CASE STUDY
HOTEL THE ALTIUS AND THE MOUNTVIEW,
CHANDIGARH
NAME ABHISHEK S. KUMAR
ROLL NO. - 01
Hotel The Altius
25/9, Chandigarh Road,
Industrial Area Phase II,
Chandigarh,160002
Hotel Mountview
Sector10A,
Chandigarh,160011
LOCATION
Hotel The Altius
• 3.8 km from airport
• 7.2 km from sector 17
• 9.5 km from railway station
Hotel Mountview
• 15.9 km from airport
• 2.8 km from sector 17
• 11 km from railway station
Hotel The Altius
• Size of plot –1,635 sq.m
• Shape –Rectangular
• Nearby cities –Zirakpur, Panchkula
• Orientation –North East facing
• Climate –Tropical
• Topography -Flat
• Accessibility –Dakshin Marg
• Surrounding Areas –Industries
• Site Constraints –High tension tower
• Size of plot –27,298 sq.m
• Shape –Abstract
• Nearby cities –Pinjore, Parwanoo, Baddi
• Orientation -South West facing
• Climate - Tropical
• Topography –Flat
• Accessibility –Gehri Route
• Surrounding Areas –Sector 10 market
• Site potentials–Shivalik hillsview
SITEANALYSIS
Hotel Mountview
Hotel The Altius
• Building type –Commercial (Boutique)
• Connecting road width –5.45m
• FAR –2
• Setbacks –Front:22.8m, Side: 4.5m
• Covered Area –568 sq.m
• Height –28m
• Basement –Yes
• Parking –No appropriate parking space
• Building type –Commercial (Three-star)
• Connecting road width –5.5m
• FAR –1.2
• Setbacks –Front:45m, Side: 10m
• Covered Area –8,578 sq.m
• Height –15m
• Basement –Yes
• Parking –Yes
BUILDING REGULATIONS
Hotel Mountview
EXTERNAL CIRCULATION
Hotel The Altius
MAIN ENTRANCE
HOTEL LOBBY ENTRY
SERVICE ENTRANCE
PARKING
• Provide short term parking on the road side.
• Front lawn with maintained landscape.
• Paved pathways.
• Service entry located in back side.
• Side setbacks –4.5m for fire.
N
Yucca glauca
Great plains yucca
Ficus
variegated
Dhupeher khiri
Ficus nuda Ficus nuda
Sago palms
Cycas revoluta
• Elements-
Small display pots
Sculptor
Ganpati statue
Fountain
EXTERNAL CIRCULATION
Hotel The Altius
Hotel Mountview
EXTERNAL CIRCULATION
MAIN ENTRANCE
ENTRANCEPORCH
PARKING
SERVICE CENTRE
• Provide short term and long term parking.
• maintained landscape.
• Areas connected with paved pathways.
• Provide entrance porch with checking area.
• Site iscovered with avenue.
N
INTERNAL CONNECTIVITY
Hotel The Altius
1. Entrance
2. Lobby
3. Restaurant
4. Help Desk
5. Public Lift
6. Staircase
7. Kitchen
8. 10 Downing Street
9. Guest Rooms
10. Bar +Disc
11. Service Lift
12.Washroom
Hotel Mountview
INTERNAL CONNECTIVITY
1. Entrance
2. Lobby
3. Round T
he Clock
4. Kitchen 2
5. Kitchen 1
6. Guest Rooms
7. Staircase
8. Service Lift
9. Capsule Lift
10.Washrooms
11.Basement
12. Shops
13. Service Entry
14. Independent Block
Hotel The Altius
• Basement –Services
• Ground Floor –Lobby
Bakery
Enquiry Desk
Banquet
Washroom
Passenger & Service Lift
Stairs
• First Floor –Blue Velvet private dining
Banquet
Control room
• Second Floor –Open dining
Quorum private dining
Kitchen 1
Managing Directors room
• T
hird Floor - Guest rooms (7)
• Fourth Floor –Guest rooms (7)
• Fifth Floor –Guest rooms (7)
• Sixth Floor –10 Downing Street
Kitchen 2
• Seventh Floor –Disc & Bar
LAYOUT
Hotel Mountview
• Basement –Bakery
Kitchen store room
Stationary
Parking
• Ground Floor –Lobby
Round The Clock (24-Hour Coffee shop)
Rustles +T
he Bar (Restaurant)
Kitchen
Executive rooms (31)
Florist
Washroom
Passenger & Service Lift
Stairs
• First Floor –Vintage Bar
Executive rooms (31)
• Second Floor -Executive rooms (31)
LAYOUT
• T
hird Floor -Executive rooms (31)
• Fourth Floor -Executive rooms (31)
• Fifth Floor –Magic Wok (Chinese Restaurant)
Kitchen
• Independent Block –Swimming Pool
Gym
Beauty Salon
Spa Lounge
Sports Facilities
Steam Room
FACILITIES
Hotel The Altius
• 24-hour room service
• 24-hour reception
• Car Park
• Conference rooms
• Hotel Disc & Bar
• Concierge
• Stairs & Lifts
• Non-smoking rooms
• Wi-Fi facility
• Restaurant
• Room Facilities (21) –Centralised A/C
Bathroom with bathtub/
shower
LED T
V
Central Heating
Working desk
T
ea & Coffee maker
Refrigerator
Internet
T
elephone
Hotel Mountview
FACILITIES
• 24-hour room service
• 24-hour reception
• Airport Shuttle
• Business Centre
• Car Park
• Conference rooms
• Deck Chairs/Sun Lounge
• Gym
• Hotel Bar
• Hotel Safe
• Concierge
• Laundry
• Stairs & Lifts
• Non-smoking rooms
• Outdoor Swimming pool
• Wi-Fi facility
• Restaurant
• Room Service
• Room Facilities (155) –Centralised A/C
Bathroom with bathtub/
shower
Cable T
V
Central Heating
Working desk
T
ea & Coffee maker
Refrigerator
HairDryer
Internet
Ironing board
Telephone
• Spa Lounge
• Beauty Salon
• Steam room
• Florist
• Sport facilities
SPACE MODULES
Hotel The Altius
Lobby
• Area –48 sq. m
•Connectivity with reception, waiting area,
helpdesk, banquet, lift, stairs and washrooms.
• Provide low height ceiling with mirror
based plastic sheets finish.
•Fixed glass windows provided on two
sides of the lobby.
Reception
Waiting Area
Washroom
Entrance
Helpdesk
Bakery Display
Way to Banquet 1.5m Wide Passage
Passenger Lifts
SPACE MODULES
Hotel The Altius
Lobby
Entrance
Reception desk placed in left
corner of the lobby.
Desk Height - 0.12m
Waiting area
in right corner.
Granite flooring
Sign board displayed to
give directions to the
visitors.
SPACE MODULES
