SlideShare une entreprise Scribd logo
1  sur  3
ANANDA PADMANABAN B
72 A2, Vaigai Street,Santhosh Nagar,Mugalivakkam,Porur, Chennai – 600125, Tamil Nadu.
E-mail: winanand@gmail.com, Mobile no: +91- 9677728277
PROFESSIONAL OBJECTIVE
Seeking a challenging and growth oriented position and to keep myself updated to meet the
fast changing Industrial needs.
PROFESSIONAL SNAPSHOT
A Graduate Electrical Engineer Having 9 + years of experience in electrical system design
(Detail engineering of Electricalsystemfor Power,Process industry, ChemicalIndustry, FMCG
Industry, Infrastructure Building).
1. Currentlyworkingasan Assistant Managerin Larsen & Toubro TechnologyServices Ltd,
Chennai, India from July 2013 to till date.
2. Worked as a Senior Engineer-Electrical in Lodge Cottrell India Private Limited, Kolkata,
India a Subsidiary of KC Cottrell limited, Korea from June 2012 to July 2013.
3. Workedasan Engineer-Electrical inCETHARLIMITED, Trichy,IndiafromJuly2006to June
2012.
PROFESSIONAL OVERVIEW
 Preparation of Single Line diagram for MV and LV System.
 Preparation of Design Basis report, CAPEX, Equipment’s and system specification.
 Preparation of Electrical Load ListDrive listconsumer List
 Load flow and short circuit analysis using ETAP for electrical power system.
 SizingCalculationsof electrical equipment’slike Transformer,DGSet,HTandLTcable,UPS,
Earthing, lightning, APFC, DC and Emergency System etc.
 Review of Electrical system layouts of Indoor & outdoor substation (i.e. Equipment,
Transformer Yard, Bus duct, HT, LT switchgear panel arrangement.)
 Development and Review of MV & LV Control Schematics.
 Design and preparation of cable Tray Routing layout drawings.(i.e. Indoor, cable
tray/trench, pipe/cable rack cable tray routings).
 Review and design of lighting schemes and layouts for switchgear room, outdoor areas
& road lighting
 Design and preparation of layout for plant lightning protection,Earthing (earth grid and
auxiliary earth mats.) as per international Standards.
 Preparationof specificationsanddatasheetsforelectricalequipmentsuchasTransformer,
HT and LT Panels, Bus ducts, DG set, Motor, HT and LT Cables, Cable tray, UPS etc.
 Preparation of Power and control Cable Schedule and interconnection diagrams, Name
Plate List and Part List.
 Preparation of tender Document and Electrical BOQ.
 Review of Technical offers and preparation of technical Bid Evaluation for Electrical
package.
 Review & approval of Vendor drawings & GTP. (i.e. Transformer, HT Motor, LT Motor,
Control, metering & relay Panel,HT switchgear, LT switchgear, DG Set HT cable, LT
cable, bus duct, UPS Battery & battery charger etc.,)
 Attendingtechnicaldiscussionwithcustomer,consultantsandvendors.
 Inspectionof all electricalequipment’s.
 Co-ordination withSite forTechnical queriesandassistances.
SOFTWARE CONVERSANT
 ETAP
 DIALUX
 INTELEC
 AUTOCAD
PROJECT SUMMARY
In Larsen & Toubro Technology Services Limited
Middle East projects:
 ADDAR Specialty Chemical Production Plant, Jubail, Saudi Arabia.
 Qatar Petroleum Fire Training Facility at Halul Island, Qatar.
Indian Projects:
 PepsiCo South Greenfield Project, Andra Pradesh, India.
 Cargill India Private Limited, Davangere, India.
 Amazon Seller India Private Limited, Mumbai, India.
Other Projects:
 AKZONobel –Chemical Production Plant, Netherland.
 Dixie Chemical – Chemical Plant, USA
In Lodge Cottrell India (P) Ltd
 Renovation and Modernization of Blast furnace at Visakhapatnam Steel Plant, India
In Cethar Limited
 M/s Shree Mega Power limited(2x150 MW) PC Boiler, Rajasthan, India
 M/s Ind Barath Energy (Utkal) Limited (2x350 MW) PC Boiler Jharsguda,India
 M/s Aryan Coal Beneficiation (2x135MW), Chattisgarh, India.
 M/s Sitapuram Power Limited ,( 1 X 43 MW),Andra Pradesh, India
EDUCATIONAL QUALIFICATION
 B.E (EEE) MAM College of Engineering, Tiruchirappalli.- Secured First class 74% in the
academic year 2006
 HSC SacredHeartHigherSecondarySchool Tiruchirappalli.-StateBoard Secured88.42% in
the academic year 2002.
 S.S.L.C Sacred Heart Higher Secondary School Tiruchirappalli-State Board Secured 87%
in the academic year 2000
PROFESSIONAL ENHANCEMENT
 Reduced Cycle time of the Engineering by standardization.
 Continual improvement of design.
 Standardization of Equipment specification.
 Preparedstandardspread/calculationsheet.
STRENGTH
 Analyzing keenly and fulfilling the work with full satisfaction.
 Ability to handle the problems and find solution.
 Good coordination with colleagues and higher officials.
 Learning new concept to develop the Electrical design.
PERSONAL DETAILS
Father’sName - P.Balakrishnamoorthy
Date of Birth - 28.08.1984
Gender - Male
Marital Status - Married
Nationality - Indian
LanguagesKnown - English,Tamil &Hindi
Passport - ValidTill 2023
I hereby declare that the above details are true and correct to the best of my knowledge.
(B.Ananda Padmanaban)
Date: 25/04/16

