Soumettre la recherche
Mettre en ligne
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
•
Télécharger en tant que PPSX, PDF
•
8 j'aime
•
2,227 vues
A
Adrias TAN
Suivre
Signaler
Partager
Signaler
Partager
1 sur 30
Télécharger maintenant
Recommandé
Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)
Fakhar-un -Nisa
Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)
mohamed Ismail
time bar clauses
time bar clauses
AMILA GAYAN
Fidic comparison red yellow - silver book
Fidic comparison red yellow - silver book
Hani Saad
Ss 5 training fidic Dr. Moustafa Ismail 2017 _ lec 5
Ss 5 training fidic Dr. Moustafa Ismail 2017 _ lec 5
Moustafa Ismail Abu Dief
Ppt on fidic claims
Ppt on fidic claims
Gattupalli Naresh, PMP
fidic-flow-chart.pptx
fidic-flow-chart.pptx
ssuserb337ce1
Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021
M Maged Hegazy, LLM, MBA, CCP, P3O
Recommandé
Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)
Fakhar-un -Nisa
Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)
mohamed Ismail
time bar clauses
time bar clauses
AMILA GAYAN
Fidic comparison red yellow - silver book
Fidic comparison red yellow - silver book
Hani Saad
Ss 5 training fidic Dr. Moustafa Ismail 2017 _ lec 5
Ss 5 training fidic Dr. Moustafa Ismail 2017 _ lec 5
Moustafa Ismail Abu Dief
Ppt on fidic claims
Ppt on fidic claims
Gattupalli Naresh, PMP
fidic-flow-chart.pptx
fidic-flow-chart.pptx
ssuserb337ce1
Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021
M Maged Hegazy, LLM, MBA, CCP, P3O
FIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshop
M Maged Hegazy, LLM, MBA, CCP, P3O
Fidic Form of Contract.
Fidic Form of Contract.
Shantanu Kumar Behera
Fidic contracts management introduction
Fidic contracts management introduction
Essam Lotffy, PMP®, CCP®
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Divyanshu Dayal
FIDIC 2017 Yellow and Silver in EPC and PPP Contracts
FIDIC 2017 Yellow and Silver in EPC and PPP Contracts
Loay Ghazaleh MBA, BSc Civil Eng.
FIDIC-Relevant to Time Management
FIDIC-Relevant to Time Management
ASHISH KUMAR SINGH
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
Asia Master Training آسيا ماسترز للتدريب والتطوير
Fidic law1
Fidic law1
dhiraj.gaur
Extension of Time (EoT) in Construction Project presentation
Extension of Time (EoT) in Construction Project presentation
Ayush Joshi
Fidic
Fidic
Ranjit Patil
Construction Contracts: Basics of Contracts and Contract Administration
Construction Contracts: Basics of Contracts and Contract Administration
Gerald R. (Jerry) Genge
FIDIC delay damages âv- Liquidated damages ( PDFDrive ).pdf
FIDIC delay damages âv- Liquidated damages ( PDFDrive ).pdf
BayuDarma4
Extension of time in construction contracts
Extension of time in construction contracts
Kheng Hoe Advocates
Assignment - FIDIC Contract
Assignment - FIDIC Contract
Kai Yun Pang
FIDIC SIlver Book in Power Projects
FIDIC SIlver Book in Power Projects
Francis Ho
Ss training fidic moustafa ismail 2017 _ lec. 1
Ss training fidic moustafa ismail 2017 _ lec. 1
Moustafa Ismail Abu Dief
Contract payment and variation
Contract payment and variation
Vj NiroSh
Fidic conditions of contract presentation
Fidic conditions of contract presentation
Jeff B
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Project Controls Expo
# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi
SN Panigrahi, PMP
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
Adrias TAN
Time Bars and their enforceability in English law EPC contracts
Time Bars and their enforceability in English law EPC contracts
Eversheds Sutherland
Contenu connexe
Tendances
FIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshop
M Maged Hegazy, LLM, MBA, CCP, P3O
Fidic Form of Contract.
Fidic Form of Contract.
