What is effective Design Management?

    Design Management is becoming increasingly recognised as critical
  to the success of complex construction projects. However, the role
  of the Design Manager is poorly defined and Design Management is a
                         discipline without robust terms of reference.


   This paper reviews the need for Design Management and the day to
   day challenges facing Design Managers. It concludes by setting out
          Adept Management’s Design Management Framework which
            provides clarity and structure to this emerging profession.




           Should you have any queries relating to this paper please contact:


                                                             Andrew Newton
                                             Director of Design Management
                                                     Adept Management Ltd
                                                          The Technocentre
                                                                  Puma Way
                                                                    Coventry
                                                                   CV1 2TW


                                                       t: +44 (0)2476 236929
                                                       f: +44 (0)2476 236930


                           E-mail: andrew.newton@adeptmanagement.com
                                     Web site: www.adeptmanagement.com
The Need for More Effective Design Management




The Arguments for the Better Management of Design

Would any commercial enterprise look to construct a new facility or asset without a detailed
schedule of the work or without a management function to co-ordinate the delivery? Would this
company leave the various tradesmen to their own devices to co-ordinate the timing and integration
of their work with that of others? This approach would undoubtedly reduce overhead but the threat
of disputes, along with likely cost and time overruns usually precludes this as a realistic approach to
delivering construction.


If experience and simple common sense tell us that this is not the way to manage the construction,
why does this sound business logic not always apply to managing the designing of that facility?
Design is an inherently more complex process than construction: you do not know what the outcome
is going to look like when you start; it’s creative; it’s iterative; yet on many projects we let those
involved in the process, the designers, plan and manage the work themselves. Year on year
measurement of the design performance in the UK1 shows the folly of this approach.


                         % of Projects where Design &                     % of Projects where Design &
      Year
                         Engineering phase overspends                     Engineering is delivered late
     2000                                 36%                                             63%
     2006                                 36%                                             42%




Whilst poor design performance in itself is unacceptable, it is merely the tip of the iceberg. The real
concern is the subsequent impact on construction performance, where the risks and capital
expenditure are usually tens times greater. Again the following figures taken from the same projects
clearly demonstrate the effect of poor design performance on construction.




                       % of Projects where Construction                % of Projects where construction
                               phase overspends                             phase is delivered late
     2000                                 55%                                             38%
     2006                                 51%                                             38%




While these figures alone are all persuasive for design to be managed more effectively, it is pertinent
to explore some of the trends and influences on modern design processes to understand some of the
issues that give rise to these figures and increase the demand for properly and professionally
managed design.




1
      These figures have been taken KPIs commissioned by Construction Excellence. For more details please refer to
      www.constructingexcellence.org.uk/zones/kpizone




© Adept Management Ltd, 2008                            2
The Need for More Effective Design Management




Emerging Trends in Design

The construction industry has changed markedly over the last twenty years and this has put an
increasing pressure on design teams and design professionals to deliver. The key trends affecting
design team performance can be summarized in the following three areas:


Contractors at the Heart of the Design Process
The introduction of Design-Build procurement, along with the increasing use of private finance to
fund public procurement has led to the contractor being involved much earlier in the project
process. Contractors now find themselves at the heart of the design process, usually in a position
where they can influence and control design outcomes. Whilst this has undoubtedly eliminated many
buildability issues from projects, contractors’ mind sets and management approaches are not
necessarily compatible with the creative and iterative process of design. In the worst examples of
contractor-led projects the design team is treated as just another member of the supply chain and
inherent importance of good design to the built environment is often lost by a one dimensional
approach to its management. Typical construction management methods are not applicable to design
and new methods need to be developed and adopted for managing design work.


Increasing Specialisms within Design
The complexity of modern day materials, systems and solutions require more defined specialist
knowledge meaning that designers have had to move from being generalists to specialists. This has
resulted in more design consultants being involved in design, which is compounded still further by
the increasing importance of design input from trade contractors. With more parties and more
technically complex solutions involved, even the most experienced of design teams will fail to ensure
that correct information is supplied at the correct time without the help of a good Design Manager.


