SlideShare une entreprise Scribd logo
1  sur  6
Télécharger pour lire hors ligne
 
 
             ​PERSONAL INFORMATION ​Abdullah Bin Mohd Arsath
     ​A­15­12 ALAM SANJUNG, SEKSYEN 22    30300 SHAH ALAM 
           ​+60123793211       ​   +603­5033 0963 
                               ​secondary19872013@gmail.com 
 
   
 
 
 
JOB APPLIED FOR              ​Network Telecommunications Department 
 
 
 
 
Employment History 
 
 
WORK EXPERIENCE 
   
 
Technician & Technical Operation 
 
❏ Company MK Contraction and Communication (MKCC) 
❏ Industry Telecommunication 
❏ Salary RM 1,800.00 
❏ Date Joined March 2006 
❏ Date Left Nov 2007 
❏ Description PACKET ONE (P1MAX) ALCATEL LUCSON 
 
SubContractor 
 
❏ Company Subcontractor MKCC 
❏ Industry Telecommunication 
❏ Salary RM 3,000.00 
❏ Date Joined March 2009 
❏ Date Left Oct 2010 
❏ Description Microwave System 
 
 
SubContractor 
 
❏ Industry Telecommunication 
❏ Salary RM 2,500.00 
❏ Date Joined Jan 2011 
❏ Date Left Nov 2011 
❏ Description BTS , Minilink , Gps , Installation and Maintenance for Alcatel 
 
Page 1 / 6 
 
 
 
Senior Engineer Technician 
 
❏ Company NGM NETWORKS SDN 
BHD    
❏ Position Senior Engineer 
Technician 
❏ Industry Telecommunication,Network Engineering and Power Solution 
(PowerOasis) 
❏ Date Joined Feb 2012 
❏ Date Joined Oct 2012 
❏ Salary USD 2,800.00 
❏ JoinedTheme Contract 8 Month 
❏ Description ​System Mini Link E 2G (ERICSSON PAPUA NEW GUINEA AB) 
❏ Work Desk ­ 
 
1. Assist materials delivery to sites and make sure all materials delivered                     
as per site documentation and inform Logistic Manager upon material                   
shortage, if any, on the same day. 
2. Documented pictures of site before installation. 
3. Record the type & serial numbers of antennas for documentations                   
before installation. 
4. Install RBS 2116 or 2111, TMR 9106,TMR 3202 , PBC 02 and MLTN 6P                           
C, 20P as​ ​per Site documentation. 
5. Configure hardware & software of RBS and Transmission equipment                 
according to site documentation. 
6. Run Ber test on all E1 by cascading and looping, make sure the result                           
is inspecification and keep data. 
7. Measure DTF,VSWR and Return Loss measurement after             
jumper­feeder connection to antenna installed and to redo all                 
connectors which had breached specification given ( DTF – 1.07dBm                   
, VSWR – 1.4dBm), if any and save the good results data ​for                         
documentations. 
8. Route the site’s and other E1 traffic’s in MLTN which passes through                       
to connect​ ​sites to the BSC according to given E1 mapping document. 
9. Coordinate with BSC personal to integrate site into network. 
10. Integration, Test and Commission the site and record all data for                     
documentation 
11. Prepare site for Acceptance according to Digicel requirement which                 
involve 7 scenarios. 
12. To install BBS and decommission PBC 02 according to site scenarios. 
13. Install house keeping alarms to BSC and test with NOC. 
14. Prepare Acceptance Documentation and present to Customer at site                 
after site clean up . 
15. To carry out Acceptance test and Documentation signing by Digicel’s                   
representative. 
16. To inform daily on progress of roll out and acceptance and handover                       
soft and hard copy of accepted sites to Implementation manager. 
17. Software Baseline and hardware upgrade Minilink Traffic Node               
(upragde capacity).   
 
