1. Page 1 of 7
Curriculum Vitae
Ahmed Gouda Khalil
Mobile Phone: (00971)-562968874 / (00964)- 7815357376
E-mail: ahmedgkhalil@gmail.com/ahmed_gouda2007@yahoo.com
Career Objective
A Stimulating and Rewarding career with good growth prospects in Engineering and
Industries to Coordinate with all activities of water and Waste Water treatment Plant by using
my Technical and Practical knowledge.
CAREER
HIGHLIGHTS
Highly experienced and skilled in the water and wastewater treatment plants operation and
maintenance to support project management from conceptual level, Planning stage,
execution stage to project close-out.
The experience encompasses of the following scope of works:
Design, Install, Commission, Operate and maintain the drinking water treatment
plant such as: Reverses Osmosis (RO), Ultra-Filtration, Multimedia/Sand filters,
Softening………..etc.
Design, Install, Commission, Operate and maintain Domestic/Industrial wastewater
treatment plant such as: Extended aeration, conventional aeration, Moving Bed
Bio-Reactor (MBBR), Membrane Bio-Reactor (MBR)……………..etc.
Operate and maintain different departments of the cane sugar factory.
Experiences
Total Experience – 16 Years and 4 months till date
Design, Install, Commission, Operate and maintain the drinking water treatment
plant with different capacity.
Design, Install, Commission, Operate and maintain domestic/industrial wastewater
treatment plant with different capacity.
Design, Install, Commission, Operate and maintain oil field seawater supply project
according to oil filed injection water quality standards.
Operate and maintain cane sugar factory according to standard limits and
equipment datasheet and supplier recommendations.
January 2013 –
Present
Employer: TISS Electromechnical Company – Abu Dhabi – UAE.
Job title: Operation and Processing manager.
Job Description
Prepare site survey of projects and study and approved tender Documents &
specifications.
To prepare suitable design and specification for RO water desalination plant &
wastewater treatment plant.
To prepare inquiry and make procurement for all equipments and send it to the
(international and local) suppliers.
To prepare Pricing spread sheet, cost estimation and technical commercial proposal.
To follow-up with the client about quotation and negotiation.
2. Page 2 of 7
To develop the plant process and equipments capacity to be able and more competitive
with the market competitors.
To Execute the project successfully as per and within the contractual requirement and
standards.
To make quality control of the final treated effluent within the acceptable limits as per the
Specifications given in the standards proposal.
To instruct operators for effective and efficient operation of the plant.
To Co-ordinate with the executive and managing director for all the activities and plans
related to develop the business and market needing.
To maintain and calculate mass balance and sludge (SRT) in typically design
parameters for commonly used processes such as {MBBR, SBR, Conventional plug flow
and extended aeration}.
To maintain and calculate (HRT) for aeration and clarifiers basins in the standards of the
designing standards.
To Co-ordinate with all discipline engineers for all maintenance jobs in the plant.
To conduct various experiments in the Influent and Effluent along with lab technicians.
To prepare all the Periodical reports like Daily, Weekly, Monthly & Yearly and submit it
to the concerned authority.
Reference Projects
Project: Common Seawater Supply Project (CSSP–Demonstration facility Plan)
Location: Khor Al Zubair – Basrah – Iraq.
Client: SOC (South Oil Company at IRAQ).
Consultant: CH2MHILL.
EPC Contractor: TISS Electromechnical Company.
The project objective:
The objective of the project is to develop a technical solution to implement a Common
Seawater Treatment Facility (STF) for the Zubair, Rumaila, West Qurna 1, West Qurna 2,
and Majnoon oil fields in Southern Iraq. Each of these oil fields requires water injection to
ensure proper oil reservoir maintenance and maximize oil recovery.
The scope of work:
Plan, design, procure, construct, and operate a demonstration facility to validate design
criteria and confirm the selected treatment system can successfully achieve the stated water
quality goals.
Project: TSE Polishing Plant with capacity 6600 cubic meter per day.
Location: District Cooling Plant (DCP) – Lusail Marina Phase # 1 – Doha – Qatar.
Client: Marafeq Qatar.
EPC Contractor: BUTEC / ADC – Energy System Abu Dhabi.
Sub-Contractor: TISS – Electromechanical Company.
The project objective:
Due to scarcity of water resources in the Gulf countries and the world, most of the GCC
countries tended to use treated sewage effluent (TSE) as an alternative to drinking water in
the district cooling plant. So The project objective is to develop the process design concepts
for TSE-Polishing plant shall be installed to meet water quality required by district cooling
plant.