Recognition that Design is a Process
The traditionally held view is that as all designs are unique and therefore they cannot be planned or
managed. This view is outdated and no longer valid; design is a process, which if correctly
understood and represented can be largely repeated from one project to the next and therefore can
be defined, measured and improved upon. In the same manner that construction work is usually paid
for on completion of elements of work or against an activity schedule, it is now possible to pay
design teams in a similar manner, based on their performance, rather than a traditional regular fee
draw down, that often leaves the client or contractor with remaining design work to be done but
with the entire fee spent. By defining the process and measuring the design team’s output against
it, the design team can be properly managed and their fee be based on performance rather time
spent.




© Adept Management Ltd, 2008                   3
The Need for More Effective Design Management




Defining Design Management & the Role of the Design Manager

The terms Design Manager, Design Team Leader, Lead Designer, Lead Consultant, Design Co-ordinator
are often used interchangeably causing confusion over roles and responsibilities. It is important to
define these roles and a useful starting point is that offered by Hughes & Gray2, who succinctly
define the two issues associated with effective design delivery as:
    (i)      The provision of accurate fully coordinated and complete information; and
    (ii)     The timely provision of that information.


The first issue is the responsibility of the Lead Consultant, usually the architect (alternatively called
the Design Team Leader or Lead Designer). Their work is checked usually by the Contractor’s Design
Co-ordinator.


The second issue is one of management and it is the responsibility of the Design Manager to ensure
that necessary framework is in place to allow the design team to produce fully coordinated and
complete information in the timely manner.


In Adept Management’s view Design Management is the management of the process of design –
not the co-ordination of the product – that remains the role of the design team, primarily the
Lead Consultant. To be successful, a design manager must maintain control without limiting
creativity.


In the following sections we look at Adept Management’s approach to Design Management in more
detail.




Adept Management’s Design Management Framework

Adept Management does not wish to prescribe exactly what Design Management is or how it should be
done. What we have developed, through experience in delivering a wide ranging services to
projects, is a framework for Design Management that captures the key components and enablers that
allow design to be managed efficiently and effectively. Adept Management’s Design Management
FrameworkTM, shown overleaf, provides a common basis and reference point against which individual
Design Managers can develop their own style and skills whilst, importantly, positioning the tool-sets
that are at their disposal.




2
           Managing Building Design, 2001, Colin Gray & Will Hughes, ISBN 0750650702




© Adept Management Ltd, 2008                               4
The Need for More Effective Design Management




                Figure 1: Adept Management’s Design Management FrameworkTM


Customer engagement
The customer is at the heart of any design process and this component looks to ensuring that the
Customer and Stakeholders are properly engaged on the project. The tools, techniques and methods
deployed should ensure that consistent and timely briefing information is delivered to the design
team and that this information is properly documented. Techniques such as Value & Risk
Management, Briefing workshops, room data sheets, and so on could be used. Just as important in
the engagement of the customer is the introduction of agreed approvals and sign off processes; these
are essential to ensuring commitment from the customer as the project proceeds.


Collaborative Working
This element relates to ensuring that the necessary project culture, protocols and processes are in
place to promote collaborative working between members of the design and project teams. Design
Managers must promote collaborative working at two levels: i) it is important to understand and
manage the dynamics of the team as this is critical to the success of a project; and ii) recognizing
the role that ICT can play in assisting and supporting collaborative working dynamic in practice. As
with all software, the technology is only part of the answer; the process by which it is introduced is
equally crucial. It might be as simple as ensuring that Information exchange protocols or CAD
layering conventions are in place or that a project extranet is implemented.


Consultant Appointment
Confirming scopes of works of each of the design team members and defining the role of the Lead
Consultant is essential in setting the project off on the right basis. The basis on which each of the
design consultants are appointed should, therefore, be determined by the Design Manager and not
left solely as a procurement department decision. Using simple tools such as responsibility matrices,
scope sheets and the appropriate appointment documents will minimize any mismatch between
designers and designers and trade contractors.




