1. Page 1 of 13
Name: Alvin Chen
IC No: 801223-13-5835
Passport No: K35305350
Offshore Safety
Passport:
Shell Malaysia Exploration and
Production / BSTS
Marital Status: Single
Nationality: Malaysian
Contact No. (H/P): +6016 521 9807
E-mail alvchen80@gmail.com
Address: Lot 9980/9981 Jalan Dusun,
Off Jalan Lutong-Kuala Baram
ByPass,
98100 Miri, Sarawak.
Qualification
1998 SPM (20 Units, Grade 1)
1999 Diploma In Business Studies – Marketing (Inti College, Kuching)
2000 Diploma In Managerial Principles (Inti College, Kuching)
2001 Advance Diploma In Managerial Principles (Inti College, Kuching)
Offshore Training/Qualification
1. Malaysia – Basic Offshore Safety and Emergency Training conducted at Terengganu
Safety Training Centre
Date Attended : 22 – 24 / 03 / 2009
Valid Until : 23/03/2012
2. Helicopter Landing Officer’s Course
Date Attended : 19 / 01 / 2009
Valid Until : 18 /01 / 2012
3. GMDSS ROC Course conducted at ALAM Maritime College
Date Attended : 04 / 2009
Valid Until : 04 / 2014
2. Page 2 of 13
EMPLOYMENT HISTORY
PREVIOUS OFFSHORE EMPLOYMENTS
Sarku Engineering
Serv. Sdn. Bhd.
28th
June 2003 till 20th
Nov 2004
Position : Technical Assistant : Major Maintenance Hook Up and Commissioning
Duties &
Responsibilities
- Overall responsibilities include but may not be limited to the following:
Monitoring the progress of all work activities and identifying the necessity for
rescheduling.
Prepare and monitor the daily productivity and non-productivity of manhours
spent at work site.
Liaise with CSR (Company Site Representative) regarding contract billing on
manpower and materials as well as logistics matters
Update the project completion status of individual jobs/tasks.
Liaise with CSR (Company Site Representative) and Construction
Superintendent regarding manpower requirements based on the planned
workpack details.
Liaise with Const. Engineer and Planner/Scheduler to prepare/compile Post-
Project Critique.
Generate DPR (Daily Progress Report) for project reporting; and DSR (Daily
Status Report) for company tender billing.
To prepare the mobilization documents and update crew list of construction
personnel who are mobilized for any projects
Prepare and inform crew of their working shifts
Prepare demobilization documents at the end of each project
Involvement in
Projects:
Provision on Hook-up & Commissioning for Petronas Carigali Facilities :
● Baram A Drilling Platform (BADP) – Topside Major Maintenance(TMM)
Provision on for Major Maintenance, Hook-up & Commissioning for
Sarawak/Sabah Shell (SSB & SSPC) for:
B 11 P-A/DR-A Hook Up Project
F6 Maintenance Works/C.D.T/C.A.O/Vent Gas Measurement
SFDP-A/P-A Rejuvenation/I-Glo Phase 1 Project
SJJT-G I-Glo / Rejuv./Pre-Drill(3rd
Visit) Project
BTMP-B Rejuv. Phase 1/ Gas Re-Injection Back Plush/ Remote Operation
Enhancement Project
SJJT-H Rejuv Phase 1 & I-Glo Project
JNDR-A (Well Tie-In, Post Drill, Blasting/Painting) Project
F6P-A Rejuvenation and Pre-Drill Project
M 03/Serai Modification Tie-In (Punchlist) Project
SJJT-A 2nd
Revisit Pre-Drill and Deck Extension Project
E 11 Rejuvenation Project
3. Page 3 of 13
Sarku Marine Sdn.
Bhd
Feb 2004 – April 2004
Position: Vessel Maintenance Planner/Scheduler
Duties &
Responsibilities:
Overall responsibilities include but may not be limited to the followings:
To prepare work scope to be carried out on 2 Sarku barges – Sarku Utama
and Sarku Samudera.
Identify manpower for each job required for vessel maintenance – dry
docking and anchorage
To anticipate the target dates for the completion of each job and the whole
maintenance as a whole.
Liaise with Sarku Marine VOM (Vessel Operations Manager) and Marine
Technical Coordinator regarding vessel maintenance matters.
To report work progress of the whole maintenance activities.
Barge administrative work in regards to the construction crew employed for
the vessel maintenance
Liaise with Third Parties undertaking jobs for various class items regarding
the vessel
Assist marine storeman in highlighting outstanding materials required for the
maintenance works.
