Installation, Testing and Jointing of LT and HT Power Cables up 
to 33 KV 
Er. Parveen Kumar Goyal 
B.E.(Electricals), M.Tech.(Power Systems),Gurgaon, India 
E-mail: pkgoyal1983@gmail.com 
Abstract 
In the electrical power distribution and transmission system for urban and rural area, overhead lines are usually 
in major practice. Underground system was not favourable in developing and under developed countries. The 
main reason behind it was the much higher capital investment of underground cabling with respect to overhead 
bare conductors. But with the advancement in technology and market competition its cost is manageable for 
urban areas. This system requires more skills and planning for installation, jointing and termination rather than 
overhead lines. The presented paper is applied on power distribution system up to 33 KV. 
Keywords: LT/HT power cables, Installation, Jointing, Termination, Testing. 
1. Introduction 
The fist step for the cabling system is selection of cable sizes. Voltage drop is the considerable factor for the 
selection of LT cables but in case of HT cable selection depend on short circuit current and current carrying 
capacity. After selection of cable there will be an inspection visit at manufacturing unit before dispatch. There 
will be numerous testing on cables to ensues the acceptibity as per electrical standards and site requirements. 
Essential testes are listed as below:- 
15 
 Tensile test ( for Aluminium conductor) 
 Wrapping test ( for aluminium conductor) 
 Annealing test ( for copper conductor) 
 Thickness of insulation and sheath 
 High voltage testing 
 Insulation resistance test 
 Hot set test ( for XLPE cables only) 
2. Cable installation 
After satisfactory testing the cable drums will be dispatched to site for installation work. Installation work will 
follow a sequence of activities. The major points to be explained as under : 
1. Storage of cable drums 
2. Route survey for installation 
3. Type of installation 
4. Road crossings/pipe laying 
5. Trenching 
6. Cable laying in ( trench/trays/ducts/racks) 
7. Testing at site 
8. Jointing 
9. Route markers 
2.1 Storage of cable drums 
Cable drums always shall be placed/store on dry and hard surface. Paved area is best for storing. There shall not 
be any kind of water logging. Drum shall always be kept on its flanged instead of flat surface. Whenever the 
storage time is very long then rotate the drum at 90 degree after every 3 months. The direction of drum rotation 
should match the direction of arrow marked on the flat side. There is no need to cover the cable drums but try to 
keep away for hard sunlight. Both the ends of cable should be sealed by insulation cap to avoid moisture ingress.
Industrial Engineering Letters www.iiste.org 
ISSN 2224-6096 (Paper) ISSN 2225-0581 (online) 
Vol.4, No.8, 2014 
Storage of cable drum 
2.2 Route survey 
Before starting the other activities there should be a detailed survey of route. Route shall be so selected that 
trenching work for cable shall not jeopardize existing utilities, which are vulnerable to damage. Maintenance 
point of view is also important. It should be straight along the roads/footpaths with some space for offset. Trench 
shall always be kept away from drains and property lines ( specially for LT cables ). HT cable shall be closer to 
the kerb line instead of LT cables. Different trenches shall be used for different voltage levels. If extra space is 
not available then kept the lower voltage cable above the higher voltages. Gap between power and 
communication cable shall be minimum 600 mm horizontally as well as vertically. 
16 
2.3 Type of installation 
 Laying in closed pipes/ducts 
 On trays 
 On surface by clamping 
 Underground 
 Entering in building 
2.4 Road crossings/pipe laying 
Stoneware/GI/CI/RCC/HDPE pipes are used for road crossing and for protection on poles only GI/metallic pipe 
shall be used. RCC pipes have high degree of mechanical strength and preferably used upto 33 kv applications. 
Minimum dia of pipe kept 1.5 times than the outer dia of cable. minimum diameter of pipe shall be 100 mm for 
single run of cable and minimum 150 mm for more than 01 cable run. Different voltage cable shall always pass 
through separate pipes. PCC bed of 100 mm thickness is required for stoneware pipes only. Top surface of pipe 
shall always be minimum 01 metre below the pavement level of Road. All metal pipes shall be properly bond 
with earthing station. Crossing shall be done askew to reduce the safe bending angle of cable. To maintain the 
safe bending radius , the road crossing angle can be calculated as below : 
X = distance between road entry and cable 
R = minimum required bending radius 
α = angular alignment of pipe/duct 
Distance deviation can be derived for pipe’s far end 
Sinθ …………………………… eq (a) 
α = 90-β 
=90-(90-θ) 
α = θ now Z = W.tanθ ……………………………. eq (b) 
take an example ( as shown in figure below)
Industrial Engineering Letters www.iiste.org 
ISSN 2224-6096 (Paper) ISSN 2225-0581 (online) 
Vol.4, No.8, 2014 
Calculation for angle of pipe crossing 
Voltage  size of cable - 33kv, 3 core, 400 sq.mm. XLPE cable 
Distance X - 300 mm = 0.3 mtr 
Road width, W - 20 mtr 
Outer diameter of cable - 105 mm = 0.105 mtr 
R, bending radius required - 12x0.105 = 1.26 mtr 
Now from eq (a), Sinθ = (1.26-0.3)/1.26 
17 
= 0.76 
And θ = 49.6 deg. 
Putting values of W and θ in eq (b), we get 
Z = 20tan49.6deg. 
= 23.5 mtr 
2.5 Trenching 
Width of trench shall be minimum 350 mm or single run of cable. Inter axial space between 02 cable shall be 
200 mm and minimum clearance between cable’s axis and sides of trench shall be 150 mm. depth for LT cable 
shall be 750 mm and for 11 kv  33 kv, it will be 900 mm and 1200 mm respectively.if there is tier formation in 
trenches than the vertical clearance between 02 tiers shall be 300 mm. trenching shall be in straight line and 
when direction has to be changed, there shall be a suitable curvature for sage bending of cables. 
2.6 Cable laying 
Cables up to dia 95 sq. mm can be removed from drum by flaking, not acceptable for higher sizes. cable shall 
always be uncoil by the help of jacks above 50 sq. mm. When cable is laying direct in ground then there shall be 
75 mm bed of fine sand in bottom before laying. Then test for insulation resistance and continuity of cable. 
Cover the cable after testing 170 mm sand from base cushion. For multilayer cabling, sand cushioning shall be 
300 mm between cables. A loop of approximate 3.0 mtr shall be kept on each termination as well as both sides of 
each joint. In very long span, cable may be looped at specified intervals. Protection cover by bricks/slates/tiles is 
placed above sand cushion with 50 mm extra cover on both sides of cable. Back filling earth shall be rammed 
