SlideShare une entreprise Scribd logo
1  sur  6
Télécharger pour lire hors ligne
Ahmed Abd Elazim Abd Elfatah
Adress: Hassan Yusuf Street. El Manil, Egypt
Mobile: +2 01111114435 /+2 3648919
E-mail: ahmedegy2002@hotmail.com
Objective
Seeking an opportunity to work as Mechanical engineer, to obtain and secure position that
will enable me to use my expertise and skills as well as my ability to work as a proactive member of
a team. I am looking forward to work in suitable environment that would improve my technical
skills and raise my knowledge.
Personal information
 Marital status: Single
 Military Status: exempted
 Nationality: Egyptian
 Birth Date:20th
Of February 1985
 Driving license: Available
Education
The Higher technological institute10th
Of Ramadan City,
Mechanical Engineering-Power Department.2010
Graduation grade: 1.55
Graduation Project: Double Tube Heat Exchanger Thermal Data analysis
Project grade: Very good. (B+)
Qualification summary
 Good Understanding of mechanical Drawings, Planning of Projects, Erection of
mechanical projects (Gas power, steam power plant and combined cycle).
 My major experiences are:
 Gas turbine erection
 Auxiliary skid erection
 Supports erection
 Plan and schedule the project activities.
 Ensure that the Scope of the Project is as the project management plan and the
approved drawings and specifications.
 Communicate with stakeholders ( Team members, sponsors, owners , vendors
…etc)
Courses & Skills
 Successfully obtained the International Computer Driving License (ICDL).
 Microsoft Word, PowerPoint, Excel
 Primavera 6 (I – II )
 PSP (Planning and scheduling professional)
 PMP (Prep. course)
 English: V. Good
Hobbies
 Sports(Swimming-football-riding horses) .
 Travel.
 Reading.
 Music
Work Experience
 Company Name: Orascom construction
 Position Title Lead Mechanical Engineer
 Date:1/5/2015-Till now:
 Project: Assuit power planet project 8x125 MW
 Leads the design, estimation, maintenance and repair of complex plant and
infrastructure mechanical equipment and components.
 Oversees, supervises and coaches others involved in distribution,
maintenance, construction, and operation of plant equipment and
infrastructure.
 Inspects, surveys and continually improves the operation and condition of
plant mechanical equipment; establishes specifications and standards for
maintenance, new equipment, and workmanship.
 Provides on-going troubleshooting and oversees maintenance and repair of
complex plant and infrastructure components and equipment.
 Designs, develops, and deploys engineering solutions in multiple, diverse
environments and applications.
 Elaborates on prior engineering experiences with all major functions, issues
and considerations.
 Plays leadership role in establishing engineering standards, policies,
strategies and best practices.
 Discusses industry and marketplace engineering trends/directions and cites
relevant case studies.
 Directly influences wide or high-impact engineering decisions and initiatives.
 Develops theoretical engineering background/understanding; discusses
historical/future perspective.
 Company Name:Misr CO.For Mechanical and Electrical Projects(KAHROMIKA)
 Position Title: Construction Manager
 Date: 1/3/2015: 30/4/2015
 Project: Emergency Power Project TM2500 (New Assuit-Bani Ghaleb-ElHamra-Gerga)
Responsibilities:
 Completes engineering projects by organizing and controlling project
elements.
 Develops project objectives by reviewing project proposals and plans;
conferring with management.
 Determines project responsibilities by identifying project phases and
elements; assigning personnel to phases and elements; reviewing bids from
contractors.
 Determines project specifications by studying product design, customer
requirements, and performance standards; completing technical studies;
preparing cost estimates.
 Determines project schedule by studying project plan and specifications;
calculating time requirements; sequencing project elements.
 Maintains project schedule by monitoring project progress; coordinating
activities; resolving problems.
 Controls project plan by reviewing design, specifications, and plan and
schedule changes; recommending actions.
 Controls project costs by approving expenditures; administering contractor
contracts.
 Prepares project status reports by collecting, analyzing, and summarizing
information and trends; recommending actions.
 Maintains safe and clean working environment by enforcing procedures,
rules, and regulations.
 Maintains project data base by writing computer programs; entering and