Hotel Mountview
Lobby
• Area –60m X 30m
•Connectivity with lifts, kiosks,
24-Hour coffee shop, guest
rooms, washrooms, restaurant &
bar
, kitchen and vintage bar
•T
ravel desk equipped with
choice of transportation to meet
the groups need Reception
Waiting Area
Round T
he Clock
(24-Hour Coffee Shop)
Water Podium
Capsule Lifts
Washroom
T
ravel Helpdesk
Florist
Way to Rustles & Bar
Washroom
Waiting Area
Way to rooms
Entrance
Kitchen
Way to kitchen
Stairsto Vintage Bar
3.6m Wide Passage
SPACE MODULES
Hotel Mountview
Lobby
Marble tile flooring
Provide false ceiling with lighting features
and chandelier in the roof center of
lobby.
SPACE MODULES
Washrooms
1.5m Wide Passage
BarLounge
Way to kitchen
Library Shelves +T
V
Entrance
Hotel The Altius
10 Downing Street (Restaurant)
• Area –94 sq. m
• Seating capacity –60
•Attached bar lounge, informal
library, washrooms and kitchen
• T
he concept based on 10 down
street of London.
• Informal library created
• Wooden furniture
• Mat flooring
SPACE MODULES
Washrooms
W ay to kitchen
Hotel The Altius
10 Downing Street (Restaurant)
SPACE MODULES
Hotel Mountview
Magic Wok (Chinese Restaurant)
• Area –10m X 10m
• Seating capacity –50
• Attached bar lounge, kitchen and open terrace
• Cuisine & style - Chinese
• Dimension of side stations –1.2m X 1.8m
Way to kitchen
BarLounge
(3m X 6m)
1.5m
Wide
Passage
Washrooms
Restaurant)
(10m X 10m)
Side Stations
Way to terrace
SPACE MODULES
Hotel The Altius
Banquet One
• Area –1500 sq.ft
• Seating capacity –60 to 70 people
• Round table seating
• Low height ceiling
• Wooden flooring
• Glassfaçade facing the lawn side
• Fire exit
provided
SPACE MODULES
Hotel The Altius
Banquet Two
• Area –3,000 sq.ft
• Seating capacity –125 people
• Standard height –12’
• Round tables
• Matt flooring
•Fire exit
provided
SPACE MODULES
Hotel The Altius
Private Dining Room
1. Blue Velvet
• Area –6m X 8m
•Attached washroom
& service lift
Mirror glass was used
to cover columns
Large window
opening on
North west
facing wall
Reflecting ballswere
used for aesthetic
purpose in ceiling
SPACE MODULES
Hotel The Altius
Private Dining Room
2. Quorum
• Area –42 sq.m
•No attached
washroom
•No proper
circulation
• Antique aesthetics used like framed mirrors
• Attached service lift
SPACE MODULES
Hotel Mountview
Rustles (Restaurant-cum-Banquet)
• Area –60m X 60m
• Attached Bar Lounge, PDR-cum-buffet setup
and kitchen
• Seating capacity –150
• Varied choice of small event and private dining
areas
•Remarkable selections of local and international
cuisine
Restaurant
(30m X 30m)
Hostage Desk
Entrance to
restaurant Entrance
T
o bar
Entrance
T
o bar
Way to
kitchen
Way to
kitchen
PDR
PDR
Buffet
Setup
Billing
counter
Side
Station
1.5m wide passage
SPACE MODULES
Hotel Mountview
Rustles (Restaurant-cum-Banquet)
SPACE MODULES
Hotel The Altius
10 D (Disc & Pub)
Hotel Mountview
Vintage Bar
SPACE MODULES
Hotel The Altius
Open Dining
• Area –48 sq.m
• Cane furniture which doesn’t gets damaged when exposed to environment
•Seating
Capacity –30
Fibber façade for
Aesthetic
Colourful lightstargeted on
façade gives a nice
aesthetical view
Landscaping elements shrubs in pot
SPACE MODULES
Hotel Mountview
24-HourCoffee Shop
• Area –30m X 30m
• Seating capacity –100
• Attached kitchen
Way to kitchen
Fall celling foraesthetics
Decorative Celling lights
SPACE MODULES
Hotel Mountview
Independent Block
•Choice of in-house activities like swimming pool, spa & lounge, gym, sports facilities, steam lounge, tennis
and beauty salon
Gymnasium with
well-equipped machines
Swimming pool in north
of site improves
microclimate and
landscaping
Deck around it
with umbrella chairs
gives a beach like
appearance
Sauna and
changing rooms
Hotel The Altius
Corridors
• 1.5m wide passage
• Low celling height
• Double loaded
corridors
• Having 4 and 3
rooms on either
sides
• One end attached
to internal staircase
& lifts.
• Other end
attached to fire exit
stairway door.
• 1.5m wide passage
• Low celling height
• Double loaded
corridors
• Having 15 and16
rooms on either
sides
• One end attached
to internal
staircase.
• Other end
attached to fire exit
stairway door.
SPACE MODULES
Hotel Mountview
Hotel The Altius
Bedrooms
• 21 executive rooms
• 7 guest rooms on 3rd, 4th, 5th floor each
• On each floor doubly loaded corridor
• Three rooms on one side and four rooms on other
• Rectangular rooms consisting of
-Living area
-Bedroom
-Bathroom (Shower Cubical, WC , Basin)
-Cupboard
-TV
SPACE MODULES
Curtains forshading on
south west facing windows
South east facing
Full wall window
Pantry cum
writing table
Mirrorglass cladding
on internal wall
flooring
SPACE MODULES
Hotel Mountview
• 155 executive rooms
• 31 rooms on Ground floor, 1st, 2nd, 3rd & 4th floor each
• Extra spacious rooms with balcony overlooking
the natural and serene looks
• Each floor having doubly loaded corridors
• 15 rooms on one side and 16 rooms on other
• Rectangular rooms of size –15’ x 12’ (4.5m x 3.6m)
consisting of
- Living area
- Bedroom
- Bathroom (Bathtub, Shower Cubical, WC, Basin)
- Cupboard
- TV
- Electronic safe
SPACE MODULES
r
balcony overlooking the
natural and serene looks
North –west facing
window in living room
North east facing
Door-window
Bedroom lighting
