SlideShare une entreprise Scribd logo
1  sur  1
Télécharger pour lire hors ligne
National Craft Assessment and Certification Program
                                    B L U E P R I N T

Industrial Millwright                                    Written Assessment Contents:
                                                         Industrial Millwright
Overview – This written assessment is a three-hour,      (MLWRT15) as of 4/2008
closed-book examination. You will be permitted to use      Module                                            Number of
a nonprogrammable, nonprinting calculator during           Number                       Topic Area           Questions
the examination. The Assessment Center will provide       00101      Basic Safety                               4
any necessary pencils. No extra papers, books, notes      15106-06   Oxyfuel Cutting                            4
or study materials are allowed in the testing area.       29105-03   SMAW Equipment and Setup                   4
                                                          15102-06   Millwright Hand Tools                      4
Study Material – All NCCER written assessments are        15103-06   Fasteners                                  4
referenced to Contren® Learning Series modules. You       15104-06   Basic Layout                               4
may order modules from Pearson Education, Inc. by         15105-06   Cutting and Fitting Gaskets                4
calling (800) 922.0579 or by logging on to                15201-07   Intermediate Trade Math                    4
www.crafttraining.com.                                    15204-07   Specialty Tools                            4
                                                          15205-07   Millwright Power Tools                     4
Assessment Development – All questions on each            15206-07   Light Lifting Devices                      4
assessment have been developed and approved by            15208-07   Lubrication                                4
subject matter experts from the respective craft.         15209-07   Introduction to Bearings                   4
Assessment development and administration operates        15302      Precision Measuring Tools
                                                                                                                4
                                                          15302-08
under the direction of Prov, NCCER’s testing partner.     15303      Installing Couplings
                                                                                                                4
                                                          15307-08
Credentials – NCCER will send appropriate                 15304      Prealignment for Drilling and Tapping
                                                                                                                4
credentials (certificate, wallet card, and official       15310-08
                                                          15305      Fabricating Shims
transcript) to the Assessment Center upon successful                                                            4
                                                          15308-08
completion of the written assessment.                     15306      Installing Packing
                                                                                                                4
                                                          15303-08
                                                          15307      Installing Mechanical Seals
Training Prescription Reports – Each candidate will                                                             4
                                                          15305-08
have access to individual results of the written          15309      Installing Belt and Chain Drives
                                                                                                                4
assessment on NCCER’s website. This training              15311-08
                                                          15310      Installing Fans and Blowers
prescription will include the overall score and           15312-08
                                                                                                                4
results by topic area.                                    15311      Installing Bearings
                                                                                                                4
                                                          15306-08
                                                          15312      Installing Seals
National Registry – Assessment results will be            15304-08
                                                                                                                4
maintained in NCCER’s National Registry and be a          15401      Conveyors                                  4
part of each candidate’s training records. These          15404      Troubleshooting and Repairing
records are stored and become a portable record of                   Compressors                                4
your training and assessment achievements.                15406      Setting Baseplates and Soleplates
                                                                                                                4
                                                          15207-07
                                                          15407      Conventional Alignment                     4
                                                          15408      Pumps                                      2
                                                          15409      Troubleshoot and Repair Pumps              4
                                                          15411      Troubleshoot and Repair Gearboxes          4
                                                          15501      Advanced Blueprint Reading                 4
                                                          15503      Turbines                                   4
                                                          15504      Troubleshoot and Repair Turbine
                                                                                                                4
                                                                     Equipment
                                                          15505      AC / DC Motor Operation                    4
                                                          15506      Preventive and Predictive Maintenance      2
                                                          15507      Performing Reverse Alignment               8
                                                          15509      Performing Laser Alignment                 2
                                                                       Total Number of Questions               146



                       National Center for Construction Education and Research (NCCER)
  3600 NW 43rd St., Bldg. G • Gainesville, Fl • 32606 • Ph: (352) 334.0911 • Fax: (352) 334.0932 • www.NCCER.org
                                                             .