and watered in the layers of 300 mm. bricks protection may be waived for LT cables if the depth is increased by 
250 mm more than standard depth. Never install a cable with kinks or damaged armour. 
Minimum bending radius Single core cable Multicore cable 
Upto 1.1 KV 15D 12D 
1.1 kv to 11 kv 15D 15D 
Above 11 kv 20D 15D 
Where D is the outer dia of cable
Industrial Engineering Letters www.iiste.org 
ISSN 2224-6096 (Paper) ISSN 2225-0581 (online) 
Vol.4, No.8, 2014 
Bending radius of steel/HDPE duct kept minimum 1.5 metre. 
Cable laying in trench 
When single core cable is installed directly on surface, clamp shall be non-magnetic and shall not pass through 
any metallic pipe. Sag and kinks are not acceptable. If cable size exceeds 120 sq. mm MS flat are allowed to 
cradle with bolting on wall at interval of 600 mm. all mild steel components shall be galvanised of painted with 
red oxide. 
In case of cable trays, coupler plate shall be 200 mm length with same material and specifications of channel of 
tray. Contact area between channel and coupler shall be scraped and removed for better earth continuity. Width 
of cable tray kept 30% higher for future expansion and shall be minimum size of 100 mm. MS flats of size 25 
mm X 5 mm may be used as suspender for tray up to 450 mm. GI rods of 10 mm dia may be bolted to tray or on 
an angle support of 50 mm x 50 mm x 5 mm size. Tray should be earthed at both ends and cable shall be 
tied/clamped on suitable intervals. There shall be cable tags for identification of feeder at fix intervals. 
When cable is entering in a building through pipe then the slope of pipe shall be downward from the building 
and pipe ends towards building shall be sealed after laying of cable. 
If site temperature is below 3 deg. C, cable should be warmed up to minimum 10 degree C before laying. It shall 
be warmed with blowers in a closed room or tents for minimum 24 hours otherwise bending will damage the 
insulation and protective covering of cable. 
2.7 Testing at site 
Three types of fault may occur in underground cabling i.e. open circuit fault, short circuit fault and earth fault. 
To avoid these faults there are some tests carried out at site before laying and after laying of each cable span. 
2.7.1 Before laying 
Insulation resistance test, continuity test, earth fault test 
2.7.2 After laying 
 Insulation resistance test 
 Continuity test 
 Earth fault test 
 DC pressure test for 15 minutes (if not possible than test for 01 minute with 1000 V megger for LT 
cable and with 2500/5000 V megger for HT cable. 
2.8 Jointing 
Before laying a cable, joint location must be identified. Is should lie in road crossings, water logging area, 
communication lines and any other main service’s line. Joints shall be at staggered position by 2-3 metres when 
02 or more cable has to be jointed. Before jointing, Aluminium conductor’s oxide film shall be completely 
removed by scraping or flux. Joining shall always be done by a certified and experienced jointer. For jointing, 
there are various jointing  termination kits. Mainly used are heat shrink, cold shrink, push on, tapex and resin 
cast jointing kits. Procedure shall be strictly follows as per manufacturer’s guidelines. After jointing and 
termination, DC high voltage test to be performed. 
18
Industrial Engineering Letters www.iiste.org 
ISSN 2224-6096 (Paper) ISSN 2225-0581 (online) 
Vol.4, No.8, 2014 
Heat shrink cable jointing 
2.9 Route markers 
GI/CI/Al plate on MS angle of 35mm x35mm x 6 mm of 600 mm length may be used for marker. It should be 
parallel to cable and kept at 300 mm from cable and at underground joints. Concrete markers can also be used 
and to be furnish above cable laid. 
Cable route markers 
3 Detailed cable installation plan 
After cable installation, jointing and termination, a plan shall be prepared. It will include the following details:- 
 Type of cable, cross sectional area, rated voltage, cable number and drum numbers. 
 Year and month of laying 
 Actual length between joints to joints and end to joints 
 Location of cable and joints in relation to certain fix reference points 
 Name of jointer 
 Date of jointing 
 Result of testing and measurement 
Conclusion 
Underground cabling are safer than overhead electrical lines and also gives aesthetic look to the projects. But 
underground installation work need higher attention and skills otherwise the performance of system may result 
unsatisfactory. The major points which are to pay major focus are bending angle, jointing, testing and protection 
for system as well as neighbourhoods 
References 
1. T.S. Swaminathan, Theory of power cable accessories, cable installation and testing (2005), Khanna 
19
Industrial Engineering Letters www.iiste.org 
ISSN 2224-6096 (Paper) ISSN 2225-0581 (online) 
Vol.4, No.8, 2014 
Publishers, Delhi -06. 
2. Bureau of Indian standards, IS : 1255-1983 (reaffirmed 1996), Code of practice for installation and 
maintenance of power cables upto and including 33 kv rating 
3. CPWD General specifications for electrical work, Part – IV (sub stations), 2013. 
4. Technical specifications of cable work, www.iacs.in/tender/electrical.. 
6. B. Prasad ( chartered engineer ) power point presentation on cable and laying, amieclub@gmail.com. 
7. Er. Mafijur rehman, professional associates limited, power point presentation on underground cabling 
8. 3M, Electrical market division, product catalogue, www.cablejoints.co.uk 
9. Quick reference guide, Raychem cable accessories, te.com/ 
10. B. Prasad ( chartered engineer ) power point presentation on cable joints and terminations, 
amieclub@gmail.com 
11. Images, www.google.com 
20
The IISTE is a pioneer in the Open-Access hosting service and academic event 
management. The aim of the firm is Accelerating Global Knowledge Sharing. 
More information about the firm can be found on the homepage: 
http://www.iiste.org 
CALL FOR JOURNAL PAPERS 
There are more than 30 peer-reviewed academic journals hosted under the hosting 
platform. 
Prospective authors of journals can find the submission instruction on the 
following page: http://www.iiste.org/journals/ All the journals articles are available 
online to the readers all over the world without financial, legal, or technical barriers 
other than those inseparable from gaining access to the internet itself. Paper version 
of the journals is also available upon request of readers and authors. 
MORE RESOURCES 
Book publication information: http://www.iiste.org/book/ 
IISTE Knowledge Sharing Partners 
EBSCO, Index Copernicus, Ulrich's Periodicals Directory, JournalTOCS, PKP Open 
Archives Harvester, Bielefeld Academic Search Engine, Elektronische 
Zeitschriftenbibliothek EZB, Open J-Gate, OCLC WorldCat, Universe Digtial 
Library , NewJour, Google Scholar