Identifying extra/urgent works needed to be carried out that were previously
not highlighted in monthly electrical/mechanical reports
Sarku Engineering Serv.
Sdn. Bhd.
Apr 2005 – March 2006
Position: Barge Admin cum Radio Operator (Seconded to TLO)
Duties & Responsibilities: Overall responsibilities include but may not be limited to the followings:
To prepare DPR, Towing reports, Brief Reports, Timesheet, Daily
POB list, and all relevant project documentations.
As liaison between offshore operations and onshore contacts.
Handle Radio Operator duties which includes communication
between vessels as well as on duty personnel
As focal point for all offshore operations reporting
Prepare clearance and documentations prior to sailing out to work
site
Involvement in Projects: TLO SDN BHD 2004-2006 TRANSPORTATION & INSTALLATION
OF OFFSHORE FACILITIES (SSB, BSP, PCSB & EPMI)
4. Page 4 of 13
E11 P-A LP/AP VENT EXTENSION & SCKA M2 AND M2A
INSTALLATION AND APPURTENANCES
BADP-C REMOVAL/INSTALLATION OF HELIDECK AND BADP-B
BOATLANDING INSTALLATION
14” BUCKLE PIPELINE RECOVERY AT KP 2.790 FBPP-1 TO BAP-
AA (FAIRLEY BARAM FIELD)
CWDP-A (BRUNEI) TOPSIDE, HELIDECK AND JACKET
INSTALLATION INCLUDING PILING
E8 DR-A JACKET AND TOPSIDE INSTALLATION
28” DIA. x 43KM E8DR-A TO E11P-B PIPELINE INSTALLATION
PBJV One Lab Instrument
Sdn Bhd.
Dec 2005 – Jan 2006
Position: Barge Admin cum Radio Operator (Manpowered to PBJV Group Sdn
Bhd.)
Involvement in Projects: COSTRUCTION 16"Ø BAP-AA / MCOT SHORE APPRACH
PIPELINE (PCSB/TLO)
Offshore Support PTE LTD
(Subsidiary of Nippon Steel
Corporation Pte Ltd.
Singapore)
March 2006 – Aug 2006
Position: Barge Admin (Onboard DLB Kuroshio)
Involvement in Projects: PremierOil West Lobe WellheadProject at Anoa Field, Natuna Sea
Indonesia
PTTEP Arthit Field Development Project Phase IIIB Campaign 2
Thailand
DLB KUROSHIO Maintenance in Batam
Gulf Asia Solutions Sdn.
Bhd.
Aug 2006 – Jul 2007
/ Ahead Dynamic Ltd
Position: Barge Admin cum Radio Operator (Seconded to TLO)
Involvement in Projects: TLO SDNBHD 2004-2007 TRANSPORTATION & INSTALLATION OF
OFFSHORE FACILITIES (SSB, BSP, PCSB & EPMI)
5. Page 5 of 13
ONBOARD DLB SEAHORIZON
SJK-A GAS TURBINE CHANGE OUT (SSB/SSPC)
SFJT-E JACKET AND TOPSIDE INSTALLATION (SSB/SSPC)
SMP-B TO SUDP-A PIPELINE INSTALLATION (16”x 12 KM) (PCSB)
SFJT-E TO SFJT-B PIPELINE INSTALLATION (8” & 10” x 1.22 KM)
(SSB/SSPC)
SFK-A TO SJP-A PIPELINE INSTALLATION (8” x 19 KM)
(SSB/SSPC)
SFP-A TO SJP-A PIPELINE INSTALLATION (20” x 18.43 KM)
(SSB/SSPC)
BUOYANCY TANKS REMOVAL FROM BUCKLE TRIGGERS AT E11
P-B / E8 DR-A FIELD (SSB)
ONBOARD DB SUPERIOR PERFORMANCE
10" & 8" SFJT-E RISER INSTALLATION (SSB/SSPC)
Position: Radio Watcher (Seconded to Hyundai Heavy Industries onboard DLB
Hyundai 2500)
Involvement in
Projects:
PTT – PHASE 2 THIRD TRANSMISSION PIPELINE PROJECT (MALAYSIA-
THAILAND JOINT DEVELOPMENT AREA, BLOCK 17 FIELD AND ARTHIT
FIELD)
Sheffield Offshore Pte Ltd Jul 2007 – June 2008
Position: Barge Admin cum Radio Operator
Involvement in Projects: Swiber Offshore Pte Ltd
Worked onboard DB Da Li Hao for Kodeco Poleng Field Project &
Petronas Carigali Putri Field Project in Kemaman, Terengganu,
Malaysia (July 07 to Oct 07)
6. Page 6 of 13
Global Industries – Subtec Middle East LLC
Worked onboard DLB 332 for Saudi Aramco Berri Water Injection Line
& Qatif Crude Pipeline off shore
TL Offshore Sdn Bhd August 2008 – June 2012
Position: Barge Admin cum Radio Operator
Duties & Responsibilities - Overall responsibilities include but may not be limited to the following:
Personnel / Crew mobilization and demobilization from project
Prepare and monitor the daily productivity and non-productivity of
manhours spent at work site.
