Why to invest in Bosnia and Herzegovina Energy
sector?
Energy sector is one of the most powerful in BiH, with huge potentials and
opportunities for further development and investment such as:
 Natural resources and attractive investment location
 Surpluses of produced electricity
 Electricity production exceeds local market needs
 Electricity export of ̴ 6000 GWh ranked BiH at 1st place in the region
 Favourable Feed-in-tariffs
 Favourable & Safe Environment for investment
 The lowest inflation in Region (-1 in 2015)
 Value-Added Tax (17%) and Corporate Income Tax (10%) among the
lowest in the region
 Competitively priced & qualified human capital
 The constant increase of energy demands in the region (World Bank research)
Favourable & Safe Environment for investment
 Bosnia and Herzegovina Law on FDI Policy as well as Energy
Community Documents and Directives, ensure:
 Protection and promotion of FDI, based on investors National
treatment
 Minimizing the risks associated with energy-related investments and
trade.
 Free trade in energy materials, products and equipment, according to
WTO rules
 Freedom of energy transit through pipelines and transmission
networks
 State – to - State or Investor – to - State Dispute Resolution
Mechanisms
 Protection against Nationalization, Expropriation or similar measures.
BiH also signed Agreements on:
 Free Trade with the countries of CEFTA , EFTA and Turkey
 Investment Promotion and Protection with 40 countries
 Avoidance of Double Taxation with 39 countries
The world wind atlas and results of last 15 years wind speed measurement in
Herzegovina region shown that the southern part of BiH is the most perspective for
wind power plant development.
Potential of BiH Wind Power Plants
The estimated wind power
potential at 18 selected locations is
1030–1180 MW with electricity
production of 2.4 TWh/year.
Average utilization factor of 30%
represents the top level of
productivity, even in European
terms.
Currently only 350 MW can be
approved for connection to the BiH
transmission network until 2019 .
Average annual wind speed 50 m a.g.l. for the period 1997-2006
The connection capacity of wind farms to the transmission grid, of 350 MW is
distributed between two entities in the ratio of the amount of 230 MW for
Federation of BiH and 120 MW for Republic of Srpska.
65
2
1
3
4
7
8
9 12
11
Planned WF in BiH:
1. Derale,Bosansko Grahovo
2. Vlašić,Travnik
3. Debelo Brdo,Livno
4. Mučevača,Livno
5. Orlovača,Livno
6. Gradina,Tomislavgrad
7. Ivovik,Tomislavgrad
8. Mesihovina,Tomislavgrad
9. Relaks ,Posušje
10. Podveležje,Mostar
11. Trusina,Nevesinje
12.Hrgud,Berkovići
Costructed WF Moštre
Planned Wind Farms (WF) in BiH
10
Incentives System- Guaranteed feed-in prices
Entities and BiH Renewable Energy Action Plans determined 143 MW as total quota
of electricity produced in wind power plants (WPPs), that will be stimulated in the
period 2014-2020 : 43 MW for Federation BiH and 100 MW for Republic of Srpska.
Amounts of Guaranteed feed-in prices for electricity generated in WPPs are:
Entity Federation of BiH
Power Plant Capacity (kW) REFERENCE PRICE
(KM/kWh)
TARIFF COEFFICIENT (C) GUARANTEED PRICE
(KM/kWh)
Micro 23 0,099458 3,7326 0,37124
Mini 150 0,099458 2,2261 0,22140
Small 1.000 0,099458 1,9020 0,18917
Middle 10.000 0,099458 1,6121 0,16033
Large 15 000 0,099458 1,4847 0,14766
Power
Plant CAPACITY
SALES IN THE OBLIGATORY PURCHASE AT
GUARANTEED FEED IN PRICES
SALES ON THE MARKETS AND
CONSUMPTION FOR OWN NEEDS
Guaranteed
feed in price
KM/kWh
Reference
price
KM/kWh
Premium
(in Guaranteed
price)
KM/kWh
Reference
price
KM/kWh
Premium
KM/kWh
Up to& including
10MW
0,1652 0,0541 0,1111 0,0776 0,0876
SOURCE: ‘‘The decision of the Federal Government on the approval of the Guaranteed purchase prices of electricity from power
plants using RES and EC(Official Gazette Federation of BiH No 27/16)
SOURCE:''Decision on the level of guaranteed redemption prices and premiums for electricity generated from renewable energy
sources or in efficient cogeneration facilities'' (Official Gazette of Republic of Srpska, no. 14/16)
Entity Republic of Srpska
ATRACTIVE INVESTMENT LOCATIONS
Wind power plants
Private Companies seeking for a strategic partner
Public Companies
LOCATION WIND POWER PLANT POWER (MW)
/PRODUCTION
(GWh)
INVESTMENT
(MILLION € )
ROI
YEARS
PROJECT STATUS
Documents available
PROJECT HOLDER
CONTACT
1 2 3 4 5 6 7
POSUŠJE POKLEČANI 72/259 108 8 Feasibility Study Public Company
Elektroprivreda HZHB d.d. Mostar
Mr.Drago Bago ,CEO for
development
drago.bago@ephzhb.ba
MOSTAR VELIKA VLAJNA 32 /190 53 8 Implementation in
progress
LIVNO BOROVA GLAVA 52 /150 78 8 Implementation in
progress
LOCATION WIND POWER
PLANT
POWER (MW)
PRODUCTION
(GWh)
INVESTMENT
(MILLION € )
ROI
YEARS
PROJECT STATUS
Documents
available
PROJECT HOLDER
CONTACT
1 2 3 4 5 6 7
GLAMOČ SLOVINJ AND
DŽEVA
130+46/500 280 12 Construction
Permit
Nova Energija d.o.o.Glamoč
Mr.Jure Mula
novaenergija@novaenergija.hr
POSUŠJE DEBELO BRDO 54 /150 83 8 Ready for
implementation
KONCIG d.o.o. Posušje
Mr.Josip Grubišić, koncig@gmail.com
TOMISLAVGRAD GRADINA 42/120 66 8 Preliminary design
&Urban permit
VRAN-DUKIĆ d.o.o. Tomislavgrad
Mr.Mate Dukić, mate.dukic@gmail.com
LIVNO ORLOVAČA 43/120 65 8 Building Permit in
progress
HB WIND d.o.o. Livno, Mrs.Žana Rimac
hb.wind3@gmail.com
NEVESINJE TRUSINA 51/115 77 8 Building Permit