 
 
 
 
Page 2 / 6 
 
 
  ​Team Leader And Site Engineer 
  
❏ Company Konsep Gelombang SDN BHD 
❏ Industry Telecommunication And Network 
Engineering. 
❏ Salary RM3,000.00 
❏ Date Joined August 2012 
❏ Date Left Feb 2013 
❏ Description DiGi NobeB, New Site Installation,Site Dicom,Site Swap, New 
Configuration​ ​And Alarm Testing. 
 
 
Freelancer LEBLANC­DIGI project 
 
❏ Company Freelance 
❏ Position Punch List and Installation. 
❏ Industry Telecommunication And Network Engineering. 
❏ Work Desk ­ 
1. CIVIL WORK INSTALLATION. 
2. CONCRETE PLINT AND I­BEAM­C­CHANNEL INSTALLATION. 
3. NEW POLE TOWER,ADD NEW BIPOD FOR ROOFTOP,ADD NEW TRIPOD 
FOR ROOFTOP. 
4. ADD MINI MONOPOLE AT ROOFTOP,ADD GROUNDING SYSTEM – 
LIGHTNING SPIKE­GROUNDING CABLE BUSBAR­EGB­IGB,CABLE 
LADDER STRUCTURE. 
5. ADD H BRACKET ADD Y BRACKET AND ADD SUPPORT BRACKET. 
6. ANTENNA AUDIT. 
7. E­TILT,M TILT AND DEEGREE COPY,REPAIRING ADJUSTING. 
 
Freelancer MAXIS­HUAWEI project 
 
❏ Work Desk WBBPB4 CARD SWAP TO WBBPD2 CARD ON BBU3900. 
❏ Work Desk Login and do backup the NodeB. 
1. UAT TEST 
2. DATA TEST 
3. CALL TEST 
4. PACKET TEST 
5. SMS TEST ​        . 
❏ Work Desk DOCUMENT AND PHOTO ARRAGEMENT. 
❏ Work Desk NEW SITE PROJECT. 
❏ Work Desk 2G/3G/LTE PROJECT. 
❏ Work Desk ERICSSON SWAP TO HUAWEI PHASE 3 2013 – PHASE 5 2015 
HUAWEI MAXIS. 
 
 
ACTING PROJECT MANAGER AND BSC COORDINATOR MAXIS HUAWEI 
 
❏ Company NGM NETWORKS SDN BHD 
❏ Industry Telecommunication And Network Engineering 
❏ Salary RM4,500.00 
❏ Joined Theme Contract 8 Month 
❏ Date Joined April 2014 
❏ Date Joined Dec 2014 
❏ Description Configure M2K via Cisco,Lte Command Promt,SDD 
APPROVAL,NSA AND SA. 
Page 3 / 6 
 
 
❏ Work Desk Make sure all site up and fill up acceptance BIS from Huawei And 
Maxis.
   
 
❏ Work Desk Complete SDD to 
Claim PO. 
❏ Work Desk Activity Report. 
❏ WorK Desk Material Order. 
❏ Work Desk Ping Test and Bind 2G Backboard or no Backboard on 
bbu3900 huawei. 
 
 
PROJECT ENGINEER 
 
 
❏ Company DLA­TECHNOLOGY SDN BHD 
❏ Industry Telecommunication And Network Engineering 
❏ Salary RM3,500.00 
❏ TERM Contract 3 Month 
❏ Date Joined Nov 2015 
❏ Date Joined Jan 2016 
❏ Work Desk Tender and project 
submission 
❏ Work Desk Activity Report 
❏ Work Desk Material Order 
❏ Work Desk Take Action to Customer​. 
 