© Adept Management Ltd, 2008                    5
The Need for More Effective Design Management




Design Team Leadership
Design Team Leadership in the context of Design Management aims to ensure effective performance
design team performance by guiding and influencing how the team interacts to draw on the strengths
of its constituent parts (the individual members). The way people work in a group depends upon their
‘Task focus’ – the specialist knowledge, qualifications, experience, the team members bring and
their ‘Team focus’ - the way they work with and contribute to the group, thereby enhancing its
effectiveness. Design Teams are often hampered by ‘group think’ and conflict often results. The
Design Manager must maintain the team (promote teamwork) though effective leadership, social
maintenance and team selection.


Defining the Design Process
It is crucial that the design process is defined, both in terms of the high-level project stages, and the
detailed scope of each of the design team members involved. Creating a high-level design process
definition involves setting high level project milestones or gateways that the team can work towards.
There are a number of well recognised definitions or descriptions of the building design process, such
as the Architect’s Plan of Work published by the RIBA that help the Design Manager define this high
level route map through the design process. Prior to any design being undertaken, it is important
that the Design Manager works with the team to fully define and document the scope of work for
each design discipline. This will both form part of the Consultant’s Contract of Appointment and act
as a precursor to any Integrated Design Planning activity.


Integrated Design Planning
Planning design is often ignored as the design process is poorly understood and poorly defined,
making the planning of the process virtually impossible. Planning of design must be based on a
detailed definition of the design process and a detailed understanding of the information flow
between all parties. Techniques such as ‘ADePT’ can then be used to optimise the design process,
understand the critical decisions required and plan out the design in an integrated fashion between
designers and also with procurement. The ADePT Design Builder software is an invaluable tool for
enabling this.


Process Control
It is essential that the Design Manager controls the completion of activities, the associated
production of information, and the release of Design Deliverable in line with the Integrated Design
Programme. Process control must not just concentrate on backward looking performance and
progress reporting; it must instead look ahead and proactively remove any barriers and constraints
that could stop the design team performing. The ADePT Design Manager software is an invaluable
tool for enabling this.


Design Development & Control
Ensuring that the design being developed is technically compliant is clearly the responsibility of the
design team. However, it is essential that the Design Manager has an understanding of these
requirements and ensures that technical reviews and audits take place at key intervention points
within the design process. Also essential is an effective design change control procedure.




© Adept Management Ltd, 2008                     6
The Need for More Effective Design Management




Commercial Control
To ensure project success, it is essential that design is developed in line with agreed affordability
criteria. All too often, however, a lack of commercial awareness amongst the design team members
leads to unrealistic and unworkable solutions being produced. Thus, another critical function of the
Design Manager is to introduce and maintain commercial control over the evolving design. There are
many simple approaches to ensuring that this happens e.g., sharing the cost plan with the design
team or ensuring that key cost drivers on the project are explored fully and the best value solution
adopted by the design team. The Design Manager needs to be capable of introducing and facilitating
these approaches throughout the design delivery process.


About Adept Management

Adept Management is a design management & project services consultancy with core expertise in the
management of design across all sectors and scales of projects. Working with our customers, Adept
Management reduce the risk from poorly managed and co-ordinated design by using the Design
Management Framework described above to plan and manage design teams, project processes and
design development more effectively. We have a number of unique methods of planning and
managing projects that we collectively call ADePT (the Analytical Design Planning Technique), and
we are confident that our methods and experience provides greater predictability to projects and, in
many cases, lead to reductions in project costs and timescales.


How can we help?
We pride ourselves on our ability to make a positive difference on projects and this is reflected in
the high proportion of repeat work and the frequency with which customers expand our commissions.


We offer complete flexibility in our approach to supporting customers in all aspects of the Adept
Management Way:
    •   We can provide interim design or bid managers into your projects for any period of time,
        providing any of the services described above.
    •   We can provide discrete services such as the production of integrated design programmes or
        work flow using our ADePT approach; &
    •   We can provide specific consultancy advice or training on any aspect of the Design
        Management Frameworks;


Our Team
The majority of our staff have trained as designers which, allied to extensive project management
skills, provides the perfect skill set to plan and manage the work of design and project teams.




