Soumettre la recherche
Mettre en ligne
Report1
•
0 j'aime
•
49 vues
A
Ammad Safdar
Suivre
Signaler
Partager
Signaler
Partager
1 sur 2
Télécharger maintenant
Télécharger pour lire hors ligne
Recommandé
Non Prime Select Guidelines call Jesse B Lucero 702-551-3125
Non Prime Select Guidelines call Jesse B Lucero 702-551-3125
Jesse B. Lucero
Irrigation designmanual
Irrigation designmanual
Claudia Crosa Rivarola
Rules of thumb for process engineer
Rules of thumb for process engineer
Karnav Rana
INVESTIGATION INTO THE AERODYNAMIC DESIGN OF A FORMULA ONE CAR
INVESTIGATION INTO THE AERODYNAMIC DESIGN OF A FORMULA ONE CAR
Daniel Baker
Cryoserver V8 admin guide
Cryoserver V8 admin guide
cryoserver
AERODYNAMIC DEVELOPMENT OF THE SEGURACING F1-R01 PROTOTYPE USING CFD
AERODYNAMIC DEVELOPMENT OF THE SEGURACING F1-R01 PROTOTYPE USING CFD
mouhamedakremmouffouk
Cryoserver v7 Administration Guide
Cryoserver v7 Administration Guide
cryoserver
Case cx800 b crawler excavator service repair manual
Case cx800 b crawler excavator service repair manual
fjjskekskem
Recommandé
Non Prime Select Guidelines call Jesse B Lucero 702-551-3125
Non Prime Select Guidelines call Jesse B Lucero 702-551-3125
Jesse B. Lucero
Irrigation designmanual
Irrigation designmanual
Claudia Crosa Rivarola
Rules of thumb for process engineer
Rules of thumb for process engineer
Karnav Rana
INVESTIGATION INTO THE AERODYNAMIC DESIGN OF A FORMULA ONE CAR
INVESTIGATION INTO THE AERODYNAMIC DESIGN OF A FORMULA ONE CAR
Daniel Baker
Cryoserver V8 admin guide
Cryoserver V8 admin guide
cryoserver
AERODYNAMIC DEVELOPMENT OF THE SEGURACING F1-R01 PROTOTYPE USING CFD
AERODYNAMIC DEVELOPMENT OF THE SEGURACING F1-R01 PROTOTYPE USING CFD
mouhamedakremmouffouk
Cryoserver v7 Administration Guide
Cryoserver v7 Administration Guide
cryoserver
Case cx800 b crawler excavator service repair manual
Case cx800 b crawler excavator service repair manual
fjjskekskem
#VirtualDesignMaster 3 Challenge 1 - Steven Viljoen
#VirtualDesignMaster 3 Challenge 1 - Steven Viljoen
vdmchallenge
CFD-Assignment_Ramji_Amit_10241445
CFD-Assignment_Ramji_Amit_10241445
Amit Ramji ✈
MEng Report Merged - FINAL
MEng Report Merged - FINAL
Amit Ramji ✈
IMechE Report Final_Fixed
IMechE Report Final_Fixed
Amit Ramji ✈
11 ak45b5 5
11 ak45b5 5
crom68
Byron Schaller - Challenge 1 - Virtual Design Master
Byron Schaller - Challenge 1 - Virtual Design Master
vdmchallenge
SRS of software project lab 1
SRS of software project lab 1
Arafat Zaman Anik
Htd group presentation
Htd group presentation
jim w
The Original Change Management Tool Book
The Original Change Management Tool Book
Luis Alejandro Molina Sánchez
Construction; BOND STREET REDEVELOPMENT
Construction; BOND STREET REDEVELOPMENT
Syed Rizvi
Kawasaki 30 zv 2 wheel loader equipment components parts catalogue manual (se...
Kawasaki 30 zv 2 wheel loader equipment components parts catalogue manual (se...
fhjsekkemm
Case cx300 d crawler excavators lc version (tier4 final) mea market service...