The scope of work:
Plan, design, procure, construct, install and commission a polishing plant (capacity=6,600
m
3
/day) which include ultra-filtration (UF) and reverse osmosis (RO) with all related
equipments.
March 2012 –
January 2013
Employer: Kadhema Scientific Consultancy and Service (KSCS) Co, Kuwait.
Job title: Operation and Processing Engineer.
Job Description
To prepare the site survey of the projects and study tender documents and approved the
total tender specifications.
To make and prepare the suitable calculations and specification for the all wastewater
treatment plant equipments.
3. Page 3 of 7
To prepare the techno-commercial proposal and calculate the total cost, installation cost
and commissioning cost.
To follow-up with the client about the quotation and negotiation about it.
To develop the plant process and equipments capacity and models to be able and more
competitive with the market competitors.
To Execute Operation / Process of the plant (MBBR, SBR, Conventional, extended
aeration successfully as per and within the contractual requirement and standards
process.
To Maintain the Quality of the Treated Effluent within the acceptable limits as per the
Specifications given in the standards proposal.
To Guide the Process personnel for effective and efficient operation of the plant.
To Co-ordinate with the Project Manager for all the activities related to the development
of the Process.
To maintain and calculate mass balance and sludge (SRT) in typically design
parameters for commonly used processes such as {MBBR, SBR, Conventional plug flow
and extended aeration}.
To maintain and calculate (HRT) for aeration and clarifiers basins in the standards of the
designing standards.
To Co-ordinate with all discipline engineers for all maintenance jobs in the plant.
To conduct various experiments in the Influent and Effluent along with lab technicians.
To prepare all the Periodical reports like Daily, Weekly, Monthly & Yearly and submit it
to the concerned authority.
Reference Projects
Project: Industrial wastewater Treatment Plant with capacity = 2500 m
3
/day.
Location: Subhan industrial area – Kuwait city - Kuwait.
Client: PEPSI-COLA Kuwait.
EPC Contractor: Kadhema Scientific Consultancy and Service (KSCS) Co.
The project objective:
The objective of the project is to treat the industrial wastewater produced from beverage
factories using Sequence Batch Reactors (SBR) technology to meet the criteria of the treated
wastewater discharged into the sewerage system.
The scope of work:
Plan, design, procure, construct, install and commission wastewater treatment plant with
capacity 2500 m
3
/day and all related equipments.
Project: Industrial wastewater Treatment Plant with capacity = 1500 m
3
/day.
Location: Subhan industrial area – Kuwait city - Kuwait.
Client: AMERICANA - Kuwait.
EPC Contractor: Kadhema Scientific Consultancy and Service (KSCS) Co.
The project objective:
The objective of the project is to treat the industrial wastewater produced from Bakeries and
Meat factories using Dissolved air flotation (DAF) technology with extended aeration system
to meet the criteria of the treated wastewater discharged into the sewerage system.
The scope of work:
Plan, design, procure, construct, install and commission wastewater treatment plant with
capacity 2500 m
3
/day and all related equipments.
July 2008- March
2012
Employer: KCC Engineering and contracting company (KCCeC ), Kuwait.
Job title: Operation and Processing Engineer
Job Description
To Execute Operation and Process of the Project No. SE / S / 137 and Project
No.:SE/S/128. Successfully as per and within the contractual requirement.
To Organize the Process as per Plant requirements and scheduling the daily activities.
To Maintain the Quality of the Treated Effluent within the acceptable limits as per the
Specifications given in the Contract by the Ministry.
4. Page 4 of 7
To Guide the Process personnel for effective and efficient operation of the plant.
To Co-ordinate with the Project Manager and MPW for all the activities related to the
development of the Process.
To maintain and calculate mass balance and sludge (SRT).
To maintain and calculate (HRT) for aeration and clarifiers basins.
To Co-ordinate with all discipline engineers for all maintenance jobs in the plant.
To conduct various experiments in the Influent and Effluent along with MPW lab
personnel.
To prepare all the Periodical reports like Daily, Weekly, Monthly & Yearly and submit it
to the concerned authority.
To carry out the Treatment of Thickened Sludge and Operation of Belt Press
Equipments using high quality Cationic Polymers.
To arrange the Disposal of Waste Sludge Out side the Plant.
To prepare Internal Work Orders and Request for Inspection, and submit to the Ministry
for approval.
To Co-ordinate with Plant Services manpower for Land Scaping & Irrigation works and
maintains the Plant area Clean & Green.