Shantanu Kumar Behera
Fidic contracts management introduction
Fidic contracts management introduction
Essam Lotffy, PMP®, CCP®
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Divyanshu Dayal
FIDIC 2017 Yellow and Silver in EPC and PPP Contracts
FIDIC 2017 Yellow and Silver in EPC and PPP Contracts
Loay Ghazaleh MBA, BSc Civil Eng.
FIDIC-Relevant to Time Management
FIDIC-Relevant to Time Management
ASHISH KUMAR SINGH
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
Asia Master Training آسيا ماسترز للتدريب والتطوير
Fidic law1
Fidic law1
dhiraj.gaur
Extension of Time (EoT) in Construction Project presentation
Extension of Time (EoT) in Construction Project presentation
Ayush Joshi
Fidic
Fidic
Ranjit Patil
Construction Contracts: Basics of Contracts and Contract Administration
Construction Contracts: Basics of Contracts and Contract Administration
Gerald R. (Jerry) Genge
FIDIC delay damages âv- Liquidated damages ( PDFDrive ).pdf
FIDIC delay damages âv- Liquidated damages ( PDFDrive ).pdf
BayuDarma4
Extension of time in construction contracts
Extension of time in construction contracts
Kheng Hoe Advocates
Assignment - FIDIC Contract
Assignment - FIDIC Contract
Kai Yun Pang
FIDIC SIlver Book in Power Projects
FIDIC SIlver Book in Power Projects
Francis Ho
Ss training fidic moustafa ismail 2017 _ lec. 1
Ss training fidic moustafa ismail 2017 _ lec. 1
Moustafa Ismail Abu Dief
Contract payment and variation
Contract payment and variation
Vj NiroSh
Fidic conditions of contract presentation
Fidic conditions of contract presentation
Jeff B
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Project Controls Expo
# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi
SN Panigrahi, PMP
Tendances
(20)
FIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshop
Fidic Form of Contract.
Fidic Form of Contract.
Fidic contracts management introduction
Fidic contracts management introduction
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
FIDIC 2017 Yellow and Silver in EPC and PPP Contracts
FIDIC 2017 Yellow and Silver in EPC and PPP Contracts
FIDIC-Relevant to Time Management
FIDIC-Relevant to Time Management
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
Fidic law1
Fidic law1
Extension of Time (EoT) in Construction Project presentation
Extension of Time (EoT) in Construction Project presentation
Fidic
Fidic
Construction Contracts: Basics of Contracts and Contract Administration
Construction Contracts: Basics of Contracts and Contract Administration
FIDIC delay damages âv- Liquidated damages ( PDFDrive ).pdf
FIDIC delay damages âv- Liquidated damages ( PDFDrive ).pdf
Extension of time in construction contracts
Extension of time in construction contracts
Assignment - FIDIC Contract
Assignment - FIDIC Contract
FIDIC SIlver Book in Power Projects
FIDIC SIlver Book in Power Projects
Ss training fidic moustafa ismail 2017 _ lec. 1
Ss training fidic moustafa ismail 2017 _ lec. 1
Contract payment and variation
Contract payment and variation
Fidic conditions of contract presentation
Fidic conditions of contract presentation
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi
Similaire à FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
Adrias TAN
Time Bars and their enforceability in English law EPC contracts
Time Bars and their enforceability in English law EPC contracts
Eversheds Sutherland
2 claims under new fidic
2 claims under new fidic
AhmetArslan47
Claims & disputes management
Claims & disputes management
Mohammed Tanbouz
How To Protect Your Construction Business and Legal Interests
How To Protect Your Construction Business and Legal Interests
Palecek & Palecek, PLLC
UK Adjudicators August 2020 newsletter
UK Adjudicators August 2020 newsletter
Sean Gibbs DipArb, FCIARB, FCIOB, FRICS, MICE
GCC2015 Course_Day2
GCC2015 Course_Day2
JB Nartey
GCC2015 Course_Day2
GCC2015 Course_Day2
JB Nartey
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006
Melvin Lim
Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)
Tahir B Mirza
Global Offshore Wind Trends-Implications and Challenges for Taiwan
Global Offshore Wind Trends-Implications and Challenges for Taiwan
Eiger
Slides from the niceties of notices and their importance for construction claims
Slides from the niceties of notices and their importance for construction claims
Robert MacDonald
Colin Harris and Mark Kenney
Colin Harris and Mark Kenney
Resolution Institute
Turnbull Bowles Lawyers - Security of Payment Act Guide - www.turnbullbowles....
