SlideShare une entreprise Scribd logo
1  sur  4
CURRICULUM VITAE JOP REQUEST
CURRICULUM VITAE
PERSONAL DATA
Name AHMED ABD-EL HADY ABD-EL SATTAR.
Date of birth JAN 24 1981, Cairo, Egypt
Nationality Egyptian
Address Alkhobar city , KSA.
Marital Status Marraied
Military Status Exempted
Mobile 00966552856137(KSA).
E-MAIL ahmedabdelhady71@yahoo.com
Ahmed.Abdelhady@alfanar.com
Driving licence Have a valid driving licence (KSA)(EGYPT)
CAREER OBJECTIVE
• Seeking a project manager position in the field of ELECTRICAL POWER
ENGINEERING FIELD in Multinational company.
EDUCATION
 B.SC. in ELECTRICAL ENGINEERING DEPARTMENT,Faculty of Engineering,
Cairo University,Egypt,By ’’ 64.35%’’ May 2003
GRADUATION PROJECT
 Project Name: Wheat silo project by motor and convyers(V.good).
CAREER HISTORY
 (K.S.A) (from 1st
Nov 2015 to till date )
Project Manager for Dammam housing115kv/13.8kv substation (Approved as PM from
National Grid/SEC)
I
 (K.S.A) (from 1st
Nov 2013 to October 2013 )
Senior Site/condtruction Manager for 380kv/110kv substation PS-1 (Pumping Station one)
Integration of new SWCC=Saline Water Conversion Corporation Phase-III
suppling power to pumping staion-1 (PS-1) in Yanbu industrial city
JOB DUTIES :
• Installation of 14 DIA 380KV GIS alomg with related GIB (ABB).
• Installation of 03 380KV power transformer 502 MVA (ABB).
• Installation of 03 380kv bus reactors 67 MVA (HYNDAI).
• Installation of 02 380KV line reactors 120 MVA (HYNDAI).
• Installation of 30 bays 110kv GIS (HYUNDAY).
• Installation of complete control and protection system (ABB).
• Installation of SAS (substaion Automation System)(ABB).
1/4
CURRICULUM VITAE JOP REQUEST
• Installation of all kinds of cables (LV ,control , FOC and power cables ).
• Installation of HVAC , fire fighting, hydrant system , drainage and plumping
sysytems .
• Installation of all aux. sysyems as lighting , grounding & AC/DC systems .
• Installation of charges and battiers 125vdc and 48vdc.(Benning)
• Installation of teleprotection and communcation sysytems.(ABB)
• Testing and Commissioning for all the above sysytems up to energization
stage.
 (K.S.A) (from 1st
April 2012 to 30.10.2013 ) energized now
Site Manager Haramain High Speed Railway HHR-2 Jeddah 380/110/33/13.8kv S/Stn
JOB DUTIES :
• Installation of 03 power transformer 502 MVA 380/110KV (HYSONG)
• Installation of 03 power transformer 73 MVA 110/13.8KV (HYSONG)
• Installation of 03 power transformer 40 MVA 110/33KV (HYSONG)
• Installation of 30 bays 110kv GIS (HYSONG)
• Installation of 06 diamaters 380kv GIS one& half scheme (ABB)
• Installation of SAS(substaion automation system) (PRP)(SIEMENS ).
• Installtion of 47 feeder13.8kv SG (AES)(Alfanar Electrical System).
• Installtion of (FM200) system,batteries and battery chargers system.
• Supervision for civil,mechanical and communication activites at site.
• Supervision for testing, commissioning and closed loop test.
• Responsibility of all construction works as per SEC standered and PTS.
• Responsibility of all activites at site from day one up to energization.
• Responsibility of all mechanical activites as HVAC,Fire alarms ayaytem,
FM200 system,hydrant system,water supply system ,……
• Responsibility of all activites from day one of the project up to energization.
 (K.S.A) (from June 2010 to April 2012 ) energized now
Site Manager for Jazan Economic City(SAS) (JEC) 380/132/13.8kv S/Stn (KSA).
JOB DUTIES :
• Installation of 02 power transformer 502 MVA(HYUNDAI)
• Installation of 10 bays 132kv GIS (HYUNDAI)