Cabinet in
bathing area
Low celling
height corridors Shower cubical
SPACE MODULES
WORKING STATIONS
Hotel The Altius
Kitchen 1
• Area –240 sq. m
• Service to banquet, guest rooms, PDR
• Food capacity –400 to 500 people
• T
ype of kitchen –Multi-cuisine (Main)
• Cooking area includes: Indian tandoor, Chinese & Italian
- Counter for storage
- Freezer and chiller for cold storage
Both freezer separately placed (Temp -16 & -4)
Chiller inbuilt in the counter
-Distance between cooking range and storage
counter is2m
WORKING STATIONS
Hotel The Altius
Kitchen 1
All cooking ranges, counter, chiller are of stainless steel.
• Washing area –4m X 2.5m
• Separate room for dry storage
• Exhaust ducts & fresh-air ducts provided
• Flooring –granite and floor traps provided to drain waste
water easily
WORKING STATIONS
Hotel The Altius
Kitchen 2
• Area –94 sq. m
• Service to bar & restaurant
• Kitchen type –Garnishing purpose
• Food capacity –150 to 200 people
• Counter –Four
• Distance between counter and cutting area -1.5m
• Chillersinbuilt in the counter
• Attached to service lift and fire lift
• Exhaust ducts, fresh-air ducts and floor traps provided
WORKING STATIONS
Hotel Mountview
Kitchen
• T
otal number of kitchens –T
hree
Main kitchen (beside Rustles and Bar)
Secondary kitchen (beside Round the Clock)
Garnishing kitchen (beside Magic Wok)
• Main kitchen
- Service to guest rooms & restaurants
- T
ype of kitchen –Multi-cuisine
- Cooking areas –Four
- Separate washing areas
- T
wo freezers
- Separate space for butchery
- Bakery in the basement
- Separate service entrance
• Exhaust ducts provided
• Flooring –granite
• Floor traps provided to drain waste water easily
Service lift entry
From inside of
Housekeeping room
Linen storage
cupboards
Visible service
Pipelinesin celling
WORKING STATIONS
Hotel Mountview
Housekeeping
Housekeeping room was attached to
bedrooms on each floor with linen storage
SERVICE CORES
Hotel The Altius
Vertical Circulation
• Passenger lifts
Number - T
wo
Size –1.5m x 1.8m
Door opening –1.2m
Number of people per flight –Five
• Service lifts
Number –One
Size –2.5m X 2.5m
Door Opening –1.5m
• Stairs
Number –One
Width –1.5m
T
read –0.28m
Riser –0.15m
Size of handrail –0.05m X 0.05m
SERVICE CORES
Hotel Mountview
Vertical Circulation
• Passenger lifts
Number - T
wo
Shape - Octagonal
Door opening –1.2m
Number of people per flight –Five
• Service lifts
Number –T
wo
Size –2.5m X 2.5m
Door Opening –1.5m
• Stairs
Number –T
hree
Width –1.5m
T
read –0.28m
Riser –0.15m
Diameter of handrail –0.08m
BUILDING SERVICES
Hotel The Altius
• Electrical panel –room in basement
-panel board in kitchen on second floor.
• Water supply - 1 lac litre water storage tank provided in basement
- 10 thousand litre water storage tank provided on roof top
• Service ducts for water supply and drainage running through
all floor levelsopen at corridors Panel box
Lose wiring in
open dinning
Lose wiring in kitchen
Along celling.
Water supply pipe line
Along celling in kitchen
BUILDING SERVICES
Hotel Mountview
• Electrical panel –room in basement
• E.T
.P
.
• Water supply –one water storage tank provided in basement
-one water storage tank provided on roof top
• Service ducts for water supply and drainage running through
all floor levelsopen at corridors
BUILDING SERVICES
Hotel The Altius
• Ventilating duct of fresh air were given in kitchen along the celling
• Ducts open up near fire exit staircase
• Chimneys were provided on top of every working slab.
Hotel Mountview
• Ventilating duct of fresh air were given in kitchen
along the celling
• Chimneys were provided on top of every working
slab
BUILDING SERVICES
Hotel The Altius
• Fire safety –10 thousand litre overhead water tank for fire only was provided.
• Water sprinklers were provided on callings of every space.
• Fire extinguishers are provided in kitchen.
• Fire hose reels were provided near fire exit staircase.
• Fire smoke detectors were provided in banquet halls.
• Fire exit signs were provided with glow in dark light.
Fire exit
staircase
Fire alarm
BUILDING SERVICES
Hotel Mountview
• Fire safety –overhead water tank for fire only was provided.
• Water sprinklers were provided on callings of every space.
• Fire extinguishers are provided in kitchen.
• Fire hose reels were provided near fire exit staircase.
• Fire smoke detectors were provided in banquet halls.
• Fire exit signs were provided.
Smoke detector in guest room
Fire exit
Fire alarm provided in corridor
ENVIRONMENTAL CONTROLS
Sustainability
• Resource conservation
Energy conservation
Water conservation
Material conservation
Hotel The Altius Hotel Mountview
NO
YES
(2 RWH plant)
NO
(Imported materials used)
YES
(Solar panelsused)
YES
(Water treatment plant)
YES
(Native materials used like
Bricks, stones, clay tiles)
ENVIRONMENTAL CONTROLS
Orientation
• North
• East
• West
Hotel The Altius Hotel Mountview
Facing of guest rooms of wing 2
Independent block
Kitchen
Guest rooms of wing 1
• South
Climate
• Materials and Landscape elements are selected according to climatic conditions of the region.
Facing of guest rooms
R
R
e
e
a
a
r
rs
s
i
i
d
d
e
eo
o
f
ft
t
h
h
e
eb
b
u
u
i
i
l
l
d
d
i
i
n
n
g
g
Entrance
K
K
i
i
t
t
c
c
h
h
e
e
n
n

