Energy Audit of WASAs
Engr. Abid Hussainy
Sr Specialist Environment Division
The Urban Unit Lahore
22th February 2015 ( PWON Bhurbhan)
What is ENERGY AUDIT?
PCGIP- DLI 4 (Revenue Collection System)
• To Reduce Energy Consumption
• Energy Efficient system
• Improve service delivery -
• Safety for the Staff
• Asset Life is improved
Why Energy Audit in
WASAs?
0
2
4
6
8
10
12
Old Energy Bill New Energy
Bill
Billing
Role of Urban Unit
Urban Unit Energy Audit Team
Engr. Abid Shah Hussainy – Task Manager
Engr. Rao Ali Raza
Mr. Syed M. Usman Ali
Mr. Abdul Basit
2 Day Energy Audit Training of WASA officials in
Collaboration with NED (24-25 October, 2014) by
International Trainer /Expert Mr Hashmi from Canada
• Training to 15 WASA officials from 5 Cities
• EA Exercises
• Development of EA Tools (Technical, Billing, Conditional Survey &
Energy Audit Performa) for TWs, DSs, W&WWT Plants.
Hands on Training in the field by Urban Unit Experts in All
WASAs ( 25 November- 19 December)
• Instrumentation
• Support in Data Collection
• On Site Energy Audit Training
• Conditional Survey
Urban Unit Capacity Building Initiative
Energy Audit Activities Status
0
20
40
60
80
100
Technical Data/ EA
Assets
Billing Detail June 13 to
June 14
Conditional Survey
Available Data Entry &
Analysis by UU
WASA Lahore
0
20
40
60
80
100
Technical Data/ EA
Assets
Billing Detail June 13 to
June 14
Conditional Survey
Available Data Entry &
Analysis by UU
WASA Rawalpindi
0
20
40
60
80
100
Technical Data/ EA
Assets
Billing Detail June
June 14
Conditional Survey
Available Data Entry &
Analysis by UU
WASA Gujranwala
0
20
40
60
80
100
Technical Data/ EA
Assets
Billing Detail June 13 to
June 14
Conditional Survey
vailable Data Entry &
Analysis by UU
WASA Multan
0
20
40
60
80
100
Technical Data/ EA
Assets
Billing Detail June 13 to
June 14
Conditional Survey
Available Data Entry &
Analysis by UU
WASA Faisalabad
Tubewell & Disposal Station Detail
491
362
102 82 67
99
21 43 22
Lahore Rawalpindi Multan Faisalabad Gujranwala
Supply Tubewells & Disposal Stations
Supply Stations Disposal Stations
EA -Asset Information
WASAs No. of Pump- Motor Sets Design Capacity
(Cusec)
Lahore 776 5668.5
Rawalpindi 362 109
Multan 161 1061
Faisalabad 222 1284
Gujranwala 112 640
Total 1633 8762.5
MGD 5663
Comparison of Load Capacity MW ( Installed Vs
Sanctioned)
64.6
6.8
20.2
11.0
6.5
78.3
11.5
14.3
19.9
7.4
0
10
20
30
40
50
60
70
80
90
WASA Lahore WASA Rawalpindi WASA Multan WASA Faisalabad WASA
Gujranwala
Installed Load (MW) Sanctioned Load (MW)
Energy Audit
Part 1
Part 2
Part 3
Conditional Survey & Analysis-Part 1
Conditional Survey
• Provide an orientation of the entire facility to observe the condition
of each asset and the factors those influencing the asset condition
towards operation.
• Identify areas that warrant further examination for operational &
maintenance practices and potential energy management
opportunities.
• Identifies obvious opportunities for the room of improvements in the
operation and management side.
Conditional Survey Parameters-24 Parameters
Physical
Condition of
Pump
Lubricant
Leakage
Water Leakage
Cable
Insulation
Cable Sizing
Transformer
Condition
Energy Meter
Condition
Performance
of Starter
Pump
Vibration
Pump Noise
Motor
Temperature
Control
Cooling Fan
Condition
Piping
Condition
Condition of
Return Valve
Pressure
Gauge
Condition
Ventilation Civil Structure
Generator
Condition
Power Factor
Improvement
Capacitor
Safety
Equipment
Chlorinator
Condition
Log Book
Earthing
Condition
Screening
Chamber
Condition
Lighting
Condition
Human
Signaling Signs
SoPs
Conditional Assessment of E-Assets
•Rating <=40 % Poor
•Rating <=60% Fair
•Rating <=70 % Good
•Rating >70 % Excellent
WASA Lahore – Conditional Survey Result &
Financing
Conditional Assessment
Rating <=40 % Poor
Rating <=60% Fair
Rating <=70 % Good
Rating >70 % Excellent
Poor
21%
Fair
64%
Good
7%
Excellent
8%
DISPOSAL STATIONS
Poor
19%
Fair
60%
Good
16%
Excellent
5%
TUBEWELL STATIONS
Rehabilitation Cost
