PROFESSIONAL PRACTICE AND VALUATION
TOPIC NAME: VALUATION
SUBJECT CODE: 2I70610
BRANCH: CIVIL ENGG,. 7TH SEM
PREPARED BY:
GUIDED BY: Prof. Pritesh Rathod
Prof. Sunil Jaganiya
content
■ Terms
■ Objects/purpose of valuation
■ Property income
■ Depreciation and Obsolescence
■ Methods of calculating Depreciation
■ Different forms of value
■ Factor affecting value of property
■ Valuation Tables and their uses
■ Valuation methods for property
■ Types of rent
Terms
■ Cost – The term cost is used to indicate the actual amount incurred in
producing a commodity.
■ Prime Cost – The expenditures or charges represented directly in the
commodity produced are called the prime cost.
■ Supplementary cost – Other expenditures or charges like rent, management,
services, salaries, depreciation, etc. represented indirectly in the production of
the commodity are called the supplementary cost.
■ Value – Value means its worth or utility.
■ Price – The term price is used to indicate the cost of the commodity plus profit
of the manufacturer.
Valuation
■ Valuation is the art of estimating or determining the fair price or value of a property such as a
building, a factory, other engineering structures, land, etc.
■ The value of a property depends on :
I. Nature of structure
II. Life
III. Maintenance
IV. Location
V. Bank interest
VI. Legal control
VII. Supply and demand
VIII.Purpose of valuation
Estimation
■ Estimation for any construction work may be defined as the process of
calculating the quantities and cost of various items required in connection with
the work.
■ Purpose of estimation:
I. Preliminary study of the project
II. Administrative approval
III. To investigate feasibility
IV. To get loan from bank
V. For insurance purpose
VI. For deciding taxes
VII. To decide rent of a building
Objects/Purpose of Valuation
■ Buying or Selling property
■ Security of loans
■ Rent fixation
■ Insurance
■ Taxation
■ Compulsory acquisition
■ Betterment charges
■ Speculation
■ Court fees
■ Gift tax
■ Balance sheet
Property income
■ Gross income – The total income from different sources is called gross income.
■ Net income – When outgoings are deducted from gross income it is called net
income.
■ Outgoing – The term outgoing is used to indicate the expenses which are to be
incurred in connection with the property so as to maintain the revenue from it.
Depreciation and Obsolescence
Depreciation Obsolescence
Physical loss in the value of the property due to
wear, tear and decay etc. is known as
depreciation.
Loss in the value of the property due to change in
design, in fashion, in structures, etc. is known as
obsolescence.
The decrease in the value of the property is
gradual and slow.
The value of property increase or decrease at a
rapid rate.
Depreciation depends on its original condition,
quality of maintenance and mode of use.
Obsolescence depends on normal progress in the
arts, inadequacy to present or growing needs, etc.
This is variable according to the age of the
property. More the age, more will be amount for
depreciation.
This is not dependent on age of the building. A
new building may suffer in its usual rent due to
obsolescence.
There are different methods by which the amount
of depreciation can be calculated.
At present there is no method of calculation of
obsolescence.
Methods of calculating Depreciation
■ Straight line method
■ Constant percentage method
■ Sinking fund method
■ Quantity survey method
Straight line method
■ In this method it is assumed that the property loses its value by the same amount every year. A
fixed amount of the original cost is deducted every year so that at the end of the utility period
only the scrap value is left.
■ D =
C−S
n
D = Annual depreciation
C = original cost
S = scrap value
N = life in year
■ Depreciation of the property after m years
=
C − S
n
× m = m × D
■ Book value after m years
= C −
C − s
n
× m = C − m × D
Constant percentage method
■ In this method it is assumed that the property will lose its value by a constant
percentage of tis value at the beginning of every year.
p = 1 −
S
C
1
n
p = percentage rate of annual depreciation
S = scrap value
C = original cost
n = life of years
Sinking fund method
■ In this method the depreciation of the property is assumed to be equal to the
annual sinking fund plus the interest on the sinking fund for that year.
■ A= Annual sinking fund
■ b,c,d,…etc. = interest on the sinking fund for the subsequent years.
■ C= original cost
Life in years Annual sinking
fund
Interest in
sinking fund
Depreciation
for that year
Total
depreciation
Book value
1 A - A A C –A
2 A b A+b 2A+b C – (2A+b)
3 A c A+c 3A+b+c C – (3A+b+c)
4 A d A+d 4A+b+c+d C – (4A+b+c+d)
So on…
If i is the rate of interest, annual sinking fund installment to accumulate 1 Rs. In
n years.
p =
i
(1+i)n−1