backing up data.
 Contributes to team effort by accomplishing related results as needed.
 Company Name:Misr CO.For Mechanical and Electrical Projects(KAHROMIKA)
 Position Title: Technical Office Manager
 Date: 15/9/2014-1/3/2015:
Project: EL-TEBBIN REHABILITATION THERMAL POWER PLANT 2X350 MW CP106
Responsibilities:
 Design and implement office policies
 Establish standards and procedures
 Organize office operations and procedures
 Supervise office staff
 Monitor and record long distance phone calls
 Prepare time sheets
 Control correspondences
 Review and approve supply requisitions
 Liaise with other agencies, organizations and groups
 Update organizational memberships
 Maintain office equipment
 Assign and monitor clerical and secretarial functions
 Orient and train employees
 Provide on the job and other training opportunities
 Supervise staff
 Evaluate staff performance
 Coaching and disciplining staff
 Plan and implement office systems, layout and equipment procurement
 Maintain and replenish inventory
 Check stock to determine inventory levels
 Anticipate needed supplies
 Verify receipt of supply
 Define procedures for record retention
 Ensure protection and security of files and records
 Ensure effective transfer of files and records
 Transfer and dispose records according to retention schedules and
policies
 Ensure personnel files are up to date and secure
 Company Name:Misr CO.For Mechanical and Electrical Projects(KAHROMIKA)
 Position Title: Senior Technical office & Tendering mechanical engineer
 Date: 2013:2014
Project: Head Office
Responsibilities:
 Provide efficient & effective application engineering & product
information support to customers and company employees covering all
areas of company Sales business.
 Guide customers through power station component installation
requirements at design stage by providing information on Power
Generation Guidelines / theory calculations / product issues.
 Checking customer designs, drawings, schemes, plans, programs and
codes.
 Provide quotation and suggestions for possible alternative explaining the
benefit to the client (cost/technical/delivery).
 Ensure new power station and products conforms to relevant regulations,
guidelines, rules, and safety directives.
 Write and publish Technical Papers and articles.
 Advice on installation guidelines & product troubleshooting.
 Create and document company structures / Project Bill of Materials in
line with business & customer requirements.
 Keep abreast of product updates, tools, development in technology and
installation guidelines for all relevant market sectors.
 Company Name:Misr CO.For Mechanical and Electrical Projects(KAHROMIKA)
 Position Title: Construction Engineer
 Date: 2012-2013:
 Project: Giza North Combined cycle Cp-101 (Gas Turbine 6*250 MW)
Responsibilities:
 Erection of gas turbine
 Erection of auxiliary skids of gas turbine.
 Erection of piping supports
 Company Name: Misr CO.For Mechanical and Electrical Projects (KAHROMIKA).
 Position Title: Technical office Engineer
 Date: 2011 - 2012:
 Projects: ELAIN-ELSOKHNA SUPER CRITICAL BOILER 2*650MW
Responsibilities:
 Be fully aware of the project specifications, drawings and contractual terms
 Ensure that all drawings, documentation and records in use are reviewed,
approved and controlled for adequacy
 Ensure the implementation of the Project is as the Quality Plan
 Prepare Method Statements
 Plan resources and plant requirements and arrange procurement to suit
program requirements
 Communicate with consultant and subcontractors
 Plan and schedule the project activities.
 Review and monitor the progress of the project
 Prepare and follow-up the documentation for claims and variation orders
 Define and implement corrective actions where deficiencies are detected
 Ensure safe work environments
 Company Name: Misr CO.For Mechanical and Electrical Projects (KAHROMIKA).
 Position Title: Mechanical construction Engineer
 Date: 2010 - 2012:
 Projects: EL-SHABAB SIMPLE CYCLE Gas turbine 8*125 MW,(2010-2011)
Responsibilities:
 Erection of gas turbine
 Erection of auxiliary skids of gas turbine.
Training
 Misr for mechanical and electrical projects (Kahromica).
Construction of North Cairo Combined cycle power plant 750 Mw ( 2*250 MW gas turbine +
250 MW steam turbine)
(Summer 2004 & summer 2005)
 Egypt Air, Cairo, Maintenance And Technical Services (Summer2006)
Technical Credentials:
 Maintenance process inside the hangers.
In Site Training:
 Basics of flight control.
Introduction to jet engines.

