2 oGIP Marketing structures and JD
Tier 2 oGIP Marketing structures and JD
 
iGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationiGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementation
 
Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement
 
IXP
IXPIXP
IXP
 
Optimized Learning and Development
Optimized Learning and Development Optimized Learning and Development
Optimized Learning and Development
 
iGCDP
iGCDPiGCDP
iGCDP
 
Synergy, Raising,MOS and OS
Synergy, Raising,MOS and OSSynergy, Raising,MOS and OS
Synergy, Raising,MOS and OS
 
iGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&DiGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&D
 

En vedette (8)

AIESEC: Develop
AIESEC: DevelopAIESEC: Develop
AIESEC: Develop
 
GET: Membership Selection
GET: Membership SelectionGET: Membership Selection
GET: Membership Selection
 
People Analytics
People AnalyticsPeople Analytics
People Analytics
 
GET: Membership Planning
GET: Membership PlanningGET: Membership Planning
GET: Membership Planning
 
AIESEC: How to downscale the team standards
AIESEC: How to downscale the team standardsAIESEC: How to downscale the team standards
AIESEC: How to downscale the team standards
 
AIESEC: The Team Standards & Explanation
AIESEC: The Team Standards & ExplanationAIESEC: The Team Standards & Explanation
AIESEC: The Team Standards & Explanation
 
Role of Talent Management
Role of Talent ManagementRole of Talent Management
Role of Talent Management
 
GET: Induction Guideline
GET: Induction GuidelineGET: Induction Guideline
GET: Induction Guideline
 

Similaire à Capacity and structures for high quality oGCDP

oGIP Capacity Quality Delivery
oGIP Capacity Quality DeliveryoGIP Capacity Quality Delivery
oGIP Capacity Quality Delivery
Firnando Buenayre
 
iGIP capacity for Quality Delivery
iGIP capacity for Quality DeliveryiGIP capacity for Quality Delivery
iGIP capacity for Quality Delivery
Firnando Buenayre
 
GCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issueGCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issue
Firnando Buenayre
 
Tier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline ManagementTier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline Management
AIESEC
 
Co delivery framework checklist
Co delivery framework checklistCo delivery framework checklist
Co delivery framework checklist
Sophia Fan
 
GIP Quality Strategy - Integration Issue
GIP Quality Strategy - Integration IssueGIP Quality Strategy - Integration Issue
GIP Quality Strategy - Integration Issue
Firnando Buenayre
 
Co delivery tier 1,2,3
Co delivery tier 1,2,3Co delivery tier 1,2,3
Co delivery tier 1,2,3
AIESEC
 
GCDP Quality Strategy - Logistic issue
GCDP Quality Strategy - Logistic issueGCDP Quality Strategy - Logistic issue
GCDP Quality Strategy - Logistic issue
Firnando Buenayre
 
Q1 functional report
Q1 functional reportQ1 functional report
Q1 functional report
647435
 
iGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDPiGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDP
AIESEC
 
Ignite2014 i gip_r&r
Ignite2014 i gip_r&rIgnite2014 i gip_r&r
Ignite2014 i gip_r&r
Vũ Hiền
 
Application package of National Control Board AIESEC MoC 14-15
Application package of National Control Board AIESEC MoC 14-15 Application package of National Control Board AIESEC MoC 14-15
Application package of National Control Board AIESEC MoC 14-15
Anastasiia Isakii
 

Similaire à Capacity and structures for high quality oGCDP (20)

iGCDP Quality Capacity
iGCDP Quality CapacityiGCDP Quality Capacity
iGCDP Quality Capacity
 
oGIP Capacity Quality Delivery
oGIP Capacity Quality DeliveryoGIP Capacity Quality Delivery
oGIP Capacity Quality Delivery
 
iGIP capacity for Quality Delivery
iGIP capacity for Quality DeliveryiGIP capacity for Quality Delivery
iGIP capacity for Quality Delivery
 
GCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issueGCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issue
 
Codelivery strategy
Codelivery strategyCodelivery strategy
Codelivery strategy
 
Tier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline ManagementTier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline Management
 
Co delivery framework checklist
Co delivery framework checklistCo delivery framework checklist
Co delivery framework checklist
 