If i is the rate of interest and 1 Rs. Is deposited every year total sinking fund
accumulated at the end of n years is
q =
(1+i)n−1
i
Rate of depreciation in n years
= (p×q)%
The cost of newly constructed building was Rs. 150000. the life of building is 75
years. Determine the depreciation in the 30th year of life by straight line method,
constant % method, and sinking fund method at the 8% compound interest. The
scarp value of building is 10% of its construction cost.
■ C = Rs 150000
■ S = 0.10×150000 = 15000 Rs.
■ N= 75 years i = 8%
(i) straight line method
D =
C−S
n
=
150000 −15000
75
= 1800 𝑅𝑠.
 total depreciation after m = 30 years
= 18000×30 = 54000 Rs.
(ii) Constant percentage method
p = 𝐶
S
C
m
n
= 150000
15000
150000
30
75
= 150000 × 0.3981 = 59715 𝑅𝑠.
 Total depreciation after 30 years
(C- S) = 150000 – 59715 = 90285 Rs.
■ (iii) sinking fund method
(C – S) = 150000 – 15000 = 135000 Rs.
Sinking fund coefficient for 75 years life
p =
i
(1+i)n−1
=
0.08
(1+0.08)75−1
= 2.498 × 10−4
q =
(1+i)n−1
i
=
(1+0.08)30−1
0.08
= 113.28
Rate of depreciation for 30 years
p×q = 2.498 × 10−4 × 113.28 = 0.02829
Total depreciation in 30 years
(C – S)×0.02829 = 135000×0.02829 = 3819.15 Rs.
Different forms of value
1. Market value 9. Investment value
2. Book value 10. Sentimental value
3. Scrap value 11. Speculative value
4. Salvage value 12. Annual value
5. Accommodation value 13. Potential value
6. Distress value 14. Occupation value
7. Monopoly value 15. Present value
8. Replacement value
Factors affecting value of a property
■ Demand and supply
■ Maintenance
■ Rise in population
■ Abnormal condition
■ Cost of construction
■ Purpose of purchase
■ Town planning Act
■ Climatic condition
■ Life
■ Improvement by public schemes
■ Migration
■ Interest of schedule banks
Valuation tables and their uses
■ In order to save time and reduce the charges of error in elaborate and laborious mathematical
calculation the valuation tables are prepared so that by referring to them suitable coefficient can be
found out.
■ TABLE -1
■ To find the amount to which Rs. 1 will accumulate at the end of given number of years
Let, i = interest per annum on Rs. 1
Interest of Rs. 1 after 1 years = i
■ Amount receivable after 1 year = ( 1+i)
■ Amount receivable after 2 year = ( 1+ i) + (1 + i) i = 1+i + i +𝑖2= (1 + 𝑖)2 Rs.
■ For Rs. 1 amount receivable after n years.
= (1 + 𝑖) 𝑛 𝐶 = (1 + 𝑖) 𝑛
■ TABLE -2
■ To find the present value of Rs. 1 receivable at the end of a given number of years.
p =
1
(1+i)n
■ TABLE -3
■ To find the amount of annual sinking fund for the redemption of Rs. 1 capital instalment of S.F.
p =
i
(1+i)n−1
■ TABLE – 4
■ If Rs. 1 is invested every year how much amount will be accumulated after n years
q =
(1+i)n−1
i
■ Example: joinA and B properly
■ (1) On investment of Rs. 1/- amount receivable after 80 years @ 2%
= (1 + 𝑖) 𝑛 = (1 + 0.02)80 = 4.8754
(2) Present value of Rs. 1/- receivable after 70 years @ 3%
p =
1
(1+i)n =
1
(1+0.03)70 = 0.1263
(3) Amount receivable after 60 years @ 4% on investment of Rs. 1 every year
q =
(1+i)n−1
i
=
(1+0.04)60−1
0.04
= 237.9907
1 On investment of Rs. 1/- amount receivable after 80 years @ 2%
2 Present value of Rs. 1/- receivable after 70 years @ 3%
3 Amount receivable after 60 years @ 4% on investment of Rs. 1 every
year
4 Years purchase in 40 years @ 6%
5 Amount of sinking fund investment for redemption if Rs. 1 capital after
50 years @ 5%
■ (4) Years purchase in 40 years @ 6%
S. F. =
i
(1+i)n−1
=
0.06
(1+0.06)40−1
= 0.00646
𝑌. 𝑃. =
1
𝑖+𝑆.𝐹.
=
1
0.06+0.00646
= 15.0463
(5) Amount of sinking fund investment for redemption if Rs. 1 capital after 50 years @ 5%
i
(1+i)n−1
=
0.05
(1+0.05)50−1
= 0.0048
1 4.8754
2 0.1263
3 237.99
4 15.0463
5 0.0048
Valuation methods for property and land
■ (A) Valuation methods for property
1. Rental method
2. Land and building based method
3. Profit based method
4. Development method
1. Rental method
■ In this method the net rental income from a property is calculated after deducting
all outgoings from the gross rent and years purchase is calculated after adopting
the current bank interest.
■ The valuation of a property is worked out as under.
■ Capitalized value = Net income ×year’s purchase
C.V.= N.I. × Y.P.
Net income = Net rent = Gross Rent – outgoing
When the rent from a property is known this method is useful for valuation of a
property.
This present value of land can be obtained as
1
(1+i)n
Value of property = value of land + value of building
2. Land and building based method
■ Properties which are used for special purpose outside the general range of
commercial and residential properties as for school police station or which
perform non- profitable community functions where there is no direct evidence
of income valuation of such properties are made by this method.