Contenu connexe

Tendances

HVAC Estimation engineer
HVAC Estimation engineerHVAC Estimation engineer
HVAC Estimation engineerAhamed Falil
 
Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Singh
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) Mudassir Nazar Dabilkar
 
Professional resume
Professional resumeProfessional resume
Professional resumeayman adawy
 
nizamuddinG Planning Engineer
nizamuddinG Planning EngineernizamuddinG Planning Engineer
nizamuddinG Planning Engineerghulam nizamuddin
 
CV-Mechanical engineer
CV-Mechanical engineerCV-Mechanical engineer
CV-Mechanical engineerMuhammad Umair
 
Hanif cv 2015 Project engineer (electrical)
Hanif cv 2015   Project engineer (electrical)Hanif cv 2015   Project engineer (electrical)
Hanif cv 2015 Project engineer (electrical)Mohd Hanif Abd Hadi
 
SYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERSYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERjaved hazari
 
Asim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedAsim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedasim siraj
 

Tendances (20)

HVAC Estimation engineer
HVAC Estimation engineerHVAC Estimation engineer
HVAC Estimation engineer
 
Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project Manager
 
Resume
ResumeResume
Resume
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
 
Amitav Sahoo-CV
Amitav Sahoo-CVAmitav Sahoo-CV
Amitav Sahoo-CV
 
Professional resume
Professional resumeProfessional resume
Professional resume
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
 
nizamuddinG Planning Engineer
nizamuddinG Planning EngineernizamuddinG Planning Engineer
nizamuddinG Planning Engineer
 
CV-Mechanical engineer
CV-Mechanical engineerCV-Mechanical engineer
CV-Mechanical engineer
 
Sanoop CV 2016
Sanoop CV 2016Sanoop CV 2016
Sanoop CV 2016
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
 
Mohaideen CV
Mohaideen CVMohaideen CV
Mohaideen CV
 
M.faqih.cv 5
M.faqih.cv   5M.faqih.cv   5
M.faqih.cv 5
 
CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016
 
RESUME - AMB- N
RESUME - AMB- NRESUME - AMB- N
RESUME - AMB- N
 
Abbott Resume
Abbott ResumeAbbott Resume
Abbott Resume
 
Resume-Wail
Resume-WailResume-Wail
Resume-Wail
 
Hanif cv 2015 Project engineer (electrical)
Hanif cv 2015   Project engineer (electrical)Hanif cv 2015   Project engineer (electrical)
Hanif cv 2015 Project engineer (electrical)
 
SYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERSYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEER
 
Asim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedAsim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updated
 

En vedette

Ashim powerpoint
Ashim powerpointAshim powerpoint
Ashim powerpointashim2u
 
Epic research malaysia daily klse report for 8th july 2015
Epic research malaysia   daily klse report for 8th july 2015Epic research malaysia   daily klse report for 8th july 2015
Epic research malaysia daily klse report for 8th july 2015Epic Research Pte. Ltd.
 
Inroduction to pair up and pair talk
Inroduction to pair up and pair talkInroduction to pair up and pair talk
Inroduction to pair up and pair talkPairUpPairTalk
 
gizi buruk terhadap balita
gizi buruk terhadap balitagizi buruk terhadap balita
gizi buruk terhadap balitaanisaanurh
 

En vedette (11)

B05630814
B05630814B05630814
B05630814
 
Presentation2
Presentation2Presentation2
Presentation2
 
Ashim powerpoint
Ashim powerpointAshim powerpoint
Ashim powerpoint
 
kasanda
kasandakasanda
kasanda
 
Epic research malaysia daily klse report for 8th july 2015
Epic research malaysia   daily klse report for 8th july 2015Epic research malaysia   daily klse report for 8th july 2015
Epic research malaysia daily klse report for 8th july 2015
 
Regal Prelude
Regal PreludeRegal Prelude
Regal Prelude
 
Inroduction to pair up and pair talk
Inroduction to pair up and pair talkInroduction to pair up and pair talk
Inroduction to pair up and pair talk
 
20150606まちづくり提案事業報告会
20150606まちづくり提案事業報告会20150606まちづくり提案事業報告会
20150606まちづくり提案事業報告会
 
gizi buruk terhadap balita
gizi buruk terhadap balitagizi buruk terhadap balita
gizi buruk terhadap balita
 
K05625558
K05625558K05625558
K05625558
 
CRISTENE O MANLANGIT
CRISTENE O MANLANGITCRISTENE O MANLANGIT
CRISTENE O MANLANGIT
 

Similaire à Ahmed abd elazim c.v (20)

randy san andres resume
randy san andres resumerandy san andres resume
randy san andres resume
 
Mari cv - office
Mari cv - officeMari cv - office
Mari cv - office
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
 
MostafaFahimHamdy25.7.2016
MostafaFahimHamdy25.7.2016MostafaFahimHamdy25.7.2016
MostafaFahimHamdy25.7.2016
 
CV
CVCV
CV
 
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Resume 1
Resume 1Resume 1
Resume 1
 
social profile.
social profile.social profile.
social profile.
 