© Adept Management Ltd, 2008                   7

Contenu connexe

Tendances

Introduction of software project management
Introduction of software project managementIntroduction of software project management
Introduction of software project managementREHMAT ULLAH
 
SYMPOSIUM 2016 : CONFÉRENCE 803 - REVIEW OF BUSINESS TRANSFORMATION FRAMEWORK...
SYMPOSIUM 2016 : CONFÉRENCE 803 - REVIEW OF BUSINESS TRANSFORMATION FRAMEWORK...SYMPOSIUM 2016 : CONFÉRENCE 803 - REVIEW OF BUSINESS TRANSFORMATION FRAMEWORK...
SYMPOSIUM 2016 : CONFÉRENCE 803 - REVIEW OF BUSINESS TRANSFORMATION FRAMEWORK...PMI-Montréal
 
VDIS10015 Design Management Skills - Lecture 4
VDIS10015 Design Management Skills - Lecture 4VDIS10015 Design Management Skills - Lecture 4
VDIS10015 Design Management Skills - Lecture 4Virtu Institute
 
A Day of the Life of a Project Manager
A Day of the Life of a Project ManagerA Day of the Life of a Project Manager
A Day of the Life of a Project Managerreeza fazily
 
Prince2 resources e book 2
Prince2 resources e book 2Prince2 resources e book 2
Prince2 resources e book 2Knowledge Train
 
Project Management 2.0
Project Management 2.0Project Management 2.0
Project Management 2.0Wrike
 
Project Management Trends
Project Management TrendsProject Management Trends
Project Management TrendsDvir Zohar
 
Flawless Project Delivery
Flawless Project DeliveryFlawless Project Delivery
Flawless Project DeliveryKen Ede
 
Project Management Best Practices
Project Management Best PracticesProject Management Best Practices
Project Management Best PracticesRohana K Amarakoon
 
SoftPMO Project Management Toolkit for Microsoft Project Server
SoftPMO Project Management Toolkit for Microsoft Project ServerSoftPMO Project Management Toolkit for Microsoft Project Server
SoftPMO Project Management Toolkit for Microsoft Project ServerMichael Kaplan
 
Are we Prepared for Scrum Master’s Role in COVID-19 Outbreak?
Are we Prepared for Scrum Master’s Role in COVID-19 Outbreak?Are we Prepared for Scrum Master’s Role in COVID-19 Outbreak?
Are we Prepared for Scrum Master’s Role in COVID-19 Outbreak?Invensis Learning
 
Project Management Fundamentals Course Preview
Project Management Fundamentals Course PreviewProject Management Fundamentals Course Preview
Project Management Fundamentals Course PreviewInvensis Learning
 
Project Management To Project Governance , Knowledge Management
Project Management To Project Governance , Knowledge ManagementProject Management To Project Governance , Knowledge Management
Project Management To Project Governance , Knowledge Managementsubramanian K
 
DFMPro Brochure
DFMPro BrochureDFMPro Brochure
DFMPro BrochureDFMPro
 
Residential Design Build Whitepaper
Residential Design Build WhitepaperResidential Design Build Whitepaper
Residential Design Build WhitepaperBethany Jenkins
 
Аліна Піддубна - "The future of project management: РМ у 2030" Kharkiv PMDay ...
Аліна Піддубна - "The future of project management: РМ у 2030" Kharkiv PMDay ...Аліна Піддубна - "The future of project management: РМ у 2030" Kharkiv PMDay ...
Аліна Піддубна - "The future of project management: РМ у 2030" Kharkiv PMDay ...Lviv Startup Club
 
Project Management Tools & Techniques Assignment 3
Project Management Tools & Techniques Assignment 3Project Management Tools & Techniques Assignment 3
Project Management Tools & Techniques Assignment 3Chetan Pandharinath Padme
 
Guide to project management by j pricci
Guide to project management by j pricciGuide to project management by j pricci
Guide to project management by j pricciJennifer Pricci
 

Tendances (20)

Introduction of software project management
Introduction of software project managementIntroduction of software project management
Introduction of software project management
 
SYMPOSIUM 2016 : CONFÉRENCE 803 - REVIEW OF BUSINESS TRANSFORMATION FRAMEWORK...
SYMPOSIUM 2016 : CONFÉRENCE 803 - REVIEW OF BUSINESS TRANSFORMATION FRAMEWORK...SYMPOSIUM 2016 : CONFÉRENCE 803 - REVIEW OF BUSINESS TRANSFORMATION FRAMEWORK...
SYMPOSIUM 2016 : CONFÉRENCE 803 - REVIEW OF BUSINESS TRANSFORMATION FRAMEWORK...
 