■ Valuation for under developed or owner occupied or vacant possession or
damaged properties may be done by this method of valuation.
■ Cost of new construction of building = total construction area×present rate of
construction
■ Calculate depreciated cost of building
■ Present value of property = cost of land + depreciated cost of building
3. Profit based method
■ This method of valuation is very similar to the rental method of valuation and is
most applicable in case of valuation of shops, hotels, cinemas, etc.
■ In tis method net profit is worked out after deducting all usual outgoings
including interest of capital investment and also remuneration of labour
rendered by owner.
■ Capitalized value = Net income × year's purchase
C.V. = N.I. ×Y.P.
Net income = total income - outgoing
4. Development method
■ Sometimes undeveloped or under developed property is bought
developed and then offered for sale. The valuation of such properties
would depend on initial investment development cost and expected profit.
■ This method of valuation is based on:
(a) Development of building estates
(b) Hypothetical building schemes
(a) Development of building estates
■ In this method an estate is developed with all the essential amenities and
sold out in small plots in most advantageous manner so that the estate is
worth more. When a city continues too expand then the land is known as
Ripe for building.
■ Valuation by development of building estates = present value – total
outgoings
(b) Hypothetical building schemes
■ In this method value of a vacant plot of land is estimated by capitalizing the
assumed rent that can be obtained from a building if erected on the land after
developing the same and then deducting the cost of development and building.
■ This is not a suitable method of valuation of land because the cost of land
depends on the magnitude of development of land.
B. Valuation method for open land
1. Comparative method
2. Hypothetical method
3. Belting method
1. Comparative Method
■ In this method the various transactions of nearby lands are property studied and then a fair rate
of land under consideration is decided.
■ Thus this method will be useful only in case of an active market where there are large number of
statistics are available for comparison.
■ Following factors are to be taken into account while analyzing value of land by this method.
(I) Situation
(II) Size
(III) Shape
(IV) Frontage and depth
(V) Front road width
(VI) Vistas
(VII)Nature of soil
2. Hypothetical Method
■ In this method value of a vacant plot of land is estimated by capitalizing the
assumed rent that can be obtained from a building.
■ If erected on the land after developing the same and then deducting the cost of
development and building.
■ This is not a suitable method of valuation of land because the cost of land
depends on the magnitude of development of land.
Valuation procedure
■ Permissible covered area = total area – (1/3) area of open space land
■ find, rental area = total area – 20 % for area of walls and wastes
■ Calculate net rent per month = gross rent – outgoing
■ Find outY.P.
■ Find out the cost of building from the total covered area and current
plinth area rent.
■ Workout the development cost of the land.
■ Find out the total cost of building and development cost.
■ Deduct the total cost of building and development cost.
3. Belting Method
■ When a plot of big size is to be
valued or when a plot with less
frontage and more depth is to be
valued it is logical to adopt the
method of belting.
■ It is due to the principle that the
value of land in general deceases
as the plot increases.
■ In this method whole area is to
be divided into the number of
belts.
Example: figure shows the plot of land. If width of first belt is 30 m and its
value is estimated to Rs. 100/sq.m. find value of the entire plot by belting
methodV1,V2,V3 ae the values and B1,B2,B3 are width.
■ Let us divide the plot in 6 parts
■ Width of first B1 =30 m
■ Width of second belt B2 = 1.5×30 = 45m
■ Width of third belt B3 = 125 -30 – 45 = 50m
■ BB1/30 = 40/125 BB1=9.6m
■ CC1/75= 40/125 CC1=24m
Plot no. Area Sq. m. Rate per Sq. m. Value of land Rs.
1 60×30 = 1800 V1 =100 180000
2 60×45 = 2700 V2 = 2/3×100=66.67 180009
3 60× 50 = 3000 V3 = 1/2×100 =50 150000
4 1/2×9.6×30=144 3/4×V1 =3/4×100 =75 10800
5 (9.6 + 24)×45/2 = 756 ¾ ×V2 = ¾ ×66.67 =50 37800
6 (24 + 40) ×50/2 = 1600 ¾ ×V3 = 3/4×50 = 37.5 60000
Total Rs. 618609
Types of Rent
■ Rent: Rent may be defined as an annual or periodic payment for the use of land or building
and land.
■ Various forms of rent are:
1. Standard rent 9. Contractual rent
2. Head rent 10. Nominal rent
3.Rack rent 11. Monopoly rent
4. Situation rent 12. Gross rent
5. Sitting rent 13. Net rent
6. Subsidized rent 14. Ground rent
7. Improved rent
8. Profit rent
Valuation