Energy Consent
EOL PRVI d.o.o. Nevesinje
Mr.Zlatko Mandžuka, zlatkom@eunet.rs
 Hydropotential is recognized as the largest potential of
renewable energy sources in BiH (6,000 MW), with
approximately a thousand small, medium and large rivers.
 With annual hydro energy potential of 99.256 GWh,
Bosnia and Herzegovina is located on the 8th place in
Europe.
 Various studies have identified close to 300 MW of
planned small hydropower plants (SHPP).
 Usable energy potential of SHPP in BiH is 1005 MW of
installed power and 3,520 GWh of annual electricity
production, that represents 12.64% of the total
hydropower potential of BiH.
Hydropotential
The quotas of electricity produced from hydro power plants that will be
stimulated in the period 2016-2020 are determined by Entities and National
Action Plans in amounts : 50 MW in Federation of BiH and 112 MW in Republic
of Srpska.
Incentives System - guaranteed feed – in prices
Amounts of Guaranteed feed-in prices for electricity generated in HPP:
SOURCE: ‘‘The decision of the Federal Government on the approval of the Guaranteed purchase prices of electricity from
power plants using RES and EC (Official Gazette Federation of BiH No 27/16 )
POWER PLANTS POWER REFERENCE PRICE (RP) TARIFF COEFFICIENT (C) GUARANTEED PRICE (GP)
kW KM / kWh KM / kWh
Micro 23 0,099458 2,9194 0,29036
Mini 150 0,099458 1,8291 0,18192
Small 1.000 0,099458 1,3826 0,13751
Medium 10.000 0,099458 1,2440 0,12373
Republic of Srpska
POWER PLANTS CAPACITY SALES IN THE OBLIGATORY PURCHASE AT GUARANTEED PRICES
SALES ON THE MARKETS AND
CONSUMPTION FOR OWN NEEDS
Guaranteed feed in
price
KM/kWh
Reference
price
KM/kWh
Premium
(in Guaranteed price)
KM/kWh
Reference
price
KM/kWh
Premium
KM/kWh
Up to& including 1MW
0,1541
0,0541 0,1000 0,0776 0,0765
Over 1MW to& including
5MW
0,1327
0,0541 0,0786 0,0776 0,0551
Over 5 MW up to& including
10 MW
0,1245
0,0541 0,0704 0,0776 0,0469
SOURCE:''Decision on the level of guaranteed redemption prices and premiums for electricity generated from renewable energy
sources or in efficient cogeneration facilities'' (Official Gazette of Republic of Srpska, No. 14/16)
Federation of BiH
HPP ATTRACTIVE PROJECTS - PUBLIC COMPANIES
Elektroprivreda Bosne i Hercegovine – EP BiH
Elektroprivreda Republike Srpske – ERS
NAME TYPE CAPACITY MW
PRODUCTION
GWH
INVESTMEN
T /MILLION
€/
PAYBACK
PERIOD
/YEARS/
STATUS /
DOCUMENTS
AVAILABLE
PROJECT HOLDER
CONTACT
JANJIĆI Run-of-river
inside dam
13 / 68 35 8 Feasibility Study
Public Company
Elektroprivreda BiH
Mr.Senad Salkić, CEO for
Capital Investment
senad.salkic@elektroprivreda.
ba
USTIKOLINA Run-of-river
inside dam
60 / 247 139 12 Preliminary design
Environmental
permit
ČAPLJE Run-of-river
inside dam
12 / 57 33 7 Site investigation
works for
Preliminary design
NAME TYPE CAPACITY MW
PRODUCTION
GWh
INVESTMENT
/MILLION €/
ROI
/YEARS/
STATUS /
DOCUMENTS
AVAILABLE
PROJECT HOLDER
CONTACT
DABAR Run-of-river 160 / 270.6 120 8 Approval for
investigation
works
Public Company EP RS
Mrs.Nada Milovcevic, Head
of Department for Project
Development of the Ministry
of Industry, Energy and
Mining
e-mail:
N.Milovcevic@mier.vladars.n
et
NEVESINJE Run-of-river 60 / 247 100 9
BILEĆA Run-of-river 33 / 130 50 8
Elektroprivreda Hrvatske Zajednice Herceg Bosna
NAME TYPE CAPACITY MW
PRODUCTION GWh
INVESTMENT
/MILLION €/
ROI
/YEARS/
STATUS /
DOCUMENTS
AVAILABLE
PROJECT HOLDER
CONTACT
RIVER BASIN TIHALJINA, MLADE, TREBIŽAT
MODRO
OKO
Run-of-river 3.74 /12.22 9,4 7
Approval for
investigation
works
Public Company
Elektroprivreda HZHB
d.d.Mostar
Drago Bago ,CEO for
development
drago.bago@ephzhb.ba
KLOKUN Derivation-
Run-of-river
3.25 / 12.00 8,6 7
KOCUSA Derivation-
Run-of-river
4.85 / 18.40 13,3 7
KRAVICA Derivation-
Run-of-river
4.99 / 21.81 13,7 7
STUBICA Derivation-
Run-of-river
2,95 / 12,75 7,9 7
RIVER BASIN LIŠTICA
DUBRAVA Run-of-river 5,00 MW/ 12,10
GWh
12,3 7
Approval for
investigation
works
LUKE&
FRATARSKA
Run-of-river 2,09 MW/ 5,7 GWh 4,8 7
RIVER BASIN ŠUJICA
BUŠKO
BLATO
Pumped
power plant
64MW/242.96
GWh
89.11 8 Issuing Permits in
progress
HPP ATTRACTIVE PROJECTS - PUBLIC COMPANIES
Small hydropower plants (SHPP) - Private Companies seeking for a strategic partner
LOCATION HPP POWER (MW)
PRODUCTION
(GWh)
INVESTMENT
MILLION €
ROI
Years
PROJECT STATUS PROJECT HOLDER
CONTACTS
1 2 3 4 5 6 7
VIŠEGRAD Vardište,Seganje
Dobrun,Veletovo
7,8/29,2 15,14 8,5 Concession Agreement
Environmental permit
RZAV d.o.o.Višegrad
Mr. Miroslav Kojić ; GSM:+ 387 65 529 962
ZVORNIK ŠEKOVIĆI 1,9/6,92 3,8 5 Concession Agreement
Construction permit in progress
EUROGRAFIKA d.o.o.Zvornik
Mr.Vaso Stanojević ; GSM:+ 387 65 667 630
PROZOR
RAMA
MARIN MOST 2.47/ 12.1 4 6
Obtaining urban permits in progress
DF GRADNJA d.o.o.Konjic
dfgradnja@bih.net.ba
Mr. Adis Fejzagić ; GSM : + 387 61 158 402KISELJAK TOPLICA 3 0,619/2.98 1,5 6
VITEZ KRUŠČICA 1 0,453/2,18 0,612 7 Concession Agreement
Construction permit
higracon@bih.net.ba
Mr. Armin Hadžialić ; GSM:+387 62 994 254
MRKONJIĆ GRAD
PONOR 9,99/53,3 17 Concession Agreement ECOVAT d.o.o.Mrkonjić Grad
Mr.Milenko Milekić
GSM:+387 65 646 325
m.milekic@mrkonjic-grad.rs.ba
ekovat@teol.net
MEDNA-SKLOP 0,89 MW
4,364 GWh
1,613 8 All approvals issued
Main project approved
Urban permit obtaining in progress
SOKOČNICA 0,75 MW
3,426 GWh
1,215 8
VITEZ
CENTAR 0,9/4,6 2 7
Concessions Agreement &Urban permit