Contenu connexe

Tendances

Conductors used in transmission line
Conductors used in transmission lineConductors used in transmission line
Conductors used in transmission lineSourabh sharma
 
A Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv SubstationA Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv SubstationSubhrajit Ghosh
 
Cable joint n end connector
Cable joint n end connectorCable joint n end connector
Cable joint n end connectorBHAGWAN PRASAD
 
Power cable selection, cable selection Methodology
Power cable selection, cable selection Methodology Power cable selection, cable selection Methodology
Power cable selection, cable selection Methodology wessam alaslmi
 
Earthing Syatem
Earthing SyatemEarthing Syatem
Earthing SyatemNoman Khan
 
Sample calculation-for-differential-relays
Sample calculation-for-differential-relaysSample calculation-for-differential-relays
Sample calculation-for-differential-relaysRoberto Costa
 
Lightning Arrester Working Principle & Types
Lightning Arrester Working Principle & TypesLightning Arrester Working Principle & Types
Lightning Arrester Working Principle & TypesPower System Operation
 
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard EquipmentSimple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard EquipmentSARAVANAN A
 
Low voltage cables
Low voltage cablesLow voltage cables
Low voltage cableshanin zeg
 
Earthing Concepts
Earthing ConceptsEarthing Concepts
Earthing Conceptsmvrkprasad
 
Earthing and bonding - Power cables
Earthing and bonding - Power cablesEarthing and bonding - Power cables
Earthing and bonding - Power cablesLeonardo ENERGY
 
Electrical grounding and earthing
Electrical grounding and earthingElectrical grounding and earthing
Electrical grounding and earthingNitesh Dash
 

Tendances (20)

Conductors used in transmission line
Conductors used in transmission lineConductors used in transmission line
Conductors used in transmission line
 
A Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv SubstationA Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv Substation
 
Cable joint n end connector
Cable joint n end connectorCable joint n end connector
Cable joint n end connector
 
Power cable selection, cable selection Methodology
Power cable selection, cable selection Methodology Power cable selection, cable selection Methodology
Power cable selection, cable selection Methodology
 
Earthing Syatem
Earthing SyatemEarthing Syatem
Earthing Syatem
 
Sample calculation-for-differential-relays
Sample calculation-for-differential-relaysSample calculation-for-differential-relays
Sample calculation-for-differential-relays
 
Lightning Arrester Working Principle & Types
Lightning Arrester Working Principle & TypesLightning Arrester Working Principle & Types
Lightning Arrester Working Principle & Types
 
Types of cables
Types of cablesTypes of cables
Types of cables
 
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard EquipmentSimple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment
 
Underground cables
Underground cablesUnderground cables
Underground cables
 
High voltage underground cables
High voltage underground cablesHigh voltage underground cables
High voltage underground cables
 
Low voltage cables
Low voltage cablesLow voltage cables
Low voltage cables
 
Underground cables vs overhead lines
Underground cables vs overhead linesUnderground cables vs overhead lines
Underground cables vs overhead lines
 
Earthing
EarthingEarthing
Earthing
 
Electrical testing
Electrical testingElectrical testing
Electrical testing
 
Earthing Concepts
Earthing ConceptsEarthing Concepts
Earthing Concepts
 
Earthing and bonding - Power cables
Earthing and bonding - Power cablesEarthing and bonding - Power cables
Earthing and bonding - Power cables
 
High Voltage
High VoltageHigh Voltage
High Voltage
 
High voltage underground cables
High voltage underground cablesHigh voltage underground cables
High voltage underground cables
 
Electrical grounding and earthing
Electrical grounding and earthingElectrical grounding and earthing
Electrical grounding and earthing
 

En vedette

Electrical switch gear parts
Electrical switch gear partsElectrical switch gear parts
Electrical switch gear partsrathod811
 
Industrial training report
Industrial training report Industrial training report
Industrial training report Pritam Samanta
 
Switch gear & control gear industry in india
Switch gear & control gear industry in indiaSwitch gear & control gear industry in india
Switch gear & control gear industry in indiaValueNotes
 
Power Transformer ( Summer Training presentation BHEL )
Power Transformer ( Summer Training presentation BHEL )Power Transformer ( Summer Training presentation BHEL )
Power Transformer ( Summer Training presentation BHEL )Dheeraj Upadhyay
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentationNageswar Rao
 
switchgear and protection by vala kamlesh
switchgear and protection by vala kamleshswitchgear and protection by vala kamlesh
switchgear and protection by vala kamleshKamlesh Vala
 
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...Thorne & Derrick International
 
3 phase of induction motor 2015 16
3 phase of induction motor 2015 163 phase of induction motor 2015 16
3 phase of induction motor 2015 16Rajputm123
 
Presentation about transformer and its types
Presentation about transformer and its types Presentation about transformer and its types
Presentation about transformer and its types M Tahir Shaheen
 
Transformer a short presentation
Transformer a short presentationTransformer a short presentation
Transformer a short presentationshakil2604
 
Transformers Project report
Transformers Project reportTransformers Project report
Transformers Project reportTanuj Gupta
 

En vedette (18)

SEB Cable Pulling & Laying Equipment Catalogue
SEB Cable Pulling & Laying Equipment CatalogueSEB Cable Pulling & Laying Equipment Catalogue
SEB Cable Pulling & Laying Equipment Catalogue
 
Electrical switch gear parts
Electrical switch gear partsElectrical switch gear parts
Electrical switch gear parts
 
Industrial training report
Industrial training report Industrial training report
Industrial training report
 
Hvdc circuit breaker
Hvdc circuit breakerHvdc circuit breaker
Hvdc circuit breaker
 
Switch gear & control gear industry in india
Switch gear & control gear industry in indiaSwitch gear & control gear industry in india
Switch gear & control gear industry in india
 
Switchgear
SwitchgearSwitchgear
Switchgear
 
Power Transformer ( Summer Training presentation BHEL )
Power Transformer ( Summer Training presentation BHEL )Power Transformer ( Summer Training presentation BHEL )
Power Transformer ( Summer Training presentation BHEL )
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
switchgear and protection by vala kamlesh
switchgear and protection by vala kamleshswitchgear and protection by vala kamlesh
switchgear and protection by vala kamlesh
 
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
 
3 phase of induction motor 2015 16
3 phase of induction motor 2015 163 phase of induction motor 2015 16
3 phase of induction motor 2015 16
 
Presentation about transformer and its types
Presentation about transformer and its types Presentation about transformer and its types
Presentation about transformer and its types
 
Transformer
TransformerTransformer
Transformer
 
Transformer construction,types and working
Transformer construction,types and workingTransformer construction,types and working
Transformer construction,types and working
 