PROJECT COORDINATOR 
 
❏ Company ARTIC ENERGY SDN BHD​ + ​A&A Telecommunication Sdn.Bhd 
❏ Industry Telecommunication And Network Engineering 
❏ Salary PER SITE 
❏ TERM Contract 3 Month 
❏ Date Joined Jan 2016 
❏ Date Joined June 2016 
❏ Work Deks ­ 
 
1. CELCOM HAMMER PROJECT ­ CENTRAL CELCOM 
2. CELCOM HAMMER BAU ­ NORTHERN CELCOM 
3. O&M DIGI ­ EASTERN DIGI 
 
 
 
 
 
 
 
 
 
 
 
Page 4 / 6 
 
 
 
TRAINING & certificated  
 
CIDB PERSONEL PENTADBIRAN 
 
IC 870228­56­5091 
 
EXPIRED 1/OCT/2018 
 
  PERSONAL SKILLS 
 
Mother tongue(s)   
BAHASA MELAYU     
Other language(s) 
  Malay     A2 
  English   B1 
 
 
Levels A1 and A2 Basic user ­ B1 and B2 Independent user  ­ C1 and C2 Proficient user 
 
 
COMMUNICATION SKILL 
 
✓ Able to work under pressure 
✓ Able to work in group or independently. 
✓ Peaceful, quick learner, highly inquisitive, creative and 
resourceful, responsible and outside work and fast learn. 
 
 
Organisational / managerial skills 
 
 
Presentation reports and present to company and/or customer. 
Make System performance reports to all Vendor. 
Make system statistic reports to make all work good in progress. 
 
 
Job­related skil 
 
✓ Able to run a new project from any telcommunication  Malaysia industrial 
Malaysian Communications​ ​And Multimedia Commission (MCMC)​. 
✓ Able to done project from start w/o and p/o. 
Page 5 / 6 
 
 
 
 
 
Digital competence 
 
 
 ♣​ ​DOS and Windows  95/97/98/ XP/ 2000/Vista/8 UNIX/ 
MS Office/IOS/Window 7/8/9/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 5 / 6 
 

Contenu connexe

En vedette

Do employers want what schools create? Hernán Araneda, gerente de Innovum, Fu...
Do employers want what schools create? Hernán Araneda, gerente de Innovum, Fu...Do employers want what schools create? Hernán Araneda, gerente de Innovum, Fu...
Do employers want what schools create? Hernán Araneda, gerente de Innovum, Fu...Innovum
 
Investigando blog Grupo 2
Investigando blog Grupo 2Investigando blog Grupo 2
Investigando blog Grupo 2nildabfce
 
Que te la pases genial en tu día
Que te la pases genial en tu díaQue te la pases genial en tu día
Que te la pases genial en tu díakarina1505
 
Proyecto de VIda Santos Suarez Jefferson Dario
Proyecto de VIda   Santos Suarez Jefferson DarioProyecto de VIda   Santos Suarez Jefferson Dario
Proyecto de VIda Santos Suarez Jefferson Dariojefferson santos
 
Menú de Programas
Menú de ProgramasMenú de Programas
Menú de Programascris kathy
 
Portafolio de Castillo Darisnel
Portafolio de Castillo DarisnelPortafolio de Castillo Darisnel
Portafolio de Castillo DarisnelDarisnel Castillo
 
Compliance HR Webinar: Countdown to Overtime - Are You Ready?
Compliance HR Webinar: Countdown to Overtime - Are You Ready?Compliance HR Webinar: Countdown to Overtime - Are You Ready?
Compliance HR Webinar: Countdown to Overtime - Are You Ready?CHRJenn26
 
Gulfnet Profile
Gulfnet ProfileGulfnet Profile
Gulfnet Profilejolian
 
Softshake 2013 Apiness SA l'envers du décor
Softshake 2013 Apiness SA l'envers du décorSoftshake 2013 Apiness SA l'envers du décor
Softshake 2013 Apiness SA l'envers du décormichaelmiguel2013
 
Postura oficial ACPR
Postura oficial ACPRPostura oficial ACPR
Postura oficial ACPRkruskis
 
Enlistment rules2014 07
Enlistment rules2014 07Enlistment rules2014 07
Enlistment rules2014 07Ptpg Stuc
 
Gaining and Maintaining a Competitive Advantage with SOCIAL MEDIA (WSI - Cyprus)
Gaining and Maintaining a Competitive Advantage with SOCIAL MEDIA (WSI - Cyprus)Gaining and Maintaining a Competitive Advantage with SOCIAL MEDIA (WSI - Cyprus)
Gaining and Maintaining a Competitive Advantage with SOCIAL MEDIA (WSI - Cyprus)WSI (Cyprus)
 