Contenu connexe

Tendances

CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
Pundlik Rathod
 

Tendances (20)

Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
Purpose of Valuation
Purpose of ValuationPurpose of Valuation
Purpose of Valuation
 
Rate analysis brief
Rate analysis briefRate analysis brief
Rate analysis brief
 
Valuation
ValuationValuation
Valuation
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and Arbitration
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
Valuation
ValuationValuation
Valuation
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 
professional practice and valuation topic of ppt:-valuation
professional practice and valuation topic of ppt:-valuationprofessional practice and valuation topic of ppt:-valuation
professional practice and valuation topic of ppt:-valuation
 
Valuation - professional prractice and valuation
Valuation - professional prractice and valuationValuation - professional prractice and valuation
Valuation - professional prractice and valuation
 
Tender notice Drafting Procedure
Tender notice Drafting ProcedureTender notice Drafting Procedure
Tender notice Drafting Procedure
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
Types of estimate
Types of estimateTypes of estimate
Types of estimate
 
What is construction management & its Benefits?
What is construction management & its Benefits?What is construction management & its Benefits?
What is construction management & its Benefits?
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
 
Building Bye laws
Building Bye lawsBuilding Bye laws
Building Bye laws
 
Real estate valuations
Real estate valuationsReal estate valuations
Real estate valuations
 

Similaire à Valuation

Engineering economics
Engineering economicsEngineering economics
Engineering economics
Deepak Kumar
 
Qus 3205 sum of years digit depreciation method
Qus 3205 sum of years digit depreciation methodQus 3205 sum of years digit depreciation method
Qus 3205 sum of years digit depreciation method
Ye Shuang Goh
 

Similaire à Valuation (20)

Professional practice and Valuation (1).pptx
Professional practice and Valuation (1).pptxProfessional practice and Valuation (1).pptx
Professional practice and Valuation (1).pptx
 
Sppu be civil sem 8 qsct unit no. 04 valuation
Sppu be civil sem 8 qsct unit no. 04 valuationSppu be civil sem 8 qsct unit no. 04 valuation
Sppu be civil sem 8 qsct unit no. 04 valuation
 
Valuation 08.04.2020
Valuation 08.04.2020Valuation 08.04.2020
Valuation 08.04.2020
 
Depreciation 2 (1)
Depreciation 2 (1)Depreciation 2 (1)
Depreciation 2 (1)
 
Unit v depreciation
Unit v depreciationUnit v depreciation
Unit v depreciation
 
Unit v depreciation
Unit v depreciationUnit v depreciation
Unit v depreciation
 
unit three.pdf
unit three.pdfunit three.pdf
unit three.pdf
 
engineering economics presentation1.pptx
engineering economics presentation1.pptxengineering economics presentation1.pptx
engineering economics presentation1.pptx
 
EngEconPatel03NOV04.ppt
EngEconPatel03NOV04.pptEngEconPatel03NOV04.ppt
EngEconPatel03NOV04.ppt
 
Depreciation.pptx related to the Chemical Process Control And Instrumentation .
Depreciation.pptx related to the Chemical Process Control And Instrumentation .Depreciation.pptx related to the Chemical Process Control And Instrumentation .
Depreciation.pptx related to the Chemical Process Control And Instrumentation .
 