Industrial Training Report-1
Industrial Training Report-1Industrial Training Report-1
Industrial Training Report-1
 
Transformer a short presentation
Transformer a short presentationTransformer a short presentation
Transformer a short presentation
 
Transformers Project report
Transformers Project reportTransformers Project report
Transformers Project report
 
transformer ppt
transformer ppttransformer ppt
transformer ppt
 

Similaire à Installation, testing and jointing of lt and ht power cables up to 33 kv

01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976Southern Railway
 
UNIT - 03 LIGHTING INSTALLATION
UNIT - 03 LIGHTING INSTALLATIONUNIT - 03 LIGHTING INSTALLATION
UNIT - 03 LIGHTING INSTALLATIONPremanandDesai
 
Laying of Underground Cables.pptx
Laying of Underground Cables.pptxLaying of Underground Cables.pptx
Laying of Underground Cables.pptxDrAkankshaSharma4
 
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedure
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief ProcedureTechnical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedure
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedurepaperpublications3
 
Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...Mahesh Chandra Manav
 
Cable Ladder Bonding with Earth Wire, Is it Necessary?
Cable Ladder Bonding with Earth Wire, Is it Necessary?Cable Ladder Bonding with Earth Wire, Is it Necessary?
Cable Ladder Bonding with Earth Wire, Is it Necessary?Mike Hamilton
 
Types of Wires and Cables
Types of Wires and CablesTypes of Wires and Cables
Types of Wires and CablesOsama Naseem
 
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...Mahesh Chandra Manav
 
Design and construction of underground cable transmission line
Design and construction of underground cable transmission lineDesign and construction of underground cable transmission line
Design and construction of underground cable transmission lineFazlur Rahman
 
Project sagarmala presentation jmv lps
Project sagarmala presentation jmv lpsProject sagarmala presentation jmv lps
Project sagarmala presentation jmv lpsMahesh Chandra Manav
 
Presentation mecon project by jmv lps
Presentation mecon project by jmv lpsPresentation mecon project by jmv lps
Presentation mecon project by jmv lpsMahesh Chandra Manav
 
Underground Cables
Underground Cables Underground Cables
Underground Cables Parth Pawar
 

Similaire à Installation, testing and jointing of lt and ht power cables up to 33 kv (20)

01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976
 
Distribution system 2
Distribution system  2Distribution system  2
Distribution system 2
 
UNIT - 03 LIGHTING INSTALLATION
UNIT - 03 LIGHTING INSTALLATIONUNIT - 03 LIGHTING INSTALLATION
UNIT - 03 LIGHTING INSTALLATION
 
Underground cable
Underground cableUnderground cable
Underground cable
 
Laying of Underground Cables.pptx
Laying of Underground Cables.pptxLaying of Underground Cables.pptx
Laying of Underground Cables.pptx
 
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedure
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief ProcedureTechnical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedure
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedure
 
Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...
 
Cable Ladder Bonding with Earth Wire, Is it Necessary?
Cable Ladder Bonding with Earth Wire, Is it Necessary?Cable Ladder Bonding with Earth Wire, Is it Necessary?
Cable Ladder Bonding with Earth Wire, Is it Necessary?
 
Lec no. 01
Lec no. 01Lec no. 01
Lec no. 01
 
Electrical System Design
Electrical System Design Electrical System Design
Electrical System Design
 
Types of Wires and Cables
Types of Wires and CablesTypes of Wires and Cables
Types of Wires and Cables
 
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
 
Design and construction of underground cable transmission line
Design and construction of underground cable transmission lineDesign and construction of underground cable transmission line
Design and construction of underground cable transmission line
 
Perfiles
PerfilesPerfiles
Perfiles
 
Project sagarmala presentation jmv lps
Project sagarmala presentation jmv lpsProject sagarmala presentation jmv lps
Project sagarmala presentation jmv lps
 
Unit I.pdf
Unit I.pdfUnit I.pdf
Unit I.pdf
 
Presentation mecon project by jmv lps
Presentation mecon project by jmv lpsPresentation mecon project by jmv lps
Presentation mecon project by jmv lps
 
Underground Cables
Underground Cables Underground Cables
Underground Cables
 
ELECTRICAL WIRING
ELECTRICAL WIRINGELECTRICAL WIRING
ELECTRICAL WIRING
 
Irfan
IrfanIrfan
Irfan
 

Plus de Alexander Decker

Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Alexander Decker
 
A validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inA validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inAlexander Decker
 
A usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesA usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesAlexander Decker
 
A universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksA universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksAlexander Decker
 
A unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dA unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dAlexander Decker
 
A trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceA trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceAlexander Decker
 
A transformational generative approach towards understanding al-istifham
A transformational  generative approach towards understanding al-istifhamA transformational  generative approach towards understanding al-istifham
A transformational generative approach towards understanding al-istifhamAlexander Decker
 
A time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaA time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaAlexander Decker
 
A therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenA therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenAlexander Decker
 
A theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksA theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksAlexander Decker
 