Manual del organizador de gotoWebinar
Manual del organizador de gotoWebinarManual del organizador de gotoWebinar
Manual del organizador de gotoWebinarAlma Segundo Escobar
 
Torre de pisa maria
Torre de pisa mariaTorre de pisa maria
Torre de pisa mariaBerakruz
 
4.4.3. Qué significa convertirse en persona. 4.4.4. Concepción de la psicoter...
4.4.3. Qué significa convertirse en persona. 4.4.4. Concepción de la psicoter...4.4.3. Qué significa convertirse en persona. 4.4.4. Concepción de la psicoter...
4.4.3. Qué significa convertirse en persona. 4.4.4. Concepción de la psicoter...Laura O. Eguia Magaña
 
Les Mills GRIT - A Great Small Group Training Solution
Les Mills GRIT - A Great Small Group Training SolutionLes Mills GRIT - A Great Small Group Training Solution
Les Mills GRIT - A Great Small Group Training SolutionBryan K. O'Rourke
 

En vedette (20)

Do employers want what schools create? Hernán Araneda, gerente de Innovum, Fu...
Do employers want what schools create? Hernán Araneda, gerente de Innovum, Fu...Do employers want what schools create? Hernán Araneda, gerente de Innovum, Fu...
Do employers want what schools create? Hernán Araneda, gerente de Innovum, Fu...
 
Investigando blog Grupo 2
Investigando blog Grupo 2Investigando blog Grupo 2
Investigando blog Grupo 2
 
Que te la pases genial en tu día
Que te la pases genial en tu díaQue te la pases genial en tu día
Que te la pases genial en tu día
 
Estrategias gestión electrónica
Estrategias gestión electrónica Estrategias gestión electrónica
Estrategias gestión electrónica
 
Proyecto de VIda Santos Suarez Jefferson Dario
Proyecto de VIda   Santos Suarez Jefferson DarioProyecto de VIda   Santos Suarez Jefferson Dario
Proyecto de VIda Santos Suarez Jefferson Dario
 
Eclampsia
EclampsiaEclampsia
Eclampsia
 
Menú de Programas
Menú de ProgramasMenú de Programas
Menú de Programas
 
Portafolio de Castillo Darisnel
Portafolio de Castillo DarisnelPortafolio de Castillo Darisnel
Portafolio de Castillo Darisnel
 
Cena baile fin de año 2012
Cena   baile fin de año 2012Cena   baile fin de año 2012
Cena baile fin de año 2012
 
Compliance HR Webinar: Countdown to Overtime - Are You Ready?
Compliance HR Webinar: Countdown to Overtime - Are You Ready?Compliance HR Webinar: Countdown to Overtime - Are You Ready?
Compliance HR Webinar: Countdown to Overtime - Are You Ready?
 
Gulfnet Profile
Gulfnet ProfileGulfnet Profile
Gulfnet Profile
 
Softshake 2013 Apiness SA l'envers du décor
Softshake 2013 Apiness SA l'envers du décorSoftshake 2013 Apiness SA l'envers du décor
Softshake 2013 Apiness SA l'envers du décor
 
Postura oficial ACPR
Postura oficial ACPRPostura oficial ACPR
Postura oficial ACPR
 
Enlistment rules2014 07
Enlistment rules2014 07Enlistment rules2014 07
Enlistment rules2014 07
 
Artículo Chamangá
Artículo Chamangá Artículo Chamangá
Artículo Chamangá
 
Gaining and Maintaining a Competitive Advantage with SOCIAL MEDIA (WSI - Cyprus)
Gaining and Maintaining a Competitive Advantage with SOCIAL MEDIA (WSI - Cyprus)Gaining and Maintaining a Competitive Advantage with SOCIAL MEDIA (WSI - Cyprus)
Gaining and Maintaining a Competitive Advantage with SOCIAL MEDIA (WSI - Cyprus)
 