GUDELJ d.o.o. Vitez
Anto Grabovac, GSM:+387 63 333 600
,anto.grabovac@tel.net.ba
LAŠVA G - TANK 0,98/5,844 3,2 7
RIJEKA 0,9/4,6 2,3 7
BUSOVAČA
IVANČICA 0,498/1,8 0,82 8 Concession Agreement Preliminary
design& Environmental Study
Urban permit in progress
BIO ENERGY d.o.o. Vitez
Mr.Marko Mišković , GSM: + 387 63 334 735
info@bioenergy.ba
OBARNICA 0,99/5,8 3,2 7 Concession Agreement
Urban permit in progres
JESS d.o.o. Busovača
Mr.Edin Adilović, GSM:+ 387 63 966 029
adilovicus@gmail.com
UGAR VLAŠIĆ
DOBRETIĆI
OŠTRAC O,89/3,86 1,6 7 Concession Agreement
Urban permit in progress
V.N.T d.o.o. n.Travnik
Mr.Vlado Ramljak, GSM:+ 387 63 334 488
v.ramljak@gmx.net
VITEZ
UŠĆE 0,92/4,43 2,9 7 Concession agreement Feasibility &
Environmental studies
Costruction permit nema?
Pole -Extra d.o.o. Novi Travnik
Mr.Bono Mlakić , GSM:+ 387 63 425 224
pole-extra@hotmail.com
UGAR VLAŠIĆ BABANOVAC 0,994/4,1 4 7 Concessions Agreement
Urban permit in progress
ESKIMO S 2 d.o.o.Travnik
Mr.Fadil Sejdić, GSM:+387 61 154 521
eskimos2doo@bih.net.ba
BUGOJNO
ZLOKUĆE 0,265/1,3 1,23KM 7 Concessions Agreement
Urban permit in progress
PLANINICA 0,148/0,673 0,7 MIL KM 7 Urban permit in progress ELEKTROVOLT d.o.o Travnik
Mr. Fadil Sejdić, GSM:+ 387 61 154 521
eskimos2doo@bih.net.baBUGOJNO-G.VAKUF ZLATAC 0,142/0,651 0,5 M KM 7 Concessions Agreement
BiH resources of solar radiation energy is above the European average with very
favorable seasonal schedule, and possibility for its effective and long-term use.
Potential of BiH PV Power Plants
Potential installed capacity for PV PP is 4010
MW that is 10% more than the total installed
capacity in the existing power plants in BiH.
Capacity of transmission grid for
integration of PV power plant in 2020 ,
amounts 565MW.
Solar irradiation vary from 1240 kWh/m2
in the north to 1,600 kWh/m2 in the
south with 270 sunny days a year
Potential locations are identified in the
region of Herzegovina and Western Bosnia,
with around 10 500 ha of available surfaces.
Iradiation map in BiH( PVGIS - Photovoltaic
Geographical Information System) is the
main indicator for the selection of locations
for solar power plants.
Source: ISO - Indicative Generation Development Plan
POWER
PLANTS
POWER Hours
of
Work
Unit
Investme
nt Value
(Cinv)
Labor&
maint.
Costs,
(Cw&m)
Fuel Costs
(Cfuel)
Invested
Capital
Compensation
Factor (Fz,n)
Production
Cost per Unit
of Electricity
(Cpc)
Reference
Price (Rp)
Tariff
Coefficient
(C)
GUARANTEED
PRICE (GP)
kW h/yea
r
KM / kW KM / kW KM / kWh KM / kWh KM / kWh KM / kWh
Micro 23 1.500 3.150 376 0 13,90 0,54190 0,099458 5,4486 0,54190
Mini 150 1.500 2.850 142 0 13,90 0,35806 0,099458 3,6001 0,35806
Small 1.000 1.500 2.750 82 0 13,90 0,30866 0,099458 3,1034 0,30866
SOURCE:''Decision on the level of guaranteed redemption prices and premiums for electricity generated from renewable energy sources
or in efficient cogeneration facilities'' (Official Gazette of Republic of Srpska, no. 14/16)
SOURCE: ‘‘The decision of the Federal Government on the approval of the Guaranteed purchase prices of electricity from power
plants using RES and EC(Official Gazette Federation of BiH No 27/16)
POWER PLANTS CAPACITY SALES IN THE OBLIGATORY PURCHASE AT GUARANTEED FEED IN
PRICES
SALES ON THE MARKETS AND FOR OWN
NEEDS
GUARANTEED FEED IN
PRICE
Reference
price
Premium
(in Guaranteed
price)
Reference
price
Premium
KM/kWh KM/kWh KM/kWh KM/kWh KM/kWh
On the
structure
Up to& including 50 kW 0,2941 0,0541 0,2400 0,0776 0,2165
Over 50 kW up
&including 250 kW
0,2530 0,0541 0,1989 0,0776 0,1754
Over 250kW up to 1MW 0,2012 0,0541 0,1471 0,0776 0,1236
On the
land
Up to&including 250 kW
0,2345 0,0570 0,1775 0,0776 0,1569
Republic of Srpska
Federation of BiH
Renewable Energy Action Plans determined 20 MW as total quotas of electricity
produced in PV power plants that will be stimulated in the period 2016-2020 of
which: 12 MW for FBiH and 8 MW for Republic of Srpska.
Incentives System- Guaranteed feed-in prices
Amounts of Guaranteed feed-in prices for electricity generated in PV PP:
ATRACTIVE INVESTMENT LOCATIONS
Small solar powar plants (SSPP) - Private Companies seeking for a strategic
partner
LOCATION SOLAR POWER
PLANT
POWER (MW)
PRODUCTION
(GWh)
ROI
(YEARS)
PROJECT STATUS
Documents available
PROJECT HOLDER
CONTACT
1 2 3 5 6 7
STOLAC
Pješevac
1,8/
3000
7 Energy Consent ENERGOSOL d.o.o , Stolac
Mr.Dražan Vučić
energosol@energosol.ba
GORNJE VODIČEVO Novi Grad 0,240/
300
5 Energy Consent
Incentives Preliminary
right
Mrs.Latinović Jelena
latinovicjelena724@yahoo.com
ŽIVINICE Stolac
Hodovo
1/
1325
6 Preliminary design
Urban permit
MM KALESIĆ,Živinice
Mr.Mustafa Kalesić
mm.kale@bih.net.ba
STOLAC CE-Hodovo 1 4,976/
7130
8 Building
&Environment
permits
Energy Consent
CE CLEAN ENERGY BH d.o.o
Sarajevo
Mr.Gordan Šiber
siber@ce-energy.eu
GRUDE Ružići Grude 0,33/
550
5 Building Permit
Energy Consent
GLOBTEK,d.o.o. Grude
Mr.Ivica Jurčić
info@globtek-doo.com
• Providing of all information related to BiH business
environment and atractive investment projects
• Analysis and presentation of attractive sectors for foreign
investors
• Servicing potential and existing investors, especially during
the process of business registration
• Legal advice for foreign investors
• Investor after-care
• Good co-operation with all levels of Government in BiH
MoFTER support
THANK YOU FOR YOUR
ATTENTION!