Lets take action
Lets take actionLets take action
Lets take action
 
AIESEC Vietnam | Talent planning for dummies
AIESEC Vietnam | Talent planning for dummiesAIESEC Vietnam | Talent planning for dummies
AIESEC Vietnam | Talent planning for dummies
 
Lets take action
Lets take actionLets take action
Lets take action
 
GIP Quality Strategy - Integration Issue
GIP Quality Strategy - Integration IssueGIP Quality Strategy - Integration Issue
GIP Quality Strategy - Integration Issue
 
Co delivery tier 1,2,3
Co delivery tier 1,2,3Co delivery tier 1,2,3
Co delivery tier 1,2,3
 
GCDP Quality Strategy - Logistic issue
GCDP Quality Strategy - Logistic issueGCDP Quality Strategy - Logistic issue
GCDP Quality Strategy - Logistic issue
 
Ram resume FPNA
Ram resume FPNARam resume FPNA
Ram resume FPNA
 
Q1 functional report
Q1 functional reportQ1 functional report
Q1 functional report
 
iGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDPiGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDP
 
Ignite2014 i gip_r&r
Ignite2014 i gip_r&rIgnite2014 i gip_r&r
Ignite2014 i gip_r&r
 
Resume Sangeeta
Resume SangeetaResume Sangeeta
Resume Sangeeta
 
Balance gcdp and gip
Balance gcdp and gipBalance gcdp and gip
Balance gcdp and gip
 
Application package of National Control Board AIESEC MoC 14-15
Application package of National Control Board AIESEC MoC 14-15 Application package of National Control Board AIESEC MoC 14-15
Application package of National Control Board AIESEC MoC 14-15
 

Plus de AIESEC

Plus de AIESEC (20)

AI 1718 plan presentation
AI 1718 plan presentationAI 1718 plan presentation
AI 1718 plan presentation
 
The AIESECer Survey March 2017
The AIESECer Survey March 2017The AIESECer Survey March 2017
The AIESECer Survey March 2017
 
APLS-IR guide for LCP
APLS-IR guide for LCP APLS-IR guide for LCP
APLS-IR guide for LCP
 
APLS-Clarity of what
APLS-Clarity of whatAPLS-Clarity of what
APLS-Clarity of what
 
APLS-iGV product session
APLS-iGV product sessionAPLS-iGV product session
APLS-iGV product session
 
APLS-Drive the ambitions of my LC
APLS-Drive the ambitions of my LCAPLS-Drive the ambitions of my LC
APLS-Drive the ambitions of my LC
 
The ultimate lcp wisdom book
The ultimate lcp wisdom bookThe ultimate lcp wisdom book
The ultimate lcp wisdom book
 
Planning planning framework odm
Planning  planning framework odmPlanning  planning framework odm
Planning planning framework odm
 
Building culture of_success
Building culture of_successBuilding culture of_success
Building culture of_success
 
Building sales driven_culture
Building sales driven_cultureBuilding sales driven_culture
Building sales driven_culture
 
Our role as p
Our role as pOur role as p
Our role as p
 
P tips for planning
P tips for planningP tips for planning
P tips for planning
 
Role of lcp
Role of lcpRole of lcp
Role of lcp
 
Building culture of excellence+recognition
Building culture of excellence+recognitionBuilding culture of excellence+recognition
Building culture of excellence+recognition
 
[Tm]forming teams
[Tm]forming teams[Tm]forming teams
[Tm]forming teams
 
Building working culture
Building working cultureBuilding working culture
Building working culture
 
Building high performance_culture_rockefeller
Building high performance_culture_rockefellerBuilding high performance_culture_rockefeller
Building high performance_culture_rockefeller
 
Finance for lc ps ensuring sustainability
Finance for lc ps ensuring sustainabilityFinance for lc ps ensuring sustainability
Finance for lc ps ensuring sustainability
 
Ceo ultimate guide to being a team leader
Ceo ultimate guide to being a team leaderCeo ultimate guide to being a team leader
Ceo ultimate guide to being a team leader
 
Ir
IrIr
Ir
 

Dernier

The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
SandaliGurusinghe2
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
AllTops
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 

Dernier (14)