VDIS10015 Design Management Skills - Lecture 4
VDIS10015 Design Management Skills - Lecture 4VDIS10015 Design Management Skills - Lecture 4
VDIS10015 Design Management Skills - Lecture 4
 
project management phase guide
project management phase guideproject management phase guide
project management phase guide
 
A Day of the Life of a Project Manager
A Day of the Life of a Project ManagerA Day of the Life of a Project Manager
A Day of the Life of a Project Manager
 
Prince2 resources e book 2
Prince2 resources e book 2Prince2 resources e book 2
Prince2 resources e book 2
 
Project Management 2.0
Project Management 2.0Project Management 2.0
Project Management 2.0
 
Project Management Trends
Project Management TrendsProject Management Trends
Project Management Trends
 
Flawless Project Delivery
Flawless Project DeliveryFlawless Project Delivery
Flawless Project Delivery
 
Project Management Best Practices
Project Management Best PracticesProject Management Best Practices
Project Management Best Practices
 
SoftPMO Project Management Toolkit for Microsoft Project Server
SoftPMO Project Management Toolkit for Microsoft Project ServerSoftPMO Project Management Toolkit for Microsoft Project Server
SoftPMO Project Management Toolkit for Microsoft Project Server
 
Are we Prepared for Scrum Master’s Role in COVID-19 Outbreak?
Are we Prepared for Scrum Master’s Role in COVID-19 Outbreak?Are we Prepared for Scrum Master’s Role in COVID-19 Outbreak?
Are we Prepared for Scrum Master’s Role in COVID-19 Outbreak?
 
Project Management Fundamentals Course Preview
Project Management Fundamentals Course PreviewProject Management Fundamentals Course Preview
Project Management Fundamentals Course Preview
 
Project Management To Project Governance , Knowledge Management
Project Management To Project Governance , Knowledge ManagementProject Management To Project Governance , Knowledge Management
Project Management To Project Governance , Knowledge Management
 
DFMPro Brochure
DFMPro BrochureDFMPro Brochure
DFMPro Brochure
 
Residential Design Build Whitepaper
Residential Design Build WhitepaperResidential Design Build Whitepaper
Residential Design Build Whitepaper
 
Аліна Піддубна - "The future of project management: РМ у 2030" Kharkiv PMDay ...
Аліна Піддубна - "The future of project management: РМ у 2030" Kharkiv PMDay ...Аліна Піддубна - "The future of project management: РМ у 2030" Kharkiv PMDay ...
Аліна Піддубна - "The future of project management: РМ у 2030" Kharkiv PMDay ...
 
project management phase guide
project management phase guideproject management phase guide
project management phase guide
 
Project Management Tools & Techniques Assignment 3
Project Management Tools & Techniques Assignment 3Project Management Tools & Techniques Assignment 3
Project Management Tools & Techniques Assignment 3
 
Guide to project management by j pricci
Guide to project management by j pricciGuide to project management by j pricci
Guide to project management by j pricci
 

Similaire à Design Management White Paper V5

Managing Design 2010
Managing Design   2010Managing Design   2010
Managing Design 2010Andrew Newton
 
100 Project Management-Success Factor
100 Project Management-Success Factor100 Project Management-Success Factor
100 Project Management-Success FactorDr Fereidoun Dejahang
 
Architectural Thinking @ Domain Driven Design Meetup Vienna Feb 2019
Architectural Thinking @ Domain Driven Design Meetup Vienna Feb 2019Architectural Thinking @ Domain Driven Design Meetup Vienna Feb 2019
Architectural Thinking @ Domain Driven Design Meetup Vienna Feb 2019Wolfgang Göbl
 
AI in Project Management.pdf
AI in Project Management.pdfAI in Project Management.pdf
AI in Project Management.pdfJamieDornan2
 
Project Management Diploma
Project Management DiplomaProject Management Diploma
Project Management DiplomaTheunis Venter
 