CV UPDATED Aug 2015 (1)
CV UPDATED Aug  2015 (1)CV UPDATED Aug  2015 (1)
CV UPDATED Aug 2015 (1)
 
Resume 1
Resume 1Resume 1
Resume 1
 
aravind ..
aravind ..aravind ..
aravind ..
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Adnan -updated CV
Adnan -updated CVAdnan -updated CV
Adnan -updated CV
 
Akshay Updated CV
Akshay Updated CVAkshay Updated CV
Akshay Updated CV
 

Dernier

Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 

Dernier (20)

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 

Ahmed abd elazim c.v

  • 1. Ahmed Abd Elazim Abd Elfatah Adress: Hassan Yusuf Street. El Manil, Egypt Mobile: +2 01111114435 /+2 3648919 E-mail: ahmedegy2002@hotmail.com Objective Seeking an opportunity to work as Mechanical engineer, to obtain and secure position that will enable me to use my expertise and skills as well as my ability to work as a proactive member of a team. I am looking forward to work in suitable environment that would improve my technical skills and raise my knowledge. Personal information  Marital status: Single  Military Status: exempted  Nationality: Egyptian  Birth Date:20th Of February 1985  Driving license: Available Education The Higher technological institute10th Of Ramadan City, Mechanical Engineering-Power Department.2010 Graduation grade: 1.55 Graduation Project: Double Tube Heat Exchanger Thermal Data analysis Project grade: Very good. (B+) Qualification summary  Good Understanding of mechanical Drawings, Planning of Projects, Erection of mechanical projects (Gas power, steam power plant and combined cycle).  My major experiences are:  Gas turbine erection  Auxiliary skid erection  Supports erection  Plan and schedule the project activities.  Ensure that the Scope of the Project is as the project management plan and the approved drawings and specifications.  Communicate with stakeholders ( Team members, sponsors, owners , vendors …etc)
  • 2. Courses & Skills  Successfully obtained the International Computer Driving License (ICDL).  Microsoft Word, PowerPoint, Excel  Primavera 6 (I – II )  PSP (Planning and scheduling professional)  PMP (Prep. course)  English: V. Good Hobbies  Sports(Swimming-football-riding horses) .  Travel.  Reading.  Music Work Experience  Company Name: Orascom construction  Position Title Lead Mechanical Engineer  Date:1/5/2015-Till now:  Project: Assuit power planet project 8x125 MW  Leads the design, estimation, maintenance and repair of complex plant and infrastructure mechanical equipment and components.  Oversees, supervises and coaches others involved in distribution, maintenance, construction, and operation of plant equipment and infrastructure.  Inspects, surveys and continually improves the operation and condition of plant mechanical equipment; establishes specifications and standards for maintenance, new equipment, and workmanship.  Provides on-going troubleshooting and oversees maintenance and repair of complex plant and infrastructure components and equipment.  Designs, develops, and deploys engineering solutions in multiple, diverse environments and applications.  Elaborates on prior engineering experiences with all major functions, issues and considerations.  Plays leadership role in establishing engineering standards, policies, strategies and best practices.  Discusses industry and marketplace engineering trends/directions and cites relevant case studies.  Directly influences wide or high-impact engineering decisions and initiatives.  Develops theoretical engineering background/understanding; discusses historical/future perspective.
  • 3.  Company Name:Misr CO.For Mechanical and Electrical Projects(KAHROMIKA)  Position Title: Construction Manager  Date: 1/3/2015: 30/4/2015  Project: Emergency Power Project TM2500 (New Assuit-Bani Ghaleb-ElHamra-Gerga) Responsibilities:  Completes engineering projects by organizing and controlling project elements.  Develops project objectives by reviewing project proposals and plans; conferring with management.  Determines project responsibilities by identifying project phases and elements; assigning personnel to phases and elements; reviewing bids from contractors.  Determines project specifications by studying product design, customer requirements, and performance standards; completing technical studies; preparing cost estimates.  Determines project schedule by studying project plan and specifications; calculating time requirements; sequencing project elements.  Maintains project schedule by monitoring project progress; coordinating activities; resolving problems.  Controls project plan by reviewing design, specifications, and plan and schedule changes; recommending actions.  Controls project costs by approving expenditures; administering contractor contracts.  Prepares project status reports by collecting, analyzing, and summarizing information and trends; recommending actions.  Maintains safe and clean working environment by enforcing procedures, rules, and regulations.  Maintains project data base by writing computer programs; entering and backing up data.  Contributes to team effort by accomplishing related results as needed.
