SlideShare une entreprise Scribd logo
1  sur  1
Télécharger pour lire hors ligne
Mr. Alwyn George Paraekkatt (hereinafter "Alwyn"), born June 29, 1986 in Dubai, United A
Emirates, was employed as an Electronics Maintenance Engineer at World Wide Power Services
FZCO (hereinafter "the Company") from June 20, 2012 until June 19, 2015, in accordance with the
original contract between Alwyn and the Company.
In this position his tasks/assignments included the following:
• Troubleshot and Repaired Ross Hill©, ISC©, EPD©, National Oil Varco (NOV©), and Integrated
Power Systems (IPS)© on-shore and off-shore rig SCR systems.
• Installed, programmed, and commissioned various ·brands of digital engine-generator
controllers , voltage regulators and load share controllers such as Woodward©, Basler and
Caterpillar©.
• Installed, repaired, tested, and commissioned various brands of Soft-Starters, Variable
Frequency Drives and Programmable Logic Controller (PLC) systems (Emotron©, Benhsaw©,
Allen-Bradley©, Siemens©)and large-frame (up to 2400AF) Circuit Breakers.
• Performed basic field calibration, repair and trouble-shooting of Ross Hill, NOV based AC and DC
Control Module.
• Repaired and troubleshot rig crane control systems (EPD).
• Performed Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) of generator
control switch gear equipment, control systems, and distribution systems.
• Carried out insulation resistance testing (Megger©, Ductor©), and power quality analysis
testing.
• Provided inputs during design of new control systems, attended client meetings at the behest of
the company, coordinated work, materials supply and logistics in various projects.
• Worked as an on-site Project engineer and supervisor for various refurbishment and build
projects undertaken by the company in various locations in the Middle East.
On a more personal level, Alwyn was a joy to work with. He was nearly always of good cheer and
demeanor, even under stressful oil-field-related time and performance constraints. With his
balanced disposition and friendly nature, he was able to effortlessly integrate into all project teams.
Alwyn was a meticulous and diligent employee. For the three years working for our Company, his
work was always of superior quality, easily placing him among the very best of our junior
engineering staff. He is quick-learning, very dynamic, and hard-working. He is very willing to take
over new challenges and responsibilities. He was well-liked among his task group members.
Alwyn left the company at his own request. Except for the duty of confidentiality, Alwyn is free from
any obligation and we wish him all the best for his personal and professional future.
Donald R. Minter
~~~Patrick Doyle
Electrical Department Manager Electrical Department Technical Manager
P 0 BOX 18088, Plot No .S, Ill 08 , Jebel Ali, Dubai, U.A. E. Tel : +971 (4) 8861 155, Fax : +971 (4) 8861 144
email : wwps@emirates .net.ae, www.wwps -dubai.com

Contenu connexe

Tendances (19)

Resume2016 - Copy
Resume2016 - CopyResume2016 - Copy
Resume2016 - Copy
 
Kenneth Miller Resume
Kenneth Miller ResumeKenneth Miller Resume
Kenneth Miller Resume
 
CVsteve2PAGE.doc
CVsteve2PAGE.docCVsteve2PAGE.doc
CVsteve2PAGE.doc
 
Eng.Ahmed-CV
Eng.Ahmed-CVEng.Ahmed-CV
Eng.Ahmed-CV
 
downloadfile
downloadfiledownloadfile
downloadfile
 
mumtaz CV (1)
mumtaz CV (1)mumtaz CV (1)
mumtaz CV (1)
 
Gavin Yates CV
Gavin Yates CVGavin Yates CV
Gavin Yates CV
 
Advertorial - Full set - Version 2
Advertorial - Full set - Version 2Advertorial - Full set - Version 2
Advertorial - Full set - Version 2
 
Khalifa_Taiseer_CV_2016
Khalifa_Taiseer_CV_2016Khalifa_Taiseer_CV_2016
Khalifa_Taiseer_CV_2016
 
Jack-Hollis King Resume
Jack-Hollis King ResumeJack-Hollis King Resume
Jack-Hollis King Resume
 
Jake-Oussoren (2)
Jake-Oussoren (2)Jake-Oussoren (2)
Jake-Oussoren (2)
 
Randy's Resume- revised
Randy's Resume- revisedRandy's Resume- revised
Randy's Resume- revised
 
Marty Andrews (1)
Marty Andrews (1)Marty Andrews (1)
Marty Andrews (1)
 
Frank randazzo resume
Frank randazzo resumeFrank randazzo resume
Frank randazzo resume
 
Richard Glenn_Resume
Richard Glenn_ResumeRichard Glenn_Resume
Richard Glenn_Resume
 
Saeed Fadl CV
Saeed Fadl CVSaeed Fadl CV
Saeed Fadl CV
 
Andryaas Project Manager Cv 2012
Andryaas Project Manager Cv 2012Andryaas Project Manager Cv 2012
Andryaas Project Manager Cv 2012
 
ricks' resume March2015
ricks' resume March2015ricks' resume March2015
ricks' resume March2015
 
Brijesh cv
Brijesh cvBrijesh cv
Brijesh cv
 

Similaire à AlwynGeorgeEmploymentReferenceLetter

GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.