Engineering economics
Engineering economicsEngineering economics
Engineering economics
 
Qus 3205 sum of years digit depreciation method
Qus 3205 sum of years digit depreciation methodQus 3205 sum of years digit depreciation method
Qus 3205 sum of years digit depreciation method
 
Engineering economics Slides for Postgraduates
Engineering economics Slides for PostgraduatesEngineering economics Slides for Postgraduates
Engineering economics Slides for Postgraduates
 
Time Value of Money.pptx .
Time Value of Money.pptx                       .Time Value of Money.pptx                       .
Time Value of Money.pptx .
 
Financial accounting mgt101 power point slides lecture 18
Financial accounting   mgt101 power point slides lecture 18Financial accounting   mgt101 power point slides lecture 18
Financial accounting mgt101 power point slides lecture 18
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
unit 5.pdf
unit 5.pdfunit 5.pdf
unit 5.pdf
 
Chapter 5-depreciation
Chapter 5-depreciationChapter 5-depreciation
Chapter 5-depreciation
 
1
11
1
 
7-L3-Time Value of Money.ppt
7-L3-Time Value of Money.ppt7-L3-Time Value of Money.ppt
7-L3-Time Value of Money.ppt
 

Plus de Aditya Mistry

APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATIONAPPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION
Aditya Mistry
 

Plus de Aditya Mistry (20)

Traffic studies
Traffic studiesTraffic studies
Traffic studies
 
Earthquake design example
Earthquake design example Earthquake design example
Earthquake design example
 
Cross section of the canal, balancing depth and canal fsl
Cross section of the canal, balancing depth  and canal fslCross section of the canal, balancing depth  and canal fsl
Cross section of the canal, balancing depth and canal fsl
 
Urban transportation system
Urban transportation systemUrban transportation system
Urban transportation system
 
Water and Waste Water Engineering
Water and Waste Water EngineeringWater and Waste Water Engineering
Water and Waste Water Engineering
 
Railway Bridge and Tunnel Engineering
Railway Bridge and Tunnel EngineeringRailway Bridge and Tunnel Engineering
Railway Bridge and Tunnel Engineering
 
Applied Fluid Mechanics
Applied Fluid MechanicsApplied Fluid Mechanics
Applied Fluid Mechanics
 
Advance Construction & Equipment
Advance Construction & EquipmentAdvance Construction & Equipment
Advance Construction & Equipment
 
Traffic control devices
Traffic control devicesTraffic control devices
Traffic control devices
 
Shear strength of soil
Shear strength of soilShear strength of soil
Shear strength of soil
 
Stiffness Matrix
Stiffness MatrixStiffness Matrix
Stiffness Matrix
 
Flood Management
Flood ManagementFlood Management
Flood Management
 
Air Pollution
Air PollutionAir Pollution
Air Pollution
 
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATIONAPPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION
 
Special concrete and concreting method
Special concrete and concreting methodSpecial concrete and concreting method
Special concrete and concreting method
 
Modern surveying instruments
Modern surveying instrumentsModern surveying instruments
Modern surveying instruments
 
Earthquake resistant building
Earthquake resistant buildingEarthquake resistant building
Earthquake resistant building
 
Direct and bending stress
Direct and bending stressDirect and bending stress
Direct and bending stress
 
Temporary works
Temporary worksTemporary works
Temporary works
 
Notches and weir
Notches and weirNotches and weir
Notches and weir
 

Dernier

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Dernier (20)