Contenu connexe

Tendances

Bosnia and herzegovina and renewable energy sources
Bosnia and herzegovina and renewable energy sourcesBosnia and herzegovina and renewable energy sources
Bosnia and herzegovina and renewable energy sources
Suat Furkan ISIK
 
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...
Lenenergo IR
 

Tendances (19)

Kopac presentation 2017 ukraine final
Kopac presentation 2017   ukraine finalKopac presentation 2017   ukraine final
Kopac presentation 2017 ukraine final
 
Estonia en
Estonia enEstonia en
Estonia en
 
Exxon mobil
Exxon mobilExxon mobil
Exxon mobil
 
JackFaureIRCapstonePoster
JackFaureIRCapstonePosterJackFaureIRCapstonePoster
JackFaureIRCapstonePoster
 
Bosnia and herzegovina and renewable energy sources
Bosnia and herzegovina and renewable energy sourcesBosnia and herzegovina and renewable energy sources
Bosnia and herzegovina and renewable energy sources
 
Slovenia
SloveniaSlovenia
Slovenia
 
Poland, going through an economic and energy transition
Poland, going through an economic and energy transitionPoland, going through an economic and energy transition
Poland, going through an economic and energy transition
 
Insights Brussels - February 2016
Insights Brussels - February 2016Insights Brussels - February 2016
Insights Brussels - February 2016
 
Hungary
HungaryHungary
Hungary
 
Ukrainian Energy Exchange Annual Report
Ukrainian Energy Exchange Annual ReportUkrainian Energy Exchange Annual Report
Ukrainian Energy Exchange Annual Report
 
Energie ned
Energie nedEnergie ned
Energie ned
 
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...
 
2. european union
2. european union2. european union
2. european union
 
Insight Brussels March 2013
Insight Brussels March 2013Insight Brussels March 2013
Insight Brussels March 2013
 
2015: A Critical Year for the Energy Union - MSLGROUP Energy Report March '15
2015: A Critical Year for the Energy Union - MSLGROUP Energy Report March '152015: A Critical Year for the Energy Union - MSLGROUP Energy Report March '15
2015: A Critical Year for the Energy Union - MSLGROUP Energy Report March '15
 
Insight Brussels April 2013
Insight Brussels April 2013Insight Brussels April 2013
Insight Brussels April 2013
 
Macedonia
MacedoniaMacedonia
Macedonia
 
Can Balkan authorities afford to subsidise renewable energy?
Can Balkan authorities afford to subsidise renewable energy?Can Balkan authorities afford to subsidise renewable energy?
Can Balkan authorities afford to subsidise renewable energy?
 
AzerEnerji ASC
AzerEnerji ASC AzerEnerji ASC
AzerEnerji ASC
 

Similaire à Dr. Admir Softic, Assistant Minister of Energy Sector

Similaire à Dr. Admir Softic, Assistant Minister of Energy Sector (20)

Belarus
BelarusBelarus
Belarus
 
Albania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordaniAlbania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordani
 
Serbia
SerbiaSerbia
Serbia
 
Albania[1]
Albania[1]Albania[1]
Albania[1]
 
Moldova
MoldovaMoldova
Moldova
 
Croatia
CroatiaCroatia
Croatia
 
Kyrgyzstan
KyrgyzstanKyrgyzstan
Kyrgyzstan
 
Azerbaijan
AzerbaijanAzerbaijan
Azerbaijan
 
Poland
PolandPoland
Poland
 
Montenegro
MontenegroMontenegro
Montenegro
 
Slovakia
SlovakiaSlovakia
Slovakia
 
Hungary
HungaryHungary
Hungary
 
Romania
RomaniaRomania
Romania
 
Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...
 
Latvia
LatviaLatvia
Latvia
 
Czech republic
Czech republicCzech republic
Czech republic
 
Bulgaria
BulgariaBulgaria
Bulgaria
 
Slovenia
SloveniaSlovenia
Slovenia
 
Uare res 2020 ukraine en
Uare res 2020 ukraine enUare res 2020 ukraine en
Uare res 2020 ukraine en
 
Kazakhstan
KazakhstanKazakhstan
Kazakhstan
 

Plus de Admir Softic

Plus de Admir Softic (20)

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Nacrt Integriranog energetskog i klimatskog plana Bosne i Hercegovine za razd...
Nacrt Integriranog energetskog i klimatskog plana Bosne i Hercegovine za razd...Nacrt Integriranog energetskog i klimatskog plana Bosne i Hercegovine za razd...
Nacrt Integriranog energetskog i klimatskog plana Bosne i Hercegovine za razd...
 
Dr. Admir Softic, Assistant Minister of Energy Sector, NACRT INTEGRISANOG ENE...
Dr. Admir Softic, Assistant Minister of Energy Sector, NACRT INTEGRISANOG ENE...Dr. Admir Softic, Assistant Minister of Energy Sector, NACRT INTEGRISANOG ENE...
Dr. Admir Softic, Assistant Minister of Energy Sector, NACRT INTEGRISANOG ENE...
 
INTEGRISANI PLAN ZA ENERGIJU I KLIMU BOSNE I HERCEGOVINE
INTEGRISANI PLAN ZA ENERGIJU I KLIMU BOSNE I HERCEGOVINEINTEGRISANI PLAN ZA ENERGIJU I KLIMU BOSNE I HERCEGOVINE
INTEGRISANI PLAN ZA ENERGIJU I KLIMU BOSNE I HERCEGOVINE
 
INTEGRATED ENERGY AND CLIMATE PLAN OF BOSNIA AND HERZEGOVINA
INTEGRATED ENERGY AND CLIMATE PLAN OF BOSNIA AND HERZEGOVINAINTEGRATED ENERGY AND CLIMATE PLAN OF BOSNIA AND HERZEGOVINA
INTEGRATED ENERGY AND CLIMATE PLAN OF BOSNIA AND HERZEGOVINA
 
Dr. Admir Softic, Assistant Minister - Okrugli sto „Tranzicija energetskog s...
Dr. Admir Softic, Assistant Minister - Okrugli sto „Tranzicija energetskog s...Dr. Admir Softic, Assistant Minister - Okrugli sto „Tranzicija energetskog s...
Dr. Admir Softic, Assistant Minister - Okrugli sto „Tranzicija energetskog s...
 
BOSNIA AND HERZEGOVINA'S COMMITMENTS ON ENERGY AND CLIMATE
BOSNIA AND HERZEGOVINA'S COMMITMENTS ON ENERGY AND CLIMATEBOSNIA AND HERZEGOVINA'S COMMITMENTS ON ENERGY AND CLIMATE
BOSNIA AND HERZEGOVINA'S COMMITMENTS ON ENERGY AND CLIMATE
 
OBAVEZE BOSNE I HERCEGOVINE U OBLASTI ENERGIJE I KLIME
OBAVEZE BOSNE I HERCEGOVINE  U OBLASTI ENERGIJE I KLIMEOBAVEZE BOSNE I HERCEGOVINE  U OBLASTI ENERGIJE I KLIME
OBAVEZE BOSNE I HERCEGOVINE U OBLASTI ENERGIJE I KLIME
 
RAZVOJ TRŽIŠTA ELEKTRIČNE ENERGIJE U BOSNI I HERCEGOVINI
RAZVOJ TRŽIŠTA ELEKTRIČNE ENERGIJE U BOSNI I HERCEGOVINIRAZVOJ TRŽIŠTA ELEKTRIČNE ENERGIJE U BOSNI I HERCEGOVINI
RAZVOJ TRŽIŠTA ELEKTRIČNE ENERGIJE U BOSNI I HERCEGOVINI
 
Dr. Admir Softic, Assistant Minister of Energy Sector
Dr. Admir Softic, Assistant Minister of Energy SectorDr. Admir Softic, Assistant Minister of Energy Sector
Dr. Admir Softic, Assistant Minister of Energy Sector
 
Dr. Admir Softic, VIZIJA RAZVOJA ENERGETIKE
Dr. Admir Softic, VIZIJA RAZVOJA ENERGETIKEDr. Admir Softic, VIZIJA RAZVOJA ENERGETIKE
Dr. Admir Softic, VIZIJA RAZVOJA ENERGETIKE
 
Dr. Admir Softic, Wood biomass in BiH state of the art, current issues and ch...
Dr. Admir Softic, Wood biomass in BiHstate of the art, current issues and ch...Dr. Admir Softic, Wood biomass in BiHstate of the art, current issues and ch...
Dr. Admir Softic, Wood biomass in BiH state of the art, current issues and ch...
 