• Installation of 04 diamaters 380kv GIS one& half scheme (AREVA)
• Installation of SAS(substaion automation system)(SIEMENS )
• Responsibility of all activites at site from day one up to energization.
• Installtion of 13.8kv SG (SCHNEIDER).
• Installtion of (FM200) system,batteries and battery chargers system.
• Supervision for civil,mechanical and communication activites at site.
• Supervision for testing, commissioning and closed loop test.
• Responsibility of all construction works as per SEC stand. and PTS.
• Responsibility of all job site requirements .
• Feed back reports to higher managenents during project execution.
 (K.S.A) (from August 2008 to June 2010) energized now
Site Manager for RABIGH-II S/Stn 380 KV RABIGH (KSA).
2/4
CURRICULUM VITAE JOP REQUEST
JOB DUTIES :
• Installation of 30 bays GIS 380kv (ABB switzerland)
• Installation of more than 170 control and protection panels with all cable
pulling and termination works.
• Installation of 02 aux. transformer plus cable pulling & termination of 13.8kv
cables.
• Installtion of 13.8kv SG,AC/DC sysem,HVAC system,fire alarm (FM200)
system,batteries and battery chargers system.
• Responsibility of all activites at site from day one up to energization.
• 14 generation feeder from new Rabigh generation station now energized.
• 04 OHTL 380kv also energized.
• Supervision for civil,mechanical and communication activites at site.
• Supervision for testing, commissioning and closed loop test.
 (K.S.A) (from August 2008 to June 2010). energized now
Site Manager for RABIGH-II to JEDDAH NORTH 380 KV GIL @ RABIGH (KSA).
 (K.S.A) (from April 2007 to August 2008 ). energized now
Site engineer for Misfallah II S/Stn 110/13.8 KV HOLY MAKKAH.
JOB DUTIES :
• Mobilization site office (start up duration).
• Following up deliverey all equipment and materials as per project scheduel.
• Installation of three 67 MVA power transformer (SIEMENS)
• Installation of 2x300KVA aux. transformer (Saudi Trans. Co.)
• NER installation.
• 110kv GIS (10 bays) erection (SIEMENS).
• 13.8kv SG erection (49 feeders) (SIEMENS).
• SCADA,Teleprotection and control panels installation.(SIEMENS).
• AC/DC DB,LDB,ELDB,battery and battery charger installation.
• All cabels(HV,MV,LV and control) pulling and termination.
• Following up Interface points bet. Civil and electrical works.
• Installion of lighting and earthing systems in s/s.
• Supervision eletromechanical works (HVAC units and ducts , sprinkler
system and FM200 fire fighting system).
 Power Generation Engineering and Servies Company
(from May,2006 to April,2007)
• Electrical system engineer (design review) for combined cycle power plants
Talkha & Elkurimat (3X250 MW) projects .
 Upper Egypt Electricity Prodution Company (UEEPC).(from July,2004 to April,2006)
El KURIMAT power generation sector.
• Operating engineer at EL-KURIMAT Substation 500/220/11kv
(MITSUBISHI).
• Responsibility of all substation activities as OHTL shutdown & lines
maintenance.
3/4
CURRICULUM VITAE JOP REQUEST
 European Arabian company. (from Jan,2004 to June,2004).
• Installation,operation and maintenance engineer (UPS,stabilizer and soft
starter for motors).
COMPUTER SKILLS
 Experience in:
 Microsoft office.
 Internet.
TRAINING
 BADER EL DIN OIL COMPANY(Egypt)
 SHOBRA POWER STATION (Egypt)
LANGUAGE SKILL
Arabic Mother-Tongue
English Excellent (reading and writing)
Excellent (speaking)
INTERPERSONAL SKILLS
• PMP preparation course .
• Leadership skills.
• Communication skills.
• Organization skills.
• Hardworking under pressure.
• Working under tight schedule plan.
4/4