The New Role of the Architect - Central to growing your business in today’s d...
The New Role of the Architect - Central to growing your business in today’s d...The New Role of the Architect - Central to growing your business in today’s d...
The New Role of the Architect - Central to growing your business in today’s d...Capgemini
 
The New Role of the architect - central to growing your business in todays di...
The New Role of the architect - central to growing your business in todays di...The New Role of the architect - central to growing your business in todays di...
The New Role of the architect - central to growing your business in todays di...Gunnar Menzel
 
Dennis stevens response
Dennis stevens responseDennis stevens response
Dennis stevens responseGlen Alleman
 
COVER PAGE-Amit Anand
COVER PAGE-Amit AnandCOVER PAGE-Amit Anand
COVER PAGE-Amit AnandAmit Anand
 
TECHNICAL PROJECT MANAGEMENT SKILLS
TECHNICAL PROJECT MANAGEMENT SKILLSTECHNICAL PROJECT MANAGEMENT SKILLS
TECHNICAL PROJECT MANAGEMENT SKILLSKenMartin18
 
Top ways to manage a remote bim team efficiently
Top ways to manage a remote bim team efficientlyTop ways to manage a remote bim team efficiently
Top ways to manage a remote bim team efficientlyiFieldsmart Technologies
 
1.1 introduction to real estate project management
1.1 introduction to real estate project management1.1 introduction to real estate project management
1.1 introduction to real estate project managementIrefuser1
 
Top ways to manage a remote bim team efficiently
Top ways to manage a remote bim team efficiently Top ways to manage a remote bim team efficiently
Top ways to manage a remote bim team efficiently iFieldsmart Technologies
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)DrFereydounDejahang
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)drdej19
 

Similaire à Design Management White Paper V5 (20)

Managing Design 2010
Managing Design   2010Managing Design   2010
Managing Design 2010
 
100 Project Management-Success Factor
100 Project Management-Success Factor100 Project Management-Success Factor
100 Project Management-Success Factor
 
Balcroft dmwb flyer
Balcroft dmwb flyerBalcroft dmwb flyer
Balcroft dmwb flyer
 
Balcroft DMWB Flyer
Balcroft DMWB FlyerBalcroft DMWB Flyer
Balcroft DMWB Flyer
 
Comprehensive Guide to SD, DD, CD in Construction Projects
Comprehensive Guide to SD, DD, CD in Construction ProjectsComprehensive Guide to SD, DD, CD in Construction Projects
Comprehensive Guide to SD, DD, CD in Construction Projects
 
Architectural Thinking @ Domain Driven Design Meetup Vienna Feb 2019
Architectural Thinking @ Domain Driven Design Meetup Vienna Feb 2019Architectural Thinking @ Domain Driven Design Meetup Vienna Feb 2019
Architectural Thinking @ Domain Driven Design Meetup Vienna Feb 2019
 
Lets get digital
Lets get digitalLets get digital
Lets get digital
 
AI in Project Management.pdf
AI in Project Management.pdfAI in Project Management.pdf
AI in Project Management.pdf
 
Project Management Diploma
Project Management DiplomaProject Management Diploma
Project Management Diploma
 
Hospitality Design Management
Hospitality Design ManagementHospitality Design Management
Hospitality Design Management
 
The New Role of the Architect - Central to growing your business in today’s d...
The New Role of the Architect - Central to growing your business in today’s d...The New Role of the Architect - Central to growing your business in today’s d...
The New Role of the Architect - Central to growing your business in today’s d...
 
The New Role of the architect - central to growing your business in todays di...
The New Role of the architect - central to growing your business in todays di...The New Role of the architect - central to growing your business in todays di...
The New Role of the architect - central to growing your business in todays di...
 