A systematic evaluation of link budget for
A systematic evaluation of link budget forA systematic evaluation of link budget for
A systematic evaluation of link budget forAlexander Decker
 
A synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabA synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabAlexander Decker
 
A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...Alexander Decker
 
A survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalA survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalAlexander Decker
 
A survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesA survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesAlexander Decker
 
A survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbA survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbAlexander Decker
 
A survey on challenges to the media cloud
A survey on challenges to the media cloudA survey on challenges to the media cloud
A survey on challenges to the media cloudAlexander Decker
 
A survey of provenance leveraged
A survey of provenance leveragedA survey of provenance leveraged
A survey of provenance leveragedAlexander Decker
 
A survey of private equity investments in kenya
A survey of private equity investments in kenyaA survey of private equity investments in kenya
A survey of private equity investments in kenyaAlexander Decker
 
A study to measures the financial health of
A study to measures the financial health ofA study to measures the financial health of
A study to measures the financial health ofAlexander Decker
 

Plus de Alexander Decker (20)

Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...
 
A validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inA validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale in
 
A usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesA usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websites
 
A universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksA universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banks
 
A unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dA unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized d
 
A trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceA trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistance
 
A transformational generative approach towards understanding al-istifham
A transformational  generative approach towards understanding al-istifhamA transformational  generative approach towards understanding al-istifham
A transformational generative approach towards understanding al-istifham
 
A time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaA time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibia
 
A therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenA therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school children
 
A theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksA theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banks
 
A systematic evaluation of link budget for
A systematic evaluation of link budget forA systematic evaluation of link budget for
A systematic evaluation of link budget for
 
A synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabA synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjab
 
A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...
 
A survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalA survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incremental
 
A survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesA survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniques
 
A survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbA survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo db
 
A survey on challenges to the media cloud
A survey on challenges to the media cloudA survey on challenges to the media cloud
A survey on challenges to the media cloud
 
A survey of provenance leveraged
A survey of provenance leveragedA survey of provenance leveraged
A survey of provenance leveraged
 
A survey of private equity investments in kenya
A survey of private equity investments in kenyaA survey of private equity investments in kenya
A survey of private equity investments in kenya
 
A study to measures the financial health of
A study to measures the financial health ofA study to measures the financial health of
A study to measures the financial health of
 

Dernier

M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxtrishalcan8
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 

Dernier (20)