Contenu connexe

Tendances (20)

san
sansan
san
 
CADD Resume 2016
CADD Resume 2016CADD Resume 2016
CADD Resume 2016
 
1Monica Jonna
1Monica Jonna 1Monica Jonna
1Monica Jonna
 
Resume for Electrical design engineer
Resume for Electrical design engineerResume for Electrical design engineer
Resume for Electrical design engineer
 
CV updated G
CV updated GCV updated G
CV updated G
 
Ranjeet resume Industrial
Ranjeet resume IndustrialRanjeet resume Industrial
Ranjeet resume Industrial
 
Ankit Resume - 1
Ankit Resume - 1Ankit Resume - 1
Ankit Resume - 1
 
amit
amitamit
amit
 
Electrical Engineer cv
Electrical Engineer cvElectrical Engineer cv
Electrical Engineer cv
 
Resume_Susanta
Resume_SusantaResume_Susanta
Resume_Susanta
 
Resume
ResumeResume
Resume
 
Sedrick Cueto_CV&Cover Letter_
Sedrick Cueto_CV&Cover Letter_Sedrick Cueto_CV&Cover Letter_
Sedrick Cueto_CV&Cover Letter_
 
Ranjeet resume Industrial
Ranjeet resume IndustrialRanjeet resume Industrial
Ranjeet resume Industrial
 
lakhwinder_Singh_CV_
lakhwinder_Singh_CV_lakhwinder_Singh_CV_
lakhwinder_Singh_CV_
 
Resume
ResumeResume
Resume
 
Er_Manish_Patel (CV)
Er_Manish_Patel (CV)Er_Manish_Patel (CV)
Er_Manish_Patel (CV)
 
Sudheer_CV
Sudheer_CVSudheer_CV
Sudheer_CV
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPL
 
JIGNESH RESUME
JIGNESH RESUMEJIGNESH RESUME
JIGNESH RESUME
 
utsav cv
utsav cvutsav cv
utsav cv
 

Similaire à Resume

Similaire à Resume (20)

Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516
 
Karthick_Electrical Draughtsman
Karthick_Electrical DraughtsmanKarthick_Electrical Draughtsman
Karthick_Electrical Draughtsman
 
Jituranjan lenka
Jituranjan lenkaJituranjan lenka
Jituranjan lenka
 
Subhankar resumé-2016
Subhankar  resumé-2016Subhankar  resumé-2016
Subhankar resumé-2016
 
electrical engineer
electrical engineerelectrical engineer
electrical engineer
 
CV-Bharadwaja
CV-BharadwajaCV-Bharadwaja
CV-Bharadwaja
 
GOWTHAMAN UPDATED ON 28 OCT 3PM
GOWTHAMAN UPDATED ON 28 OCT 3PM GOWTHAMAN UPDATED ON 28 OCT 3PM
GOWTHAMAN UPDATED ON 28 OCT 3PM
 
pecaaa
pecaaapecaaa
pecaaa
 
Resume-Smita
Resume-SmitaResume-Smita
Resume-Smita
 
SOURABH SONI
SOURABH SONISOURABH SONI
SOURABH SONI
 
attachment
attachmentattachment
attachment
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
 
sanjog navandars
sanjog navandarssanjog navandars
sanjog navandars
 
jey new resume
jey new resumejey new resume
jey new resume
 
Ravi_ElectricalEngineer
Ravi_ElectricalEngineerRavi_ElectricalEngineer
Ravi_ElectricalEngineer
 
Resume - Electrical Engineer
Resume - Electrical EngineerResume - Electrical Engineer
Resume - Electrical Engineer
 
Chaithanya Potluri
Chaithanya PotluriChaithanya Potluri
Chaithanya Potluri
 
Electrical engg 3 year
Electrical engg 3 yearElectrical engg 3 year
Electrical engg 3 year
 
Balaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBalaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical Designer
 
cv (2)
cv (2)cv (2)
cv (2)
 