Manual del organizador de gotoWebinar
Manual del organizador de gotoWebinarManual del organizador de gotoWebinar
Manual del organizador de gotoWebinar
 
Torre de pisa maria
Torre de pisa mariaTorre de pisa maria
Torre de pisa maria
 
4.4.3. Qué significa convertirse en persona. 4.4.4. Concepción de la psicoter...
4.4.3. Qué significa convertirse en persona. 4.4.4. Concepción de la psicoter...4.4.3. Qué significa convertirse en persona. 4.4.4. Concepción de la psicoter...
4.4.3. Qué significa convertirse en persona. 4.4.4. Concepción de la psicoter...
 
Les Mills GRIT - A Great Small Group Training Solution
Les Mills GRIT - A Great Small Group Training SolutionLes Mills GRIT - A Great Small Group Training Solution
Les Mills GRIT - A Great Small Group Training Solution
 

Similaire à Abdullah update 7-7-2016 cv

Similaire à Abdullah update 7-7-2016 cv (20)

Anthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_VitaeAnthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_Vitae
 
Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015
 
CV2016
CV2016CV2016
CV2016
 
CV_SIVAM OCT.doc 1
CV_SIVAM OCT.doc 1CV_SIVAM OCT.doc 1
CV_SIVAM OCT.doc 1
 
Alaa hady
Alaa hadyAlaa hady
Alaa hady
 
CV_Devesh
CV_DeveshCV_Devesh
CV_Devesh
 
APAA SIMON AHUNGWA
APAA SIMON AHUNGWAAPAA SIMON AHUNGWA
APAA SIMON AHUNGWA
 
CV_guyroger_updated
CV_guyroger_updatedCV_guyroger_updated
CV_guyroger_updated
 
ENGR M FAHIM IQBAL CV
ENGR M FAHIM IQBAL CVENGR M FAHIM IQBAL CV
ENGR M FAHIM IQBAL CV
 
Cv faisal mehmood-telecommunication
Cv faisal mehmood-telecommunicationCv faisal mehmood-telecommunication
Cv faisal mehmood-telecommunication
 
Telecoms Service Assurance & Service Fulfillment with Neo4j Graph Database
Telecoms Service Assurance & Service Fulfillment with Neo4j Graph DatabaseTelecoms Service Assurance & Service Fulfillment with Neo4j Graph Database
Telecoms Service Assurance & Service Fulfillment with Neo4j Graph Database
 
Rizwan Ahmad (f)
Rizwan Ahmad (f)Rizwan Ahmad (f)
Rizwan Ahmad (f)
 
AHMAD HUSSAIN CV
AHMAD HUSSAIN CVAHMAD HUSSAIN CV
AHMAD HUSSAIN CV
 
Rami Abou Omeira_CV
Rami Abou Omeira_CVRami Abou Omeira_CV
Rami Abou Omeira_CV
 
Naveed CV (1) (1)
Naveed CV (1) (1)Naveed CV (1) (1)
Naveed CV (1) (1)
 
M Khalid Javed Update
M Khalid Javed UpdateM Khalid Javed Update
M Khalid Javed Update
 
Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)
 