Turnbull Bowles Lawyers - Security of Payment Act Guide - www.turnbullbowles....
Pierrette Khoury BComm/B Laws, GDLP
Professional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOT
Yee Len Wan
Breyer Group PLC and Others 2015
Breyer Group PLC and Others 2015
Matheson Law Firm
Claims and insolvencies (1)
Claims and insolvencies (1)
mohammedAlmusawi11
Chapter 26: Holders in Due Course and Defense
Chapter 26: Holders in Due Course and Defense
Tara Kissel, M.Ed
Managing the Risks of Delay in Construction Projects
Managing the Risks of Delay in Construction Projects
Francis Ho
Construction claims, disputes and project closure
Construction claims, disputes and project closure
srinivas2036
Similaire à FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
(20)
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
Time Bars and their enforceability in English law EPC contracts
Time Bars and their enforceability in English law EPC contracts
2 claims under new fidic
2 claims under new fidic
Claims & disputes management
Claims & disputes management
How To Protect Your Construction Business and Legal Interests
How To Protect Your Construction Business and Legal Interests
UK Adjudicators August 2020 newsletter
UK Adjudicators August 2020 newsletter
GCC2015 Course_Day2
GCC2015 Course_Day2
GCC2015 Course_Day2
GCC2015 Course_Day2
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006
Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)
Global Offshore Wind Trends-Implications and Challenges for Taiwan
Global Offshore Wind Trends-Implications and Challenges for Taiwan
Slides from the niceties of notices and their importance for construction claims
Slides from the niceties of notices and their importance for construction claims
Colin Harris and Mark Kenney
Colin Harris and Mark Kenney
Turnbull Bowles Lawyers - Security of Payment Act Guide - www.turnbullbowles....
Turnbull Bowles Lawyers - Security of Payment Act Guide - www.turnbullbowles....
Professional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOT
Breyer Group PLC and Others 2015
Breyer Group PLC and Others 2015
Claims and insolvencies (1)
Claims and insolvencies (1)
Chapter 26: Holders in Due Course and Defense
Chapter 26: Holders in Due Course and Defense
Managing the Risks of Delay in Construction Projects
Managing the Risks of Delay in Construction Projects
Construction claims, disputes and project closure
Construction claims, disputes and project closure
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
1.
Adrias Tan MSc BSc(Hons)
LLB(Hons) FCIArb FSIArb Senior Legal Counsel, Hyundai Engg & Construction Co Ltd
2.
Managing Claims Under
FIDIC © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb Senior Legal Counsel, Hyundai Engineering & Construction Co Ltd Fellow, Chartered Institute of Arbitrators Fellow, Singapore Institute of Arbitrators Fellow, Singapore Institute of Builders Member, Society of Construction Law, UK Member, Society of Construction Law, Singapore Associate Member, Singapore Academy of Law Associate Lecturer, Royal Melbourne Institute of Technology (SIM Singapore) Panel of Arbitrators, SIArb
3.
• Claim and
Procurement • After Contract Award: How to minimise Claims and, if the Claims are disagreed, how to avoid contested Claims from becoming disputes? • Pursuing Claims (if you haven’t managed to avoid them!) • Civil v Common Law comparison: different approaches to Claim Quantification • The Requirements for Notices of Claim • Can the Conditions Precedent for notices always be enforced? • What constitutes detailed particulars of a Claim? • The Engineer’s Obligations © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb Managing Claims Under FIDIC ADRIAS TAN
4.
Managing Claims Under
FIDIC Claim and Procurement • Claims Differentiated from Variations • Contractual Provisions on Variations – Alterations and Modifications to Original Scope and Extent of Permanent Works • Contractual Provisions on Claims – Compensation not anticipated in Original Contract • Cost Implications from Variations – Evaluation and Remeasurement • Cost and Time Implications from Claims – Express contractual provisions entitling submission of claims © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
5.