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 

Valuation

  • 2. TOPIC NAME: VALUATION SUBJECT CODE: 2I70610 BRANCH: CIVIL ENGG,. 7TH SEM PREPARED BY: GUIDED BY: Prof. Pritesh Rathod Prof. Sunil Jaganiya
  • 3. content ■ Terms ■ Objects/purpose of valuation ■ Property income ■ Depreciation and Obsolescence ■ Methods of calculating Depreciation ■ Different forms of value ■ Factor affecting value of property ■ Valuation Tables and their uses ■ Valuation methods for property ■ Types of rent
  • 4. Terms ■ Cost – The term cost is used to indicate the actual amount incurred in producing a commodity. ■ Prime Cost – The expenditures or charges represented directly in the commodity produced are called the prime cost. ■ Supplementary cost – Other expenditures or charges like rent, management, services, salaries, depreciation, etc. represented indirectly in the production of the commodity are called the supplementary cost. ■ Value – Value means its worth or utility. ■ Price – The term price is used to indicate the cost of the commodity plus profit of the manufacturer.
  • 5. Valuation ■ Valuation is the art of estimating or determining the fair price or value of a property such as a building, a factory, other engineering structures, land, etc. ■ The value of a property depends on : I. Nature of structure II. Life III. Maintenance IV. Location V. Bank interest VI. Legal control VII. Supply and demand VIII.Purpose of valuation
  • 6. Estimation ■ Estimation for any construction work may be defined as the process of calculating the quantities and cost of various items required in connection with the work. ■ Purpose of estimation: I. Preliminary study of the project II. Administrative approval III. To investigate feasibility IV. To get loan from bank V. For insurance purpose VI. For deciding taxes VII. To decide rent of a building
  • 7. Objects/Purpose of Valuation ■ Buying or Selling property ■ Security of loans ■ Rent fixation ■ Insurance ■ Taxation ■ Compulsory acquisition ■ Betterment charges ■ Speculation ■ Court fees ■ Gift tax ■ Balance sheet
  • 8. Property income ■ Gross income – The total income from different sources is called gross income. ■ Net income – When outgoings are deducted from gross income it is called net income. ■ Outgoing – The term outgoing is used to indicate the expenses which are to be incurred in connection with the property so as to maintain the revenue from it.
  • 9. Depreciation and Obsolescence Depreciation Obsolescence Physical loss in the value of the property due to wear, tear and decay etc. is known as depreciation. Loss in the value of the property due to change in design, in fashion, in structures, etc. is known as obsolescence. The decrease in the value of the property is gradual and slow. The value of property increase or decrease at a rapid rate. Depreciation depends on its original condition, quality of maintenance and mode of use. Obsolescence depends on normal progress in the arts, inadequacy to present or growing needs, etc. This is variable according to the age of the property. More the age, more will be amount for depreciation. This is not dependent on age of the building. A new building may suffer in its usual rent due to obsolescence. There are different methods by which the amount of depreciation can be calculated. At present there is no method of calculation of obsolescence.
  • 10. Methods of calculating Depreciation ■ Straight line method ■ Constant percentage method ■ Sinking fund method ■ Quantity survey method
  • 11. Straight line method ■ In this method it is assumed that the property loses its value by the same amount every year. A fixed amount of the original cost is deducted every year so that at the end of the utility period only the scrap value is left. ■ D = C−S n D = Annual depreciation C = original cost S = scrap value N = life in year ■ Depreciation of the property after m years = C − S n × m = m × D ■ Book value after m years = C − C − s n × m = C − m × D
  • 12. Constant percentage method ■ In this method it is assumed that the property will lose its value by a constant percentage of tis value at the beginning of every year. p = 1 − S C 1 n p = percentage rate of annual depreciation S = scrap value C = original cost n = life of years
  • 13. Sinking fund method ■ In this method the depreciation of the property is assumed to be equal to the annual sinking fund plus the interest on the sinking fund for that year. ■ A= Annual sinking fund ■ b,c,d,…etc. = interest on the sinking fund for the subsequent years. ■ C= original cost
  • 14. Life in years Annual sinking fund Interest in sinking fund Depreciation for that year Total depreciation Book value 1 A - A A C –A 2 A b A+b 2A+b C – (2A+b) 3 A c A+c 3A+b+c C – (3A+b+c) 4 A d A+d 4A+b+c+d C – (4A+b+c+d) So on… If i is the rate of interest, annual sinking fund installment to accumulate 1 Rs. In n years. p = i (1+i)n−1 If i is the rate of interest and 1 Rs. Is deposited every year total sinking fund accumulated at the end of n years is q = (1+i)n−1 i Rate of depreciation in n years = (p×q)%
