CONCRETE PAVEMENT
CONSTRUCTION OF ROAD
Presenters :Aman Shakya
Vijay Kumar Sharma
Ayush Maheshwari
PRESENTING TO : Veerendra Kumar Shivhare
CIVIL Dept. HCST
INTRODUCTION
 Development of a country depends on the connectivity of various places with adequate road
network.
 Roads constitute the most important mode of communication in areas where railways have
not developed much.
 India has one of the largest road networks in the world (over 3 million km at present).For the
purpose of management and administration, roads in India are divided into the following five
categories:
• National Highways (NH)
• State Highways (SH)
• Major District Roads (MDR)
• Other District Roads (ODR)
• Village Roads (VR)
WHAT IS ROAD PAVEMENT
Pavement is finished with a hard smooth surface directly above the
subgrade. It helped make roads durable and able to withstand traffic and
the environment.
One of the primary functions of pavement is load distribution.
TYPES OF PAVEMENTS
• There are various types of pavements depending upon the materials used; a briefs
description of all types is given here-
• FLEXIBLE PAVEMENT
• Bitumen has been widely used in the construction of flexible pavements for a long time.
This is the most convenient and simple type of construction. The cost of construction of
single lane bituminous pavement varies from 20 to 30 lakhs per km in plain area.
• Flexible pavement have-
 Have low flexural strength
 Load is transferred by grain to grain contact
 Have low completion cost but repairing cost is high
RIGID PAVEMENT
• Rigid pavements, though costly in initial investment, are cheap in long run because of low
maintenance costs, The cost of construction of single lane rigid pavement varies from 35 to
50 lakh per km in plain area,
• Rigid pavement have-
 Deformation in the sub grade is not transferred to subsequent layers
 Design is based on flexural strength or slab action
 Have high flexural strength
 No such phenomenon of grain to grain load
transfer exists
 Have low repairing cost but completion cost is high
 Low Maintenance Cost
Difference b/w Flexible and Rigid
Pavement in terms of load
distribution In different layers
Different layers in Flexible and
Rigid Pavement
Basic Components of a Concrete Pavement
• Cement
 Ordinary Portland cement (OPC)
• Ordinary Portland cement and High Strength Ordinary Portland Cement are most
widely used for concrete pavements.
 Rapid hardening Portland cement
• In general, this cement would be used only where time is a critical factor and the road is
required to be opened to traffic at an earlier date than would be possible if Ordinary
Portland Cement or High Strength Ordinary Portland Cement is used.
MINERALS
USED
Aggregates
• There are two types of Aggregates are used during construction of road i.e. Fine
and Coarse Aggregate depending on requirements.
• Maximum size of aggregate should not exceed 1/4th of the pavement slab
thickness.
Water
• Water used in mixing or curing of concrete shall be clean and free from
injurious amounts of oil, salt, acid, vegetable matter or other substances harmful
to the finished concrete.
Mineral used( cont.)
A list of tools, equipment and appliances required for the different phases of
concrete road construction is given below
 Three wheeled or vibratory roller for compaction purpose
 Shovels, spades and Sieving screens
 Concrete mixer for mixing of concrete
 Formwork and iron stakes
 Watering devices - Water Lorries, water carriers or watering cans
 Wooden hand tampers for concrete compaction
 Cycle pump/pneumatic air blower for cleaning of joint
 Mild steel sections and blocks for making joint grooves for finishing purpose
Equipments used
Before construction begins, the construction site must be carefully prepared, This includes preparing the
grade or road base, sub grade and sub base-
 First the site is graded to cut high points and fill low areas to the desired roadway profile
elevations.
 Generally, cut material can be used as embankment fill.
 A course of material is placed on the sub grade to provide drainage and stability.
 A course of fairly rigid material, sometimes cement- or asphalt-treated, that is placed on the sub base to
provide a stable platform for the concrete pavement slab.
Site Preparation
Construction Process
Wooden sheets, battens, plywood, fibre hard board, steel plates, angles, rope etc are
generally use for form work.
 before using form work, it should free from all type material like as dust ,cement.
 To placing the concrete in appropriate depth used 2.5-5cm thick and 3mtr long wooden
sheeting
 The depth of wooden block must be same as level of slab thick.
 After 24hrs, form work displaced next length
of road.
FORM WORK
After site preparation, Construction process consists of
various steps, which are described below-
Watering of base
If the base of the road is dry or construction is taken place during summer seasons
Then watering is done using the sprinkling process, after this concrete should be
Placed.
Construction of
Joints
• There are three basic joint types used in concrete pavement: contraction,
construction and isolation.
• Except for some isolation joints, all joints provide a means to
mechanically connect slabs. The connection helps to spread a load applied
on one slab onto slabs along its perimeter.
• Where it is necessary to provide transverse and Longitudinal joints;
there wedge of woods, metals fix on level of concrete.
• After setting of concrete it should be pull out.
PLACING OF CONCRETE
Two methods generally used in placing of concrete-
1- Alternate bay method-
Placed the concrete on both side of road alternatively like as1,3,5… part at one side and 2,4,6… part other
side, This method have slow process due to road traffic problems.
2- Continuous bay method-
Construct one side of road regularly, and after construction of some part of first side than construct other
side, this method have fast process without no obstruction of traffic
COMPACTION OF CONCRETE
Purpose of compaction is that to pull out air from void and make concrete harden.
Compaction done by-
1.Mechanically surface vibrator
2. Manually hand tempers
 After this, Floating, Belting, Screeding or strike off, Bull floating and Brooming is done
as per requirement for the finishing purpose of concrete pavement to smoothen the top
surface.
CURING
After completion of the finishing operations, the surface of the pavement shall be entirely
covered with wet hessian cloth, burlap or jute mats
Curing is the process of increasing the hydration of cement, after setting the concrete curing
process done till 14-28days.
THANK YOU