for TW & DS
62.10 million
(BOQs for
Rehabilitation have
been Prepared)
WASA Multan – Conditional Survey Result
Conditional Assessment
Rating <=40 % Poor
Rating <=60% Fair
Rating <=70 % Good
Rating >70 % Excellent
Poor
4%
Fair
37%
Good
21%
Excellent
38%
CONDITIONAL SURVEY RESULT -
DISPOSAL STATION WASA MULTAN
Poor
3%
Fair
56%
Good
41%
Excellent
0%
CONDITIONAL SURVEY RESULT -
TUBEWELL STATIONS
Rehabilitation Cost
for TW & DS
11.16 million
(BOQs for
Rehabilitation have
been Prepared)
WASA Faisalabad – Conditional Survey Result
Conditional Assessment
Rating <=40 % Poor
Rating <=60% Fair
Rating <=70 % Good
Rating >70 % Excellent
Poor
42%
Fair
51%
Good
7%
Excellent
0%
DISPOSAL STATION
Poor
2% Fair
0%
Good
39%
Excellent
59%
TUBE WELL STATION
Rehabilitation Cost
for TW & DS
6.50 million
(BOQs for
Rehabilitation
have been
Prepared)
WASA Rawalpindi – Conditional Survey Result
Conditional Assessment
Rating <=40 % Poor
Rating <=60% Fair
Rating <=70 % Good
Rating >70 % Excellent
Poor
44%
Fair
56%
TUBE WELL STATIONS
Rehabilitation Cost
for TW & DS
32.58 million
(BOQs for
Rehabilitation have
been Prepared)
WASA Gujranwala – Conditional Survey Result
Conditional Assessment
Rating <=40 % Poor
Rating <=60% Fair
Rating <=70 % Good
Rating >70 % Excellent
Poor
34%
Fair
14%
Good
33%
Excellent
19%
DISPOSAL STATIONS
Poor
29%
Fair
23%
Good
15%
Excellent
30%
Not
Operational
3%
TUBEWELL STATIONS
Rehabilitation Cost
for TW & DS
8.01 million
(BOQs for
Rehabilitation have
been Prepared)
Energy Audit Findings
Annual Electric Billing on TW & DS
WASAs Sanctioned Load
from WAPDA
(Mega Watt-MW)
Bill Amount
Fiscal Year 2013-
2014
(PKR-In Million)
Low Power Factor
Penalty
(PKR-In Million)
Lahore 78.3 3092.4 21.4
Rawalpindi 11.5 382.4 1.9
Multan 14.3 355.5 5.5
Faisalabad 19.9 580.1 6.3
Gujranwala 7.4 286.9 5.1
Total 131.4 4697.4 40.2
Annual Billing & Annual Low Power Factor
Penalty
0
5
10
15
20
25
Lahore Rawalpindi Multan Faisalabad Gujranwala
21.4
2.0
5.5 6.3 5.1
Low Power Factor Penalty
(PKR-In Million)
Power Factor Definition
Ratio b/w active power to apparent power is called
the Power Factor.
Disadvantages of Low Power Factor:-
1. Penalty from Electric Power Supply Company
Penalty Formula (PKR)= (0.9-Actual PF)*2*Energy
Charges
2. Large Line Loss (Copper Loss)
3. High input current requirement
4. Large KVA Rating of Transformer & large size of
equipment requirement
5. Greater Conductor /cable Size & Cost
6. Poor Voltage Regulation & Large Voltage Drop
7. Low efficiency of equipment
Gadgets for Improving Power Factor:-
1. Static Capacitors (Fixed Compensation )
2. Automatic Power Factor Improvement Relay
(Automatic Compensation)
3,092.5
580.1
355.5 286.9 382.4
0
500
1000
1500
2000
2500
3000
3500
WASA Lahore WASA Faisalabad WASA Multan WASA
Gujranwala
WASA
Rawalpindi
Bill Amount Fiscal Year 2013-2014
(PKR-In Million)
Low Power Factor Penalty PAID by WASAs
Since PCGIP Inception
42.8
12.6 11.0 10.1
3.9
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
WASA Lahore WASA Faisalabad WASA Multan WASA
Gujranwala
WASA Rawalpindi
LPF PENALTY PAID- 80.4 MILLION PKR
(LAST TWO YEARS)
Costing of LPF Correction of DS & TW
WASAs Annual Low Power
Factor Penalty
(PKR-In Million)
Cost to Remove L.P.F
Penalty (using
Automatic Power
Factor Relay / Static
Capacitors)
(PKR- In Million)
Payback Time
(Months)
Lahore 21.4 11.4 7
Rawalpindi 1.9 0.7 4
Multan 5.5 3.9 9
Faisalabad 6.3 3.7 7
Gujranwala 5.1 3.1 8
Total 40.2 22.8
LPF Savings for Next Three Years- 2014-2017
64.2
18.8
16.6 15.2
5.90.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
WASA Lahore WASA Faisalabad WASA Multan WASA Gujranwala WASA Rawalpindi
Projected Savings 2016-2017 120.6 Million PKR
Measurement
Flow Meter
Power Analyzer
Tachometer
General Tool Kit
Vibrometer
Well Sounder
Temperature Gun
Safety Kit
Camera
Energy Audit Instruments
Equipment Procurement- Status
WASAs W- Faisalabad W- Lahore W- Rawalpindi W- Multan W- Gujranwala
Status Procured Tendered Purchasing
Stage
Tendered Not Procured