Contenu connexe

Tendances

Hotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis BookHotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis Book
rajensen00
 

Tendances (20)

Five Star Hotel case study Mana ranakpur ppt
Five Star Hotel case study Mana ranakpur pptFive Star Hotel case study Mana ranakpur ppt
Five Star Hotel case study Mana ranakpur ppt
 
Hotels literature and case study
Hotels literature and case studyHotels literature and case study
Hotels literature and case study
 
Case study - Hotel The Altius & Hotel Mountview
Case study - Hotel The Altius & Hotel MountviewCase study - Hotel The Altius & Hotel Mountview
Case study - Hotel The Altius & Hotel Mountview
 
Case study
Case studyCase study
Case study
 
Literature Study of Hotels
Literature Study of HotelsLiterature Study of Hotels
Literature Study of Hotels
 
Chrome Hotel , Loisium Hotel
Chrome Hotel , Loisium HotelChrome Hotel , Loisium Hotel
Chrome Hotel , Loisium Hotel
 
Hotel avasa, hyderabad
Hotel avasa, hyderabadHotel avasa, hyderabad
Hotel avasa, hyderabad
 
Case Study -Hotel design
Case Study -Hotel designCase Study -Hotel design
Case Study -Hotel design
 
Live case study motel
Live case study motelLive case study motel
Live case study motel
 
5 Star Hotel - Vivanta, Gurgaon - Case Study
5 Star Hotel - Vivanta, Gurgaon - Case Study5 Star Hotel - Vivanta, Gurgaon - Case Study
5 Star Hotel - Vivanta, Gurgaon - Case Study
 
HOTEL CASE STUDY LUCKNOW
HOTEL CASE STUDY LUCKNOWHOTEL CASE STUDY LUCKNOW
HOTEL CASE STUDY LUCKNOW
 
3 star hotel
3  star hotel3  star hotel
3 star hotel
 
Case study on Oberoi Amarvillas, Agra and Grand Imperial, Agra
Case study on Oberoi Amarvillas, Agra and Grand Imperial, AgraCase study on Oberoi Amarvillas, Agra and Grand Imperial, Agra
Case study on Oberoi Amarvillas, Agra and Grand Imperial, Agra
 
HRACC 5 Star Hotel Design Requirements,India
HRACC 5 Star Hotel Design Requirements,IndiaHRACC 5 Star Hotel Design Requirements,India
HRACC 5 Star Hotel Design Requirements,India
 
Case study - Hotel Silicrest
Case study - Hotel SilicrestCase study - Hotel Silicrest
Case study - Hotel Silicrest
 
Motel online case study
Motel online case studyMotel online case study
Motel online case study
 
RADISSON BLU GUWAHATI
RADISSON BLU GUWAHATIRADISSON BLU GUWAHATI
RADISSON BLU GUWAHATI
 
Marriott hyderabad hotel & convention center
Marriott hyderabad hotel &  convention centerMarriott hyderabad hotel &  convention center
Marriott hyderabad hotel & convention center
 
Hotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis BookHotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis Book
 
Andaz hyatt case study
Andaz hyatt case studyAndaz hyatt case study
Andaz hyatt case study
 

Similaire à case study of hotels (1)chandigarh.pptx

European presentation sep 2014
European presentation sep 2014European presentation sep 2014
European presentation sep 2014
ChelseaTab1
 
The Open Door - Research Facility - Delhi
The Open Door - Research Facility - DelhiThe Open Door - Research Facility - Delhi
The Open Door - Research Facility - Delhi
Dimple Gupta
 

Similaire à case study of hotels (1)chandigarh.pptx (20)

HOTEL Design - Case Study
HOTEL Design - Case StudyHOTEL Design - Case Study
HOTEL Design - Case Study
 
SCD Tour
SCD TourSCD Tour
SCD Tour
 
European presentation sep 2014
European presentation sep 2014European presentation sep 2014
European presentation sep 2014
 
5 star hotel complete research including back of house and front of house all...
5 star hotel complete research including back of house and front of house all...5 star hotel complete research including back of house and front of house all...
5 star hotel complete research including back of house and front of house all...
 
1334 fact sheet snl
1334 fact sheet snl1334 fact sheet snl
1334 fact sheet snl
 
Express avenue mall architectural case study,chennai
Express avenue mall architectural case study,chennaiExpress avenue mall architectural case study,chennai
Express avenue mall architectural case study,chennai
 
Winsten Park : A Look Through
Winsten Park : A Look ThroughWinsten Park : A Look Through
Winsten Park : A Look Through
 
Akshaya Rubix
Akshaya RubixAkshaya Rubix
Akshaya Rubix
 
Commercial projects thirty six capital
Commercial projects   thirty six capitalCommercial projects   thirty six capital
Commercial projects thirty six capital
 
international hotel case study of leisure hotel
international hotel case study of leisure hotelinternational hotel case study of leisure hotel
international hotel case study of leisure hotel
 
case study of Elante mall, chandigarh,
case study of Elante mall, chandigarh, case study of Elante mall, chandigarh,
case study of Elante mall, chandigarh,
 
Frankfinn Hospitality Presentation ...
Frankfinn Hospitality Presentation ...Frankfinn Hospitality Presentation ...
Frankfinn Hospitality Presentation ...
 