Case cx300 d crawler excavators lc version (tier4 final) mea market service...
fujsjefjkskekfm
Oaktree funding non-prime_select_guidelines
Oaktree funding non-prime_select_guidelines
Jesse B. Lucero
Link SDVOSB Past Performance Summaries
Link SDVOSB Past Performance Summaries
gasanden
Link SDVOSB Past Performance Summaries
Link SDVOSB Past Performance Summaries
gasanden
Link Resources Past Performance Summaries
Link Resources Past Performance Summaries
Link Resources
Hermosa Beach - Cost Benefit Analysis 2014
Hermosa Beach - Cost Benefit Analysis 2014
StopHermosaBeachOil
Adopted scoping plan
Adopted scoping plan
archercri
WCDSB_EnergyPlan
WCDSB_EnergyPlan
Arnie Wohlgemut
Market for Portable Medication Compliance Devices
Market for Portable Medication Compliance Devices
Alok Narula
Earthing
Earthing
Rui Sousa
Report on Field Investigation - Alpha Project, Palawan - September 2007
Report on Field Investigation - Alpha Project, Palawan - September 2007
No to mining in Palawan
Contenu connexe
Tendances
#VirtualDesignMaster 3 Challenge 1 - Steven Viljoen
#VirtualDesignMaster 3 Challenge 1 - Steven Viljoen
vdmchallenge
CFD-Assignment_Ramji_Amit_10241445
CFD-Assignment_Ramji_Amit_10241445
Amit Ramji ✈
MEng Report Merged - FINAL
MEng Report Merged - FINAL
Amit Ramji ✈
IMechE Report Final_Fixed
IMechE Report Final_Fixed
Amit Ramji ✈
11 ak45b5 5
11 ak45b5 5
crom68
Byron Schaller - Challenge 1 - Virtual Design Master
Byron Schaller - Challenge 1 - Virtual Design Master
vdmchallenge
SRS of software project lab 1
SRS of software project lab 1
Arafat Zaman Anik
Htd group presentation
Htd group presentation
jim w
The Original Change Management Tool Book
The Original Change Management Tool Book
Luis Alejandro Molina Sánchez
Construction; BOND STREET REDEVELOPMENT
Construction; BOND STREET REDEVELOPMENT
Syed Rizvi
Kawasaki 30 zv 2 wheel loader equipment components parts catalogue manual (se...
Kawasaki 30 zv 2 wheel loader equipment components parts catalogue manual (se...
fhjsekkemm
Case cx300 d crawler excavators lc version (tier4 final) mea market service...
Case cx300 d crawler excavators lc version (tier4 final) mea market service...
fujsjefjkskekfm
Tendances
(12)
#VirtualDesignMaster 3 Challenge 1 - Steven Viljoen
#VirtualDesignMaster 3 Challenge 1 - Steven Viljoen
CFD-Assignment_Ramji_Amit_10241445
CFD-Assignment_Ramji_Amit_10241445
MEng Report Merged - FINAL
MEng Report Merged - FINAL
IMechE Report Final_Fixed
IMechE Report Final_Fixed
11 ak45b5 5
11 ak45b5 5
Byron Schaller - Challenge 1 - Virtual Design Master
Byron Schaller - Challenge 1 - Virtual Design Master
SRS of software project lab 1
SRS of software project lab 1
Htd group presentation
Htd group presentation
The Original Change Management Tool Book
The Original Change Management Tool Book
Construction; BOND STREET REDEVELOPMENT
Construction; BOND STREET REDEVELOPMENT
Kawasaki 30 zv 2 wheel loader equipment components parts catalogue manual (se...
Kawasaki 30 zv 2 wheel loader equipment components parts catalogue manual (se...
Case cx300 d crawler excavators lc version (tier4 final) mea market service...
Case cx300 d crawler excavators lc version (tier4 final) mea market service...