Dr. Admir Softic - REFORMA OIE, BOSNA I HERCEGOVINA, prijedlog
Dr. Admir Softic - REFORMA OIE, BOSNA I HERCEGOVINA, prijedlogDr. Admir Softic - REFORMA OIE, BOSNA I HERCEGOVINA, prijedlog
Dr. Admir Softic - REFORMA OIE, BOSNA I HERCEGOVINA, prijedlog
 
Dr. Admir Softic, Assistant Minister of Energy Sector, OBAVEZE BOSNE I HERCEG...
Dr. Admir Softic, Assistant Minister of Energy Sector, OBAVEZE BOSNE I HERCEG...Dr. Admir Softic, Assistant Minister of Energy Sector, OBAVEZE BOSNE I HERCEG...
Dr. Admir Softic, Assistant Minister of Energy Sector, OBAVEZE BOSNE I HERCEG...
 
Dr. Admir Softic, Assistant Minister of Energy Sector
Dr. Admir Softic, Assistant Minister of Energy SectorDr. Admir Softic, Assistant Minister of Energy Sector
Dr. Admir Softic, Assistant Minister of Energy Sector
 
Dr. Admir Softic, Assistant Minister of Energy Sector, Izrada NECP BiH 2021-2...
Dr. Admir Softic, Assistant Minister of Energy Sector, Izrada NECP BiH 2021-2...Dr. Admir Softic, Assistant Minister of Energy Sector, Izrada NECP BiH 2021-2...
Dr. Admir Softic, Assistant Minister of Energy Sector, Izrada NECP BiH 2021-2...
 
Dr. Admir Softic, Assistant Minister of Energy Sector
Dr. Admir Softic, Assistant Minister of Energy SectorDr. Admir Softic, Assistant Minister of Energy Sector
Dr. Admir Softic, Assistant Minister of Energy Sector
 
Dr. Admir Softic, Assistant Minister of Energy Sector
Dr. Admir Softic, Assistant Minister of Energy SectorDr. Admir Softic, Assistant Minister of Energy Sector
Dr. Admir Softic, Assistant Minister of Energy Sector
 
Dr. Admir Softic, Assistant Minister of Energy Sector
Dr. Admir Softic, Assistant Minister of Energy SectorDr. Admir Softic, Assistant Minister of Energy Sector
Dr. Admir Softic, Assistant Minister of Energy Sector
 

Dernier

VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
sonatiwari757
 

Dernier (20)

The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
Top Rated Pune Call Girls Wadgaon Sheri ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Wadgaon Sheri ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Wadgaon Sheri ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Wadgaon Sheri ⟟ 6297143586 ⟟ Call Me For Genuine S...
 
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at work
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptx
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
 