Liaise with CSR (Company Site Representative) regarding contract
billing on manpower and materials as well as manpower logistics
matters
Update the project completion status of individual jobs/tasks.
Generate DPR (Daily Progress Report) for project reporting
To prepare the mobilization documents and update crew list of
construction personnel who are mobilized for any projects
Prepare demobilization documents at the end of each project
Allocation of cabin of onsigning crew
Preparation of passenger manifests for chopper and crew boat runs
Arrange crew movement for mobilization and demobilization
Generate monthly crew timesheet for payroll purposes
Exercisecommunicationwith spread vessels chartered for each project
Vessels Assigned To: DLB SEAHORIZON
DLB LEWEK CHAMPION
MV SAPURA 3000
DLB ENTERPRISE 3
HLV LTS 3000
MV IMS AMAN
DLB QUIPPO PRAKASH
Projects Involved: Project Location:
B11DR-A/PC4DP-A FIELD (MIRI WATER) PETRONAS CARIGALI SDN
BHD
Project Description:
12’’ DIA X 22.178 Km PC4DP-A to B11DR-A GAS Pipeline Installation
Project Location:
BODP-A/ BODP-B FIELD (BOKOR) PETRONAS CARIGALI SDN BHD
Project Description:
12’’ DIA X 0.903 Km BODP-B to BODP-AOIL Pipeline & Sub sea Cable
Route.
Project Location:
BODP-A/ BODP-C FIELD (BOKOR) PETRONAS CARIGALI SDN BHD
Project Description:
10’’ DIA. X 671 m BODP-C to BODP-AOIL Pipeline Installation
Project Location:
TCOT/ANDR-A FIELD (TCOT) PETRONAS CARIGALI SDN BHD
7. Page 7 of 13
Project Description:
24’’ DIA X 163.5 KM TCOT to ANDR-A Pipeline Installation
Project Location:
ANDR-A/ ANDP-A (ANGSI) PETRONAS CARIGALI SDN BHD
Project Description:
10’’ DIA X 10.977 KM ANDR-A to ANDP-A Pipeline Installation
Project Location:
KUMANG FIELD PETRONAS CARIGALI SDN BHD
Project Description:
28’’ DIA X 92.5 KM F9JTA to KAKG-A Pipeline Installation
Project Location:
ANDR-A (ANGSI FIELD) PETRONAS CARIGALI SDN BHD
Project Description:
24’’ DIA ANDR-A Riser Installation
Project Location:
TCOT/ANDR-A FIELD (TCOT) PETRONAS CARIGALI SDN BHD
Project Description:
24’’ DIA X 163.5 KM TCOT to ANDR-A Pipeline Installation (Final Lay
down)
Project Location:
KUJT-A / KAKG-A - KUMANG FIELD (TERRENGANU WATER)
PETRONAS CARIGALI SDN BHD
Project Description:
18’’ Dia. KUJT-A to KAKG-A OIL Pipeline Installation
Project Location:
BEP-A / BKP-A (BAKAU) FIELD PETRONAS CARIGALI SDN BHD
Project Description:
10’’ Dia. X 17.788 BKP-A to BKP-A OIL Pipeline Installation
Project Location:
BEDP-A (MIRI WATER) PETRONAS CARIGALI SDN BHD
Project Description:
10’’ DIA X 5.2 KM Pipeline Riser Installation
Project Location:
WEST BELUMUT FIELD (KEMAMAN) NEWFIELD PENINSULAR
MALAYSIA INC
Project Description:
4’’ & 10’’ Pipeline Piggy Back WBWP to BEL-A
Project Location:
SELIGI FIELD (KEMAMAN) EXXON MOBIL EXPLORATION &
PRODUCTION MALAYSIA
Project Description:
12’’ CRA Pipeline Replacement
Project Location:
PC4DP-A / PC4V-A FIELD PETRONAS CARIGALI SDN BHD
Project Description:
8. Page 8 of 13
PC4DP-A & PC4V-A PLATFORM INSTALLATION
Project Location:
SMJT-C SUMANDAK FIELD PETRONAS CARIGALI SDN BHD
Project Description:
SMJT-C PLATFORM (PL-125-A, PC-11A & PL – 113 A) RISER/SPOOL
INSTALLATION
Project Location:
F9JT-A PETRONAS CARIGALI SDN BHD