Managing Claims Under
FIDIC Claim and Procurement • Contractual Basis for Variations – Changes in quantities of any item of work included in the Contract – Changes to quality and other characteristics of any item of work – Changes to levels, positions and/or dimensions of any part of work – Omission of any work unless it is to be carried out by others – Any additional work, Plant, Materials or services necessary for Permanent Works, including any associated Tests on Completion, boreholes and other testing and exploratory work – Changes to sequence or timing of execution of works © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
6.
Managing Claims Under
FIDIC Claim and Procurement • Contractual Basis for Claims – Delayed drawings or instructions – Right of access – Setting out – Unforeseen physical conditions – Fossils – Testing – Extension of Time for Completion – Loss and Expense due to Variations – Delay caused by Authorities © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb – Suspension of works – Evaluation and Measurement – Omissions – Value Engineering – Interference with tests on completion – Changes in legislation – Employer’s Risks
7.
Managing Claims Under
FIDIC Minimising and Avoiding Claims • Commercial Risks and Monetising Profits • Complexity of Claims – Changes in Design Intent and Employer’s Requirements – Ambiguities in Contract Documents • Contracting Strategies – Lump Sum EPC – Reimbursable – Mixed or Hybrid Design/Bid/Build Procurement, etc • Dispute Adjudication Board – Resolving disputes at early stages © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
8.
Managing Claims Under
FIDIC Pursuing Claims • Administration and Management of Contract – Familiarity with Contract Documents, Forms of Contract – Familiarity with Contractual procedures and protocol • Claims Management – Notices and Timelines – Substantiation of Information • Notices and Correspondence – Timeline Condition Precedent – Notices for Actual and Potential Delay • Contemporary Records – AG Falkland Islands v Gordon Forbes Construction © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
9.
Managing Claims Under
FIDIC Different Approaches to Claim • Common Law Approach – Timescales: Directory or Mandatory Requirements – Bremer Handelgesellschaft v Vanden Avenne Izegem • Notice precedent held binding if precise time is stipulated • Express language used on forfeiture of rights due to non compliance with condition precedent – Multiplex Construction v Honeywell Control Systems • Condition precedent allows Employer opportunity to withdraw instructions with time implications – Heilbut, Symons v Buckleton • misstatement of facts, negligent misrepresentation, fraudulent misinterpretation of contract terms © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
10.
Managing Claims Under
FIDIC Different Approaches to Claim • Civil Law Approach – More Lenient – Non compliance with time bar not fatal – UAE Civil Code Article 243(2) • “With regard to the rights (obligations) arising out of the contract, each of the contracting parties must perform that which the contract obliges him to do” – UAE Civil Code Article 265(1) • “If the wording of a contract is clear, it may not be departed from by way of interpretation to ascertain the intention of the parties” – UAE Civil Code Article 246(1) • “The contract must be performed in ... good faith” © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
11.
Managing Claims Under
FIDIC Different Approaches to Claim • Civil Law Approach – UAE Civil Code Article 318 • “No person may take the property of another without lawful cause, and if he takes it he must return it” – Doctrine of Unjust Enrichment • The Employer precluded from relying on a time bar provision to avoid payment to the Contractor for works performed and for works from which the Employer has benefitted particularly if the only reason for withholding payment is the lateness of the Contractor’s claim © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
12.
Managing Claims Under
FIDIC Requirements for Notices of Claim • Notice in Writing – Notice served under Clause 20.1 – Within 28 days after he “became aware, or should have become aware, of the event or circumstance” • When should the Contractor be aware: Imputed Knowledge or Objective standard • Question: who is the arbiter of when the Contractor should have become aware, the Engineer or Contractor? – Event or Circumstance Giving Rise to Claim • Fully detailed claim, monthly updated particulars, extension of time required and/or additional payment • Keeping of contemporary records © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
13.