How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 

Capacity and structures for high quality oGCDP

  • 1. oGCDP Quality - Capacity Quality
  • 2.
  • 3. Role of HOME ENTITY in GCDP Strong EP Preparation, support with matching and the VISA Process Alignment of Expectations about the JD between EP and Host Entity Regular communication with EP during realization and post realization period EP Re-integration post Re
  • 4. HOW? STEP 1: Plan for Capacity for Quality STEP 2: Structure, JD and KPI in different LC Volumes in iGIP
  • 5. GCDP Clustering for LC oGCDP Beginner 0-25 X RE Intermediate 25-100 X RE Advanced 100-200 X RE Mature +200 X RE
  • 6. Use the TM Planning tool to plan oGCDP STEP 1: Plan for Capacity for Summer
  • 7. STEP 1: Plan for Capacity for Summer Here enter number of EPs one member can deliver Eg: 1 member – 3 EPs oGIPoGCDP
  • 8. That number from slide 2 will multiply with Re goal you enter for the quarter so you know how many members are needed for delivery in each programme oGCDP STEP 1: Plan for Capacity for Summer
  • 9. STEP 2: Create structures for quality delivery Structures by Volume of Realizations the LC does Customize your structures for the fruit peak if needed
  • 10. VP Member Member Member ∞ Ra-Ma-Re STEP 2: An LC that has planned between 0-25 Re in 2014
  • 11. VP Member Member Member ∞ Ra-Ma-Re Key focus • Start up initial issue-based oGCDP project for local market Team Duration: 3 months Member JD • Design issue-based oGCDP project • Ra(Marketing)-Ma-Re-Reintegration process management • EP’s inner-outer journey(experience) management STEP 2: An LC that has planned between 0-25 Re in 2014
  • 12. STEP 2: An LC that has planned between 0-25 Re in 2014 JD of members for delivery • In start up LCs, every member is working on Ra, Ma and Delivery • Each member is managing his/her Eps • On an average each members manages 3-4 EPs • Project/issue based promotion to attract EPs with the right expectation setting • Support with matching process and visa information/documents • Coordinating communication between EP and host entity • Continuous communication with EP and re-integration post internship
  • 13. STEP 2: KPI within the structure KPI 1: For a single member - % of Promoters/Total Realizations of the member For a Team - % of Promoters/Total Realizations of the team KPI 2: Reducing/Eliminating the largest detractor issue of the LC/MC
  • 14. VP TL TL TL ∞ Ra-Ma-Re ∞ Ra-Ma-Re ∞ Ra-Ma-Re Key focus • National project implementation, showcasing and process standardization Duration: 3 months Member JD • Localize national issue-based oGCDP project • Ra(Marketing)-Ma-Re-Reintegration process management • EP’s inner-outer journey (experience) management • Showcasing STEP 2: An LC that has planned between 25-100 Re in 2014
  • 15. STEP 2: An LC that has planned between 25-100 Re in 2014 JD of members for delivery • Project/issue based promotion to attract EPs with the right expectation setting • Support with matching process and visa information/documents • Coordinating communication between EP and host entity • Continuous communication with EP and re-integration post internship • Ensuring quick fire fighting on NPS and high response rate • Effective Synergy for Project/issue based promotion with the Marketing Team in the LC. • Since these teams are working on national project implementation, aligning with the MC in terms of expectation from host entity etc is important • Communicate with host entity during the match stage about EP Accommodation, EP Integration and any other information the EP needs • Involve host entity virtually in EP Prep
  • 16. STEP 2: An LC that has planned between 25-100 Re in 2014 JD of members for delivery Role of VP in ensuring quality delivery: • Coordinating with MC about expectations with host entity • Coordination of EP Induction, support through matching process and EP Integration Role of TL in ensuring quality delivery: • Ensuring every TL is supporting his/her Eps and his/her members Eps • Synergy of TLs between each other to ensure alignment of EP Induction, support through matching and realization process
  • 17. STEP 2: KPI within the structure KPI 1: For a single member - % of Promoters/Total Realizations of the member For a Team - % of Promoters/Total Realizations of the team KPI 2: Reducing/Eliminating the largest detractor issue of the LC/MC