M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 

Installation, testing and jointing of lt and ht power cables up to 33 kv

  • 1. Industrial Engineering Letters www.iiste.org ISSN 2224-6096 (Paper) ISSN 2225-0581 (online) Vol.4, No.8, 2014 Installation, Testing and Jointing of LT and HT Power Cables up to 33 KV Er. Parveen Kumar Goyal B.E.(Electricals), M.Tech.(Power Systems),Gurgaon, India E-mail: pkgoyal1983@gmail.com Abstract In the electrical power distribution and transmission system for urban and rural area, overhead lines are usually in major practice. Underground system was not favourable in developing and under developed countries. The main reason behind it was the much higher capital investment of underground cabling with respect to overhead bare conductors. But with the advancement in technology and market competition its cost is manageable for urban areas. This system requires more skills and planning for installation, jointing and termination rather than overhead lines. The presented paper is applied on power distribution system up to 33 KV. Keywords: LT/HT power cables, Installation, Jointing, Termination, Testing. 1. Introduction The fist step for the cabling system is selection of cable sizes. Voltage drop is the considerable factor for the selection of LT cables but in case of HT cable selection depend on short circuit current and current carrying capacity. After selection of cable there will be an inspection visit at manufacturing unit before dispatch. There will be numerous testing on cables to ensues the acceptibity as per electrical standards and site requirements. Essential testes are listed as below:- 15 Tensile test ( for Aluminium conductor) Wrapping test ( for aluminium conductor) Annealing test ( for copper conductor) Thickness of insulation and sheath High voltage testing Insulation resistance test Hot set test ( for XLPE cables only) 2. Cable installation After satisfactory testing the cable drums will be dispatched to site for installation work. Installation work will follow a sequence of activities. The major points to be explained as under : 1. Storage of cable drums 2. Route survey for installation 3. Type of installation 4. Road crossings/pipe laying 5. Trenching 6. Cable laying in ( trench/trays/ducts/racks) 7. Testing at site 8. Jointing 9. Route markers 2.1 Storage of cable drums Cable drums always shall be placed/store on dry and hard surface. Paved area is best for storing. There shall not be any kind of water logging. Drum shall always be kept on its flanged instead of flat surface. Whenever the storage time is very long then rotate the drum at 90 degree after every 3 months. The direction of drum rotation should match the direction of arrow marked on the flat side. There is no need to cover the cable drums but try to keep away for hard sunlight. Both the ends of cable should be sealed by insulation cap to avoid moisture ingress.
  • 2. Industrial Engineering Letters www.iiste.org ISSN 2224-6096 (Paper) ISSN 2225-0581 (online) Vol.4, No.8, 2014 Storage of cable drum 2.2 Route survey Before starting the other activities there should be a detailed survey of route. Route shall be so selected that trenching work for cable shall not jeopardize existing utilities, which are vulnerable to damage. Maintenance point of view is also important. It should be straight along the roads/footpaths with some space for offset. Trench shall always be kept away from drains and property lines ( specially for LT cables ). HT cable shall be closer to the kerb line instead of LT cables. Different trenches shall be used for different voltage levels. If extra space is not available then kept the lower voltage cable above the higher voltages. Gap between power and communication cable shall be minimum 600 mm horizontally as well as vertically. 16 2.3 Type of installation Laying in closed pipes/ducts On trays On surface by clamping Underground Entering in building 2.4 Road crossings/pipe laying Stoneware/GI/CI/RCC/HDPE pipes are used for road crossing and for protection on poles only GI/metallic pipe shall be used. RCC pipes have high degree of mechanical strength and preferably used upto 33 kv applications. Minimum dia of pipe kept 1.5 times than the outer dia of cable. minimum diameter of pipe shall be 100 mm for single run of cable and minimum 150 mm for more than 01 cable run. Different voltage cable shall always pass through separate pipes. PCC bed of 100 mm thickness is required for stoneware pipes only. Top surface of pipe shall always be minimum 01 metre below the pavement level of Road. All metal pipes shall be properly bond with earthing station. Crossing shall be done askew to reduce the safe bending angle of cable. To maintain the safe bending radius , the road crossing angle can be calculated as below : X = distance between road entry and cable R = minimum required bending radius α = angular alignment of pipe/duct Distance deviation can be derived for pipe’s far end Sinθ …………………………… eq (a) α = 90-β =90-(90-θ) α = θ now Z = W.tanθ ……………………………. eq (b) take an example ( as shown in figure below)
  • 3. Industrial Engineering Letters www.iiste.org ISSN 2224-6096 (Paper) ISSN 2225-0581 (online) Vol.4, No.8, 2014 Calculation for angle of pipe crossing Voltage size of cable - 33kv, 3 core, 400 sq.mm. XLPE cable Distance X - 300 mm = 0.3 mtr Road width, W - 20 mtr Outer diameter of cable - 105 mm = 0.105 mtr R, bending radius required - 12x0.105 = 1.26 mtr Now from eq (a), Sinθ = (1.26-0.3)/1.26 17 = 0.76 And θ = 49.6 deg. Putting values of W and θ in eq (b), we get Z = 20tan49.6deg. = 23.5 mtr 2.5 Trenching Width of trench shall be minimum 350 mm or single run of cable. Inter axial space between 02 cable shall be 200 mm and minimum clearance between cable’s axis and sides of trench shall be 150 mm. depth for LT cable shall be 750 mm and for 11 kv 33 kv, it will be 900 mm and 1200 mm respectively.if there is tier formation in trenches than the vertical clearance between 02 tiers shall be 300 mm. trenching shall be in straight line and when direction has to be changed, there shall be a suitable curvature for sage bending of cables. 2.6 Cable laying Cables up to dia 95 sq. mm can be removed from drum by flaking, not acceptable for higher sizes. cable shall always be uncoil by the help of jacks above 50 sq. mm. When cable is laying direct in ground then there shall be 75 mm bed of fine sand in bottom before laying. Then test for insulation resistance and continuity of cable. Cover the cable after testing 170 mm sand from base cushion. For multilayer cabling, sand cushioning shall be 300 mm between cables. A loop of approximate 3.0 mtr shall be kept on each termination as well as both sides of each joint. In very long span, cable may be looped at specified intervals. Protection cover by bricks/slates/tiles is placed above sand cushion with 50 mm extra cover on both sides of cable. Back filling earth shall be rammed and watered in the layers of 300 mm. bricks protection may be waived for LT cables if the depth is increased by 250 mm more than standard depth. Never install a cable with kinks or damaged armour. Minimum bending radius Single core cable Multicore cable Upto 1.1 KV 15D 12D 1.1 kv to 11 kv 15D 15D Above 11 kv 20D 15D Where D is the outer dia of cable