  • 4.  Company Name:Misr CO.For Mechanical and Electrical Projects(KAHROMIKA)  Position Title: Technical Office Manager  Date: 15/9/2014-1/3/2015: Project: EL-TEBBIN REHABILITATION THERMAL POWER PLANT 2X350 MW CP106 Responsibilities:  Design and implement office policies  Establish standards and procedures  Organize office operations and procedures  Supervise office staff  Monitor and record long distance phone calls  Prepare time sheets  Control correspondences  Review and approve supply requisitions  Liaise with other agencies, organizations and groups  Update organizational memberships  Maintain office equipment  Assign and monitor clerical and secretarial functions  Orient and train employees  Provide on the job and other training opportunities  Supervise staff  Evaluate staff performance  Coaching and disciplining staff  Plan and implement office systems, layout and equipment procurement  Maintain and replenish inventory  Check stock to determine inventory levels  Anticipate needed supplies  Verify receipt of supply  Define procedures for record retention  Ensure protection and security of files and records  Ensure effective transfer of files and records  Transfer and dispose records according to retention schedules and policies  Ensure personnel files are up to date and secure  Company Name:Misr CO.For Mechanical and Electrical Projects(KAHROMIKA)  Position Title: Senior Technical office & Tendering mechanical engineer  Date: 2013:2014 Project: Head Office Responsibilities:  Provide efficient & effective application engineering & product information support to customers and company employees covering all areas of company Sales business.  Guide customers through power station component installation requirements at design stage by providing information on Power Generation Guidelines / theory calculations / product issues.
  • 5.  Checking customer designs, drawings, schemes, plans, programs and codes.  Provide quotation and suggestions for possible alternative explaining the benefit to the client (cost/technical/delivery).  Ensure new power station and products conforms to relevant regulations, guidelines, rules, and safety directives.  Write and publish Technical Papers and articles.  Advice on installation guidelines & product troubleshooting.  Create and document company structures / Project Bill of Materials in line with business & customer requirements.  Keep abreast of product updates, tools, development in technology and installation guidelines for all relevant market sectors.  Company Name:Misr CO.For Mechanical and Electrical Projects(KAHROMIKA)  Position Title: Construction Engineer  Date: 2012-2013:  Project: Giza North Combined cycle Cp-101 (Gas Turbine 6*250 MW) Responsibilities:  Erection of gas turbine  Erection of auxiliary skids of gas turbine.  Erection of piping supports  Company Name: Misr CO.For Mechanical and Electrical Projects (KAHROMIKA).  Position Title: Technical office Engineer  Date: 2011 - 2012:  Projects: ELAIN-ELSOKHNA SUPER CRITICAL BOILER 2*650MW Responsibilities:  Be fully aware of the project specifications, drawings and contractual terms  Ensure that all drawings, documentation and records in use are reviewed, approved and controlled for adequacy  Ensure the implementation of the Project is as the Quality Plan  Prepare Method Statements  Plan resources and plant requirements and arrange procurement to suit program requirements  Communicate with consultant and subcontractors  Plan and schedule the project activities.  Review and monitor the progress of the project  Prepare and follow-up the documentation for claims and variation orders  Define and implement corrective actions where deficiencies are detected  Ensure safe work environments
  • 6.  Company Name: Misr CO.For Mechanical and Electrical Projects (KAHROMIKA).  Position Title: Mechanical construction Engineer  Date: 2010 - 2012:  Projects: EL-SHABAB SIMPLE CYCLE Gas turbine 8*125 MW,(2010-2011) Responsibilities:  Erection of gas turbine  Erection of auxiliary skids of gas turbine. Training  Misr for mechanical and electrical projects (Kahromica). Construction of North Cairo Combined cycle power plant 750 Mw ( 2*250 MW gas turbine + 250 MW steam turbine) (Summer 2004 & summer 2005)  Egypt Air, Cairo, Maintenance And Technical Services (Summer2006) Technical Credentials:  Maintenance process inside the hangers. In Site Training:  Basics of flight control. Introduction to jet engines.