Garry Doiron
 
Saeed Fadl CV
Saeed Fadl CVSaeed Fadl CV
Saeed Fadl CV
saeed981
 
CVPeterDevers 2015
CVPeterDevers 2015CVPeterDevers 2015
CVPeterDevers 2015
Peter Devers
 
ResumeDavidClay090216 (1) (2)
ResumeDavidClay090216 (1) (2)ResumeDavidClay090216 (1) (2)
ResumeDavidClay090216 (1) (2)
David Clay
 
Stuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWStuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEW
stuart johnson
 
D fountain JIB Time served Maintenance and Installation Electrician
D fountain JIB Time served Maintenance and Installation Electrician D fountain JIB Time served Maintenance and Installation Electrician
D fountain JIB Time served Maintenance and Installation Electrician
Darren Fountain
 
WilliamBaillieCVNew (1)
WilliamBaillieCVNew (1)WilliamBaillieCVNew (1)
WilliamBaillieCVNew (1)
Wullie Baillie
 
Sadiq new Resume
Sadiq new ResumeSadiq new Resume
Sadiq new Resume
sadiq rizan
 
Live Strong Company Portfolio
Live Strong Company PortfolioLive Strong Company Portfolio
Live Strong Company Portfolio
Celso Tinio
 
Steve Allan Sept2016
Steve Allan Sept2016  Steve Allan Sept2016
Steve Allan Sept2016
Steve Allan
 

Similaire à AlwynGeorgeEmploymentReferenceLetter (20)

GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.
 
AZEEZ EDITED CV
AZEEZ EDITED CVAZEEZ EDITED CV
AZEEZ EDITED CV
 
Saeed Fadl CV
Saeed Fadl CVSaeed Fadl CV
Saeed Fadl CV
 
zahid anwar
zahid anwarzahid anwar
zahid anwar
 
CVPeterDevers 2015
CVPeterDevers 2015CVPeterDevers 2015
CVPeterDevers 2015
 
Resume_1
Resume_1Resume_1
Resume_1
 
Jai Townsend - CV
Jai Townsend - CVJai Townsend - CV
Jai Townsend - CV
 
ResumeDavidClay090216 (1) (2)
ResumeDavidClay090216 (1) (2)ResumeDavidClay090216 (1) (2)
ResumeDavidClay090216 (1) (2)
 
Knowledge William Mushore Resume
Knowledge William Mushore ResumeKnowledge William Mushore Resume
Knowledge William Mushore Resume
 
Stuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWStuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEW
 
November Cv
November CvNovember Cv
November Cv
 
D fountain JIB Time served Maintenance and Installation Electrician
D fountain JIB Time served Maintenance and Installation Electrician D fountain JIB Time served Maintenance and Installation Electrician
D fountain JIB Time served Maintenance and Installation Electrician
 
WilliamBaillieCVNew (1)
WilliamBaillieCVNew (1)WilliamBaillieCVNew (1)
WilliamBaillieCVNew (1)
 
My Last Cv August 2010
My Last Cv August 2010My Last Cv August 2010
My Last Cv August 2010
 
bahadin elec.eng
bahadin elec.engbahadin elec.eng
bahadin elec.eng
 
Sadiq new Resume
Sadiq new ResumeSadiq new Resume
Sadiq new Resume
 
Live Strong Company Portfolio
Live Strong Company PortfolioLive Strong Company Portfolio
Live Strong Company Portfolio
 
Steve Allan Sept2016
Steve Allan Sept2016  Steve Allan Sept2016
Steve Allan Sept2016
 
Amanda Methola Resume
Amanda Methola ResumeAmanda Methola Resume
Amanda Methola Resume
 
Husam CV
Husam CVHusam CV
Husam CV
 

AlwynGeorgeEmploymentReferenceLetter

  • 1. Mr. Alwyn George Paraekkatt (hereinafter "Alwyn"), born June 29, 1986 in Dubai, United A Emirates, was employed as an Electronics Maintenance Engineer at World Wide Power Services FZCO (hereinafter "the Company") from June 20, 2012 until June 19, 2015, in accordance with the original contract between Alwyn and the Company. In this position his tasks/assignments included the following: • Troubleshot and Repaired Ross Hill©, ISC©, EPD©, National Oil Varco (NOV©), and Integrated Power Systems (IPS)© on-shore and off-shore rig SCR systems. • Installed, programmed, and commissioned various ·brands of digital engine-generator controllers , voltage regulators and load share controllers such as Woodward©, Basler and Caterpillar©. • Installed, repaired, tested, and commissioned various brands of Soft-Starters, Variable Frequency Drives and Programmable Logic Controller (PLC) systems (Emotron©, Benhsaw©, Allen-Bradley©, Siemens©)and large-frame (up to 2400AF) Circuit Breakers. • Performed basic field calibration, repair and trouble-shooting of Ross Hill, NOV based AC and DC Control Module. • Repaired and troubleshot rig crane control systems (EPD). • Performed Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) of generator control switch gear equipment, control systems, and distribution systems. • Carried out insulation resistance testing (Megger©, Ductor©), and power quality analysis testing. • Provided inputs during design of new control systems, attended client meetings at the behest of the company, coordinated work, materials supply and logistics in various projects. • Worked as an on-site Project engineer and supervisor for various refurbishment and build projects undertaken by the company in various locations in the Middle East. On a more personal level, Alwyn was a joy to work with. He was nearly always of good cheer and demeanor, even under stressful oil-field-related time and performance constraints. With his balanced disposition and friendly nature, he was able to effortlessly integrate into all project teams. Alwyn was a meticulous and diligent employee. For the three years working for our Company, his work was always of superior quality, easily placing him among the very best of our junior engineering staff. He is quick-learning, very dynamic, and hard-working. He is very willing to take over new challenges and responsibilities. He was well-liked among his task group members. Alwyn left the company at his own request. Except for the duty of confidentiality, Alwyn is free from any obligation and we wish him all the best for his personal and professional future. Donald R. Minter ~~~Patrick Doyle Electrical Department Manager Electrical Department Technical Manager P 0 BOX 18088, Plot No .S, Ill 08 , Jebel Ali, Dubai, U.A. E. Tel : +971 (4) 8861 155, Fax : +971 (4) 8861 144 email : wwps@emirates .net.ae, www.wwps -dubai.com