Contenu connexe

Tendances

Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
Shaik Ghouse
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
Chandra Battu
 
Resume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorResume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC Inspector
M.ZUBAIR KHAN
 
Catalog cables and_wires_novkabel
Catalog cables and_wires_novkabelCatalog cables and_wires_novkabel
Catalog cables and_wires_novkabel
EUROPAGES
 
CV of Yogesh Final
CV of Yogesh FinalCV of Yogesh Final
CV of Yogesh Final
Yogesh V.K
 
PORTFOLIO (Project Engineering)
PORTFOLIO (Project Engineering)PORTFOLIO (Project Engineering)
PORTFOLIO (Project Engineering)
David Diaz
 

Tendances (20)

Mani cv
Mani   cvMani   cv
Mani cv
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
Study on properties of concrete by partially replacing cement with GGBS
Study on properties of concrete by partially replacing cement with GGBSStudy on properties of concrete by partially replacing cement with GGBS
Study on properties of concrete by partially replacing cement with GGBS
 
CURRICULUM_VITAE__NHAI_latest
CURRICULUM_VITAE__NHAI_latestCURRICULUM_VITAE__NHAI_latest
CURRICULUM_VITAE__NHAI_latest
 
Caterpillar cat 385 c l excavator (prefix jcm) service repair manual (jcm0000...
Caterpillar cat 385 c l excavator (prefix jcm) service repair manual (jcm0000...Caterpillar cat 385 c l excavator (prefix jcm) service repair manual (jcm0000...
Caterpillar cat 385 c l excavator (prefix jcm) service repair manual (jcm0000...
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
 
Ms.jkr.20800.2005
Ms.jkr.20800.2005Ms.jkr.20800.2005
Ms.jkr.20800.2005
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
 
Resume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorResume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC Inspector
 
Plastic soil concrete
Plastic soil concretePlastic soil concrete
Plastic soil concrete
 
Catalog cables and_wires_novkabel
Catalog cables and_wires_novkabelCatalog cables and_wires_novkabel
Catalog cables and_wires_novkabel
 
CV of Yogesh Final
CV of Yogesh FinalCV of Yogesh Final
CV of Yogesh Final
 
Precast Concrete QA/QC CV
Precast Concrete QA/QC CVPrecast Concrete QA/QC CV
Precast Concrete QA/QC CV
 
Plastic Waste Road and its Construction
Plastic Waste Road and its ConstructionPlastic Waste Road and its Construction
Plastic Waste Road and its Construction
 
Kpr resume tunnel engineer
Kpr resume tunnel engineerKpr resume tunnel engineer
Kpr resume tunnel engineer
 
PORTFOLIO (Project Engineering)
PORTFOLIO (Project Engineering)PORTFOLIO (Project Engineering)
PORTFOLIO (Project Engineering)
 
Bondstrand serie 2000 m-7000m product data
Bondstrand   serie 2000 m-7000m product dataBondstrand   serie 2000 m-7000m product data
Bondstrand serie 2000 m-7000m product data
 
Journal on plastic roads
Journal on plastic roadsJournal on plastic roads
Journal on plastic roads
 
POWER PLANT, QA/QC ENGINEER, WELDING INSPECTOR
POWER PLANT, QA/QC ENGINEER, WELDING INSPECTORPOWER PLANT, QA/QC ENGINEER, WELDING INSPECTOR
POWER PLANT, QA/QC ENGINEER, WELDING INSPECTOR
 

Plus de AmericanMillwright

Plus de AmericanMillwright (20)

Triangle Chart
Triangle ChartTriangle Chart
Triangle Chart
 
Steam Turbinesforcombinedcycle
Steam TurbinesforcombinedcycleSteam Turbinesforcombinedcycle
Steam Turbinesforcombinedcycle
 
10 Inch Diameter
10 Inch Diameter10 Inch Diameter
10 Inch Diameter
 
How To Use A Transit Final2
How To Use A Transit Final2How To Use A Transit Final2
How To Use A Transit Final2
 
Ge Steam Turbinesfor Industrial
Ge Steam Turbinesfor IndustrialGe Steam Turbinesfor Industrial
Ge Steam Turbinesfor Industrial
 
Ge Steam Turbine Products
Ge Steam Turbine ProductsGe Steam Turbine Products
Ge Steam Turbine Products
 
Inch To Millimeter Conversion Table
Inch To Millimeter Conversion TableInch To Millimeter Conversion Table
Inch To Millimeter Conversion Table
 
Layout Basics I Ne
Layout Basics I NeLayout Basics I Ne
Layout Basics I Ne
 
Metric & Inch Equivalent
Metric & Inch EquivalentMetric & Inch Equivalent
Metric & Inch Equivalent
 
Millimeter Tap Drill Sizes
Millimeter Tap Drill SizesMillimeter Tap Drill Sizes
Millimeter Tap Drill Sizes
 
Millimeter To Inch Conversion Table
Millimeter To Inch Conversion TableMillimeter To Inch Conversion Table
Millimeter To Inch Conversion Table
 