Dennis stevens response
Dennis stevens responseDennis stevens response
Dennis stevens response
 
COVER PAGE-Amit Anand
COVER PAGE-Amit AnandCOVER PAGE-Amit Anand
COVER PAGE-Amit Anand
 
TECHNICAL PROJECT MANAGEMENT SKILLS
TECHNICAL PROJECT MANAGEMENT SKILLSTECHNICAL PROJECT MANAGEMENT SKILLS
TECHNICAL PROJECT MANAGEMENT SKILLS
 
Top ways to manage a remote bim team efficiently
Top ways to manage a remote bim team efficientlyTop ways to manage a remote bim team efficiently
Top ways to manage a remote bim team efficiently
 
1.1 introduction to real estate project management
1.1 introduction to real estate project management1.1 introduction to real estate project management
1.1 introduction to real estate project management
 
Top ways to manage a remote bim team efficiently
Top ways to manage a remote bim team efficiently Top ways to manage a remote bim team efficiently
Top ways to manage a remote bim team efficiently
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 

Dernier

Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 

Dernier (20)

Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 

Design Management White Paper V5

  • 1. What is effective Design Management? Design Management is becoming increasingly recognised as critical to the success of complex construction projects. However, the role of the Design Manager is poorly defined and Design Management is a discipline without robust terms of reference. This paper reviews the need for Design Management and the day to day challenges facing Design Managers. It concludes by setting out Adept Management’s Design Management Framework which provides clarity and structure to this emerging profession. Should you have any queries relating to this paper please contact: Andrew Newton Director of Design Management Adept Management Ltd The Technocentre Puma Way Coventry CV1 2TW t: +44 (0)2476 236929 f: +44 (0)2476 236930 E-mail: andrew.newton@adeptmanagement.com Web site: www.adeptmanagement.com
  • 2. The Need for More Effective Design Management The Arguments for the Better Management of Design Would any commercial enterprise look to construct a new facility or asset without a detailed schedule of the work or without a management function to co-ordinate the delivery? Would this company leave the various tradesmen to their own devices to co-ordinate the timing and integration of their work with that of others? This approach would undoubtedly reduce overhead but the threat of disputes, along with likely cost and time overruns usually precludes this as a realistic approach to delivering construction. If experience and simple common sense tell us that this is not the way to manage the construction, why does this sound business logic not always apply to managing the designing of that facility? Design is an inherently more complex process than construction: you do not know what the outcome is going to look like when you start; it’s creative; it’s iterative; yet on many projects we let those involved in the process, the designers, plan and manage the work themselves. Year on year measurement of the design performance in the UK1 shows the folly of this approach. % of Projects where Design & % of Projects where Design & Year Engineering phase overspends Engineering is delivered late 2000 36% 63% 2006 36% 42% Whilst poor design performance in itself is unacceptable, it is merely the tip of the iceberg. The real concern is the subsequent impact on construction performance, where the risks and capital expenditure are usually tens times greater. Again the following figures taken from the same projects clearly demonstrate the effect of poor design performance on construction. % of Projects where Construction % of Projects where construction phase overspends phase is delivered late 2000 55% 38% 2006 51% 38% While these figures alone are all persuasive for design to be managed more effectively, it is pertinent to explore some of the trends and influences on modern design processes to understand some of the issues that give rise to these figures and increase the demand for properly and professionally managed design. 1 These figures have been taken KPIs commissioned by Construction Excellence. For more details please refer to www.constructingexcellence.org.uk/zones/kpizone © Adept Management Ltd, 2008 2
  • 3. The Need for More Effective Design Management Emerging Trends in Design The construction industry has changed markedly over the last twenty years and this has put an increasing pressure on design teams and design professionals to deliver. The key trends affecting design team performance can be summarized in the following three areas: Contractors at the Heart of the Design Process The introduction of Design-Build procurement, along with the increasing use of private finance to fund public procurement has led to the contractor being involved much earlier in the project process. Contractors now find themselves at the heart of the design process, usually in a position where they can influence and control design outcomes. Whilst this has undoubtedly eliminated many buildability issues from projects, contractors’ mind sets and management approaches are not necessarily compatible with the creative and iterative process of design. In the worst examples of contractor-led projects the design team is treated as just another member of the supply chain and inherent importance of good design to the built environment is often lost by a one dimensional approach to its management. Typical construction management methods are not applicable to design and new methods need to be developed and adopted for managing design work. Increasing Specialisms within Design The complexity of modern day materials, systems and solutions require more defined specialist knowledge meaning that designers have had to move from being generalists to specialists. This has resulted in more design