Managing Claims Under
FIDIC Enforcing Condition Precedent • Doctrine of Consensus ad Idem – “If the Contractor fails to give notice of a claim within such period of 28 days, the Time for Completion shall not be extended, the Contractor shall not be entitled to additional payment, and the Employer shall be discharged from all liability in connection with the claim” • Rationale – Contractor notifies Employer, to enable Employer to avert unintended consequences – potential disputes resolved early – Failure to comply with timescale – party loses right of claim © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
14.
Managing Claims Under
FIDIC Enforcing Condition Precedent • Multiplex Constr v Honeywell Control Systems – “Contractual terms requiring a contractor to give prompt notice of delay serve a valuable purpose; such notice enables matters to be investigated while they are still current. Furthermore, such notice sometimes gives the employer the opportunity to withdraw instructions when the financial consequences become apparent” per Justice Jackson – Notice triggered not only upon Contractor becoming aware of relevant event or circumstance, but also when Contractor should have become aware of it © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
15.
Managing Claims Under
FIDIC Enforcing Condition Precedent • Non Compliance Not Fatal – “If the Contractor fails to comply with this or another Sub-Clause in relation to any claim, any extension of time and/or additional payment shall take account of the extent (if any) to which the failure has prevented or prejudiced proper investigation of the claim …” – Whether enforcing time bar amounts to a penalty in the face of an Employer’s Valid Delay Factor or a Valid Variation – Onus of proof that the time bar should be imposed generally lies with the Employer © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
16.
Managing Claims Under
FIDIC Enforcing Condition Precedent • Obrascon Huarte Lain SA v HM’s AG for Gibraltar – Technology and Construction Court (TCC) in London adopted a relaxed interpretation of this requirement, ruled that the 28-day period for notifying a claim for EOT only begins following the onset of actual delay flowing from the event or circumstance which caused it – Judge Akenhead J remarked that he could see no reason why Clause 20.1 should be construed strictly against Contractor: "can see reason why it should be construed reasonably broadly, given its serious effect on what could otherwise be good claims for instance of Employer’s breach " © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
17.
Managing Claims Under
FIDIC Enforcing Condition Precedent • Obrascon Huarte Lain SA v HM’s AG for Gibraltar – notice of a claim for EOT does not have to be given pursuant to Clause 20.1 until there actually is delay, although Contractor can give notice when it reasonably believes that it will be delayed – Clause 8.4: entitlement to extension arises if and to the extent that the completion “is or will be delayed by” various listed events, such as variations or “unforeseeable” conditions – Extension of time can be claimed either when it is clear that there will be delay (prospective delay) or when delay has at least started to be incurred (retrospective delay) © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
18.
Managing Claims Under
FIDIC Enforcing Condition Precedent • Obrascon Huarte Lain SA v HM’s AG for Gibraltar – Clause 20.1: “event or circumstance” described in can mean either the incident (variation, exceptional weather or one of the other specified grounds for extension), or the delay which results or will inevitably result from the incident in question – Clause 8.4: Wording is “is or will be delayed by”, and not: “is or will be delayed whichever is the earliest” © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
19.
Managing Claims Under
FIDIC Enforcing Condition Precedent • Chiemauer Membran-und Zeltbau GmbH v New Millennium Experience – English Court of Appeal held that such condition precedent is not enforceable – Depending on commercial sense and intentions of contracting parties, and even for some condition precedent clauses, a court or arbitral tribunal may refuse to interpret it literally © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
20.
Managing Claims Under
FIDIC Detailed Particulars of a Claim • Chiemauer Membran-und Zeltbau GmbH v New Millennium Experience – Contractor to submit Fully Detailed Claim within 42 days of “event or circumstance” – Contractor can propose for the Engineer’s approval an extended time period to submit a detailed claim – Cause and effect of Delay, Culpable and Concurrent Delay, reasonable measures taken to mitigate delay – Particulars include correspondence, meeting minutes, site records, photographs, narratives, schedules, etc – Updated construction program showing planned, impacted and actual schedule © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
21.
Managing Claims Under
FIDIC Engineer’s Obligations • Engineer has 42 days to Approve or Disapprove with Detailed Comments – Engineer can propose for the Contractor’s approval an extended time period to respond – Request “any necessary further particulars” – Engineer unreasonably delaying a response to a Claim or requesting unnecessary further particulars – Clause 3.5: consulting with Contractor, try to reach an agreement. If not possible to reach agreement, make a fair determination © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
22.
