1. CURRICULUM VITAE JOP REQUEST
CURRICULUM VITAE
PERSONAL DATA
Name AHMED ABD-EL HADY ABD-EL SATTAR.
Date of birth JAN 24 1981, Cairo, Egypt
Nationality Egyptian
Address Alkhobar city , KSA.
Marital Status Marraied
Military Status Exempted
Mobile 00966552856137(KSA).
E-MAIL ahmedabdelhady71@yahoo.com
Ahmed.Abdelhady@alfanar.com
Driving licence Have a valid driving licence (KSA)(EGYPT)
CAREER OBJECTIVE
• Seeking a project manager position in the field of ELECTRICAL POWER
ENGINEERING FIELD in Multinational company.
EDUCATION
B.SC. in ELECTRICAL ENGINEERING DEPARTMENT,Faculty of Engineering,
Cairo University,Egypt,By ’’ 64.35%’’ May 2003
GRADUATION PROJECT
Project Name: Wheat silo project by motor and convyers(V.good).
CAREER HISTORY
(K.S.A) (from 1st
Nov 2015 to till date )
Project Manager for Dammam housing115kv/13.8kv substation (Approved as PM from
National Grid/SEC)
I
(K.S.A) (from 1st
Nov 2013 to October 2013 )
Senior Site/condtruction Manager for 380kv/110kv substation PS-1 (Pumping Station one)
Integration of new SWCC=Saline Water Conversion Corporation Phase-III
suppling power to pumping staion-1 (PS-1) in Yanbu industrial city
JOB DUTIES :
• Installation of 14 DIA 380KV GIS alomg with related GIB (ABB).
• Installation of 03 380KV power transformer 502 MVA (ABB).
• Installation of 03 380kv bus reactors 67 MVA (HYNDAI).
• Installation of 02 380KV line reactors 120 MVA (HYNDAI).
• Installation of 30 bays 110kv GIS (HYUNDAY).
• Installation of complete control and protection system (ABB).
• Installation of SAS (substaion Automation System)(ABB).
1/4
2. CURRICULUM VITAE JOP REQUEST
• Installation of all kinds of cables (LV ,control , FOC and power cables ).
• Installation of HVAC , fire fighting, hydrant system , drainage and plumping
sysytems .
• Installation of all aux. sysyems as lighting , grounding & AC/DC systems .
• Installation of charges and battiers 125vdc and 48vdc.(Benning)
• Installation of teleprotection and communcation sysytems.(ABB)
• Testing and Commissioning for all the above sysytems up to energization
stage.
(K.S.A) (from 1st
April 2012 to 30.10.2013 ) energized now
Site Manager Haramain High Speed Railway HHR-2 Jeddah 380/110/33/13.8kv S/Stn
JOB DUTIES :
• Installation of 03 power transformer 502 MVA 380/110KV (HYSONG)
• Installation of 03 power transformer 73 MVA 110/13.8KV (HYSONG)
• Installation of 03 power transformer 40 MVA 110/33KV (HYSONG)
• Installation of 30 bays 110kv GIS (HYSONG)
• Installation of 06 diamaters 380kv GIS one& half scheme (ABB)
• Installation of SAS(substaion automation system) (PRP)(SIEMENS ).
• Installtion of 47 feeder13.8kv SG (AES)(Alfanar Electrical System).
• Installtion of (FM200) system,batteries and battery chargers system.
• Supervision for civil,mechanical and communication activites at site.
• Supervision for testing, commissioning and closed loop test.
• Responsibility of all construction works as per SEC standered and PTS.
• Responsibility of all activites at site from day one up to energization.
• Responsibility of all mechanical activites as HVAC,Fire alarms ayaytem,
FM200 system,hydrant system,water supply system ,……
• Responsibility of all activites from day one of the project up to energization.
(K.S.A) (from June 2010 to April 2012 ) energized now
Site Manager for Jazan Economic City(SAS) (JEC) 380/132/13.8kv S/Stn (KSA).