Dr. Admir Softic, Assistant Minister of Energy Sector

  • 1.
  • 2. Why to invest in Bosnia and Herzegovina Energy sector? Energy sector is one of the most powerful in BiH, with huge potentials and opportunities for further development and investment such as:  Natural resources and attractive investment location  Surpluses of produced electricity  Electricity production exceeds local market needs  Electricity export of ̴ 6000 GWh ranked BiH at 1st place in the region  Favourable Feed-in-tariffs  Favourable & Safe Environment for investment  The lowest inflation in Region (-1 in 2015)  Value-Added Tax (17%) and Corporate Income Tax (10%) among the lowest in the region  Competitively priced & qualified human capital  The constant increase of energy demands in the region (World Bank research)
  • 3. Favourable & Safe Environment for investment  Bosnia and Herzegovina Law on FDI Policy as well as Energy Community Documents and Directives, ensure:  Protection and promotion of FDI, based on investors National treatment  Minimizing the risks associated with energy-related investments and trade.  Free trade in energy materials, products and equipment, according to WTO rules  Freedom of energy transit through pipelines and transmission networks  State – to - State or Investor – to - State Dispute Resolution Mechanisms  Protection against Nationalization, Expropriation or similar measures. BiH also signed Agreements on:  Free Trade with the countries of CEFTA , EFTA and Turkey  Investment Promotion and Protection with 40 countries  Avoidance of Double Taxation with 39 countries
  • 4. The world wind atlas and results of last 15 years wind speed measurement in Herzegovina region shown that the southern part of BiH is the most perspective for wind power plant development. Potential of BiH Wind Power Plants The estimated wind power potential at 18 selected locations is 1030–1180 MW with electricity production of 2.4 TWh/year. Average utilization factor of 30% represents the top level of productivity, even in European terms. Currently only 350 MW can be approved for connection to the BiH transmission network until 2019 . Average annual wind speed 50 m a.g.l. for the period 1997-2006 The connection capacity of wind farms to the transmission grid, of 350 MW is distributed between two entities in the ratio of the amount of 230 MW for Federation of BiH and 120 MW for Republic of Srpska.
  • 5. 65 2 1 3 4 7 8 9 12 11 Planned WF in BiH: 1. Derale,Bosansko Grahovo 2. Vlašić,Travnik 3. Debelo Brdo,Livno 4. Mučevača,Livno 5. Orlovača,Livno 6. Gradina,Tomislavgrad 7. Ivovik,Tomislavgrad 8. Mesihovina,Tomislavgrad 9. Relaks ,Posušje 10. Podveležje,Mostar 11. Trusina,Nevesinje 12.Hrgud,Berkovići Costructed WF Moštre Planned Wind Farms (WF) in BiH 10
  • 6. Incentives System- Guaranteed feed-in prices Entities and BiH Renewable Energy Action Plans determined 143 MW as total quota of electricity produced in wind power plants (WPPs), that will be stimulated in the period 2014-2020 : 43 MW for Federation BiH and 100 MW for Republic of Srpska. Amounts of Guaranteed feed-in prices for electricity generated in WPPs are: Entity Federation of BiH Power Plant Capacity (kW) REFERENCE PRICE (KM/kWh) TARIFF COEFFICIENT (C) GUARANTEED PRICE (KM/kWh) Micro 23 0,099458 3,7326 0,37124 Mini 150 0,099458 2,2261 0,22140 Small 1.000 0,099458 1,9020 0,18917 Middle 10.000 0,099458 1,6121 0,16033 Large 15 000 0,099458 1,4847 0,14766 Power Plant CAPACITY SALES IN THE OBLIGATORY PURCHASE AT GUARANTEED FEED IN PRICES SALES ON THE MARKETS AND CONSUMPTION FOR OWN NEEDS Guaranteed feed in price KM/kWh Reference price KM/kWh Premium (in Guaranteed price) KM/kWh Reference price KM/kWh Premium KM/kWh Up to& including 10MW 0,1652 0,0541 0,1111 0,0776 0,0876 SOURCE: ‘‘The decision of the Federal Government on the approval of the Guaranteed purchase prices of electricity from power plants using RES and EC(Official Gazette Federation of BiH No 27/16) SOURCE:''Decision on the level of guaranteed redemption prices and premiums for electricity generated from renewable energy sources or in efficient cogeneration facilities'' (Official Gazette of Republic of Srpska, no. 14/16) Entity Republic of Srpska
  • 7. ATRACTIVE INVESTMENT LOCATIONS Wind power plants Private Companies seeking for a strategic partner Public Companies LOCATION WIND POWER PLANT POWER (MW) /PRODUCTION (GWh) INVESTMENT (MILLION € ) ROI YEARS PROJECT STATUS Documents available PROJECT HOLDER CONTACT 1 2 3 4 5 6 7 POSUŠJE POKLEČANI 72/259 108 8 Feasibility Study Public Company Elektroprivreda HZHB d.d. Mostar Mr.Drago Bago ,CEO for development drago.bago@ephzhb.ba MOSTAR VELIKA VLAJNA 32 /190 53 8 Implementation in progress LIVNO BOROVA GLAVA 52 /150 78 8 Implementation in progress LOCATION WIND POWER PLANT POWER (MW) PRODUCTION (GWh) INVESTMENT (MILLION € ) ROI YEARS PROJECT STATUS Documents available PROJECT HOLDER CONTACT 1 2 3 4 5 6 7 GLAMOČ SLOVINJ AND DŽEVA 130+46/500 280 12 Construction Permit Nova Energija d.o.o.Glamoč Mr.Jure Mula novaenergija@novaenergija.hr POSUŠJE DEBELO BRDO 54 /150 83 8 Ready for implementation KONCIG d.o.o. Posušje Mr.Josip Grubišić, koncig@gmail.com TOMISLAVGRAD GRADINA 42/120 66 8 Preliminary design &Urban permit VRAN-DUKIĆ d.o.o. Tomislavgrad Mr.Mate Dukić, mate.dukic@gmail.com LIVNO ORLOVAČA 43/120 65 8 Building Permit in progress HB WIND d.o.o. Livno, Mrs.Žana Rimac hb.wind3@gmail.com NEVESINJE TRUSINA 51/115 77 8 Building Permit Energy Consent EOL PRVI d.o.o. Nevesinje Mr.Zlatko Mandžuka, zlatkom@eunet.rs
  • 8.
  • 9.  Hydropotential is recognized as the largest potential of renewable energy sources in BiH (6,000 MW), with approximately a thousand small, medium and large rivers.  With annual hydro energy potential of 99.256 GWh, Bosnia and Herzegovina is located on the 8th place in Europe.  Various studies have identified close to 300 MW of planned small hydropower plants (SHPP).  Usable energy potential of SHPP in BiH is 1005 MW of installed power and 3,520 GWh of annual electricity production, that represents 12.64% of the total hydropower potential of BiH. Hydropotential
  • 10. The quotas of electricity produced from hydro power plants that will be stimulated in the period 2016-2020 are determined by Entities and National Action Plans in amounts : 50 MW in Federation of BiH and 112 MW in Republic of Srpska. Incentives System - guaranteed feed – in prices Amounts of Guaranteed feed-in prices for electricity generated in HPP: SOURCE: ‘‘The decision of the Federal Government on the approval of the Guaranteed purchase prices of electricity from power plants using RES and EC (Official Gazette Federation of BiH No 27/16 ) POWER PLANTS POWER REFERENCE PRICE (RP) TARIFF COEFFICIENT (C) GUARANTEED PRICE (GP) kW KM / kWh KM / kWh Micro 23 0,099458 2,9194 0,29036 Mini 150 0,099458 1,8291 0,18192 Small 1.000 0,099458 1,3826 0,13751 Medium 10.000 0,099458 1,2440 0,12373 Republic of Srpska POWER PLANTS CAPACITY SALES IN THE OBLIGATORY PURCHASE AT GUARANTEED PRICES SALES ON THE MARKETS AND CONSUMPTION FOR OWN NEEDS Guaranteed feed in price KM/kWh Reference price KM/kWh Premium (in Guaranteed price) KM/kWh Reference price KM/kWh Premium KM/kWh Up to& including 1MW 0,1541 0,0541 0,1000 0,0776 0,0765 Over 1MW to& including 5MW 0,1327 0,0541 0,0786 0,0776 0,0551 Over 5 MW up to& including 10 MW 0,1245 0,0541 0,0704 0,0776 0,0469 SOURCE:''Decision on the level of guaranteed redemption prices and premiums for electricity generated from renewable energy sources or in efficient cogeneration facilities'' (Official Gazette of Republic of Srpska, No. 14/16) Federation of BiH