The Open Door - Research Facility - Delhi
The Open Door - Research Facility - DelhiThe Open Door - Research Facility - Delhi
The Open Door - Research Facility - Delhi
 
Elante mall Chandigarh case study
Elante mall Chandigarh case studyElante mall Chandigarh case study
Elante mall Chandigarh case study
 
Industrial Training 2.pptx
Industrial Training 2.pptxIndustrial Training 2.pptx
Industrial Training 2.pptx
 
Messukeskus Helsinki brochure
Messukeskus Helsinki brochureMessukeskus Helsinki brochure
Messukeskus Helsinki brochure
 
architectural portfolio
architectural portfolio architectural portfolio
architectural portfolio
 
Sokharoth hotel
Sokharoth hotel Sokharoth hotel
Sokharoth hotel
 
MOTEL LIBRARY STUDY & CASE STUDY
MOTEL LIBRARY STUDY & CASE STUDYMOTEL LIBRARY STUDY & CASE STUDY
MOTEL LIBRARY STUDY & CASE STUDY
 
Corporate Office
Corporate OfficeCorporate Office
Corporate Office
 

Plus de AbhiSharma727808 (14)

SITE ANALYSIS.pptx about site analysis .
SITE ANALYSIS.pptx about site analysis .SITE ANALYSIS.pptx about site analysis .
SITE ANALYSIS.pptx about site analysis .
 
SPECIFICATION WRITING II-FIRE FIGHTING.pptx
SPECIFICATION WRITING II-FIRE FIGHTING.pptxSPECIFICATION WRITING II-FIRE FIGHTING.pptx
SPECIFICATION WRITING II-FIRE FIGHTING.pptx
 
gurukul ppt.pptx
gurukul ppt.pptxgurukul ppt.pptx
gurukul ppt.pptx
 
anna-bhau-sathe-auditorium_compress (1).pptx
anna-bhau-sathe-auditorium_compress (1).pptxanna-bhau-sathe-auditorium_compress (1).pptx
anna-bhau-sathe-auditorium_compress (1).pptx
 
ELEMENT LANDSCAPE.pptx
ELEMENT LANDSCAPE.pptxELEMENT LANDSCAPE.pptx
ELEMENT LANDSCAPE.pptx
 
SITE_ANALYSIS_HINJEWADI[1].pptx
SITE_ANALYSIS_HINJEWADI[1].pptxSITE_ANALYSIS_HINJEWADI[1].pptx
SITE_ANALYSIS_HINJEWADI[1].pptx
 
site anaylsis kharadi FINAL.pptx
site anaylsis kharadi FINAL.pptxsite anaylsis kharadi FINAL.pptx
site anaylsis kharadi FINAL.pptx
 
site anaylsis kharadi FINAL.pptx
site anaylsis kharadi FINAL.pptxsite anaylsis kharadi FINAL.pptx
site anaylsis kharadi FINAL.pptx
 
anna-bhau-sathe-auditorium_compress (1) (1).pptx
anna-bhau-sathe-auditorium_compress (1) (1).pptxanna-bhau-sathe-auditorium_compress (1) (1).pptx
anna-bhau-sathe-auditorium_compress (1) (1).pptx
 
mindmap abhishek (1).pptx
mindmap abhishek (1).pptxmindmap abhishek (1).pptx
mindmap abhishek (1).pptx
 
interface.pptx
interface.pptxinterface.pptx
interface.pptx
 
ABCS auditorium case study.pptx
ABCS  auditorium case study.pptxABCS  auditorium case study.pptx
ABCS auditorium case study.pptx
 
SHILPRAMAM AD3.pptx
SHILPRAMAM AD3.pptxSHILPRAMAM AD3.pptx
SHILPRAMAM AD3.pptx
 
Study tour report fromat 2020-21BB 23.2.21 (1).pptx
Study tour report fromat 2020-21BB 23.2.21 (1).pptxStudy tour report fromat 2020-21BB 23.2.21 (1).pptx
Study tour report fromat 2020-21BB 23.2.21 (1).pptx
 

Dernier

Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
instagramfab782445
 
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
wpkuukw
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
awasv46j
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
balqisyamutia
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
eeanqy
 
poliovirus-190801072449. pptx
poliovirus-190801072449.            pptxpoliovirus-190801072449.            pptx
poliovirus-190801072449. pptx
ssuser0ad194
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
CristineGraceAcuyan
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
nirzagarg
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
ehyxf
 
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
eeanqy
 

Dernier (20)

Essential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive GuideEssential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive Guide
 
The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
 
Furniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptxFurniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptx
 
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
 
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
 
Lecture 01 Introduction To Multimedia.pptx
Lecture 01 Introduction To Multimedia.pptxLecture 01 Introduction To Multimedia.pptx
Lecture 01 Introduction To Multimedia.pptx
 
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
 
Eye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docxEye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docx
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
 
poliovirus-190801072449. pptx
poliovirus-190801072449.            pptxpoliovirus-190801072449.            pptx
poliovirus-190801072449. pptx
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
 
BLOCK CHAIN PROJECT block chain project
BLOCK CHAIN  PROJECT block chain projectBLOCK CHAIN  PROJECT block chain project
BLOCK CHAIN PROJECT block chain project
 
TRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptxTRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptx
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
 