Cv meynard
Cv meynardCv meynard
Cv meynard
 
Cv meynard
Cv meynardCv meynard
Cv meynard
 
Devesh CV
Devesh CVDevesh CV
Devesh CV
 

Abdullah update 7-7-2016 cv

  • 1.                  ​PERSONAL INFORMATION ​Abdullah Bin Mohd Arsath      ​A­15­12 ALAM SANJUNG, SEKSYEN 22    30300 SHAH ALAM             ​+60123793211       ​   +603­5033 0963                                 ​secondary19872013@gmail.com              JOB APPLIED FOR              ​Network Telecommunications Department          Employment History      WORK EXPERIENCE        Technician & Technical Operation    ❏ Company MK Contraction and Communication (MKCC)  ❏ Industry Telecommunication  ❏ Salary RM 1,800.00  ❏ Date Joined March 2006  ❏ Date Left Nov 2007  ❏ Description PACKET ONE (P1MAX) ALCATEL LUCSON    SubContractor    ❏ Company Subcontractor MKCC  ❏ Industry Telecommunication  ❏ Salary RM 3,000.00  ❏ Date Joined March 2009  ❏ Date Left Oct 2010  ❏ Description Microwave System      SubContractor    ❏ Industry Telecommunication  ❏ Salary RM 2,500.00  ❏ Date Joined Jan 2011  ❏ Date Left Nov 2011  ❏ Description BTS , Minilink , Gps , Installation and Maintenance for Alcatel    Page 1 / 6   
  • 2.     Senior Engineer Technician    ❏ Company NGM NETWORKS SDN  BHD     ❏ Position Senior Engineer  Technician  ❏ Industry Telecommunication,Network Engineering and Power Solution  (PowerOasis)  ❏ Date Joined Feb 2012  ❏ Date Joined Oct 2012  ❏ Salary USD 2,800.00  ❏ JoinedTheme Contract 8 Month  ❏ Description ​System Mini Link E 2G (ERICSSON PAPUA NEW GUINEA AB)  ❏ Work Desk ­    1. Assist materials delivery to sites and make sure all materials delivered                      as per site documentation and inform Logistic Manager upon material                    shortage, if any, on the same day.  2. Documented pictures of site before installation.  3. Record the type & serial numbers of antennas for documentations                    before installation.  4. Install RBS 2116 or 2111, TMR 9106,TMR 3202 , PBC 02 and MLTN 6P                            C, 20P as​ ​per Site documentation.  5. Configure hardware & software of RBS and Transmission equipment                  according to site documentation.  6. Run Ber test on all E1 by cascading and looping, make sure the result                            is inspecification and keep data.  7. Measure DTF,VSWR and Return Loss measurement after              jumper­feeder connection to antenna installed and to redo all                  connectors which had breached specification given ( DTF – 1.07dBm                    , VSWR – 1.4dBm), if any and save the good results data ​for                          documentations.  8. Route the site’s and other E1 traffic’s in MLTN which passes through                        to connect​ ​sites to the BSC according to given E1 mapping document.  9. Coordinate with BSC personal to integrate site into network.  10. Integration, Test and Commission the site and record all data for                      documentation  11. Prepare site for Acceptance according to Digicel requirement which                  involve 7 scenarios.  12. To install BBS and decommission PBC 02 according to site scenarios.  13. Install house keeping alarms to BSC and test with NOC.  14. Prepare Acceptance Documentation and present to Customer at site                  after site clean up .  15. To carry out Acceptance test and Documentation signing by Digicel’s                    representative.  16. To inform daily on progress of roll out and acceptance and handover                        soft and hard copy of accepted sites to Implementation manager.  17. Software Baseline and hardware upgrade Minilink Traffic Node                (upragde capacity).              Page 2 / 6   