due to
Insufficient
budget.
Energy Audit Results – Chiniot & JICA Tube
wells in WASA Faisalabad
Tube well
Name
No.s Avg. Motor
Efficiency
Avg. Pump
Efficiency
Recommendations
Chiniot- Jhang
Branch Canal
(KSB &
Siemens)
21 83.58% 58.95% i) There is no need to replace these motors & Pumps
as they are operating at acceptable efficiency range.
ii) 17 tube wells require PF improvement.
Automatic PFI compensating up to 40KVARS should
be installed on these tube wells.
JICA-
KSB &
Siemens
25 83.57% 75.79% i) There is no need to replace motors & pumps as
they are operating at acceptable efficiency range.
ii) 09 tube wells require PF improvement.
Automatic PFI compensating up to 25KVARS should
be installed on these tube wells.
Challenges in Energy Audit (EA)
Data Collection
Data Provision
Equipment
Dedicated Team
• Field Staff
• High Response Time
• Systematic Record Inadequate
• No EA Equipment
• Funds
• No Training of Instruments
• Work Overload
• EA Experience
• Lack of Capacity
Recommendation of Energy Audit – Part 1 and 2
Energy Audit Recommendations WASA Rough Cost in Rs
Million
Conditional Survey Improvement of All
Assets as poor and
Average
All WASA from Power &
Energy Head of PCGIP
120.39
PF Corrections 1. Static Capacitors
(Fixed Compensation )
2. Automatic Power
Factor Improvement
Relay (Automatic
Compensation
All WASAs from Power
and Energy Head of
PCGIP
22.87
Equipment Immediate Purchase of
EA Equipment/Set –
All WASAs except WASA F 1.5 -2
Energy Management Plan
Step 1
• Conditional Rehabilitation – Completed – Costing done and need procurement
Step 2
• Power Factor Correction
• 10% Saving Potential- Completed – Costing done and need procurement -
Step 3
• Energy Auditing- Procurement of Firm
Step 4
• Efficiency Improvement- 4th Year Procurement Plans
• 15% Saving Potential -
Step 5
• Capacity Building in Energy Management- & System for Monitoring
Comparison of Annual Billing after EMP
Saving Potential 706 Million PKR
3092.5
382.4 355.5
580.1 286.9
2319.4
286.8 266.6 435.1 215.2
Lahore Rawalpindi Multan Faisalabad Gujranwala
Annual Billing Vs Expected Billing after EA
Bill AmountFiscal Year 2013-2014 (PKR-In Million)
Bill Amount After Implementing EMOs (PKR-In Million)
Cost of Energy Management Plan
Component Cost (Million PKR) Time Lines Remarks
Asset Improvement 120.39 Dec 2016
PF Correction 22.87 Dec 2016
Replacement of Pumps 161.50 Dec 2016 Replacement of 316
pumps
Replacement of Motors 129.48 Dec 2016 Replacement of 316
motors
Capacity Building &
Monitoring
5.00 Dec 2016
Total 439.24
Add on Asset Management MIS Application
• Each Asset has Unique Asset Number /Application Number
1. Attachment of Electricity Bill
 Attach Electricity Bill from DISCO
 Entry of Monthly Bill Amount, Payment, Power Factor and Power Factor Penalty
 Responsible Authority: Concern XEN/SDO
 Frequency: 1 Month updating
2. Conditional of Asset
 Conditional Assessment of Asset
 Picture of Every Asset
 Responsible Authority: Concern XEN/SDO
 Frequency: 6 Month for updateing
Add on Asset Management Application continues …
• 3Efficiency of Pump & Motor :Asset Efficiency
 Data Entry of Name Plate Data of Pump & Motor (Year, Make, Sr. No. Rating,
Head, Flow, Pump Type, RPM & Efficiency . Class )
 Record of Power Parameters (kW, KVARS, PF, Volts, RPM and Amps)
 Record of Head, Water Table Depth, Flow & Pressure Gauge
 Suction Length, Delivery Length, Suction & Delivery Dia, Drawdown
 Attachment of Pump Curve
 Highlight the Poor Efficiency Equipment
 Responsible Authority: Concern XEN/SDO
 Frequency: 6 Month
• O&M History- Cost Centre
 Rewinding History (Date, Copper (Kg) Required & Labor Cost)
 Bearing Replacement (Replacement Date, Greasing Date, Bearing No. & Cost)
 Pump Wear & Tear (Repairing /Replacement Date, Trimming Date & Labor
Cost)
 Valves Wear & Tear (Valve Type, Repairing/Replacement Date, Cost & Labor
Cost)
 Next O&M Frequency for Planning -
 Responsible Authority: Concern XEN/SDO
 Action Frequency: Quarterly
THANK
YOU