Siemens1000 Mw
Siemens1000 MwSiemens1000 Mw
Siemens1000 Mw
 
Siemens Fuel Gasifier
Siemens Fuel GasifierSiemens Fuel Gasifier
Siemens Fuel Gasifier
 
Siemens Gas Turbine4000 F
Siemens Gas Turbine4000 FSiemens Gas Turbine4000 F
Siemens Gas Turbine4000 F
 
Soft Foot
Soft FootSoft Foot
Soft Foot
 
Ge Combined Cycle
Ge Combined CycleGe Combined Cycle
Ge Combined Cycle
 
Easy Laser Shaft Alignment Worksheet
Easy Laser   Shaft Alignment WorksheetEasy Laser   Shaft Alignment Worksheet
Easy Laser Shaft Alignment Worksheet
 
Decimal Equivalents Of Number Size Drills
Decimal Equivalents Of Number Size DrillsDecimal Equivalents Of Number Size Drills
Decimal Equivalents Of Number Size Drills
 
Carbon Capture
Carbon CaptureCarbon Capture
Carbon Capture
 
Compressor Valves
Compressor ValvesCompressor Valves
Compressor Valves
 

Nccer Millwright

  • 1. National Craft Assessment and Certification Program B L U E P R I N T Industrial Millwright Written Assessment Contents: Industrial Millwright Overview – This written assessment is a three-hour, (MLWRT15) as of 4/2008 closed-book examination. You will be permitted to use Module Number of a nonprogrammable, nonprinting calculator during Number Topic Area Questions the examination. The Assessment Center will provide 00101 Basic Safety 4 any necessary pencils. No extra papers, books, notes 15106-06 Oxyfuel Cutting 4 or study materials are allowed in the testing area. 29105-03 SMAW Equipment and Setup 4 15102-06 Millwright Hand Tools 4 Study Material – All NCCER written assessments are 15103-06 Fasteners 4 referenced to Contren® Learning Series modules. You 15104-06 Basic Layout 4 may order modules from Pearson Education, Inc. by 15105-06 Cutting and Fitting Gaskets 4 calling (800) 922.0579 or by logging on to 15201-07 Intermediate Trade Math 4 www.crafttraining.com. 15204-07 Specialty Tools 4 15205-07 Millwright Power Tools 4 Assessment Development – All questions on each 15206-07 Light Lifting Devices 4 assessment have been developed and approved by 15208-07 Lubrication 4 subject matter experts from the respective craft. 15209-07 Introduction to Bearings 4 Assessment development and administration operates 15302 Precision Measuring Tools 4 15302-08 under the direction of Prov, NCCER’s testing partner. 15303 Installing Couplings 4 15307-08 Credentials – NCCER will send appropriate 15304 Prealignment for Drilling and Tapping 4 credentials (certificate, wallet card, and official 15310-08 15305 Fabricating Shims transcript) to the Assessment Center upon successful 4 15308-08 completion of the written assessment. 15306 Installing Packing 4 15303-08 15307 Installing Mechanical Seals Training Prescription Reports – Each candidate will 4 15305-08 have access to individual results of the written 15309 Installing Belt and Chain Drives 4 assessment on NCCER’s website. This training 15311-08 15310 Installing Fans and Blowers prescription will include the overall score and 15312-08 4 results by topic area. 15311 Installing Bearings 4 15306-08 15312 Installing Seals National Registry – Assessment results will be 15304-08 4 maintained in NCCER’s National Registry and be a 15401 Conveyors 4 part of each candidate’s training records. These 15404 Troubleshooting and Repairing records are stored and become a portable record of Compressors 4 your training and assessment achievements. 15406 Setting Baseplates and Soleplates 4 15207-07 15407 Conventional Alignment 4 15408 Pumps 2 15409 Troubleshoot and Repair Pumps 4 15411 Troubleshoot and Repair Gearboxes 4 15501 Advanced Blueprint Reading 4 15503 Turbines 4 15504 Troubleshoot and Repair Turbine 4 Equipment 15505 AC / DC Motor Operation 4 15506 Preventive and Predictive Maintenance 2 15507 Performing Reverse Alignment 8 15509 Performing Laser Alignment 2 Total Number of Questions 146 National Center for Construction Education and Research (NCCER) 3600 NW 43rd St., Bldg. G • Gainesville, Fl • 32606 • Ph: (352) 334.0911 • Fax: (352) 334.0932 • www.NCCER.org .