Resume

  • 1. ANANDA PADMANABAN B 72 A2, Vaigai Street,Santhosh Nagar,Mugalivakkam,Porur, Chennai – 600125, Tamil Nadu. E-mail: winanand@gmail.com, Mobile no: +91- 9677728277 PROFESSIONAL OBJECTIVE Seeking a challenging and growth oriented position and to keep myself updated to meet the fast changing Industrial needs. PROFESSIONAL SNAPSHOT A Graduate Electrical Engineer Having 9 + years of experience in electrical system design (Detail engineering of Electricalsystemfor Power,Process industry, ChemicalIndustry, FMCG Industry, Infrastructure Building). 1. Currentlyworkingasan Assistant Managerin Larsen & Toubro TechnologyServices Ltd, Chennai, India from July 2013 to till date. 2. Worked as a Senior Engineer-Electrical in Lodge Cottrell India Private Limited, Kolkata, India a Subsidiary of KC Cottrell limited, Korea from June 2012 to July 2013. 3. Workedasan Engineer-Electrical inCETHARLIMITED, Trichy,IndiafromJuly2006to June 2012. PROFESSIONAL OVERVIEW  Preparation of Single Line diagram for MV and LV System.  Preparation of Design Basis report, CAPEX, Equipment’s and system specification.  Preparation of Electrical Load ListDrive listconsumer List  Load flow and short circuit analysis using ETAP for electrical power system.  SizingCalculationsof electrical equipment’slike Transformer,DGSet,HTandLTcable,UPS, Earthing, lightning, APFC, DC and Emergency System etc.  Review of Electrical system layouts of Indoor & outdoor substation (i.e. Equipment, Transformer Yard, Bus duct, HT, LT switchgear panel arrangement.)  Development and Review of MV & LV Control Schematics.  Design and preparation of cable Tray Routing layout drawings.(i.e. Indoor, cable tray/trench, pipe/cable rack cable tray routings).  Review and design of lighting schemes and layouts for switchgear room, outdoor areas & road lighting  Design and preparation of layout for plant lightning protection,Earthing (earth grid and auxiliary earth mats.) as per international Standards.  Preparationof specificationsanddatasheetsforelectricalequipmentsuchasTransformer, HT and LT Panels, Bus ducts, DG set, Motor, HT and LT Cables, Cable tray, UPS etc.  Preparation of Power and control Cable Schedule and interconnection diagrams, Name Plate List and Part List.  Preparation of tender Document and Electrical BOQ.
  • 2.  Review of Technical offers and preparation of technical Bid Evaluation for Electrical package.  Review & approval of Vendor drawings & GTP. (i.e. Transformer, HT Motor, LT Motor, Control, metering & relay Panel,HT switchgear, LT switchgear, DG Set HT cable, LT cable, bus duct, UPS Battery & battery charger etc.,)  Attendingtechnicaldiscussionwithcustomer,consultantsandvendors.  Inspectionof all electricalequipment’s.  Co-ordination withSite forTechnical queriesandassistances. SOFTWARE CONVERSANT  ETAP  DIALUX  INTELEC  AUTOCAD PROJECT SUMMARY In Larsen & Toubro Technology Services Limited Middle East projects:  ADDAR Specialty Chemical Production Plant, Jubail, Saudi Arabia.  Qatar Petroleum Fire Training Facility at Halul Island, Qatar. Indian Projects:  PepsiCo South Greenfield Project, Andra Pradesh, India.  Cargill India Private Limited, Davangere, India.  Amazon Seller India Private Limited, Mumbai, India. Other Projects:  AKZONobel –Chemical Production Plant, Netherland.  Dixie Chemical – Chemical Plant, USA In Lodge Cottrell India (P) Ltd  Renovation and Modernization of Blast furnace at Visakhapatnam Steel Plant, India In Cethar Limited  M/s Shree Mega Power limited(2x150 MW) PC Boiler, Rajasthan, India  M/s Ind Barath Energy (Utkal) Limited (2x350 MW) PC Boiler Jharsguda,India  M/s Aryan Coal Beneficiation (2x135MW), Chattisgarh, India.  M/s Sitapuram Power Limited ,( 1 X 43 MW),Andra Pradesh, India
  • 3. EDUCATIONAL QUALIFICATION  B.E (EEE) MAM College of Engineering, Tiruchirappalli.- Secured First class 74% in the academic year 2006  HSC SacredHeartHigherSecondarySchool Tiruchirappalli.-StateBoard Secured88.42% in the academic year 2002.  S.S.L.C Sacred Heart Higher Secondary School Tiruchirappalli-State Board Secured 87% in the academic year 2000 PROFESSIONAL ENHANCEMENT  Reduced Cycle time of the Engineering by standardization.  Continual improvement of design.  Standardization of Equipment specification.  Preparedstandardspread/calculationsheet. STRENGTH  Analyzing keenly and fulfilling the work with full satisfaction.  Ability to handle the problems and find solution.  Good coordination with colleagues and higher officials.  Learning new concept to develop the Electrical design. PERSONAL DETAILS Father’sName - P.Balakrishnamoorthy Date of Birth - 28.08.1984 Gender - Male Marital Status - Married Nationality - Indian LanguagesKnown - English,Tamil &Hindi Passport - ValidTill 2023 I hereby declare that the above details are true and correct to the best of my knowledge. (B.Ananda Padmanaban) Date: 25/04/16