Contenu connexe

Tendances

Energy audit by Qazi Arsalan Hamid-Dy Manager Technical KESC
Energy audit by Qazi Arsalan Hamid-Dy Manager Technical KESCEnergy audit by Qazi Arsalan Hamid-Dy Manager Technical KESC
Energy audit by Qazi Arsalan Hamid-Dy Manager Technical KESCQazi Arsalan Hamid
 
UNDP_Energy Audits_2015
UNDP_Energy Audits_2015UNDP_Energy Audits_2015
UNDP_Energy Audits_2015UNDPhr
 
SEMINAR ON ENERGY AUDIT
SEMINAR ON ENERGY AUDITSEMINAR ON ENERGY AUDIT
SEMINAR ON ENERGY AUDITHarsha Vardhan
 
Energy audit report presentation
Energy audit report presentationEnergy audit report presentation
Energy audit report presentationKyambadde Francisco
 
Energy Management Audit
Energy Management AuditEnergy Management Audit
Energy Management Auditalnaidu305
 
technical audit in murugappa group - toward converting the audit from cost ...
 technical audit in murugappa group - toward converting the audit from  cost ... technical audit in murugappa group - toward converting the audit from  cost ...
technical audit in murugappa group - toward converting the audit from cost ...Rajeswaran Muthu Venkatachalam
 
Energy audit for citm college
Energy audit for citm collegeEnergy audit for citm college
Energy audit for citm collegeRamsahay Nagar
 
Working Manual on Energy Auditing in industries
Working Manual on Energy Auditing in industriesWorking Manual on Energy Auditing in industries
Working Manual on Energy Auditing in industrieszubeditufail
 
Introduction to energy audit part 2
Introduction to energy audit part 2Introduction to energy audit part 2
Introduction to energy audit part 2ZAINI ABDUL WAHAB
 
Energy Audit Procedure
Energy Audit ProcedureEnergy Audit Procedure
Energy Audit Proceduredarkpage
 
Energy Audit in the Dairy Industry - Sitaram Gokul Dairy Nepal
Energy Audit in the Dairy Industry - Sitaram Gokul Dairy NepalEnergy Audit in the Dairy Industry - Sitaram Gokul Dairy Nepal
Energy Audit in the Dairy Industry - Sitaram Gokul Dairy Nepaleecfncci
 
How to conduct energy audit
How to conduct energy auditHow to conduct energy audit
How to conduct energy auditD.Pawan Kumar
 
Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Anish Maman
 

Tendances (20)

Energy audit by Qazi Arsalan Hamid-Dy Manager Technical KESC
Energy audit by Qazi Arsalan Hamid-Dy Manager Technical KESCEnergy audit by Qazi Arsalan Hamid-Dy Manager Technical KESC
Energy audit by Qazi Arsalan Hamid-Dy Manager Technical KESC
 
UNDP_Energy Audits_2015
UNDP_Energy Audits_2015UNDP_Energy Audits_2015
UNDP_Energy Audits_2015
 
SEMINAR ON ENERGY AUDIT
SEMINAR ON ENERGY AUDITSEMINAR ON ENERGY AUDIT
SEMINAR ON ENERGY AUDIT
 
Energy Efficiency and Energy Audit
Energy Efficiency and Energy AuditEnergy Efficiency and Energy Audit
Energy Efficiency and Energy Audit
 
Energy audit report presentation
Energy audit report presentationEnergy audit report presentation
Energy audit report presentation
 
Energy audit 1
Energy audit 1Energy audit 1
Energy audit 1
 
Energy Management Audit
Energy Management AuditEnergy Management Audit
Energy Management Audit
 
technical audit in murugappa group - toward converting the audit from cost ...
 technical audit in murugappa group - toward converting the audit from  cost ... technical audit in murugappa group - toward converting the audit from  cost ...
technical audit in murugappa group - toward converting the audit from cost ...
 
Energy audit for citm college
Energy audit for citm collegeEnergy audit for citm college
Energy audit for citm college
 
Working Manual on Energy Auditing in industries
Working Manual on Energy Auditing in industriesWorking Manual on Energy Auditing in industries
Working Manual on Energy Auditing in industries
 
Introduction to energy audit part 2
Introduction to energy audit part 2Introduction to energy audit part 2
Introduction to energy audit part 2
 
Energy Audit Procedure
Energy Audit ProcedureEnergy Audit Procedure
Energy Audit Procedure
 
Energy Audit in the Dairy Industry - Sitaram Gokul Dairy Nepal
Energy Audit in the Dairy Industry - Sitaram Gokul Dairy NepalEnergy Audit in the Dairy Industry - Sitaram Gokul Dairy Nepal
Energy Audit in the Dairy Industry - Sitaram Gokul Dairy Nepal
 
energy audit
energy auditenergy audit
energy audit
 
How to conduct energy audit
How to conduct energy auditHow to conduct energy audit
How to conduct energy audit
 
Energy audit
Energy auditEnergy audit
Energy audit
 
Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)
 
Energy audit
Energy auditEnergy audit
Energy audit
 
Energy audit
Energy auditEnergy audit
Energy audit
 
Energy audit
Energy auditEnergy audit
Energy audit
 

Similaire à Energy Audit in WASAs of Punjab

Best Electricity Supplier -Tata Power DDL
Best Electricity Supplier -Tata Power DDLBest Electricity Supplier -Tata Power DDL
Best Electricity Supplier -Tata Power DDLArikJonson1
 
Business potential of Energy Auditing in Kerala
Business potential of Energy Auditing in KeralaBusiness potential of Energy Auditing in Kerala
Business potential of Energy Auditing in KeralaPremsankar Chakkingal
 
Restoration after Blackout IME.pdf
Restoration after Blackout IME.pdfRestoration after Blackout IME.pdf
Restoration after Blackout IME.pdfIzharKhan472377
 
Activities of Anil Patil for Engineeraward
Activities of Anil Patil for EngineerawardActivities of Anil Patil for Engineeraward
Activities of Anil Patil for EngineerawardAnil Patil
 
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...IRJET Journal
 
Instruction manual
Instruction manualInstruction manual
Instruction manualrohit singh
 
Energy & safety audit of rice mill for husk based power plant for finance, ...
Energy & safety audit of rice mill for husk based power plant   for finance, ...Energy & safety audit of rice mill for husk based power plant   for finance, ...
Energy & safety audit of rice mill for husk based power plant for finance, ...Radha Krishna Sahoo
 