  • 3.     ​Team Leader And Site Engineer     ❏ Company Konsep Gelombang SDN BHD  ❏ Industry Telecommunication And Network  Engineering.  ❏ Salary RM3,000.00  ❏ Date Joined August 2012  ❏ Date Left Feb 2013  ❏ Description DiGi NobeB, New Site Installation,Site Dicom,Site Swap, New  Configuration​ ​And Alarm Testing.      Freelancer LEBLANC­DIGI project    ❏ Company Freelance  ❏ Position Punch List and Installation.  ❏ Industry Telecommunication And Network Engineering.  ❏ Work Desk ­  1. CIVIL WORK INSTALLATION.  2. CONCRETE PLINT AND I­BEAM­C­CHANNEL INSTALLATION.  3. NEW POLE TOWER,ADD NEW BIPOD FOR ROOFTOP,ADD NEW TRIPOD  FOR ROOFTOP.  4. ADD MINI MONOPOLE AT ROOFTOP,ADD GROUNDING SYSTEM –  LIGHTNING SPIKE­GROUNDING CABLE BUSBAR­EGB­IGB,CABLE  LADDER STRUCTURE.  5. ADD H BRACKET ADD Y BRACKET AND ADD SUPPORT BRACKET.  6. ANTENNA AUDIT.  7. E­TILT,M TILT AND DEEGREE COPY,REPAIRING ADJUSTING.    Freelancer MAXIS­HUAWEI project    ❏ Work Desk WBBPB4 CARD SWAP TO WBBPD2 CARD ON BBU3900.  ❏ Work Desk Login and do backup the NodeB.  1. UAT TEST  2. DATA TEST  3. CALL TEST  4. PACKET TEST  5. SMS TEST ​        .  ❏ Work Desk DOCUMENT AND PHOTO ARRAGEMENT.  ❏ Work Desk NEW SITE PROJECT.  ❏ Work Desk 2G/3G/LTE PROJECT.  ❏ Work Desk ERICSSON SWAP TO HUAWEI PHASE 3 2013 – PHASE 5 2015  HUAWEI MAXIS.      ACTING PROJECT MANAGER AND BSC COORDINATOR MAXIS HUAWEI    ❏ Company NGM NETWORKS SDN BHD  ❏ Industry Telecommunication And Network Engineering  ❏ Salary RM4,500.00  ❏ Joined Theme Contract 8 Month  ❏ Date Joined April 2014  ❏ Date Joined Dec 2014  ❏ Description Configure M2K via Cisco,Lte Command Promt,SDD  APPROVAL,NSA AND SA.  Page 3 / 6   
  • 4.   ❏ Work Desk Make sure all site up and fill up acceptance BIS from Huawei And  Maxis.       ❏ Work Desk Complete SDD to  Claim PO.  ❏ Work Desk Activity Report.  ❏ WorK Desk Material Order.  ❏ Work Desk Ping Test and Bind 2G Backboard or no Backboard on  bbu3900 huawei.      PROJECT ENGINEER      ❏ Company DLA­TECHNOLOGY SDN BHD  ❏ Industry Telecommunication And Network Engineering  ❏ Salary RM3,500.00  ❏ TERM Contract 3 Month  ❏ Date Joined Nov 2015  ❏ Date Joined Jan 2016  ❏ Work Desk Tender and project  submission  ❏ Work Desk Activity Report  ❏ Work Desk Material Order  ❏ Work Desk Take Action to Customer​.    PROJECT COORDINATOR    ❏ Company ARTIC ENERGY SDN BHD​ + ​A&A Telecommunication Sdn.Bhd  ❏ Industry Telecommunication And Network Engineering  ❏ Salary PER SITE  ❏ TERM Contract 3 Month  ❏ Date Joined Jan 2016  ❏ Date Joined June 2016  ❏ Work Deks ­    1. CELCOM HAMMER PROJECT ­ CENTRAL CELCOM  2. CELCOM HAMMER BAU ­ NORTHERN CELCOM  3. O&M DIGI ­ EASTERN DIGI                        Page 4 / 6     
  • 5.   TRAINING & certificated     CIDB PERSONEL PENTADBIRAN    IC 870228­56­5091    EXPIRED 1/OCT/2018      PERSONAL SKILLS    Mother tongue(s)    BAHASA MELAYU      Other language(s)    Malay     A2    English   B1      Levels A1 and A2 Basic user ­ B1 and B2 Independent user  ­ C1 and C2 Proficient user      COMMUNICATION SKILL    ✓ Able to work under pressure  ✓ Able to work in group or independently.  ✓ Peaceful, quick learner, highly inquisitive, creative and  resourceful, responsible and outside work and fast learn.      Organisational / managerial skills      Presentation reports and present to company and/or customer.  Make System performance reports to all Vendor.  Make system statistic reports to make all work good in progress.      Job­related skil    ✓ Able to run a new project from any telcommunication  Malaysia industrial  Malaysian Communications​ ​And Multimedia Commission (MCMC)​.  ✓ Able to done project from start w/o and p/o.  Page 5 / 6