Similaire à Report1
Oaktree funding non-prime_select_guidelines
Oaktree funding non-prime_select_guidelines
Jesse B. Lucero
Link SDVOSB Past Performance Summaries
Link SDVOSB Past Performance Summaries
gasanden
Link SDVOSB Past Performance Summaries
Link SDVOSB Past Performance Summaries
gasanden
Link Resources Past Performance Summaries
Link Resources Past Performance Summaries
Link Resources
Hermosa Beach - Cost Benefit Analysis 2014
Hermosa Beach - Cost Benefit Analysis 2014
StopHermosaBeachOil
Adopted scoping plan
Adopted scoping plan
archercri
WCDSB_EnergyPlan
WCDSB_EnergyPlan
Arnie Wohlgemut
Market for Portable Medication Compliance Devices
Market for Portable Medication Compliance Devices
Alok Narula
Earthing
Earthing
Rui Sousa
Report on Field Investigation - Alpha Project, Palawan - September 2007
Report on Field Investigation - Alpha Project, Palawan - September 2007
No to mining in Palawan
The us-contact-center-decision-makers-guide-2012
The us-contact-center-decision-makers-guide-2012
blueC 802
RMI Golf Cart Report
RMI Golf Cart Report
Mike Penso
2 instructor's remarks
2 instructor's remarks
Hoàng Hà Lê
gem-south-africa-2014-report-1431707163
gem-south-africa-2014-report-1431707163
Nigel Engelbrecht
Final Project - COMBINATION
Final Project - COMBINATION
Felicity Phillips
Mastering the Art of Battery Reconditioning
Mastering the Art of Battery Reconditioning
predsek
C2C Survey Report
C2C Survey Report
Danielle Jacobs, MPH, MUP
Agronomy handbook
Agronomy handbook
Midwest Laboratories
Canal interoceánico nicaragua canalprojectdescription hknd-doc dic 2014
Canal interoceánico nicaragua canalprojectdescription hknd-doc dic 2014
MSc. Alfonso Antonio Navarrete Centeno
Cyp management stan
Cyp management stan
Navy CYP
Similaire à Report1
(20)
Oaktree funding non-prime_select_guidelines
Oaktree funding non-prime_select_guidelines
Link SDVOSB Past Performance Summaries
Link SDVOSB Past Performance Summaries
Link SDVOSB Past Performance Summaries
Link SDVOSB Past Performance Summaries
Link Resources Past Performance Summaries
Link Resources Past Performance Summaries
Hermosa Beach - Cost Benefit Analysis 2014
Hermosa Beach - Cost Benefit Analysis 2014
Adopted scoping plan
Adopted scoping plan
WCDSB_EnergyPlan
WCDSB_EnergyPlan
Market for Portable Medication Compliance Devices
Market for Portable Medication Compliance Devices
Earthing
Earthing
Report on Field Investigation - Alpha Project, Palawan - September 2007
Report on Field Investigation - Alpha Project, Palawan - September 2007
The us-contact-center-decision-makers-guide-2012
The us-contact-center-decision-makers-guide-2012
RMI Golf Cart Report
RMI Golf Cart Report
2 instructor's remarks
2 instructor's remarks
gem-south-africa-2014-report-1431707163
gem-south-africa-2014-report-1431707163
Final Project - COMBINATION
Final Project - COMBINATION
Mastering the Art of Battery Reconditioning
Mastering the Art of Battery Reconditioning
C2C Survey Report
C2C Survey Report
Agronomy handbook
Agronomy handbook
Canal interoceánico nicaragua canalprojectdescription hknd-doc dic 2014
Canal interoceánico nicaragua canalprojectdescription hknd-doc dic 2014
Cyp management stan
Cyp management stan
Report1
1.
September 24, 2014 [ENERGY AUDIT ] Coral Enterprise 1 Table of Contents Coral Enterprise ................................................................................................................................................. 2 Preliminary Visit ............................................................................................................................................. 2 Scope of the work .......................................................................................................................................... 2 Detailed Audit ................................................................................................................................................ 3 Meeting at site ........................................................................................................................................... 3 The Audit .................................................................................................................................................... 3 Quantitative Analysis .................................................................................................................................. 12 BOQ .............................................................................................................................................................. 14 Lump Sum Price Estimate ............................................................................................................................ 14 Exclusions ................................................................................................................................................. 14 Annex ‐1 ....................................................................................................................................................... 15
2.
September 24, 2014 [ENERGY AUDIT ] Coral Enterprise 2 Coral Enterprise Preliminary Visit Preliminary visit was made on Saturday, Sept 13, 2014. Complete factory visit was conducted by axel engineering team with client representative Mr. Hafeez. At the end of the visit, a meeting was done with Mr. Tanveer to discuss the day. Mr Tanveer detailed the scope of the work and accompanied the Axel team through a factory again. Scope of the work ANNEXURE ‘A’ Steam System 1. Two day audit of the complete steam system of the plant including the furnace, boiler, piping, insulation, water treatment and condensate recovery system. 2.
Flue gases analyzer and temperature gun would be used to take measurements. 3. Focus during the audit would be on: a) Identification of the quantity and cost of fuel consumed. b) Identification of energy wastages. c) Excess air calculation. d) Calculation of heat losses from the piping system. e) Calculation of boiler efficiency. 4. Water quality and chemical dosing.
Télécharger maintenant