Presentation by bhavesh thakkar
Presentation by bhavesh thakkarPresentation by bhavesh thakkar
Presentation by bhavesh thakkarPMI_IREP_TP
 

Similaire à Energy Audit in WASAs of Punjab (20)

REC status
REC statusREC status
REC status
 
Best Electricity Supplier -Tata Power DDL
Best Electricity Supplier -Tata Power DDLBest Electricity Supplier -Tata Power DDL
Best Electricity Supplier -Tata Power DDL
 
Tata Power - DDL Company Profile
Tata Power - DDL Company ProfileTata Power - DDL Company Profile
Tata Power - DDL Company Profile
 
Business potential of Energy Auditing in Kerala
Business potential of Energy Auditing in KeralaBusiness potential of Energy Auditing in Kerala
Business potential of Energy Auditing in Kerala
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
CV_ RKS 2016
CV_ RKS 2016 CV_ RKS 2016
CV_ RKS 2016
 
Restoration after Blackout IME.pdf
Restoration after Blackout IME.pdfRestoration after Blackout IME.pdf
Restoration after Blackout IME.pdf
 
ajayuikey
ajayuikeyajayuikey
ajayuikey
 
Ajay Uikey
Ajay UikeyAjay Uikey
Ajay Uikey
 
Resume_Ravindra
Resume_RavindraResume_Ravindra
Resume_Ravindra
 
Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
 
Encotec -Company Presentation_Apr 2016
Encotec -Company Presentation_Apr 2016Encotec -Company Presentation_Apr 2016
Encotec -Company Presentation_Apr 2016
 
Activities of Anil Patil for Engineeraward
Activities of Anil Patil for EngineerawardActivities of Anil Patil for Engineeraward
Activities of Anil Patil for Engineeraward
 
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
 
Instruction manual
Instruction manualInstruction manual
Instruction manual
 
Energy & safety audit of rice mill for husk based power plant for finance, ...
Energy & safety audit of rice mill for husk based power plant   for finance, ...Energy & safety audit of rice mill for husk based power plant   for finance, ...
Energy & safety audit of rice mill for husk based power plant for finance, ...
 
Presentation by bhavesh thakkar
Presentation by bhavesh thakkarPresentation by bhavesh thakkar
Presentation by bhavesh thakkar
 
Malikjan Resume New
Malikjan Resume NewMalikjan Resume New
Malikjan Resume New
 
SAYYED TAUSIF ALAM.doc 2 (1)
SAYYED TAUSIF ALAM.doc 2 (1)SAYYED TAUSIF ALAM.doc 2 (1)
SAYYED TAUSIF ALAM.doc 2 (1)
 

Plus de Abid Hussainy

Performance Improvement Plan Water Utilities
Performance Improvement Plan  Water Utilities Performance Improvement Plan  Water Utilities
Performance Improvement Plan Water Utilities Abid Hussainy
 
Business Planning WASAs
Business Planning WASAs Business Planning WASAs
Business Planning WASAs Abid Hussainy
 
Gap analysis &amp; target setting
Gap analysis &amp; target settingGap analysis &amp; target setting
Gap analysis &amp; target settingAbid Hussainy
 
Functioning of local government
Functioning of local government Functioning of local government
Functioning of local government Abid Hussainy
 
Definition and scope of environmental education
Definition and scope of environmental education Definition and scope of environmental education
Definition and scope of environmental education Abid Hussainy
 
Punjab WATSAN Academy
Punjab WATSAN AcademyPunjab WATSAN Academy
Punjab WATSAN AcademyAbid Hussainy
 
Proposed Model of Operation & maintenance & M&E of Saaf Pani Program of Punjab
Proposed Model of Operation & maintenance & M&E of Saaf Pani Program of Punjab Proposed Model of Operation & maintenance & M&E of Saaf Pani Program of Punjab
Proposed Model of Operation & maintenance & M&E of Saaf Pani Program of Punjab Abid Hussainy
 
EIA training for Environmental Management Plan
EIA training for Environmental Management PlanEIA training for Environmental Management Plan
EIA training for Environmental Management PlanAbid Hussainy
 
Punjab intermediate Cities Improvement program ADB
Punjab intermediate Cities Improvement program   ADB Punjab intermediate Cities Improvement program   ADB
Punjab intermediate Cities Improvement program ADB Abid Hussainy
 
NSUSC Urban Service Delivery Model in Sindh, Asian Development Bank
NSUSC Urban Service Delivery Model in Sindh,  Asian Development Bank NSUSC Urban Service Delivery Model in Sindh,  Asian Development Bank
NSUSC Urban Service Delivery Model in Sindh, Asian Development Bank Abid Hussainy
 

Plus de Abid Hussainy (10)

Performance Improvement Plan Water Utilities
Performance Improvement Plan  Water Utilities Performance Improvement Plan  Water Utilities
Performance Improvement Plan Water Utilities
 
Business Planning WASAs
Business Planning WASAs Business Planning WASAs
Business Planning WASAs
 
Gap analysis &amp; target setting
Gap analysis &amp; target settingGap analysis &amp; target setting
Gap analysis &amp; target setting
 
Functioning of local government
Functioning of local government Functioning of local government
Functioning of local government
 