Contenu connexe

Tendances

Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
Engr.ayaz khan
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
Iqbal Mohamed
 
Osama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) newOsama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) new
osama atef
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
sheik syedali
 
Ornetpower Company Profile ENG 170515A
Ornetpower Company Profile ENG 170515AOrnetpower Company Profile ENG 170515A
Ornetpower Company Profile ENG 170515A
Ziv Farfara
 
CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANT
CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANTCARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANT
CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANT
Ankit Singh
 
Compliance Contracting Brochure
Compliance Contracting Brochure Compliance Contracting Brochure
Compliance Contracting Brochure
Paul Wagner
 

Tendances (20)

cv
cvcv
cv
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
Abbas fadhil resume
Abbas fadhil resumeAbbas fadhil resume
Abbas fadhil resume
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
Eng Kamran zfp
Eng Kamran zfpEng Kamran zfp
Eng Kamran zfp
 
Osama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) newOsama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) new
 
Nidec asi wind farm applications
Nidec asi wind farm applicationsNidec asi wind farm applications
Nidec asi wind farm applications
 
Nidec asi silcovert tn
Nidec asi silcovert tnNidec asi silcovert tn
Nidec asi silcovert tn
 
Nidec asi ship to shore connection for navy base
Nidec asi ship to shore connection for navy baseNidec asi ship to shore connection for navy base
Nidec asi ship to shore connection for navy base
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Nidec asi silcovert h series
Nidec asi silcovert h seriesNidec asi silcovert h series
Nidec asi silcovert h series
 
Hussein CV 2016 OCTOBER
Hussein CV 2016 OCTOBERHussein CV 2016 OCTOBER
Hussein CV 2016 OCTOBER
 
Ornetpower Company Profile ENG 170515A
Ornetpower Company Profile ENG 170515AOrnetpower Company Profile ENG 170515A
Ornetpower Company Profile ENG 170515A
 
CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANT
CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANTCARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANT
CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANT
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
RESUME - Copy
RESUME - CopyRESUME - Copy
RESUME - Copy
 
Compliance Contracting Brochure
Compliance Contracting Brochure Compliance Contracting Brochure
Compliance Contracting Brochure
 
Nidec asi electric power solutions for pipeline applications
Nidec asi electric power solutions for pipeline applicationsNidec asi electric power solutions for pipeline applications
Nidec asi electric power solutions for pipeline applications
 
vizag steel plant
vizag steel plantvizag steel plant
vizag steel plant
 
Nidec asi soft starters-mv-e
Nidec asi soft starters-mv-eNidec asi soft starters-mv-e
Nidec asi soft starters-mv-e
 

Similaire à PM Ahmed Abdelhady CV (20)

CVJ_29466149_20150624093911
CVJ_29466149_20150624093911CVJ_29466149_20150624093911
CVJ_29466149_20150624093911
 
Engr kashif cv
Engr kashif cvEngr kashif cv
Engr kashif cv
 
Mohamed saeed elsayed cv 2015 updated
Mohamed saeed elsayed cv  2015 updatedMohamed saeed elsayed cv  2015 updated
Mohamed saeed elsayed cv 2015 updated
 
Akram CV- Updated
Akram CV- UpdatedAkram CV- Updated
Akram CV- Updated
 
FAWZEY CV LATEST UPDATE-3
FAWZEY CV LATEST  UPDATE-3FAWZEY CV LATEST  UPDATE-3
FAWZEY CV LATEST UPDATE-3
 
ahmed mohamed diaa_original
ahmed mohamed diaa_originalahmed mohamed diaa_original
ahmed mohamed diaa_original
 
venkatCV
venkatCVvenkatCV
venkatCV
 
Mohamed salem c.v
Mohamed  salem  c.vMohamed  salem  c.v
Mohamed salem c.v
 
MOHAMED SALEM C.V
MOHAMED  SALEM  C.VMOHAMED  SALEM  C.V
MOHAMED SALEM C.V
 
Mohamed Abou mesalem updated CV
Mohamed Abou mesalem  updated CVMohamed Abou mesalem  updated CV
Mohamed Abou mesalem updated CV
 