Project Description:
F9JT-A JACKET INSTALLATION
Project Location:
KAKG-A PETRONAS CARIGALI SDN BHD
Project Description:
KAKG-A JACKET INSTALLATION
Project Location:
KUJT-A PETRONAS CARIGALI SDN BHD
Project Description:
KUJT-A TOPSIDE INSTALLATION
Project Location:
LHDP-A PETRONAS CARIGALI SDN BHD
Project Description:
LHDP-A JACKET INSTALLATION
Project Location:
JSML YARD SINGAPORE
Project Description:
DLB ENTERPRISE 3 UPGRADING WORKS
Project Location:
10" X 7.16 KM PIGGYBACK 4" WBWP TO BEL-ANEW FIELD
PENINSULA MALAYSIA INC
Project Description:
10" X 7.16 KM PIGGYBACK 4" WBWP
REMOVAL OF COMPRESSOR AT BEL-A
INSTALLATION OF DEBOTTLENECKING VESSEL (1 LIFT) @ BEL-A VIA
SUPPLY VESSEL
INSTALLATION OF COMPUND RISER @ BEL-A (73M)
LIFT INTREGATED COMPRESSOR MODULE (500MT) REQUIRE
SHUTDOWN) @ BEL-A
10" + 4" SPOOLS @ BEL-A (73M)
10" + 4" SPOOLS @ WBWP (73M)
HYDROTEST OF 10" X 7.16 KM WB TO BEL-A
HYDROTEST OF 4" X 7.16 KM WB TO BEL-A
Project Location:
12" x 5.6KM SeA TO SeC (CRA) 459JTS
9. Page 9 of 13
EXXONMOBIL EXPLORATION AND PRODUCTIONMALAYSIA INC
Project Description:
12" x 5.6KM SeA TO SeC (CRA) 459JTS
12" x 3.7KM SeA TO SeD (CRA) 301JTS
12" x 4.3KM SeD TO SeF (CRA) 355JTS
12" x 2.8KM SmA TO SmB (CRA) 230JTS
PIPELINE SIDEWALK & METROLOGY @ SmB
PIPELINE LOWERING & METROLOGY @ SmA
PIPELINE LOWERING & METROLOGY @SeA (PL TO SeD)
12" SPOOL WET STORE @ SeA (PL TO SeD)
PIPELINE LOWERING & METROLOGY @SeA (PL TO SeC)
12" SPOOL WET STORE @ SeA (PL TO SeC)
12" SPOOL WET STORE @ SeC
PIPELINE SIDEWALK & METROLOGY @ SeD
12" SPOOL WET STORE @ SeD
PIPELINE LOWERING & METROLOGY @SeD (PL TO SeF)
12" SPOOL WET STORE @ SeD
12" SPOOL WET STORE @ SeF
Project Location:
KNPG-B JKT INSTALLATION PETRONAS CARIGALI SDN BHD
Project Description:
LHDP-A JACKET INSTALLATION
KAV-A PLATFORM INSTALLATION
Project Location:
SJQ-A JKT INSTALLATION SHELL SARAWAK BERHAD
Project Description:
SJQ-A TOPSIDE
SJQ-A LQ MODULE
SJQ-A BRIDGE
Project Location:
TANGGA BARAT REMAINING WORKS PETRONAS CARIGALI SDN BHD
Project Description:
INSTALLATION OF TBDR-A CONDUCTOR LAST ADD-ON
INSTALLATION OF TBDR-A SERVICE PLATFORM
Project Location:
KNJT-C TOPSIDE AND VENT BOOM INSTALLATION PETRONAS
CARIGALI SDN BHD
Project Description:
KNJT-C TOPSIDE INSTALLATION
KNJT-C VENT BOOM INSTALLATION
TOPSIDE/VENT BOOM MISCELLANEOUS WORKS
JACKET MISCELLANEOUS WORKS
POST INSTALLATION SURVEY, MATERIALS RESHUFLING & FINAL
WALKABOUT
Project Location:
F28DR-A JACKET INSTALLATION SHELL SARAWAK BERHAD
Project Description:
F28DR-A JACKET INSTALLATION
10. Page 10 of 13
PRESENT EMPLOYMENT
TL Offshore Sdn Bhd July 2012 – Present
Position: Crew Logistics Coordinator
Duties & Responsibilities - Overall responsibilities include but may not be limited to the following:
To assist Senior Management Manager in the day to day
administration of Manpower Contract including to co-ordinate
logistics / manpower requirements, HSE & Competency
Trainings
To assist the personnel to settle in quickly at the work locations,
make any travel arrangement, prepare & ensure timesheet
reach HR period ending monthly
To provide employees with the required skills & support to meet
the company’s commitment to health & safety.