Definition and scope of environmental education
Definition and scope of environmental education Definition and scope of environmental education
Definition and scope of environmental education
 
Punjab WATSAN Academy
Punjab WATSAN AcademyPunjab WATSAN Academy
Punjab WATSAN Academy
 
Proposed Model of Operation & maintenance & M&E of Saaf Pani Program of Punjab
Proposed Model of Operation & maintenance & M&E of Saaf Pani Program of Punjab Proposed Model of Operation & maintenance & M&E of Saaf Pani Program of Punjab
Proposed Model of Operation & maintenance & M&E of Saaf Pani Program of Punjab
 
EIA training for Environmental Management Plan
EIA training for Environmental Management PlanEIA training for Environmental Management Plan
EIA training for Environmental Management Plan
 
Punjab intermediate Cities Improvement program ADB
Punjab intermediate Cities Improvement program   ADB Punjab intermediate Cities Improvement program   ADB
Punjab intermediate Cities Improvement program ADB
 
NSUSC Urban Service Delivery Model in Sindh, Asian Development Bank
NSUSC Urban Service Delivery Model in Sindh,  Asian Development Bank NSUSC Urban Service Delivery Model in Sindh,  Asian Development Bank
NSUSC Urban Service Delivery Model in Sindh, Asian Development Bank
 

Dernier

VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Servicesexy call girls service in goa
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Standkumarajju5765
 
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...Suhani Kapoor
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abrahamssuserbb03ff
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...ranjana rawat
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girlsPooja Nehwal
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesDr. Salem Baidas
 

Dernier (20)

VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCREscort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
 
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls ServicesGandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abraham
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and Challenges
 