Wajid Ali Shah
Wajid Ali ShahWajid Ali Shah
Wajid Ali Shah
 
chiranjib
chiranjibchiranjib
chiranjib
 
Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV
 
Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV
 
Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV
 
Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
sivachandran resume
sivachandran resumesivachandran resume
sivachandran resume
 
PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
 
ajit-cv-updated
ajit-cv-updatedajit-cv-updated
ajit-cv-updated
 

PM Ahmed Abdelhady CV

  • 1. CURRICULUM VITAE JOP REQUEST CURRICULUM VITAE PERSONAL DATA Name AHMED ABD-EL HADY ABD-EL SATTAR. Date of birth JAN 24 1981, Cairo, Egypt Nationality Egyptian Address Alkhobar city , KSA. Marital Status Marraied Military Status Exempted Mobile 00966552856137(KSA). E-MAIL ahmedabdelhady71@yahoo.com Ahmed.Abdelhady@alfanar.com Driving licence Have a valid driving licence (KSA)(EGYPT) CAREER OBJECTIVE • Seeking a project manager position in the field of ELECTRICAL POWER ENGINEERING FIELD in Multinational company. EDUCATION  B.SC. in ELECTRICAL ENGINEERING DEPARTMENT,Faculty of Engineering, Cairo University,Egypt,By ’’ 64.35%’’ May 2003 GRADUATION PROJECT  Project Name: Wheat silo project by motor and convyers(V.good). CAREER HISTORY  (K.S.A) (from 1st Nov 2015 to till date ) Project Manager for Dammam housing115kv/13.8kv substation (Approved as PM from National Grid/SEC) I  (K.S.A) (from 1st Nov 2013 to October 2013 ) Senior Site/condtruction Manager for 380kv/110kv substation PS-1 (Pumping Station one) Integration of new SWCC=Saline Water Conversion Corporation Phase-III suppling power to pumping staion-1 (PS-1) in Yanbu industrial city JOB DUTIES : • Installation of 14 DIA 380KV GIS alomg with related GIB (ABB). • Installation of 03 380KV power transformer 502 MVA (ABB). • Installation of 03 380kv bus reactors 67 MVA (HYNDAI). • Installation of 02 380KV line reactors 120 MVA (HYNDAI). • Installation of 30 bays 110kv GIS (HYUNDAY). • Installation of complete control and protection system (ABB). • Installation of SAS (substaion Automation System)(ABB). 1/4
  • 2. CURRICULUM VITAE JOP REQUEST • Installation of all kinds of cables (LV ,control , FOC and power cables ). • Installation of HVAC , fire fighting, hydrant system , drainage and plumping sysytems . • Installation of all aux. sysyems as lighting , grounding & AC/DC systems . • Installation of charges and battiers 125vdc and 48vdc.(Benning) • Installation of teleprotection and communcation sysytems.(ABB) • Testing and Commissioning for all the above sysytems up to energization stage.  (K.S.A) (from 1st April 2012 to 30.10.2013 ) energized now Site Manager Haramain High Speed Railway HHR-2 Jeddah 380/110/33/13.8kv S/Stn JOB DUTIES : • Installation of 03 power transformer 502 MVA 380/110KV (HYSONG) • Installation of 03 power transformer 73 MVA 110/13.8KV (HYSONG) • Installation of 03 power transformer 40 MVA 110/33KV (HYSONG) • Installation of 30 bays 110kv GIS (HYSONG) • Installation of 06 diamaters 380kv GIS one& half scheme (ABB) • Installation of SAS(substaion automation system) (PRP)(SIEMENS ). • Installtion of 47 feeder13.8kv SG (AES)(Alfanar Electrical System). • Installtion of (FM200) system,batteries and battery chargers system. • Supervision for civil,mechanical and communication activites at site. • Supervision for testing, commissioning and closed loop test. • Responsibility of all construction works as per SEC standered and PTS. • Responsibility of all activites at site from day one up to energization. • Responsibility of all mechanical activites as HVAC,Fire alarms ayaytem, FM200 system,hydrant system,water supply system ,…… • Responsibility of all activites from day one of the project up to energization.  (K.S.A) (from June 2010 to April 2012 ) energized now Site Manager for Jazan Economic City(SAS) (JEC) 380/132/13.8kv S/Stn (KSA). JOB DUTIES : • Installation of 02 power transformer 502 MVA(HYUNDAI) • Installation of 10 bays 132kv GIS (HYUNDAI) • Installation of 04 diamaters 380kv GIS one& half scheme (AREVA) • Installation of SAS(substaion automation system)(SIEMENS ) • Responsibility of all activites at site from day one up to energization. • Installtion of 13.8kv SG (SCHNEIDER). • Installtion of (FM200) system,batteries and battery chargers system. • Supervision for civil,mechanical and communication activites at site. • Supervision for testing, commissioning and closed loop test. • Responsibility of all construction works as per SEC stand. and PTS. • Responsibility of all job site requirements . • Feed back reports to higher managenents during project execution.  (K.S.A) (from August 2008 to June 2010) energized now Site Manager for RABIGH-II S/Stn 380 KV RABIGH (KSA). 2/4
  • 3. CURRICULUM VITAE JOP REQUEST JOB DUTIES : • Installation of 30 bays GIS 380kv (ABB switzerland) • Installation of more than 170 control and protection panels with all cable pulling and termination works. • Installation of 02 aux. transformer plus cable pulling & termination of 13.8kv cables. • Installtion of 13.8kv SG,AC/DC sysem,HVAC system,fire alarm (FM200) system,batteries and battery chargers system. • Responsibility of all activites at site from day one up to energization. • 14 generation feeder from new Rabigh generation station now energized. • 04 OHTL 380kv also energized. • Supervision for civil,mechanical and communication activites at site. • Supervision for testing, commissioning and closed loop test.  (K.S.A) (from August 2008 to June 2010). energized now Site Manager for RABIGH-II to JEDDAH NORTH 380 KV GIL @ RABIGH (KSA).  (K.S.A) (from April 2007 to August 2008 ). energized now Site engineer for Misfallah II S/Stn 110/13.8 KV HOLY MAKKAH. JOB DUTIES : • Mobilization site office (start up duration). • Following up deliverey all equipment and materials as per project scheduel. • Installation of three 67 MVA power transformer (SIEMENS) • Installation of 2x300KVA aux. transformer (Saudi Trans. Co.) • NER installation. • 110kv GIS (10 bays) erection (SIEMENS). • 13.8kv SG erection (49 feeders) (SIEMENS). • SCADA,Teleprotection and control panels installation.(SIEMENS). • AC/DC DB,LDB,ELDB,battery and battery charger installation. • All cabels(HV,MV,LV and control) pulling and termination. • Following up Interface points bet. Civil and electrical works. • Installion of lighting and earthing systems in s/s. • Supervision eletromechanical works (HVAC units and ducts , sprinkler system and FM200 fire fighting system).  Power Generation Engineering and Servies Company (from May,2006 to April,2007) • Electrical system engineer (design review) for combined cycle power plants Talkha & Elkurimat (3X250 MW) projects .  Upper Egypt Electricity Prodution Company (UEEPC).(from July,2004 to April,2006) El KURIMAT power generation sector. • Operating engineer at EL-KURIMAT Substation 500/220/11kv (MITSUBISHI). • Responsibility of all substation activities as OHTL shutdown & lines maintenance. 3/4
  • 4. CURRICULUM VITAE JOP REQUEST  European Arabian company. (from Jan,2004 to June,2004). • Installation,operation and maintenance engineer (UPS,stabilizer and soft starter for motors). COMPUTER SKILLS  Experience in:  Microsoft office.  Internet. TRAINING  BADER EL DIN OIL COMPANY(Egypt)  SHOBRA POWER STATION (Egypt) LANGUAGE SKILL Arabic Mother-Tongue English Excellent (reading and writing) Excellent (speaking) INTERPERSONAL SKILLS • PMP preparation course . • Leadership skills. • Communication skills. • Organization skills. • Hardworking under pressure. • Working under tight schedule plan. 4/4