  • 15. The cost of newly constructed building was Rs. 150000. the life of building is 75 years. Determine the depreciation in the 30th year of life by straight line method, constant % method, and sinking fund method at the 8% compound interest. The scarp value of building is 10% of its construction cost. ■ C = Rs 150000 ■ S = 0.10×150000 = 15000 Rs. ■ N= 75 years i = 8% (i) straight line method D = C−S n = 150000 −15000 75 = 1800 𝑅𝑠.  total depreciation after m = 30 years = 18000×30 = 54000 Rs. (ii) Constant percentage method p = 𝐶 S C m n = 150000 15000 150000 30 75 = 150000 × 0.3981 = 59715 𝑅𝑠.  Total depreciation after 30 years (C- S) = 150000 – 59715 = 90285 Rs.
  • 16. ■ (iii) sinking fund method (C – S) = 150000 – 15000 = 135000 Rs. Sinking fund coefficient for 75 years life p = i (1+i)n−1 = 0.08 (1+0.08)75−1 = 2.498 × 10−4 q = (1+i)n−1 i = (1+0.08)30−1 0.08 = 113.28 Rate of depreciation for 30 years p×q = 2.498 × 10−4 × 113.28 = 0.02829 Total depreciation in 30 years (C – S)×0.02829 = 135000×0.02829 = 3819.15 Rs.
  • 17. Different forms of value 1. Market value 9. Investment value 2. Book value 10. Sentimental value 3. Scrap value 11. Speculative value 4. Salvage value 12. Annual value 5. Accommodation value 13. Potential value 6. Distress value 14. Occupation value 7. Monopoly value 15. Present value 8. Replacement value
  • 18. Factors affecting value of a property ■ Demand and supply ■ Maintenance ■ Rise in population ■ Abnormal condition ■ Cost of construction ■ Purpose of purchase ■ Town planning Act ■ Climatic condition ■ Life ■ Improvement by public schemes ■ Migration ■ Interest of schedule banks
  • 19. Valuation tables and their uses ■ In order to save time and reduce the charges of error in elaborate and laborious mathematical calculation the valuation tables are prepared so that by referring to them suitable coefficient can be found out. ■ TABLE -1 ■ To find the amount to which Rs. 1 will accumulate at the end of given number of years Let, i = interest per annum on Rs. 1 Interest of Rs. 1 after 1 years = i ■ Amount receivable after 1 year = ( 1+i) ■ Amount receivable after 2 year = ( 1+ i) + (1 + i) i = 1+i + i +𝑖2= (1 + 𝑖)2 Rs. ■ For Rs. 1 amount receivable after n years. = (1 + 𝑖) 𝑛 𝐶 = (1 + 𝑖) 𝑛
  • 20. ■ TABLE -2 ■ To find the present value of Rs. 1 receivable at the end of a given number of years. p = 1 (1+i)n ■ TABLE -3 ■ To find the amount of annual sinking fund for the redemption of Rs. 1 capital instalment of S.F. p = i (1+i)n−1 ■ TABLE – 4 ■ If Rs. 1 is invested every year how much amount will be accumulated after n years q = (1+i)n−1 i
  • 21. ■ Example: joinA and B properly ■ (1) On investment of Rs. 1/- amount receivable after 80 years @ 2% = (1 + 𝑖) 𝑛 = (1 + 0.02)80 = 4.8754 (2) Present value of Rs. 1/- receivable after 70 years @ 3% p = 1 (1+i)n = 1 (1+0.03)70 = 0.1263 (3) Amount receivable after 60 years @ 4% on investment of Rs. 1 every year q = (1+i)n−1 i = (1+0.04)60−1 0.04 = 237.9907 1 On investment of Rs. 1/- amount receivable after 80 years @ 2% 2 Present value of Rs. 1/- receivable after 70 years @ 3% 3 Amount receivable after 60 years @ 4% on investment of Rs. 1 every year 4 Years purchase in 40 years @ 6% 5 Amount of sinking fund investment for redemption if Rs. 1 capital after 50 years @ 5%
  • 22. ■ (4) Years purchase in 40 years @ 6% S. F. = i (1+i)n−1 = 0.06 (1+0.06)40−1 = 0.00646 𝑌. 𝑃. = 1 𝑖+𝑆.𝐹. = 1 0.06+0.00646 = 15.0463 (5) Amount of sinking fund investment for redemption if Rs. 1 capital after 50 years @ 5% i (1+i)n−1 = 0.05 (1+0.05)50−1 = 0.0048 1 4.8754 2 0.1263 3 237.99 4 15.0463 5 0.0048
  • 23. Valuation methods for property and land ■ (A) Valuation methods for property 1. Rental method 2. Land and building based method 3. Profit based method 4. Development method
  • 24. 1. Rental method ■ In this method the net rental income from a property is calculated after deducting all outgoings from the gross rent and years purchase is calculated after adopting the current bank interest. ■ The valuation of a property is worked out as under. ■ Capitalized value = Net income ×year’s purchase C.V.= N.I. × Y.P. Net income = Net rent = Gross Rent – outgoing When the rent from a property is known this method is useful for valuation of a property. This present value of land can be obtained as 1 (1+i)n Value of property = value of land + value of building
  • 25. 2. Land and building based method ■ Properties which are used for special purpose outside the general range of commercial and residential properties as for school police station or which perform non- profitable community functions where there is no direct evidence of income valuation of such properties are made by this method. ■ Valuation for under developed or owner occupied or vacant possession or damaged properties may be done by this method of valuation. ■ Cost of new construction of building = total construction area×present rate of construction ■ Calculate depreciated cost of building ■ Present value of property = cost of land + depreciated cost of building