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
 

case study of hotels (1)chandigarh.pptx

  • 1. CASE STUDY HOTEL THE ALTIUS AND THE MOUNTVIEW, CHANDIGARH NAME ABHISHEK S. KUMAR ROLL NO. - 01
  • 2. Hotel The Altius 25/9, Chandigarh Road, Industrial Area Phase II, Chandigarh,160002 Hotel Mountview Sector10A, Chandigarh,160011
  • 3. LOCATION Hotel The Altius • 3.8 km from airport • 7.2 km from sector 17 • 9.5 km from railway station Hotel Mountview • 15.9 km from airport • 2.8 km from sector 17 • 11 km from railway station
  • 4. Hotel The Altius • Size of plot –1,635 sq.m • Shape –Rectangular • Nearby cities –Zirakpur, Panchkula • Orientation –North East facing • Climate –Tropical • Topography -Flat • Accessibility –Dakshin Marg • Surrounding Areas –Industries • Site Constraints –High tension tower • Size of plot –27,298 sq.m • Shape –Abstract • Nearby cities –Pinjore, Parwanoo, Baddi • Orientation -South West facing • Climate - Tropical • Topography –Flat • Accessibility –Gehri Route • Surrounding Areas –Sector 10 market • Site potentials–Shivalik hillsview SITEANALYSIS Hotel Mountview
  • 5. Hotel The Altius • Building type –Commercial (Boutique) • Connecting road width –5.45m • FAR –2 • Setbacks –Front:22.8m, Side: 4.5m • Covered Area –568 sq.m • Height –28m • Basement –Yes • Parking –No appropriate parking space • Building type –Commercial (Three-star) • Connecting road width –5.5m • FAR –1.2 • Setbacks –Front:45m, Side: 10m • Covered Area –8,578 sq.m • Height –15m • Basement –Yes • Parking –Yes BUILDING REGULATIONS Hotel Mountview
  • 6. EXTERNAL CIRCULATION Hotel The Altius MAIN ENTRANCE HOTEL LOBBY ENTRY SERVICE ENTRANCE PARKING • Provide short term parking on the road side. • Front lawn with maintained landscape. • Paved pathways. • Service entry located in back side. • Side setbacks –4.5m for fire. N
  • 7. Yucca glauca Great plains yucca Ficus variegated Dhupeher khiri Ficus nuda Ficus nuda Sago palms Cycas revoluta • Elements- Small display pots Sculptor Ganpati statue Fountain EXTERNAL CIRCULATION Hotel The Altius
  • 8. Hotel Mountview EXTERNAL CIRCULATION MAIN ENTRANCE ENTRANCEPORCH PARKING SERVICE CENTRE • Provide short term and long term parking. • maintained landscape. • Areas connected with paved pathways. • Provide entrance porch with checking area. • Site iscovered with avenue. N
  • 9. INTERNAL CONNECTIVITY Hotel The Altius 1. Entrance 2. Lobby 3. Restaurant 4. Help Desk 5. Public Lift 6. Staircase 7. Kitchen 8. 10 Downing Street 9. Guest Rooms 10. Bar +Disc 11. Service Lift 12.Washroom
  • 10. Hotel Mountview INTERNAL CONNECTIVITY 1. Entrance 2. Lobby 3. Round T he Clock 4. Kitchen 2 5. Kitchen 1 6. Guest Rooms 7. Staircase 8. Service Lift 9. Capsule Lift 10.Washrooms 11.Basement 12. Shops 13. Service Entry 14. Independent Block
  • 11. Hotel The Altius • Basement –Services • Ground Floor –Lobby Bakery Enquiry Desk Banquet Washroom Passenger & Service Lift Stairs • First Floor –Blue Velvet private dining Banquet Control room • Second Floor –Open dining Quorum private dining Kitchen 1 Managing Directors room • T hird Floor - Guest rooms (7) • Fourth Floor –Guest rooms (7) • Fifth Floor –Guest rooms (7) • Sixth Floor –10 Downing Street Kitchen 2 • Seventh Floor –Disc & Bar LAYOUT
  • 12. Hotel Mountview • Basement –Bakery Kitchen store room Stationary Parking • Ground Floor –Lobby Round The Clock (24-Hour Coffee shop) Rustles +T he Bar (Restaurant) Kitchen Executive rooms (31) Florist Washroom Passenger & Service Lift Stairs • First Floor –Vintage Bar Executive rooms (31) • Second Floor -Executive rooms (31) LAYOUT • T hird Floor -Executive rooms (31) • Fourth Floor -Executive rooms (31) • Fifth Floor –Magic Wok (Chinese Restaurant) Kitchen • Independent Block –Swimming Pool Gym Beauty Salon Spa Lounge Sports Facilities Steam Room
  • 13. FACILITIES Hotel The Altius • 24-hour room service • 24-hour reception • Car Park • Conference rooms • Hotel Disc & Bar • Concierge • Stairs & Lifts • Non-smoking rooms • Wi-Fi facility • Restaurant • Room Facilities (21) –Centralised A/C Bathroom with bathtub/ shower LED T V Central Heating Working desk T ea & Coffee maker Refrigerator Internet T elephone
  • 14. Hotel Mountview FACILITIES • 24-hour room service • 24-hour reception • Airport Shuttle • Business Centre • Car Park • Conference rooms • Deck Chairs/Sun Lounge • Gym • Hotel Bar • Hotel Safe • Concierge • Laundry • Stairs & Lifts • Non-smoking rooms • Outdoor Swimming pool • Wi-Fi facility • Restaurant • Room Service • Room Facilities (155) –Centralised A/C Bathroom with bathtub/ shower Cable T V Central Heating Working desk T ea & Coffee maker Refrigerator HairDryer Internet Ironing board Telephone • Spa Lounge • Beauty Salon • Steam room • Florist • Sport facilities
  • 15. SPACE MODULES Hotel The Altius Lobby • Area –48 sq. m •Connectivity with reception, waiting area, helpdesk, banquet, lift, stairs and washrooms. • Provide low height ceiling with mirror based plastic sheets finish. •Fixed glass windows provided on two sides of the lobby. Reception Waiting Area Washroom Entrance Helpdesk Bakery Display Way to Banquet 1.5m Wide Passage Passenger Lifts
  • 16. SPACE MODULES Hotel The Altius Lobby Entrance Reception desk placed in left corner of the lobby. Desk Height - 0.12m Waiting area in right corner. Granite flooring Sign board displayed to give directions to the visitors.
