September 24, 2014  [ENERGY AUDIT ] 
 
 
Coral Enterprise 
1 
 
 
 
 
 
 
Table	of	Contents	
Coral Enterprise ................................................................................................................................................. 2 
Preliminary Visit ............................................................................................................................................. 2 
Scope of the work .......................................................................................................................................... 2 
Detailed Audit ................................................................................................................................................ 3 
Meeting at site ........................................................................................................................................... 3 
The Audit .................................................................................................................................................... 3 
Quantitative  Analysis .................................................................................................................................. 12 
BOQ .............................................................................................................................................................. 14 
Lump Sum Price Estimate ............................................................................................................................ 14 
Exclusions ................................................................................................................................................. 14 
Annex ‐1 ....................................................................................................................................................... 15 
 
 
 
 
 
 
 
 
 
 
September 24, 2014  [ENERGY AUDIT ] 
 
 
Coral Enterprise 
2 
 
 
 
 
Coral	Enterprise		
 
 
Preliminary	Visit		
Preliminary visit was made on Saturday, Sept 13, 2014. Complete factory visit was conducted by axel 
engineering team with client representative Mr. Hafeez. At the end of the visit, a meeting was done with 
Mr. Tanveer to discuss the day. Mr Tanveer detailed the scope of the work and accompanied the Axel team 
through a factory again.  
Scope	of	the	work		
 
ANNEXURE   ‘A’ 
 
   Steam System 
1. Two day audit of the complete steam system of the plant including the furnace, boiler, piping, 
insulation, water treatment and condensate recovery system. 
2. Flue gases analyzer and temperature gun would be used to take measurements. 
3. Focus during the audit would be on: 
 
a) Identification of the quantity and cost of fuel consumed.  
b) Identification of energy wastages. 
c) Excess air calculation. 
d) Calculation of heat losses from the piping system. 
e) Calculation of boiler efficiency. 
 
4. Water quality and chemical dosing. 
 
 
 

Contenu connexe

Tendances

#VirtualDesignMaster 3 Challenge 1 - Steven Viljoen
#VirtualDesignMaster 3 Challenge 1 - Steven Viljoen#VirtualDesignMaster 3 Challenge 1 - Steven Viljoen
#VirtualDesignMaster 3 Challenge 1 - Steven Viljoenvdmchallenge
 
CFD-Assignment_Ramji_Amit_10241445
CFD-Assignment_Ramji_Amit_10241445CFD-Assignment_Ramji_Amit_10241445
CFD-Assignment_Ramji_Amit_10241445Amit Ramji ✈
 
MEng Report Merged - FINAL
MEng Report Merged - FINALMEng Report Merged - FINAL
MEng Report Merged - FINALAmit Ramji ✈
 
IMechE Report Final_Fixed
IMechE Report Final_FixedIMechE Report Final_Fixed
IMechE Report Final_FixedAmit Ramji ✈
 
11 ak45b5 5
11 ak45b5 511 ak45b5 5
11 ak45b5 5crom68
 
Byron Schaller - Challenge 1 - Virtual Design Master
Byron Schaller - Challenge 1 - Virtual Design MasterByron Schaller - Challenge 1 - Virtual Design Master
Byron Schaller - Challenge 1 - Virtual Design Mastervdmchallenge
 
SRS of software project lab 1
SRS of software project lab 1SRS of software project lab 1
SRS of software project lab 1Arafat Zaman Anik
 
Htd group presentation
Htd group  presentationHtd group  presentation
Htd group presentationjim w
 
Construction; BOND STREET REDEVELOPMENT
Construction; BOND STREET REDEVELOPMENTConstruction; BOND STREET REDEVELOPMENT
Construction; BOND STREET REDEVELOPMENTSyed Rizvi
 
Kawasaki 30 zv 2 wheel loader equipment components parts catalogue manual (se...
Kawasaki 30 zv 2 wheel loader equipment components parts catalogue manual (se...Kawasaki 30 zv 2 wheel loader equipment components parts catalogue manual (se...
Kawasaki 30 zv 2 wheel loader equipment components parts catalogue manual (se...fhjsekkemm
 
Case cx300 d crawler excavators lc version (tier4 final) mea market service...
Case cx300 d crawler excavators lc version (tier4 final)   mea market service...Case cx300 d crawler excavators lc version (tier4 final)   mea market service...
Case cx300 d crawler excavators lc version (tier4 final) mea market service...fujsjefjkskekfm
 