Managing Claims Under
FIDIC Engineer’s Obligations • Engineer Failure to Respond within 42 days – No express sanctions for the Engineer’s failure to provide a timely response – Effect is Contractor unduly relieved of his contractual obligations; Contractor not kept aware of his contractual rights and entitlements arising from such valid claims and notifications © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
23.
Managing Claims Under
FIDIC Engineer’s Obligations • Prevention Principle – Where Engineer fails to provide a timely response or fails or refuses to grant an extension of time inspite of the Valid Delay Factor – Employer precluded from holding Contractor to completion date, due to Employer or his authorised Representative’s act or omission preventing Contractor from completing by that date – Completion time becomes at large; obligation to complete by specified date replaced by implied obligation to complete within a reasonable time © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
24.
Managing Claims Under
FIDIC Engineer’s Obligations • Roberts v Bury Improvement Commissioners – well established principle at common law that: “... no person can take advantage of the non-fulfilment of a condition the performance of which has been hindered by himself ...” per Blackburn and Mellor JJ – Reason for that rule is that otherwise a most unreasonable burden would be imposed upon the Contractor – Employer’s right to impose liquidated damages for delay replaced by unliquidated damages, based on new ‘reasonable time’ completion date © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
25.
Managing Claims Under
FIDIC Engineer’s Obligations • Shawton Engineering Ltd v DGP International Ltd – Court of Appeal held that what is a reasonable time has to be judged as at the time when the question arose, in the light of all the relevant circumstances: “There were variations, but no contractual mechanisms for extending time on account of the variations (or the mechanisms have failed). The effect in law of the variations was that the Contractor became obligated to complete their work within a reasonable time” © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
26.
Managing Claims Under
FIDIC Engineer’s Obligations • Shawton Engineering Ltd v DGP International Ltd – The judge rejected that a reasonable time should be ascertained by reference to the Original Contract Periods as extended only by the agreed periods for variations – “The question of what is a reasonable time within which to complete particular work is an objective question and is not dependent upon the actual time which a person may have agreed to carry out the work. Parties may have over or under estimated what time the work would actually require. The time which has to be ascertained is the time it would reasonably take to complete the whole of the works” © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
27.
Managing Claims Under
FIDIC FLOW CHART – Clause 20.1 Claims © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb
28.
Managing Claims Under
FIDIC © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb Interactive Voting System – Multiple Choice Questions The Engineer is empowered under the prevailing express conditions to require that the Contractor submits claims for evaluation of Variations pursuant to Clause 20.1 and subject to the timeline condition precedent before he is entitled to compensation for the additional work instructed? 1) AGREE 2) DISAGREE
29.
Managing Claims Under
FIDIC © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb Interactive Voting System – Multiple Choice Questions If the Engineer delays, refuses or fails to respond to the Contractor’s Claims pursuant to Clause 20.1, the Contractor’s rights may be prejudiced as a result. The FIDIC Forms should address this lacuna. 1) AGREE 2) DISAGREE
30.
MSc | BSc(Hons)
| LLB(Hons) | FCIArb | FSIArb Adrias has more than two decades of practical working experience in the construction industry, working currently as in-house legal counsel for an MNC Company. Adrias is professionally trained in litigation, arbitration, adjudication, mediation and dispute resolution, and is an accredited arbitrator. He has handled several institutional and ad-hoc arbitral proceedings, as well as having tutored in SIArb, and conducted numerous workshops and seminars on diverse construction, contractual and legal issues including various Standard Forms of Contracts. He also lectures at the Royal Melbourne Institute of Technology, at the Singapore Institute of Management Campus teaching law subjects. email: adriastan@yahoo.com sg.linkedin.com/in/adrias-tan-5ab34035 Managing Claims Under FIDIC © 2016 Adrias Tan MSc BSc(Hons) LLB(Hons) FCIArb FSIArb Adrias Tan
Télécharger maintenant