  • 18. STEP 2: An LC that has planned between 100-200 Re in 2014 VP TL TL TL TL (Off-Peak) ∞ Ra-Ma-Re ∞ Ra-Ma-Re ∞ Ra-Ma-Re ∞ Ra-Ma-Re Key focus Product development, Product sales and delivery Structure Project based team: 2-4 National issue-based project + 1-2 Local new project(off peak) Member JD in each National Project Team -Localize national issue-based oGCDP project -Ra(Marketing)-Ma (IL S&D Mgt)-Re-Reintegration process management -EP’s inner-outer journey(experience) management: Event management -Showcasing Member JD in Local New Project team -Product development(Design and Packaging) -Product marketing and sales -Ra(Marketing)-Ma-Re-Reintegration process management -EP’s inner-outer journey(experience) management: Event management
  • 19. STEP 2: An LC that has planned between 100-200 Re in 2014 JD of members for delivery • Project/issue based promotion to attract EPs with the right expectation setting • Support with matching process and visa information/documents • Coordinating communication between EP and host entity • Continuous communication with EP and re-integration post internship • Ensuring quick fire fighting on NPS and high response rate • Effective Synergy for Project/issue based promotion with the Marketing Team in the LC. • Since these teams are working on national project implementation, aligning with the MC in terms of expectation from host entity etc is important • Communicate with host entity during the match stage about EP Accommodation, EP Integration and any other information the EP needs • Involve host entity virtually in EP Prep
  • 20. STEP 2: An LC that has planned between 100-200 Re in 2014 This LC has an off peak team who is starting to prep for Raising for Aug-Oct realizations The other teams are working on matching and realization for the summer
  • 21. STEP 2: An LC that has planned between 100-200 Re in 2014 In this LC Type, In each team there can be specific members for delivery while the other members are Ra and Ma. Sample Timeline for the summer May • Matching peak for peak teams • Raising preparation for off peak teams • If there are specific members for delivery, they work on EP Prep June • Work on realization support to Eps and EP Preparation • Off peak teams start raising and doing partnerships for Aug-Sep-Oct
  • 22. STEP 2: KPI within the structure KPI 1: For a single member - % of Promoters/Total Realizations of the member For a Team - % of Promoters/Total Realizations of the team KPI 2: Reducing/Eliminating the largest detractor issue of the LC/MC
  • 23. STEP 2: An LC that has planned 200+ oGCDP in 2014 VP TL TL TL Stakehold. Mngr. Process Mngr. ∞ Ra-Ma-Re ∞ Ra-Ma-Re ∞ Ra-Ma-Re ∞ Ra-Ma-Re Key focus Project sales and delivery, Process optimization, EP learning and service. Member JD in issue-based Project Team Project design, marketing and sales; EP’s inner-outer journey(experience) management: Event management EP Education and Management on Exchange Process Showcasing Duration 3 months
  • 24. JD of members for delivery • Project/issue based promotion to attract EPs with the right expectation setting • Support with matching process and visa information/documents • Coordinating communication between EP and host entity • Continuous communication with EP and re-integration post internship • Ensuring quick fire fighting on NPS and high response rate • Effective Synergy for Project/issue based promotion with the Marketing Team in the LC. • Since these teams are working on national project implementation, aligning with the MC in terms of expectation from host entity etc is important • Communicate with host entity during the match stage about EP Accommodation, EP Integration and any other information the EP needs • Involve host entity virtually in EP Prep STEP 2: An LC that has planned 200+ oGCDP in 2014
  • 25. This LC has an off peak team too like the 100-200 Re LC working on Aug-Oct realizations There is a team for process management/Stake holder mgmt who works on details of the delivery process since there is a high volume of EPs STEP 2: An LC that has planned 200+ oGCDP in 2014 The other teams are only raising and matching FAST for the summer
  • 26. • The LCVP needs to ensure coordination between the process management team, stakeholder management team and the Raising and matching teams • The process management and stakeholder management teams need to focus on peak and off peak realizations (In May for delivery support to peak teams and raise support to off peak teams) STEP 2: An LC that has planned 200+ oGCDP in 2014
  • 27. STEP 2: KPI within the structure KPI 1: For a single member - % of Promoters/Total Realizations of the member For a Team - % of Promoters/Total Realizations of the team KPI 2: Reducing/Eliminating the largest detractor issue of the LC/MC