  • 11. HPP ATTRACTIVE PROJECTS - PUBLIC COMPANIES Elektroprivreda Bosne i Hercegovine – EP BiH Elektroprivreda Republike Srpske – ERS NAME TYPE CAPACITY MW PRODUCTION GWH INVESTMEN T /MILLION €/ PAYBACK PERIOD /YEARS/ STATUS / DOCUMENTS AVAILABLE PROJECT HOLDER CONTACT JANJIĆI Run-of-river inside dam 13 / 68 35 8 Feasibility Study Public Company Elektroprivreda BiH Mr.Senad Salkić, CEO for Capital Investment senad.salkic@elektroprivreda. ba USTIKOLINA Run-of-river inside dam 60 / 247 139 12 Preliminary design Environmental permit ČAPLJE Run-of-river inside dam 12 / 57 33 7 Site investigation works for Preliminary design NAME TYPE CAPACITY MW PRODUCTION GWh INVESTMENT /MILLION €/ ROI /YEARS/ STATUS / DOCUMENTS AVAILABLE PROJECT HOLDER CONTACT DABAR Run-of-river 160 / 270.6 120 8 Approval for investigation works Public Company EP RS Mrs.Nada Milovcevic, Head of Department for Project Development of the Ministry of Industry, Energy and Mining e-mail: N.Milovcevic@mier.vladars.n et NEVESINJE Run-of-river 60 / 247 100 9 BILEĆA Run-of-river 33 / 130 50 8
  • 12. Elektroprivreda Hrvatske Zajednice Herceg Bosna NAME TYPE CAPACITY MW PRODUCTION GWh INVESTMENT /MILLION €/ ROI /YEARS/ STATUS / DOCUMENTS AVAILABLE PROJECT HOLDER CONTACT RIVER BASIN TIHALJINA, MLADE, TREBIŽAT MODRO OKO Run-of-river 3.74 /12.22 9,4 7 Approval for investigation works Public Company Elektroprivreda HZHB d.d.Mostar Drago Bago ,CEO for development drago.bago@ephzhb.ba KLOKUN Derivation- Run-of-river 3.25 / 12.00 8,6 7 KOCUSA Derivation- Run-of-river 4.85 / 18.40 13,3 7 KRAVICA Derivation- Run-of-river 4.99 / 21.81 13,7 7 STUBICA Derivation- Run-of-river 2,95 / 12,75 7,9 7 RIVER BASIN LIŠTICA DUBRAVA Run-of-river 5,00 MW/ 12,10 GWh 12,3 7 Approval for investigation works LUKE& FRATARSKA Run-of-river 2,09 MW/ 5,7 GWh 4,8 7 RIVER BASIN ŠUJICA BUŠKO BLATO Pumped power plant 64MW/242.96 GWh 89.11 8 Issuing Permits in progress HPP ATTRACTIVE PROJECTS - PUBLIC COMPANIES
  • 13. Small hydropower plants (SHPP) - Private Companies seeking for a strategic partner LOCATION HPP POWER (MW) PRODUCTION (GWh) INVESTMENT MILLION € ROI Years PROJECT STATUS PROJECT HOLDER CONTACTS 1 2 3 4 5 6 7 VIŠEGRAD Vardište,Seganje Dobrun,Veletovo 7,8/29,2 15,14 8,5 Concession Agreement Environmental permit RZAV d.o.o.Višegrad Mr. Miroslav Kojić ; GSM:+ 387 65 529 962 ZVORNIK ŠEKOVIĆI 1,9/6,92 3,8 5 Concession Agreement Construction permit in progress EUROGRAFIKA d.o.o.Zvornik Mr.Vaso Stanojević ; GSM:+ 387 65 667 630 PROZOR RAMA MARIN MOST 2.47/ 12.1 4 6 Obtaining urban permits in progress DF GRADNJA d.o.o.Konjic dfgradnja@bih.net.ba Mr. Adis Fejzagić ; GSM : + 387 61 158 402KISELJAK TOPLICA 3 0,619/2.98 1,5 6 VITEZ KRUŠČICA 1 0,453/2,18 0,612 7 Concession Agreement Construction permit higracon@bih.net.ba Mr. Armin Hadžialić ; GSM:+387 62 994 254 MRKONJIĆ GRAD PONOR 9,99/53,3 17 Concession Agreement ECOVAT d.o.o.Mrkonjić Grad Mr.Milenko Milekić GSM:+387 65 646 325 m.milekic@mrkonjic-grad.rs.ba ekovat@teol.net MEDNA-SKLOP 0,89 MW 4,364 GWh 1,613 8 All approvals issued Main project approved Urban permit obtaining in progress SOKOČNICA 0,75 MW 3,426 GWh 1,215 8 VITEZ CENTAR 0,9/4,6 2 7 Concessions Agreement &Urban permit GUDELJ d.o.o. Vitez Anto Grabovac, GSM:+387 63 333 600 ,anto.grabovac@tel.net.ba LAŠVA G - TANK 0,98/5,844 3,2 7 RIJEKA 0,9/4,6 2,3 7 BUSOVAČA IVANČICA 0,498/1,8 0,82 8 Concession Agreement Preliminary design& Environmental Study Urban permit in progress BIO ENERGY d.o.o. Vitez Mr.Marko Mišković , GSM: + 387 63 334 735 info@bioenergy.ba OBARNICA 0,99/5,8 3,2 7 Concession Agreement Urban permit in progres JESS d.o.o. Busovača Mr.Edin Adilović, GSM:+ 387 63 966 029 adilovicus@gmail.com UGAR VLAŠIĆ DOBRETIĆI OŠTRAC O,89/3,86 1,6 7 Concession Agreement Urban permit in progress V.N.T d.o.o. n.Travnik Mr.Vlado Ramljak, GSM:+ 387 63 334 488 v.ramljak@gmx.net VITEZ UŠĆE 0,92/4,43 2,9 7 Concession agreement Feasibility & Environmental studies Costruction permit nema? Pole -Extra d.o.o. Novi Travnik Mr.Bono Mlakić , GSM:+ 387 63 425 224 pole-extra@hotmail.com UGAR VLAŠIĆ BABANOVAC 0,994/4,1 4 7 Concessions Agreement Urban permit in progress ESKIMO S 2 d.o.o.Travnik Mr.Fadil Sejdić, GSM:+387 61 154 521 eskimos2doo@bih.net.ba BUGOJNO ZLOKUĆE 0,265/1,3 1,23KM 7 Concessions Agreement Urban permit in progress PLANINICA 0,148/0,673 0,7 MIL KM 7 Urban permit in progress ELEKTROVOLT d.o.o Travnik Mr. Fadil Sejdić, GSM:+ 387 61 154 521 eskimos2doo@bih.net.baBUGOJNO-G.VAKUF ZLATAC 0,142/0,651 0,5 M KM 7 Concessions Agreement
  • 14.
  • 15. BiH resources of solar radiation energy is above the European average with very favorable seasonal schedule, and possibility for its effective and long-term use. Potential of BiH PV Power Plants Potential installed capacity for PV PP is 4010 MW that is 10% more than the total installed capacity in the existing power plants in BiH. Capacity of transmission grid for integration of PV power plant in 2020 , amounts 565MW. Solar irradiation vary from 1240 kWh/m2 in the north to 1,600 kWh/m2 in the south with 270 sunny days a year Potential locations are identified in the region of Herzegovina and Western Bosnia, with around 10 500 ha of available surfaces. Iradiation map in BiH( PVGIS - Photovoltaic Geographical Information System) is the main indicator for the selection of locations for solar power plants. Source: ISO - Indicative Generation Development Plan
  • 16. POWER PLANTS POWER Hours of Work Unit Investme nt Value (Cinv) Labor& maint. Costs, (Cw&m) Fuel Costs (Cfuel) Invested Capital Compensation Factor (Fz,n) Production Cost per Unit of Electricity (Cpc) Reference Price (Rp) Tariff Coefficient (C) GUARANTEED PRICE (GP) kW h/yea r KM / kW KM / kW KM / kWh KM / kWh KM / kWh KM / kWh Micro 23 1.500 3.150 376 0 13,90 0,54190 0,099458 5,4486 0,54190 Mini 150 1.500 2.850 142 0 13,90 0,35806 0,099458 3,6001 0,35806 Small 1.000 1.500 2.750 82 0 13,90 0,30866 0,099458 3,1034 0,30866 SOURCE:''Decision on the level of guaranteed redemption prices and premiums for electricity generated from renewable energy sources or in efficient cogeneration facilities'' (Official Gazette of Republic of Srpska, no. 14/16) SOURCE: ‘‘The decision of the Federal Government on the approval of the Guaranteed purchase prices of electricity from power plants using RES and EC(Official Gazette Federation of BiH No 27/16) POWER PLANTS CAPACITY SALES IN THE OBLIGATORY PURCHASE AT GUARANTEED FEED IN PRICES SALES ON THE MARKETS AND FOR OWN NEEDS GUARANTEED FEED IN PRICE Reference price Premium (in Guaranteed price) Reference price Premium KM/kWh KM/kWh KM/kWh KM/kWh KM/kWh On the structure Up to& including 50 kW 0,2941 0,0541 0,2400 0,0776 0,2165 Over 50 kW up &including 250 kW 0,2530 0,0541 0,1989 0,0776 0,1754 Over 250kW up to 1MW 0,2012 0,0541 0,1471 0,0776 0,1236 On the land Up to&including 250 kW 0,2345 0,0570 0,1775 0,0776 0,1569 Republic of Srpska Federation of BiH Renewable Energy Action Plans determined 20 MW as total quotas of electricity produced in PV power plants that will be stimulated in the period 2016-2020 of which: 12 MW for FBiH and 8 MW for Republic of Srpska. Incentives System- Guaranteed feed-in prices Amounts of Guaranteed feed-in prices for electricity generated in PV PP:
  • 17. ATRACTIVE INVESTMENT LOCATIONS Small solar powar plants (SSPP) - Private Companies seeking for a strategic partner LOCATION SOLAR POWER PLANT POWER (MW) PRODUCTION (GWh) ROI (YEARS) PROJECT STATUS Documents available PROJECT HOLDER CONTACT 1 2 3 5 6 7 STOLAC Pješevac 1,8/ 3000 7 Energy Consent ENERGOSOL d.o.o , Stolac Mr.Dražan Vučić energosol@energosol.ba GORNJE VODIČEVO Novi Grad 0,240/ 300 5 Energy Consent Incentives Preliminary right Mrs.Latinović Jelena latinovicjelena724@yahoo.com ŽIVINICE Stolac Hodovo 1/ 1325 6 Preliminary design Urban permit MM KALESIĆ,Živinice Mr.Mustafa Kalesić mm.kale@bih.net.ba STOLAC CE-Hodovo 1 4,976/ 7130 8 Building &Environment permits Energy Consent CE CLEAN ENERGY BH d.o.o Sarajevo Mr.Gordan Šiber siber@ce-energy.eu GRUDE Ružići Grude 0,33/ 550 5 Building Permit Energy Consent GLOBTEK,d.o.o. Grude Mr.Ivica Jurčić info@globtek-doo.com
  • 18. • Providing of all information related to BiH business environment and atractive investment projects • Analysis and presentation of attractive sectors for foreign investors • Servicing potential and existing investors, especially during the process of business registration • Legal advice for foreign investors • Investor after-care • Good co-operation with all levels of Government in BiH MoFTER support
  • 19. THANK YOU FOR YOUR ATTENTION!