  • 17. SPACE MODULES Hotel Mountview Lobby • Area –60m X 30m •Connectivity with lifts, kiosks, 24-Hour coffee shop, guest rooms, washrooms, restaurant & bar , kitchen and vintage bar •T ravel desk equipped with choice of transportation to meet the groups need Reception Waiting Area Round T he Clock (24-Hour Coffee Shop) Water Podium Capsule Lifts Washroom T ravel Helpdesk Florist Way to Rustles & Bar Washroom Waiting Area Way to rooms Entrance Kitchen Way to kitchen Stairsto Vintage Bar 3.6m Wide Passage
  • 18. SPACE MODULES Hotel Mountview Lobby Marble tile flooring Provide false ceiling with lighting features and chandelier in the roof center of lobby.
  • 19. SPACE MODULES Washrooms 1.5m Wide Passage BarLounge Way to kitchen Library Shelves +T V Entrance Hotel The Altius 10 Downing Street (Restaurant) • Area –94 sq. m • Seating capacity –60 •Attached bar lounge, informal library, washrooms and kitchen • T he concept based on 10 down street of London. • Informal library created • Wooden furniture • Mat flooring
  • 20. SPACE MODULES Washrooms W ay to kitchen Hotel The Altius 10 Downing Street (Restaurant)
  • 21. SPACE MODULES Hotel Mountview Magic Wok (Chinese Restaurant) • Area –10m X 10m • Seating capacity –50 • Attached bar lounge, kitchen and open terrace • Cuisine & style - Chinese • Dimension of side stations –1.2m X 1.8m Way to kitchen BarLounge (3m X 6m) 1.5m Wide Passage Washrooms Restaurant) (10m X 10m) Side Stations Way to terrace
  • 22. SPACE MODULES Hotel The Altius Banquet One • Area –1500 sq.ft • Seating capacity –60 to 70 people • Round table seating • Low height ceiling • Wooden flooring • Glassfaçade facing the lawn side • Fire exit provided
  • 23. SPACE MODULES Hotel The Altius Banquet Two • Area –3,000 sq.ft • Seating capacity –125 people • Standard height –12’ • Round tables • Matt flooring •Fire exit provided
  • 24. SPACE MODULES Hotel The Altius Private Dining Room 1. Blue Velvet • Area –6m X 8m •Attached washroom & service lift Mirror glass was used to cover columns Large window opening on North west facing wall Reflecting ballswere used for aesthetic purpose in ceiling
  • 25. SPACE MODULES Hotel The Altius Private Dining Room 2. Quorum • Area –42 sq.m •No attached washroom •No proper circulation • Antique aesthetics used like framed mirrors • Attached service lift
  • 26. SPACE MODULES Hotel Mountview Rustles (Restaurant-cum-Banquet) • Area –60m X 60m • Attached Bar Lounge, PDR-cum-buffet setup and kitchen • Seating capacity –150 • Varied choice of small event and private dining areas •Remarkable selections of local and international cuisine Restaurant (30m X 30m) Hostage Desk Entrance to restaurant Entrance T o bar Entrance T o bar Way to kitchen Way to kitchen PDR PDR Buffet Setup Billing counter Side Station 1.5m wide passage
  • 27. SPACE MODULES Hotel Mountview Rustles (Restaurant-cum-Banquet)
  • 28. SPACE MODULES Hotel The Altius 10 D (Disc & Pub) Hotel Mountview Vintage Bar
  • 29. SPACE MODULES Hotel The Altius Open Dining • Area –48 sq.m • Cane furniture which doesn’t gets damaged when exposed to environment •Seating Capacity –30 Fibber façade for Aesthetic Colourful lightstargeted on façade gives a nice aesthetical view Landscaping elements shrubs in pot
  • 30. SPACE MODULES Hotel Mountview 24-HourCoffee Shop • Area –30m X 30m • Seating capacity –100 • Attached kitchen Way to kitchen Fall celling foraesthetics Decorative Celling lights
  • 31. SPACE MODULES Hotel Mountview Independent Block •Choice of in-house activities like swimming pool, spa & lounge, gym, sports facilities, steam lounge, tennis and beauty salon Gymnasium with well-equipped machines Swimming pool in north of site improves microclimate and landscaping Deck around it with umbrella chairs gives a beach like appearance Sauna and changing rooms
  • 32. Hotel The Altius Corridors • 1.5m wide passage • Low celling height • Double loaded corridors • Having 4 and 3 rooms on either sides • One end attached to internal staircase & lifts. • Other end attached to fire exit stairway door. • 1.5m wide passage • Low celling height • Double loaded corridors • Having 15 and16 rooms on either sides • One end attached to internal staircase. • Other end attached to fire exit stairway door. SPACE MODULES Hotel Mountview
  • 33. Hotel The Altius Bedrooms • 21 executive rooms • 7 guest rooms on 3rd, 4th, 5th floor each • On each floor doubly loaded corridor • Three rooms on one side and four rooms on other • Rectangular rooms consisting of -Living area -Bedroom -Bathroom (Shower Cubical, WC , Basin) -Cupboard -TV SPACE MODULES
  • 34. Curtains forshading on south west facing windows South east facing Full wall window Pantry cum writing table Mirrorglass cladding on internal wall flooring SPACE MODULES
  • 35. Hotel Mountview • 155 executive rooms • 31 rooms on Ground floor, 1st, 2nd, 3rd & 4th floor each • Extra spacious rooms with balcony overlooking the natural and serene looks • Each floor having doubly loaded corridors • 15 rooms on one side and 16 rooms on other • Rectangular rooms of size –15’ x 12’ (4.5m x 3.6m) consisting of - Living area - Bedroom - Bathroom (Bathtub, Shower Cubical, WC, Basin) - Cupboard - TV - Electronic safe SPACE MODULES