JOB DUTIES :
• Installation of 02 power transformer 502 MVA(HYUNDAI)
• Installation of 10 bays 132kv GIS (HYUNDAI)
• Installation of 04 diamaters 380kv GIS one& half scheme (AREVA)
• Installation of SAS(substaion automation system)(SIEMENS )
• Responsibility of all activites at site from day one up to energization.
• Installtion of 13.8kv SG (SCHNEIDER).
• Installtion of (FM200) system,batteries and battery chargers system.
• Supervision for civil,mechanical and communication activites at site.
• Supervision for testing, commissioning and closed loop test.
• Responsibility of all construction works as per SEC stand. and PTS.
• Responsibility of all job site requirements .
• Feed back reports to higher managenents during project execution.
(K.S.A) (from August 2008 to June 2010) energized now
Site Manager for RABIGH-II S/Stn 380 KV RABIGH (KSA).
2/4
3. CURRICULUM VITAE JOP REQUEST
JOB DUTIES :
• Installation of 30 bays GIS 380kv (ABB switzerland)
• Installation of more than 170 control and protection panels with all cable
pulling and termination works.
• Installation of 02 aux. transformer plus cable pulling & termination of 13.8kv
cables.
• Installtion of 13.8kv SG,AC/DC sysem,HVAC system,fire alarm (FM200)
system,batteries and battery chargers system.
• Responsibility of all activites at site from day one up to energization.
• 14 generation feeder from new Rabigh generation station now energized.
• 04 OHTL 380kv also energized.
• Supervision for civil,mechanical and communication activites at site.
• Supervision for testing, commissioning and closed loop test.
(K.S.A) (from August 2008 to June 2010). energized now
Site Manager for RABIGH-II to JEDDAH NORTH 380 KV GIL @ RABIGH (KSA).
(K.S.A) (from April 2007 to August 2008 ). energized now
Site engineer for Misfallah II S/Stn 110/13.8 KV HOLY MAKKAH.
JOB DUTIES :
• Mobilization site office (start up duration).
• Following up deliverey all equipment and materials as per project scheduel.
• Installation of three 67 MVA power transformer (SIEMENS)
• Installation of 2x300KVA aux. transformer (Saudi Trans. Co.)
• NER installation.
• 110kv GIS (10 bays) erection (SIEMENS).
• 13.8kv SG erection (49 feeders) (SIEMENS).
• SCADA,Teleprotection and control panels installation.(SIEMENS).
• AC/DC DB,LDB,ELDB,battery and battery charger installation.
• All cabels(HV,MV,LV and control) pulling and termination.
• Following up Interface points bet. Civil and electrical works.
• Installion of lighting and earthing systems in s/s.
• Supervision eletromechanical works (HVAC units and ducts , sprinkler
system and FM200 fire fighting system).
Power Generation Engineering and Servies Company
(from May,2006 to April,2007)
• Electrical system engineer (design review) for combined cycle power plants
Talkha & Elkurimat (3X250 MW) projects .
Upper Egypt Electricity Prodution Company (UEEPC).(from July,2004 to April,2006)
El KURIMAT power generation sector.
• Operating engineer at EL-KURIMAT Substation 500/220/11kv
(MITSUBISHI).
• Responsibility of all substation activities as OHTL shutdown & lines
maintenance.
3/4
4. CURRICULUM VITAE JOP REQUEST
European Arabian company. (from Jan,2004 to June,2004).
• Installation,operation and maintenance engineer (UPS,stabilizer and soft
starter for motors).
COMPUTER SKILLS
Experience in:
Microsoft office.
Internet.
TRAINING
BADER EL DIN OIL COMPANY(Egypt)
SHOBRA POWER STATION (Egypt)
LANGUAGE SKILL
Arabic Mother-Tongue
English Excellent (reading and writing)
Excellent (speaking)
INTERPERSONAL SKILLS
• PMP preparation course .
• Leadership skills.
• Communication skills.
• Organization skills.
• Hardworking under pressure.
• Working under tight schedule plan.
4/4