Contenu connexe

Tendances

Tendances (20)

Highway construction or Road work report
Highway construction or Road work reportHighway construction or Road work report
Highway construction or Road work report
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
 
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGUnit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement design
 
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
 
Types of pavements
Types of pavementsTypes of pavements
Types of pavements
 
Construction Of Road
Construction Of RoadConstruction Of Road
Construction Of Road
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentation
 
Concrete Road Pavement
Concrete Road Pavement Concrete Road Pavement
Concrete Road Pavement
 
highway maintenance and evaluation
highway maintenance and evaluation highway maintenance and evaluation
highway maintenance and evaluation
 
Highway failure and their maintenance
Highway failure and their maintenanceHighway failure and their maintenance
Highway failure and their maintenance
 
highway engineering/ transportation engineering-I
highway engineering/ transportation engineering-Ihighway engineering/ transportation engineering-I
highway engineering/ transportation engineering-I
 
BITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROADBITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROAD
 
PAVEMENT DESIGN
PAVEMENT DESIGNPAVEMENT DESIGN
PAVEMENT DESIGN
 
Highway planning
Highway planningHighway planning
Highway planning
 
CONSTRUCTION OF ROADS
CONSTRUCTION OF ROADSCONSTRUCTION OF ROADS
CONSTRUCTION OF ROADS
 
Pavement failures and maintenance
Pavement failures and maintenancePavement failures and maintenance
Pavement failures and maintenance
 
Unit 1
Unit 1Unit 1
Unit 1
 
Project report on CC road
Project report on CC roadProject report on CC road
Project report on CC road
 
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
 

Similaire à Construction of Road

Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07
aryan kumar
 
highway materials and desihn.pptx
highway materials and desihn.pptxhighway materials and desihn.pptx
highway materials and desihn.pptx
SekharJ4
 

Similaire à Construction of Road (20)

ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
 
Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07
 
Highway report
Highway reportHighway report
Highway report
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdfROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
 
Construction of rigid pavement
Construction of rigid pavement Construction of rigid pavement
Construction of rigid pavement
 
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
Anshuman.pptx
Anshuman.pptxAnshuman.pptx
Anshuman.pptx
 
Road construction ppt for college rajkiya presentation
Road construction ppt for college rajkiya presentationRoad construction ppt for college rajkiya presentation
Road construction ppt for college rajkiya presentation
 
Rigid pavement in Magallanes Interchange
Rigid pavement in Magallanes InterchangeRigid pavement in Magallanes Interchange
Rigid pavement in Magallanes Interchange
 
Geometric design of highway
Geometric design of  highwayGeometric design of  highway
Geometric design of highway
 
Roads & Pavements
Roads & PavementsRoads & Pavements
Roads & Pavements
 
PRESENTATION ON RIGID PAVEMExNT.pptx for
PRESENTATION ON RIGID PAVEMExNT.pptx forPRESENTATION ON RIGID PAVEMExNT.pptx for
PRESENTATION ON RIGID PAVEMExNT.pptx for
 
Mukesh ppt cc road
Mukesh ppt cc roadMukesh ppt cc road
Mukesh ppt cc road
 
highway materials and desihn.pptx
highway materials and desihn.pptxhighway materials and desihn.pptx
highway materials and desihn.pptx
 
Types of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. ITypes of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. I
 
transportation
transportationtransportation
transportation
 
Transportation engg
Transportation enggTransportation engg
Transportation engg
 

Dernier

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 

Dernier (20)