Tendances (12)

#VirtualDesignMaster 3 Challenge 1 - Steven Viljoen
#VirtualDesignMaster 3 Challenge 1 - Steven Viljoen#VirtualDesignMaster 3 Challenge 1 - Steven Viljoen
#VirtualDesignMaster 3 Challenge 1 - Steven Viljoen
 
CFD-Assignment_Ramji_Amit_10241445
CFD-Assignment_Ramji_Amit_10241445CFD-Assignment_Ramji_Amit_10241445
CFD-Assignment_Ramji_Amit_10241445
 
MEng Report Merged - FINAL
MEng Report Merged - FINALMEng Report Merged - FINAL
MEng Report Merged - FINAL
 
IMechE Report Final_Fixed
IMechE Report Final_FixedIMechE Report Final_Fixed
IMechE Report Final_Fixed
 
11 ak45b5 5
11 ak45b5 511 ak45b5 5
11 ak45b5 5
 
Byron Schaller - Challenge 1 - Virtual Design Master
Byron Schaller - Challenge 1 - Virtual Design MasterByron Schaller - Challenge 1 - Virtual Design Master
Byron Schaller - Challenge 1 - Virtual Design Master
 
SRS of software project lab 1
SRS of software project lab 1SRS of software project lab 1
SRS of software project lab 1
 
Htd group presentation
Htd group  presentationHtd group  presentation
Htd group presentation
 
The Original Change Management Tool Book
The Original Change Management Tool BookThe Original Change Management Tool Book
The Original Change Management Tool Book
 
Construction; BOND STREET REDEVELOPMENT
Construction; BOND STREET REDEVELOPMENTConstruction; BOND STREET REDEVELOPMENT
Construction; BOND STREET REDEVELOPMENT
 
Kawasaki 30 zv 2 wheel loader equipment components parts catalogue manual (se...
Kawasaki 30 zv 2 wheel loader equipment components parts catalogue manual (se...Kawasaki 30 zv 2 wheel loader equipment components parts catalogue manual (se...
Kawasaki 30 zv 2 wheel loader equipment components parts catalogue manual (se...
 
Case cx300 d crawler excavators lc version (tier4 final) mea market service...
Case cx300 d crawler excavators lc version (tier4 final)   mea market service...Case cx300 d crawler excavators lc version (tier4 final)   mea market service...
Case cx300 d crawler excavators lc version (tier4 final) mea market service...
 

Similaire à Report1

Oaktree funding non-prime_select_guidelines
Oaktree funding non-prime_select_guidelinesOaktree funding non-prime_select_guidelines
Oaktree funding non-prime_select_guidelinesJesse B. Lucero
 
Link SDVOSB Past Performance Summaries
Link SDVOSB Past Performance SummariesLink SDVOSB Past Performance Summaries
Link SDVOSB Past Performance Summariesgasanden
 
Link SDVOSB Past Performance Summaries
Link SDVOSB Past Performance SummariesLink SDVOSB Past Performance Summaries
Link SDVOSB Past Performance Summariesgasanden
 
Link Resources Past Performance Summaries
Link Resources Past Performance SummariesLink Resources Past Performance Summaries
Link Resources Past Performance SummariesLink Resources
 
Hermosa Beach - Cost Benefit Analysis 2014
Hermosa Beach - Cost Benefit Analysis 2014Hermosa Beach - Cost Benefit Analysis 2014
Hermosa Beach - Cost Benefit Analysis 2014StopHermosaBeachOil
 
Adopted scoping plan
Adopted scoping planAdopted scoping plan
Adopted scoping planarchercri
 
Market for Portable Medication Compliance Devices
Market for Portable Medication Compliance DevicesMarket for Portable Medication Compliance Devices
Market for Portable Medication Compliance DevicesAlok Narula
 
Report on Field Investigation - Alpha Project, Palawan - September 2007
Report on Field Investigation - Alpha Project, Palawan - September 2007Report on Field Investigation - Alpha Project, Palawan - September 2007
Report on Field Investigation - Alpha Project, Palawan - September 2007No to mining in Palawan
 
The us-contact-center-decision-makers-guide-2012
The us-contact-center-decision-makers-guide-2012The us-contact-center-decision-makers-guide-2012
The us-contact-center-decision-makers-guide-2012blueC 802
 