To make arrangements for ensuring safety & absence of risk to
health in connection with the handling of personnel
transportation.
To ensure that the standard of work of employee is to the
required standards by the company.
To ensure employee undertake any task or operation unless
they have received adequate trainings.
To ensure that all new employees mobilize to worksite receive
an adequate briefing on the work program.
To ensure all personnel / employees in possession of the
appropriate documentations prior to mobilization [Passport,
Letter of appointment, Certificate of Medical Fitness & Safety
Course Certificates].
Liaise with onshore logistics management team to co-ordinate
personnel movements, travel & hotel arrangements and
11. Page 11 of 13
maintain crew rotation schedules [mobilization / demobilization]
for project
Prepare timesheets and transmits to Payroll Department &
handling salary related issues
Verification of Crew travel expenses of crew and transmits to
Payroll Department
Liaise with HSE Department to maintain safety matrix for
offshore crew personnel
Maintain all important events and records to provide feedback
to management
Co-Ordinate with agent for personnel clearance inward &
outward for offshore projects
To attend kick-off meeting on Project Execution
Vessels Assigned To: DLB SEAHORIZON
MV SAPURA 3000
HLV LTS 3000
DLB SK 900
HLV SK 3500
HLV SK 1200
DSV KREUZ INSTALLER
DSV TOISAPALADIN
DLB 1 MAS
DLB PJV 3000
PETRACHALLENGER
DSV SKANDI PROTECTOR
DSV SARKU CLEMENTINE
Projects Involved: Project Involvement June to Dec 2015
Project : Nam Con Son Phase 2 Project Vung Tau, Vietnam
Base location : Vung Tau Vietnam
Client : PVGAS / Vietsov Petro Vietnam
Project Involvement October to November 2014
Project : Demobilization of SKPB Vessels & Barges
Base location : SapuraKencana Operations Base, Pasir Gudang, Johor Port
Client : Internal
Project Involvement August to September 2014
Project : HLJOC H5 Whp Jacket And Drilling Well Bay Installation
Base location : Vung Tau Vietnam
Client : POS Vietnam
Project Involvement June to July 2014
Project : Pearl Mubadala Manora Installation Campaign
Base location : Sattahip, Thailand
Client : Clough / Pearl Mubadala
12. Page 12 of 13
Project Involvement April to May 2014
Project : Diamond Development Project Phase 2 with Pre Commissioning
Base location : Vung Tau Vietnam
Client : Petronas Carigali Vietnam
Project Involvement August to November 2013
Project : Diamond Development Project Phase 1
Base location : Vung Tau Vietnam
Client : Petronas Carigali Vietnam
Project Involvement February to March 2013
Project : F23 DPA Conductor Repair Works
Base location : Shin Yang Wharf, Miri, Sarawak
Client : Sarawak Shell Berhad
Project Involvement October to December 2012
Project : SKO D21 & D35 Installation / Balai Cluster Installation Project
Base location : Shin Yang Wharf, Miri, Sarawak
Client : Petronas Carigali Sdn Bhd / BC Petroleum
Project Involvement August to September 2012
Project : 1. SKO PCSB Pipeline Installation And Rejuvenation
2. MURPHY OIL CORPORATION Installation Project
3. CARIGALI HESS PHASE 2
Base location : Bintulu Sarawak / Tok Bali, Kelantan
Client : 1. PCSB
2. MURPHY OIL CORPORATION
3. CARIGALI HESS Operating Company Sdn Bhd
Project Involvement July to August 2012
Project : Epic Booster Compressor Installation
Base location : Vung Tau, Vietnam
Client : POS / KNOC
References
Mr. Davis Loh Jack Yau
General Manager
Perkasa Padu Sdn Bhd
Personal Mobile: +60128043939
Mr Wilfred Nissom
Political Secretary Of
The Chief Minister Of Sarawak
Tel (Residence) : 082-259376