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 

Construction of Road

  • 1. CONCRETE PAVEMENT CONSTRUCTION OF ROAD Presenters :Aman Shakya Vijay Kumar Sharma Ayush Maheshwari PRESENTING TO : Veerendra Kumar Shivhare CIVIL Dept. HCST
  • 2. INTRODUCTION  Development of a country depends on the connectivity of various places with adequate road network.  Roads constitute the most important mode of communication in areas where railways have not developed much.  India has one of the largest road networks in the world (over 3 million km at present).For the purpose of management and administration, roads in India are divided into the following five categories: • National Highways (NH) • State Highways (SH) • Major District Roads (MDR) • Other District Roads (ODR) • Village Roads (VR)
  • 3. WHAT IS ROAD PAVEMENT Pavement is finished with a hard smooth surface directly above the subgrade. It helped make roads durable and able to withstand traffic and the environment. One of the primary functions of pavement is load distribution.
  • 4. TYPES OF PAVEMENTS • There are various types of pavements depending upon the materials used; a briefs description of all types is given here- • FLEXIBLE PAVEMENT • Bitumen has been widely used in the construction of flexible pavements for a long time. This is the most convenient and simple type of construction. The cost of construction of single lane bituminous pavement varies from 20 to 30 lakhs per km in plain area. • Flexible pavement have-  Have low flexural strength  Load is transferred by grain to grain contact  Have low completion cost but repairing cost is high
  • 5. RIGID PAVEMENT • Rigid pavements, though costly in initial investment, are cheap in long run because of low maintenance costs, The cost of construction of single lane rigid pavement varies from 35 to 50 lakh per km in plain area, • Rigid pavement have-  Deformation in the sub grade is not transferred to subsequent layers  Design is based on flexural strength or slab action  Have high flexural strength  No such phenomenon of grain to grain load transfer exists  Have low repairing cost but completion cost is high  Low Maintenance Cost
  • 6. Difference b/w Flexible and Rigid Pavement in terms of load distribution In different layers Different layers in Flexible and Rigid Pavement
  • 7. Basic Components of a Concrete Pavement
  • 8. • Cement  Ordinary Portland cement (OPC) • Ordinary Portland cement and High Strength Ordinary Portland Cement are most widely used for concrete pavements.  Rapid hardening Portland cement • In general, this cement would be used only where time is a critical factor and the road is required to be opened to traffic at an earlier date than would be possible if Ordinary Portland Cement or High Strength Ordinary Portland Cement is used. MINERALS USED
  • 9. Aggregates • There are two types of Aggregates are used during construction of road i.e. Fine and Coarse Aggregate depending on requirements. • Maximum size of aggregate should not exceed 1/4th of the pavement slab thickness. Water • Water used in mixing or curing of concrete shall be clean and free from injurious amounts of oil, salt, acid, vegetable matter or other substances harmful to the finished concrete. Mineral used( cont.)
  • 10. A list of tools, equipment and appliances required for the different phases of concrete road construction is given below  Three wheeled or vibratory roller for compaction purpose  Shovels, spades and Sieving screens  Concrete mixer for mixing of concrete  Formwork and iron stakes  Watering devices - Water Lorries, water carriers or watering cans  Wooden hand tampers for concrete compaction  Cycle pump/pneumatic air blower for cleaning of joint  Mild steel sections and blocks for making joint grooves for finishing purpose Equipments used
  • 11. Before construction begins, the construction site must be carefully prepared, This includes preparing the grade or road base, sub grade and sub base-  First the site is graded to cut high points and fill low areas to the desired roadway profile elevations.  Generally, cut material can be used as embankment fill.  A course of material is placed on the sub grade to provide drainage and stability.  A course of fairly rigid material, sometimes cement- or asphalt-treated, that is placed on the sub base to provide a stable platform for the concrete pavement slab. Site Preparation
  • 12. Construction Process Wooden sheets, battens, plywood, fibre hard board, steel plates, angles, rope etc are generally use for form work.  before using form work, it should free from all type material like as dust ,cement.  To placing the concrete in appropriate depth used 2.5-5cm thick and 3mtr long wooden sheeting  The depth of wooden block must be same as level of slab thick.  After 24hrs, form work displaced next length of road. FORM WORK After site preparation, Construction process consists of various steps, which are described below-
  • 13. Watering of base If the base of the road is dry or construction is taken place during summer seasons Then watering is done using the sprinkling process, after this concrete should be Placed. Construction of Joints • There are three basic joint types used in concrete pavement: contraction, construction and isolation. • Except for some isolation joints, all joints provide a means to mechanically connect slabs. The connection helps to spread a load applied on one slab onto slabs along its perimeter. • Where it is necessary to provide transverse and Longitudinal joints; there wedge of woods, metals fix on level of concrete. • After setting of concrete it should be pull out.
  • 14. PLACING OF CONCRETE Two methods generally used in placing of concrete- 1- Alternate bay method- Placed the concrete on both side of road alternatively like as1,3,5… part at one side and 2,4,6… part other side, This method have slow process due to road traffic problems. 2- Continuous bay method- Construct one side of road regularly, and after construction of some part of first side than construct other side, this method have fast process without no obstruction of traffic
  • 15. COMPACTION OF CONCRETE Purpose of compaction is that to pull out air from void and make concrete harden. Compaction done by- 1.Mechanically surface vibrator 2. Manually hand tempers  After this, Floating, Belting, Screeding or strike off, Bull floating and Brooming is done as per requirement for the finishing purpose of concrete pavement to smoothen the top surface. CURING After completion of the finishing operations, the surface of the pavement shall be entirely covered with wet hessian cloth, burlap or jute mats Curing is the process of increasing the hydration of cement, after setting the concrete curing process done till 14-28days.