  • 36. r balcony overlooking the natural and serene looks North –west facing window in living room North east facing Door-window Bedroom lighting Cabinet in bathing area Low celling height corridors Shower cubical SPACE MODULES
  • 37. WORKING STATIONS Hotel The Altius Kitchen 1 • Area –240 sq. m • Service to banquet, guest rooms, PDR • Food capacity –400 to 500 people • T ype of kitchen –Multi-cuisine (Main) • Cooking area includes: Indian tandoor, Chinese & Italian - Counter for storage - Freezer and chiller for cold storage Both freezer separately placed (Temp -16 & -4) Chiller inbuilt in the counter -Distance between cooking range and storage counter is2m
  • 38. WORKING STATIONS Hotel The Altius Kitchen 1 All cooking ranges, counter, chiller are of stainless steel. • Washing area –4m X 2.5m • Separate room for dry storage • Exhaust ducts & fresh-air ducts provided • Flooring –granite and floor traps provided to drain waste water easily
  • 39. WORKING STATIONS Hotel The Altius Kitchen 2 • Area –94 sq. m • Service to bar & restaurant • Kitchen type –Garnishing purpose • Food capacity –150 to 200 people • Counter –Four • Distance between counter and cutting area -1.5m • Chillersinbuilt in the counter • Attached to service lift and fire lift • Exhaust ducts, fresh-air ducts and floor traps provided
  • 40. WORKING STATIONS Hotel Mountview Kitchen • T otal number of kitchens –T hree Main kitchen (beside Rustles and Bar) Secondary kitchen (beside Round the Clock) Garnishing kitchen (beside Magic Wok) • Main kitchen - Service to guest rooms & restaurants - T ype of kitchen –Multi-cuisine - Cooking areas –Four - Separate washing areas - T wo freezers - Separate space for butchery - Bakery in the basement - Separate service entrance • Exhaust ducts provided • Flooring –granite • Floor traps provided to drain waste water easily
  • 41. Service lift entry From inside of Housekeeping room Linen storage cupboards Visible service Pipelinesin celling WORKING STATIONS Hotel Mountview Housekeeping Housekeeping room was attached to bedrooms on each floor with linen storage
  • 42. SERVICE CORES Hotel The Altius Vertical Circulation • Passenger lifts Number - T wo Size –1.5m x 1.8m Door opening –1.2m Number of people per flight –Five • Service lifts Number –One Size –2.5m X 2.5m Door Opening –1.5m • Stairs Number –One Width –1.5m T read –0.28m Riser –0.15m Size of handrail –0.05m X 0.05m
  • 43. SERVICE CORES Hotel Mountview Vertical Circulation • Passenger lifts Number - T wo Shape - Octagonal Door opening –1.2m Number of people per flight –Five • Service lifts Number –T wo Size –2.5m X 2.5m Door Opening –1.5m • Stairs Number –T hree Width –1.5m T read –0.28m Riser –0.15m Diameter of handrail –0.08m
  • 44. BUILDING SERVICES Hotel The Altius • Electrical panel –room in basement -panel board in kitchen on second floor. • Water supply - 1 lac litre water storage tank provided in basement - 10 thousand litre water storage tank provided on roof top • Service ducts for water supply and drainage running through all floor levelsopen at corridors Panel box Lose wiring in open dinning Lose wiring in kitchen Along celling. Water supply pipe line Along celling in kitchen
  • 45. BUILDING SERVICES Hotel Mountview • Electrical panel –room in basement • E.T .P . • Water supply –one water storage tank provided in basement -one water storage tank provided on roof top • Service ducts for water supply and drainage running through all floor levelsopen at corridors
  • 46. BUILDING SERVICES Hotel The Altius • Ventilating duct of fresh air were given in kitchen along the celling • Ducts open up near fire exit staircase • Chimneys were provided on top of every working slab. Hotel Mountview • Ventilating duct of fresh air were given in kitchen along the celling • Chimneys were provided on top of every working slab
  • 47. BUILDING SERVICES Hotel The Altius • Fire safety –10 thousand litre overhead water tank for fire only was provided. • Water sprinklers were provided on callings of every space. • Fire extinguishers are provided in kitchen. • Fire hose reels were provided near fire exit staircase. • Fire smoke detectors were provided in banquet halls. • Fire exit signs were provided with glow in dark light. Fire exit staircase Fire alarm
  • 48. BUILDING SERVICES Hotel Mountview • Fire safety –overhead water tank for fire only was provided. • Water sprinklers were provided on callings of every space. • Fire extinguishers are provided in kitchen. • Fire hose reels were provided near fire exit staircase. • Fire smoke detectors were provided in banquet halls. • Fire exit signs were provided. Smoke detector in guest room Fire exit Fire alarm provided in corridor
  • 49. ENVIRONMENTAL CONTROLS Sustainability • Resource conservation Energy conservation Water conservation Material conservation Hotel The Altius Hotel Mountview NO YES (2 RWH plant) NO (Imported materials used) YES (Solar panelsused) YES (Water treatment plant) YES (Native materials used like Bricks, stones, clay tiles)
  • 50. ENVIRONMENTAL CONTROLS Orientation • North • East • West Hotel The Altius Hotel Mountview Facing of guest rooms of wing 2 Independent block Kitchen Guest rooms of wing 1 • South Climate • Materials and Landscape elements are selected according to climatic conditions of the region. Facing of guest rooms R R e e a a r rs s i i d d e eo o f ft t h h e eb b u u i i l l d d i i n n g g Entrance K K i i t t c c h h e e n n