To Co-ordinate with Safety Officer and take utmost care towards safety of the Work
Force.
To Co-ordinate with Instrumentation Engineer for Calibration of Flow measuring devices
as per the Preventive Maintenance Schedule.
To Co-ordinate with Project Manager for preparing Monthly payment bill and getting
monthly work orders from Ministry of Public Works.
To Co-ordinate with our inside and outside supplier for getting chemicals and materials
required for wastewater treatment plant and laboratory tests.
Reference Projects
Project: Al JAHRA wastewater treatment plant (Capacity= 120,000 m
3
/day).
Location: Amgarah area – Jahra city - Kuwait.
Client: Ministry of Public Work (MPW) - Kuwait.
EPC Contractor: KCC Engineering and contracting company.
The project objective:
Operate and maintain the sewage treatment plant using extended aeration system and
attached activated sludge according to the design standards and criteria of treated
wastewater used in irrigation.
The scope of work:
Operate and maintain wastewater treatment plant with capacity 120,000 m
3
/day.
Project: Al REKKA wastewater treatment plant (Capacity= 250,000 m
3
/day).
Location: AL AHMADI city - Kuwait.
Client: Ministry of Public Work (MPW) - Kuwait.
EPC Contractor: KCC Engineering and contracting company.
The project objective:
Operate and maintain the sewage treatment plant using extended aeration system and
attached activated sludge according to the design standards and criteria of treated
wastewater used in irrigation.
The scope of work:
Operate and maintain wastewater treatment plant with capacity 250,000 m
3
/day.
Nov.2004 – July
2008
Egyptian Sugar and Integrated Industrial company (ESIIC), Egypt.
Job title: Operation and Processing Engineer.
Job Description
In charge for Operation and Maintenance of sulfur Dioxide production plant.
In charge for Operation and Maintenance of milk of lime (Calcium Hydroxide) production
plant.
In charge for operation of raw and mixed Juice extraction (by mills & diffuser) plant.
In charge for operate and maintenance of raw and mixed cane Juice treatment plant
(chemicals & thermal treatment).
5. Page 5 of 7
In charge for Juice clarifier plant and Mud of juice filtration plant.
In charge for Juice evaporation plant and concentrated syrup production.
To prepare all the Periodical reports like Daily, Weekly, Monthly & Yearly and submit it
to the concerned authority.
To Co-ordinate with all discipline engineers for all maintenance jobs in the plant.
To Co-ordinate and contact with our inside and outside supply of materials required for
all production processes.
To Co-ordinate with factory and other work shop for repairing and maintenance our
equipments required in our factory processes.
To maintain and calculate mass and energy balance for cane sugar factory.
To maintain and calculate Capacity of all our equipments in cane sugar factory.
Reference Projects
Project: Qus Cane Sugar Factory.
Location: Qus city - QENA Governorate - Egypt
Owner: Egyptian Sugar and Integrated Industrial company (ESIIC).
The project objective:
The project objective to produce white or brown sugar from cane sugar using sugar factory
with capacity of 1500 ton of white/brown sugar and bi-products such as Molasses and
Bagasse.
The scope of work:
Operate and maintain cane sugar factory to produce white/brown sugar according to the
design criteria and equipment datasheet.
May 2000 – Oct.
2004
SYSTEM TECHNIQUE – Water Management, Giza, Egypt.
Job title: Operation and Processing Engineer.
Job Description
To prepare the site survey of the projects and study tender documents and approved the
total tender specifications.
To make and prepare the suitable calculations and specification for the all wastewater
treatment plant equipments.
To prepare the techno-commercial proposal and calculate the total cost, installation cost
and commissioning cost.
To follow-up with the client about the quotation and negotiation about it.
To develop the plant process and equipments capacity and models to be able and more
competitive with the market competitors.
To Execute Operation / Process of the plant (MBBR, SBR, Conventional, extended
aeration successfully as per and within the contractual requirement and standards
process.
To Maintain the Quality of the Treated Effluent within the acceptable limits as per the
Specifications given in the standards proposal.
To Guide the Process personnel for effective and efficient operation of the plant.
To Co-ordinate with the Project Manager for all the activities related to the development
of the Process.
To maintain and calculate mass balance and sludge (SRT) in typically design
parameters for commonly used processes such as {MBBR, SBR, Conventional plug flow
and extended aeration}.
To maintain and calculate (HRT) for aeration and clarifiers basins in the standards of the
designing standards.