Notes de l'éditeur

  1. ...Ministry of Foreign Trade and Economic Relations of Bosnia and Herzegovina, which is a Ministry that is, at state level, in charge for energy issues. Within the next few minutes i would try to give you some basic information about renewable energy sector, especially wind potential and its investments oportunities.
  2. First of all I would like to inform you why to invest in our energy sector. As you can see, energy sector is one of the most...
  3. Also BiH has a favourable and safe environment for investment. Our Law on FDI policy as well as...
  4. BiH is a country with signnificant renewable energy potential that, mostly due to the low electricity price from the one hand, and surplus of electricity production ( as you probably know BiH is a net exporter of electricity) , from the other hand, was not not used enough in the past. However, in recent period situation is changing and there is a huge interest of the both doemstic and foreign investor in development of RE projects. When it comes to the wind potential the world wind atla...
  5. At the picture below you can see a location of new planned wind farm in our country. As you can see, the southern part of BiH has the bigest wind potential. There is a huge interest for investement in WF. Within the Indicative Generation Development Plan for the period 2018-2027 that has been prepared by the Independent System operator of BIH more than 30 new WPP are registred, with total installed capacity of more than 1750 MW. But, as i have already sad – for the time been, 350 MW is the connection capacity of wind farms to the transmission grid, and this is distributed between two entities in the ratio of the amount of 230 MW for Federation of BiH and 120 MW for Republic of Srpska.
  6. Bosnia and Herzegovina as a memeber of Energy Community Treaty, among other, undertook certain obligation related to the transposition and implementation of RE directive (2009/28/EC). According to this Directive we were obliged to prepare Renewable energy action plans and to determine binding national target to be achieved through the use of renewable energy in the electricity, heating and cooling, and transport sectors by 2020. For BiH this target is 40% of RES in total energy conumption until 2020. Renewable energy AP for BiH has been prepared and adopted in march 2016. Entities has also prepred and dopted theirs RE AP. These AP determined... Both entity regulatory commisions for energy made Decision of the guaraneed prices and premium for electricity generated from RES. According to them amounts of guaranteed feed in prices for electricity generated in WPP are given in the tables below. I will not read all these data, this is for your information, and if you are interested you can see it here or at the entiy regulatory commisions web sites.
  7. On this slide i would like to give you information about atractive investment locations for development of the WPP as well as some basic information about name of the WPP, its installed capacity and estimated production, amount of investments, period of return of investment and current projects status. Also, in case you are interested here is a project holder contact information.
  8. As I have already said BiH has a significant potential when it comes to the RES, so except of wind we have a big hidro and solar potential. Actually, curently we are using less than 40% of total available hidro potentilal. Subject of my presentation is BOSNIA AND HERZEGOVINA WIND POWER PLANTS INVESTMENT OPPORTUNITIES, but I would like to give you some basic information about other RES potential as well. First about hydro.
  9. According to the Renewavble Energy action plans the quotas... Again, I will not read all these data, this is for your information, and if you are interested you can see it here or at the entity regulatory commisions web sites. Of course, for all information neede MoFTER is at your disposal. At the end of my presentation is my contact information.
  10. Within the next three slides i will gove you information about atractive investment locations for development of the HPP- both big and small HPPs, as well as some basic information about name of the HPP, its type – is it run of river, or deerivation plant or pumpped PP. Also here is amount of installed capacity and estimated production, amount of investments, expected pay back period and current projects status. Again, in case that you are interested here is a project holder contact information. At this first slide is a list of attractive project of two public companies EPBiH and ERS. In BiH we have three public companies. Third is EP HZHB and its list of attractive project is given on the next slide
  11. Same as for other two public companies, in this table is list of basic information about name of the HPP, its type – is it run of river, or deerivation plant or pumpped PP, amount of installed capacity and estimated production, amount of investments, expected pay back period, current projects status and project holder contact information.
  12. Within this table a basic information about Small hydropower plants (SHPP) - Private Companies that are seeking for a strategic partner are given: name of the HPP, its type , amount of installed capacity and estimated production, amount of investments, expected pay back period, current projects status and project holder contact information.
  13. And last but not least is a BiH photo voltagic potential and PV PP investemnt oportunities
  14. I will not read all data given in the table below, These are Amounts of Guaranteed feed-in prices for electricity generated in PV PP according to the entity regulatory commisions for energy decisions Same as for other two RES, if you are interested you can see it here or at the entity regulatory commisions web sites .
  15. Table below gives you information about atractive investment locations for development of the Small solar powar plants (SSPP) where Private Companies seeking for a strategic partner. These are information about name of the SPP, its installed capacity and estimated production,, period of return of investment and current projects status. Also, in case you are interested here is a project holder contact information.