RMI Golf Cart Report
RMI Golf Cart ReportRMI Golf Cart Report
RMI Golf Cart ReportMike Penso
 
2 instructor's remarks
2  instructor's remarks2  instructor's remarks
2 instructor's remarksHoàng Hà Lê
 
gem-south-africa-2014-report-1431707163
gem-south-africa-2014-report-1431707163gem-south-africa-2014-report-1431707163
gem-south-africa-2014-report-1431707163Nigel Engelbrecht
 
Mastering the Art of Battery Reconditioning
Mastering the Art of Battery ReconditioningMastering the Art of Battery Reconditioning
Mastering the Art of Battery Reconditioningpredsek
 
Canal interoceánico nicaragua canalprojectdescription hknd-doc dic 2014
Canal interoceánico nicaragua canalprojectdescription hknd-doc dic 2014Canal interoceánico nicaragua canalprojectdescription hknd-doc dic 2014
Canal interoceánico nicaragua canalprojectdescription hknd-doc dic 2014MSc. Alfonso Antonio Navarrete Centeno
 
Cyp management stan
Cyp management stanCyp management stan
Cyp management stanNavy CYP
 

Similaire à Report1 (20)

Oaktree funding non-prime_select_guidelines
Oaktree funding non-prime_select_guidelinesOaktree funding non-prime_select_guidelines
Oaktree funding non-prime_select_guidelines
 
Link SDVOSB Past Performance Summaries
Link SDVOSB Past Performance SummariesLink SDVOSB Past Performance Summaries
Link SDVOSB Past Performance Summaries
 
Link SDVOSB Past Performance Summaries
Link SDVOSB Past Performance SummariesLink SDVOSB Past Performance Summaries
Link SDVOSB Past Performance Summaries
 
Link Resources Past Performance Summaries
Link Resources Past Performance SummariesLink Resources Past Performance Summaries
Link Resources Past Performance Summaries
 
Hermosa Beach - Cost Benefit Analysis 2014
Hermosa Beach - Cost Benefit Analysis 2014Hermosa Beach - Cost Benefit Analysis 2014
Hermosa Beach - Cost Benefit Analysis 2014
 
Adopted scoping plan
Adopted scoping planAdopted scoping plan
Adopted scoping plan
 
WCDSB_EnergyPlan
WCDSB_EnergyPlanWCDSB_EnergyPlan
WCDSB_EnergyPlan
 
Market for Portable Medication Compliance Devices
Market for Portable Medication Compliance DevicesMarket for Portable Medication Compliance Devices
Market for Portable Medication Compliance Devices
 
Earthing
Earthing Earthing
Earthing
 
Report on Field Investigation - Alpha Project, Palawan - September 2007
Report on Field Investigation - Alpha Project, Palawan - September 2007Report on Field Investigation - Alpha Project, Palawan - September 2007
Report on Field Investigation - Alpha Project, Palawan - September 2007
 
The us-contact-center-decision-makers-guide-2012
The us-contact-center-decision-makers-guide-2012The us-contact-center-decision-makers-guide-2012
The us-contact-center-decision-makers-guide-2012
 
RMI Golf Cart Report
RMI Golf Cart ReportRMI Golf Cart Report
RMI Golf Cart Report
 
2 instructor's remarks
2  instructor's remarks2  instructor's remarks
2 instructor's remarks
 
gem-south-africa-2014-report-1431707163
gem-south-africa-2014-report-1431707163gem-south-africa-2014-report-1431707163
gem-south-africa-2014-report-1431707163
 
Final Project - COMBINATION
Final Project - COMBINATIONFinal Project - COMBINATION
Final Project - COMBINATION
 
Mastering the Art of Battery Reconditioning
Mastering the Art of Battery ReconditioningMastering the Art of Battery Reconditioning
Mastering the Art of Battery Reconditioning
 
C2C Survey Report
C2C Survey ReportC2C Survey Report
C2C Survey Report
 
Agronomy handbook
Agronomy handbookAgronomy handbook
Agronomy handbook
 
Canal interoceánico nicaragua canalprojectdescription hknd-doc dic 2014
Canal interoceánico nicaragua canalprojectdescription hknd-doc dic 2014Canal interoceánico nicaragua canalprojectdescription hknd-doc dic 2014
Canal interoceánico nicaragua canalprojectdescription hknd-doc dic 2014
 
Cyp management stan
Cyp management stanCyp management stan
Cyp management stan
 

Report1