To Co-ordinate with all discipline engineers for all maintenance jobs in the plant.
To conduct various experiments in the Influent and Effluent along with lab technicians.
To prepare all the Periodical reports like Daily, Weekly, Monthly & Yearly and submit it
to the concerned authority.
6. Page 6 of 7
Reference Projects
Project: Reverse Osmosis (RO) plant with capacity 2,000 m
3
/day.
Location: SONESTA Beach resorts – Sharm El Sheikh City – South Sinai Gov. - Egypt.
Client: SONESTA Resorts and Hotels - Egypt.
EPC Contractor: SYSTEM TECHNIQUE company, Egypt.
The project objective:
Due to scarcity of water resources in South Sinai Governorate-Egypt, most of the resorts and
hotels tended to use treated seawater as drinking water source. So The project objective is to
design and install RO plant to treat seawater and meet drinking water criteria and limits.
The scope of work:
Design, Supply, Operate and maintain Reverse Osmosis (RO) plant (capacity 2,000 m
3
/day)
according to the design standards and criteria of treated seawater used in drinking and other
applications.
Project: Reverse Osmosis (RO) plant with capacity 1,500 m
3
/day.
Location: HYATT REGENCY resorts – Sharm El Sheikh City – South Sinai Gov. - Egypt.
Client: HYATT REGENCY Hotels - Egypt.
EPC Contractor: SYSTEM TECHNIQUE company, Egypt.
The project objective:
Due to scarcity of water resources in South Sinai Governorate-Egypt, most of the resorts and
hotels tended to use treated seawater as drinking water source. So The project objective is to
design and install RO plant to treat seawater and meet drinking water criteria and limits.
The scope of work:
Design, Supply, Operate and maintain Reverse Osmosis (RO) plant (capacity 1,500 m
3
/day)
according to the design standards and criteria of treated seawater used in drinking and other
applications.
Project: Reverse Osmosis (RO) plant with capacity 2,500 m
3
/day.
Location: Mövenpick Resorts – Sharm El Sheikh City – South Sinai Gov. - Egypt.
Client: Mövenpick Hotels - Egypt.
EPC Contractor: SYSTEM TECHNIQUE company, Egypt.
The project objective:
Due to scarcity of water resources in South Sinai Governorate-Egypt, most of the resorts and
hotels tended to use treated seawater as drinking water source. So The project objective is to
design and install RO plant to treat seawater and meet drinking water criteria and limits.
The scope of work:
Design, Supply, Operate and maintain Reverse Osmosis (RO) plant (capacity 2,500 m
3
/day)
according to the design standards and criteria of treated seawater used in drinking and other
applications.
Project: Reverse Osmosis (RO) plant with capacity 800 m
3
/day.
Location: HYATT REGENCY resorts – Taba City – South Sinai Gov. - Egypt.
Client: HYATT REGENCY Hotels - Egypt.
EPC Contractor: SYSTEM TECHNIQUE company, Egypt.
The project objective:
Due to scarcity of water resources in South Sinai Governorate-Egypt, most of the resorts and
hotels tended to use treated seawater as drinking water source. So The project objective is to
design and install RO plant to treat seawater and meet drinking water criteria and limits.
The scope of work:
Design, Supply, Operate and maintain Reverse Osmosis (RO) plant (capacity 800 m
3
/day)
according to the design standards and criteria of treated seawater used in drinking and other
applications.
Educational Details
B.Sc. Of Chemical 1999 South Valley university, Egypt. First Class (72.5%)
Target Job
Job location Any Country
7. Page 7 of 7
Job Category Process and Operation for Water / Waste Water Treatment plants.
Employment Type Permanent / Contract.
Employment Status Full Time
Current location United Arab Emirates (UAE).
Driving License UAE driving license (Valid upto: 2022)
Computer Skills
Processing System
1. MS Windows, MS Office (Word / Excel / Power Point / Internet access).
2. AUTO CAD software and design in to 2 dimensions.
Significant Skills
Excellent Team Work and Technical Support
Good Analytical, Organizational and Interpersonal Skills
Good Leadership, People Management, self motivation & negotiating Skills
Highly disciplined work habits, Dedication towards work & commitments
Accurate planning and completion of the work schedule in time
Excellent English Language and Presentation Skills
Languages Known English, Arabic.
Personal Information
Father’s Name
Nationality
Religion
Date of Birth
Ahmed Gouda Khalil
Egyptian
Muslim
16/01/1976
Up-Date: 15.06.2016 Ahmed G. Khalil