Energy Audit in WASAs of Punjab

  • 1. Energy Audit of WASAs Engr. Abid Hussainy Sr Specialist Environment Division The Urban Unit Lahore 22th February 2015 ( PWON Bhurbhan)
  • 2. What is ENERGY AUDIT?
  • 3. PCGIP- DLI 4 (Revenue Collection System) • To Reduce Energy Consumption • Energy Efficient system • Improve service delivery - • Safety for the Staff • Asset Life is improved Why Energy Audit in WASAs? 0 2 4 6 8 10 12 Old Energy Bill New Energy Bill Billing
  • 5. Urban Unit Energy Audit Team Engr. Abid Shah Hussainy – Task Manager Engr. Rao Ali Raza Mr. Syed M. Usman Ali Mr. Abdul Basit
  • 6. 2 Day Energy Audit Training of WASA officials in Collaboration with NED (24-25 October, 2014) by International Trainer /Expert Mr Hashmi from Canada • Training to 15 WASA officials from 5 Cities • EA Exercises • Development of EA Tools (Technical, Billing, Conditional Survey & Energy Audit Performa) for TWs, DSs, W&WWT Plants. Hands on Training in the field by Urban Unit Experts in All WASAs ( 25 November- 19 December) • Instrumentation • Support in Data Collection • On Site Energy Audit Training • Conditional Survey Urban Unit Capacity Building Initiative
  • 7. Energy Audit Activities Status 0 20 40 60 80 100 Technical Data/ EA Assets Billing Detail June 13 to June 14 Conditional Survey Available Data Entry & Analysis by UU WASA Lahore 0 20 40 60 80 100 Technical Data/ EA Assets Billing Detail June 13 to June 14 Conditional Survey Available Data Entry & Analysis by UU WASA Rawalpindi 0 20 40 60 80 100 Technical Data/ EA Assets Billing Detail June June 14 Conditional Survey Available Data Entry & Analysis by UU WASA Gujranwala 0 20 40 60 80 100 Technical Data/ EA Assets Billing Detail June 13 to June 14 Conditional Survey vailable Data Entry & Analysis by UU WASA Multan 0 20 40 60 80 100 Technical Data/ EA Assets Billing Detail June 13 to June 14 Conditional Survey Available Data Entry & Analysis by UU WASA Faisalabad
  • 8. Tubewell & Disposal Station Detail 491 362 102 82 67 99 21 43 22 Lahore Rawalpindi Multan Faisalabad Gujranwala Supply Tubewells & Disposal Stations Supply Stations Disposal Stations
  • 9. EA -Asset Information WASAs No. of Pump- Motor Sets Design Capacity (Cusec) Lahore 776 5668.5 Rawalpindi 362 109 Multan 161 1061 Faisalabad 222 1284 Gujranwala 112 640 Total 1633 8762.5 MGD 5663
  • 10. Comparison of Load Capacity MW ( Installed Vs Sanctioned) 64.6 6.8 20.2 11.0 6.5 78.3 11.5 14.3 19.9 7.4 0 10 20 30 40 50 60 70 80 90 WASA Lahore WASA Rawalpindi WASA Multan WASA Faisalabad WASA Gujranwala Installed Load (MW) Sanctioned Load (MW)
  • 12. Conditional Survey & Analysis-Part 1
  • 13. Conditional Survey • Provide an orientation of the entire facility to observe the condition of each asset and the factors those influencing the asset condition towards operation. • Identify areas that warrant further examination for operational & maintenance practices and potential energy management opportunities. • Identifies obvious opportunities for the room of improvements in the operation and management side.
  • 14. Conditional Survey Parameters-24 Parameters Physical Condition of Pump Lubricant Leakage Water Leakage Cable Insulation Cable Sizing Transformer Condition Energy Meter Condition Performance of Starter Pump Vibration Pump Noise Motor Temperature Control Cooling Fan Condition Piping Condition Condition of Return Valve Pressure Gauge Condition Ventilation Civil Structure Generator Condition Power Factor Improvement Capacitor Safety Equipment Chlorinator Condition Log Book Earthing Condition Screening Chamber Condition Lighting Condition Human Signaling Signs SoPs
  • 15. Conditional Assessment of E-Assets •Rating <=40 % Poor •Rating <=60% Fair •Rating <=70 % Good •Rating >70 % Excellent
  • 16. WASA Lahore – Conditional Survey Result & Financing Conditional Assessment Rating <=40 % Poor Rating <=60% Fair Rating <=70 % Good Rating >70 % Excellent Poor 21% Fair 64% Good 7% Excellent 8% DISPOSAL STATIONS Poor 19% Fair 60% Good 16% Excellent 5% TUBEWELL STATIONS Rehabilitation Cost for TW & DS 62.10 million (BOQs for Rehabilitation have been Prepared)
  • 17. WASA Multan – Conditional Survey Result Conditional Assessment Rating <=40 % Poor Rating <=60% Fair Rating <=70 % Good Rating >70 % Excellent Poor 4% Fair 37% Good 21% Excellent 38% CONDITIONAL SURVEY RESULT - DISPOSAL STATION WASA MULTAN Poor 3% Fair 56% Good 41% Excellent 0% CONDITIONAL SURVEY RESULT - TUBEWELL STATIONS Rehabilitation Cost for TW & DS 11.16 million (BOQs for Rehabilitation have been Prepared)
  • 18. WASA Faisalabad – Conditional Survey Result Conditional Assessment Rating <=40 % Poor Rating <=60% Fair Rating <=70 % Good Rating >70 % Excellent Poor 42% Fair 51% Good 7% Excellent 0% DISPOSAL STATION Poor 2% Fair 0% Good 39% Excellent 59% TUBE WELL STATION Rehabilitation Cost for TW & DS 6.50 million (BOQs for Rehabilitation have been Prepared)
  • 19. WASA Rawalpindi – Conditional Survey Result Conditional Assessment Rating <=40 % Poor Rating <=60% Fair Rating <=70 % Good Rating >70 % Excellent Poor 44% Fair 56% TUBE WELL STATIONS Rehabilitation Cost for TW & DS 32.58 million (BOQs for Rehabilitation have been Prepared)
  • 20. WASA Gujranwala – Conditional Survey Result Conditional Assessment Rating <=40 % Poor Rating <=60% Fair Rating <=70 % Good Rating >70 % Excellent Poor 34% Fair 14% Good 33% Excellent 19% DISPOSAL STATIONS Poor 29% Fair 23% Good 15% Excellent 30% Not Operational 3% TUBEWELL STATIONS Rehabilitation Cost for TW & DS 8.01 million (BOQs for Rehabilitation have been Prepared)
  • 22. Annual Electric Billing on TW & DS WASAs Sanctioned Load from WAPDA (Mega Watt-MW) Bill Amount Fiscal Year 2013- 2014 (PKR-In Million) Low Power Factor Penalty (PKR-In Million) Lahore 78.3 3092.4 21.4 Rawalpindi 11.5 382.4 1.9 Multan 14.3 355.5 5.5 Faisalabad 19.9 580.1 6.3 Gujranwala 7.4 286.9 5.1 Total 131.4 4697.4 40.2