  • 26. 3. Profit based method ■ This method of valuation is very similar to the rental method of valuation and is most applicable in case of valuation of shops, hotels, cinemas, etc. ■ In tis method net profit is worked out after deducting all usual outgoings including interest of capital investment and also remuneration of labour rendered by owner. ■ Capitalized value = Net income × year's purchase C.V. = N.I. ×Y.P. Net income = total income - outgoing
  • 27. 4. Development method ■ Sometimes undeveloped or under developed property is bought developed and then offered for sale. The valuation of such properties would depend on initial investment development cost and expected profit. ■ This method of valuation is based on: (a) Development of building estates (b) Hypothetical building schemes
  • 28. (a) Development of building estates ■ In this method an estate is developed with all the essential amenities and sold out in small plots in most advantageous manner so that the estate is worth more. When a city continues too expand then the land is known as Ripe for building. ■ Valuation by development of building estates = present value – total outgoings
  • 29. (b) Hypothetical building schemes ■ In this method value of a vacant plot of land is estimated by capitalizing the assumed rent that can be obtained from a building if erected on the land after developing the same and then deducting the cost of development and building. ■ This is not a suitable method of valuation of land because the cost of land depends on the magnitude of development of land.
  • 30. B. Valuation method for open land 1. Comparative method 2. Hypothetical method 3. Belting method
  • 31. 1. Comparative Method ■ In this method the various transactions of nearby lands are property studied and then a fair rate of land under consideration is decided. ■ Thus this method will be useful only in case of an active market where there are large number of statistics are available for comparison. ■ Following factors are to be taken into account while analyzing value of land by this method. (I) Situation (II) Size (III) Shape (IV) Frontage and depth (V) Front road width (VI) Vistas (VII)Nature of soil
  • 32. 2. Hypothetical Method ■ In this method value of a vacant plot of land is estimated by capitalizing the assumed rent that can be obtained from a building. ■ If erected on the land after developing the same and then deducting the cost of development and building. ■ This is not a suitable method of valuation of land because the cost of land depends on the magnitude of development of land.
  • 33. Valuation procedure ■ Permissible covered area = total area – (1/3) area of open space land ■ find, rental area = total area – 20 % for area of walls and wastes ■ Calculate net rent per month = gross rent – outgoing ■ Find outY.P. ■ Find out the cost of building from the total covered area and current plinth area rent. ■ Workout the development cost of the land. ■ Find out the total cost of building and development cost. ■ Deduct the total cost of building and development cost.
  • 34. 3. Belting Method ■ When a plot of big size is to be valued or when a plot with less frontage and more depth is to be valued it is logical to adopt the method of belting. ■ It is due to the principle that the value of land in general deceases as the plot increases. ■ In this method whole area is to be divided into the number of belts.
  • 35. Example: figure shows the plot of land. If width of first belt is 30 m and its value is estimated to Rs. 100/sq.m. find value of the entire plot by belting methodV1,V2,V3 ae the values and B1,B2,B3 are width.
  • 36. ■ Let us divide the plot in 6 parts ■ Width of first B1 =30 m ■ Width of second belt B2 = 1.5×30 = 45m ■ Width of third belt B3 = 125 -30 – 45 = 50m ■ BB1/30 = 40/125 BB1=9.6m ■ CC1/75= 40/125 CC1=24m Plot no. Area Sq. m. Rate per Sq. m. Value of land Rs. 1 60×30 = 1800 V1 =100 180000 2 60×45 = 2700 V2 = 2/3×100=66.67 180009 3 60× 50 = 3000 V3 = 1/2×100 =50 150000 4 1/2×9.6×30=144 3/4×V1 =3/4×100 =75 10800 5 (9.6 + 24)×45/2 = 756 ¾ ×V2 = ¾ ×66.67 =50 37800 6 (24 + 40) ×50/2 = 1600 ¾ ×V3 = 3/4×50 = 37.5 60000 Total Rs. 618609
  • 37. Types of Rent ■ Rent: Rent may be defined as an annual or periodic payment for the use of land or building and land. ■ Various forms of rent are: 1. Standard rent 9. Contractual rent 2. Head rent 10. Nominal rent 3.Rack rent 11. Monopoly rent 4. Situation rent 12. Gross rent 5. Sitting rent 13. Net rent 6. Subsidized rent 14. Ground rent 7. Improved rent 8. Profit rent