  • 4. Industrial Engineering Letters www.iiste.org ISSN 2224-6096 (Paper) ISSN 2225-0581 (online) Vol.4, No.8, 2014 Bending radius of steel/HDPE duct kept minimum 1.5 metre. Cable laying in trench When single core cable is installed directly on surface, clamp shall be non-magnetic and shall not pass through any metallic pipe. Sag and kinks are not acceptable. If cable size exceeds 120 sq. mm MS flat are allowed to cradle with bolting on wall at interval of 600 mm. all mild steel components shall be galvanised of painted with red oxide. In case of cable trays, coupler plate shall be 200 mm length with same material and specifications of channel of tray. Contact area between channel and coupler shall be scraped and removed for better earth continuity. Width of cable tray kept 30% higher for future expansion and shall be minimum size of 100 mm. MS flats of size 25 mm X 5 mm may be used as suspender for tray up to 450 mm. GI rods of 10 mm dia may be bolted to tray or on an angle support of 50 mm x 50 mm x 5 mm size. Tray should be earthed at both ends and cable shall be tied/clamped on suitable intervals. There shall be cable tags for identification of feeder at fix intervals. When cable is entering in a building through pipe then the slope of pipe shall be downward from the building and pipe ends towards building shall be sealed after laying of cable. If site temperature is below 3 deg. C, cable should be warmed up to minimum 10 degree C before laying. It shall be warmed with blowers in a closed room or tents for minimum 24 hours otherwise bending will damage the insulation and protective covering of cable. 2.7 Testing at site Three types of fault may occur in underground cabling i.e. open circuit fault, short circuit fault and earth fault. To avoid these faults there are some tests carried out at site before laying and after laying of each cable span. 2.7.1 Before laying Insulation resistance test, continuity test, earth fault test 2.7.2 After laying Insulation resistance test Continuity test Earth fault test DC pressure test for 15 minutes (if not possible than test for 01 minute with 1000 V megger for LT cable and with 2500/5000 V megger for HT cable. 2.8 Jointing Before laying a cable, joint location must be identified. Is should lie in road crossings, water logging area, communication lines and any other main service’s line. Joints shall be at staggered position by 2-3 metres when 02 or more cable has to be jointed. Before jointing, Aluminium conductor’s oxide film shall be completely removed by scraping or flux. Joining shall always be done by a certified and experienced jointer. For jointing, there are various jointing termination kits. Mainly used are heat shrink, cold shrink, push on, tapex and resin cast jointing kits. Procedure shall be strictly follows as per manufacturer’s guidelines. After jointing and termination, DC high voltage test to be performed. 18
  • 5. Industrial Engineering Letters www.iiste.org ISSN 2224-6096 (Paper) ISSN 2225-0581 (online) Vol.4, No.8, 2014 Heat shrink cable jointing 2.9 Route markers GI/CI/Al plate on MS angle of 35mm x35mm x 6 mm of 600 mm length may be used for marker. It should be parallel to cable and kept at 300 mm from cable and at underground joints. Concrete markers can also be used and to be furnish above cable laid. Cable route markers 3 Detailed cable installation plan After cable installation, jointing and termination, a plan shall be prepared. It will include the following details:- Type of cable, cross sectional area, rated voltage, cable number and drum numbers. Year and month of laying Actual length between joints to joints and end to joints Location of cable and joints in relation to certain fix reference points Name of jointer Date of jointing Result of testing and measurement Conclusion Underground cabling are safer than overhead electrical lines and also gives aesthetic look to the projects. But underground installation work need higher attention and skills otherwise the performance of system may result unsatisfactory. The major points which are to pay major focus are bending angle, jointing, testing and protection for system as well as neighbourhoods References 1. T.S. Swaminathan, Theory of power cable accessories, cable installation and testing (2005), Khanna 19
  • 6. Industrial Engineering Letters www.iiste.org ISSN 2224-6096 (Paper) ISSN 2225-0581 (online) Vol.4, No.8, 2014 Publishers, Delhi -06. 2. Bureau of Indian standards, IS : 1255-1983 (reaffirmed 1996), Code of practice for installation and maintenance of power cables upto and including 33 kv rating 3. CPWD General specifications for electrical work, Part – IV (sub stations), 2013. 4. Technical specifications of cable work, www.iacs.in/tender/electrical.. 6. B. Prasad ( chartered engineer ) power point presentation on cable and laying, amieclub@gmail.com. 7. Er. Mafijur rehman, professional associates limited, power point presentation on underground cabling 8. 3M, Electrical market division, product catalogue, www.cablejoints.co.uk 9. Quick reference guide, Raychem cable accessories, te.com/ 10. B. Prasad ( chartered engineer ) power point presentation on cable joints and terminations, amieclub@gmail.com 11. Images, www.google.com 20
  • 7. The IISTE is a pioneer in the Open-Access hosting service and academic event management. The aim of the firm is Accelerating Global Knowledge Sharing. More information about the firm can be found on the homepage: http://www.iiste.org CALL FOR JOURNAL PAPERS There are more than 30 peer-reviewed academic journals hosted under the hosting platform. Prospective authors of journals can find the submission instruction on the following page: http://www.iiste.org/journals/ All the journals articles are available online to the readers all over the world without financial, legal, or technical barriers other than those inseparable from gaining access to the internet itself. Paper version of the journals is also available upon request of readers and authors. MORE RESOURCES Book publication information: http://www.iiste.org/book/ IISTE Knowledge Sharing Partners EBSCO, Index Copernicus, Ulrich's Periodicals Directory, JournalTOCS, PKP Open Archives Harvester, Bielefeld Academic Search Engine, Elektronische Zeitschriftenbibliothek EZB, Open J-Gate, OCLC WorldCat, Universe Digtial Library , NewJour, Google Scholar