  • 23. Annual Billing & Annual Low Power Factor Penalty 0 5 10 15 20 25 Lahore Rawalpindi Multan Faisalabad Gujranwala 21.4 2.0 5.5 6.3 5.1 Low Power Factor Penalty (PKR-In Million) Power Factor Definition Ratio b/w active power to apparent power is called the Power Factor. Disadvantages of Low Power Factor:- 1. Penalty from Electric Power Supply Company Penalty Formula (PKR)= (0.9-Actual PF)*2*Energy Charges 2. Large Line Loss (Copper Loss) 3. High input current requirement 4. Large KVA Rating of Transformer & large size of equipment requirement 5. Greater Conductor /cable Size & Cost 6. Poor Voltage Regulation & Large Voltage Drop 7. Low efficiency of equipment Gadgets for Improving Power Factor:- 1. Static Capacitors (Fixed Compensation ) 2. Automatic Power Factor Improvement Relay (Automatic Compensation) 3,092.5 580.1 355.5 286.9 382.4 0 500 1000 1500 2000 2500 3000 3500 WASA Lahore WASA Faisalabad WASA Multan WASA Gujranwala WASA Rawalpindi Bill Amount Fiscal Year 2013-2014 (PKR-In Million)
  • 24. Low Power Factor Penalty PAID by WASAs Since PCGIP Inception 42.8 12.6 11.0 10.1 3.9 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 WASA Lahore WASA Faisalabad WASA Multan WASA Gujranwala WASA Rawalpindi LPF PENALTY PAID- 80.4 MILLION PKR (LAST TWO YEARS)
  • 25. Costing of LPF Correction of DS & TW WASAs Annual Low Power Factor Penalty (PKR-In Million) Cost to Remove L.P.F Penalty (using Automatic Power Factor Relay / Static Capacitors) (PKR- In Million) Payback Time (Months) Lahore 21.4 11.4 7 Rawalpindi 1.9 0.7 4 Multan 5.5 3.9 9 Faisalabad 6.3 3.7 7 Gujranwala 5.1 3.1 8 Total 40.2 22.8
  • 26. LPF Savings for Next Three Years- 2014-2017 64.2 18.8 16.6 15.2 5.90.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 WASA Lahore WASA Faisalabad WASA Multan WASA Gujranwala WASA Rawalpindi Projected Savings 2016-2017 120.6 Million PKR
  • 28. Flow Meter Power Analyzer Tachometer General Tool Kit Vibrometer Well Sounder Temperature Gun Safety Kit Camera Energy Audit Instruments
  • 29. Equipment Procurement- Status WASAs W- Faisalabad W- Lahore W- Rawalpindi W- Multan W- Gujranwala Status Procured Tendered Purchasing Stage Tendered Not Procured due to Insufficient budget.
  • 30. Energy Audit Results – Chiniot & JICA Tube wells in WASA Faisalabad Tube well Name No.s Avg. Motor Efficiency Avg. Pump Efficiency Recommendations Chiniot- Jhang Branch Canal (KSB & Siemens) 21 83.58% 58.95% i) There is no need to replace these motors & Pumps as they are operating at acceptable efficiency range. ii) 17 tube wells require PF improvement. Automatic PFI compensating up to 40KVARS should be installed on these tube wells. JICA- KSB & Siemens 25 83.57% 75.79% i) There is no need to replace motors & pumps as they are operating at acceptable efficiency range. ii) 09 tube wells require PF improvement. Automatic PFI compensating up to 25KVARS should be installed on these tube wells.
  • 31. Challenges in Energy Audit (EA) Data Collection Data Provision Equipment Dedicated Team • Field Staff • High Response Time • Systematic Record Inadequate • No EA Equipment • Funds • No Training of Instruments • Work Overload • EA Experience • Lack of Capacity
  • 32. Recommendation of Energy Audit – Part 1 and 2 Energy Audit Recommendations WASA Rough Cost in Rs Million Conditional Survey Improvement of All Assets as poor and Average All WASA from Power & Energy Head of PCGIP 120.39 PF Corrections 1. Static Capacitors (Fixed Compensation ) 2. Automatic Power Factor Improvement Relay (Automatic Compensation All WASAs from Power and Energy Head of PCGIP 22.87 Equipment Immediate Purchase of EA Equipment/Set – All WASAs except WASA F 1.5 -2
  • 33. Energy Management Plan Step 1 • Conditional Rehabilitation – Completed – Costing done and need procurement Step 2 • Power Factor Correction • 10% Saving Potential- Completed – Costing done and need procurement - Step 3 • Energy Auditing- Procurement of Firm Step 4 • Efficiency Improvement- 4th Year Procurement Plans • 15% Saving Potential - Step 5 • Capacity Building in Energy Management- & System for Monitoring
  • 34. Comparison of Annual Billing after EMP Saving Potential 706 Million PKR 3092.5 382.4 355.5 580.1 286.9 2319.4 286.8 266.6 435.1 215.2 Lahore Rawalpindi Multan Faisalabad Gujranwala Annual Billing Vs Expected Billing after EA Bill AmountFiscal Year 2013-2014 (PKR-In Million) Bill Amount After Implementing EMOs (PKR-In Million)
  • 35. Cost of Energy Management Plan Component Cost (Million PKR) Time Lines Remarks Asset Improvement 120.39 Dec 2016 PF Correction 22.87 Dec 2016 Replacement of Pumps 161.50 Dec 2016 Replacement of 316 pumps Replacement of Motors 129.48 Dec 2016 Replacement of 316 motors Capacity Building & Monitoring 5.00 Dec 2016 Total 439.24
  • 36. Add on Asset Management MIS Application • Each Asset has Unique Asset Number /Application Number 1. Attachment of Electricity Bill  Attach Electricity Bill from DISCO  Entry of Monthly Bill Amount, Payment, Power Factor and Power Factor Penalty  Responsible Authority: Concern XEN/SDO  Frequency: 1 Month updating 2. Conditional of Asset  Conditional Assessment of Asset  Picture of Every Asset  Responsible Authority: Concern XEN/SDO  Frequency: 6 Month for updateing
  • 37. Add on Asset Management Application continues … • 3Efficiency of Pump & Motor :Asset Efficiency  Data Entry of Name Plate Data of Pump & Motor (Year, Make, Sr. No. Rating, Head, Flow, Pump Type, RPM & Efficiency . Class )  Record of Power Parameters (kW, KVARS, PF, Volts, RPM and Amps)  Record of Head, Water Table Depth, Flow & Pressure Gauge  Suction Length, Delivery Length, Suction & Delivery Dia, Drawdown  Attachment of Pump Curve  Highlight the Poor Efficiency Equipment  Responsible Authority: Concern XEN/SDO  Frequency: 6 Month
  • 38. • O&M History- Cost Centre  Rewinding History (Date, Copper (Kg) Required & Labor Cost)  Bearing Replacement (Replacement Date, Greasing Date, Bearing No. & Cost)  Pump Wear & Tear (Repairing /Replacement Date, Trimming Date & Labor Cost)  Valves Wear & Tear (Valve Type, Repairing/Replacement Date, Cost & Labor Cost)  Next O&M Frequency for Planning -  Responsible Authority: Concern XEN/SDO  Action Frequency: Quarterly