consultants being involved in design, which is compounded still further by the increasing importance of design input from trade contractors. With more parties and more technically complex solutions involved, even the most experienced of design teams will fail to ensure that correct information is supplied at the correct time without the help of a good Design Manager. Recognition that Design is a Process The traditionally held view is that as all designs are unique and therefore they cannot be planned or managed. This view is outdated and no longer valid; design is a process, which if correctly understood and represented can be largely repeated from one project to the next and therefore can be defined, measured and improved upon. In the same manner that construction work is usually paid for on completion of elements of work or against an activity schedule, it is now possible to pay design teams in a similar manner, based on their performance, rather than a traditional regular fee draw down, that often leaves the client or contractor with remaining design work to be done but with the entire fee spent. By defining the process and measuring the design team’s output against it, the design team can be properly managed and their fee be based on performance rather time spent. © Adept Management Ltd, 2008 3
  • 4. The Need for More Effective Design Management Defining Design Management & the Role of the Design Manager The terms Design Manager, Design Team Leader, Lead Designer, Lead Consultant, Design Co-ordinator are often used interchangeably causing confusion over roles and responsibilities. It is important to define these roles and a useful starting point is that offered by Hughes & Gray2, who succinctly define the two issues associated with effective design delivery as: (i) The provision of accurate fully coordinated and complete information; and (ii) The timely provision of that information. The first issue is the responsibility of the Lead Consultant, usually the architect (alternatively called the Design Team Leader or Lead Designer). Their work is checked usually by the Contractor’s Design Co-ordinator. The second issue is one of management and it is the responsibility of the Design Manager to ensure that necessary framework is in place to allow the design team to produce fully coordinated and complete information in the timely manner. In Adept Management’s view Design Management is the management of the process of design – not the co-ordination of the product – that remains the role of the design team, primarily the Lead Consultant. To be successful, a design manager must maintain control without limiting creativity. In the following sections we look at Adept Management’s approach to Design Management in more detail. Adept Management’s Design Management Framework Adept Management does not wish to prescribe exactly what Design Management is or how it should be done. What we have developed, through experience in delivering a wide ranging services to projects, is a framework for Design Management that captures the key components and enablers that allow design to be managed efficiently and effectively. Adept Management’s Design Management FrameworkTM, shown overleaf, provides a common basis and reference point against which individual Design Managers can develop their own style and skills whilst, importantly, positioning the tool-sets that are at their disposal. 2 Managing Building Design, 2001, Colin Gray & Will Hughes, ISBN 0750650702 © Adept Management Ltd, 2008 4
  • 5. The Need for More Effective Design Management Figure 1: Adept Management’s Design Management FrameworkTM Customer engagement The customer is at the heart of any design process and this component looks to ensuring that the Customer and Stakeholders are properly engaged on the project. The tools, techniques and methods deployed should ensure that consistent and timely briefing information is delivered to the design team and that this information is properly documented. Techniques such as Value & Risk Management, Briefing workshops, room data sheets, and so on could be used. Just as important in the engagement of the customer is the introduction of agreed approvals and sign off processes; these are essential to ensuring commitment from the customer as the project proceeds. Collaborative Working This element relates to ensuring that the necessary project culture, protocols and processes are in place to promote collaborative working between members of the design and project teams. Design Managers must promote collaborative working at two levels: i) it is important to understand and manage the dynamics of the team as this is critical to the success of a project; and ii) recognizing the role that ICT can play in assisting and supporting collaborative working dynamic in practice. As with all software, the technology is only part of the answer; the process by which it is introduced is equally crucial. It might be as simple as ensuring that Information exchange protocols or CAD layering conventions are in place or that a project extranet is implemented. Consultant Appointment Confirming scopes of works of each of the design team members and defining the role of the Lead Consultant is essential in setting the project off on the right basis. The basis on which each of the design consultants are appointed should, therefore, be determined by the Design Manager and not left solely as a procurement department decision. Using simple tools such as responsibility matrices, scope sheets and the appropriate appointment documents will minimize any mismatch between designers and designers and trade contractors. © Adept Management Ltd, 2008 5
  • 6. The Need for More Effective Design Management Design Team Leadership Design Team Leadership in the context of Design Management aims to ensure effective performance design team performance by guiding and influencing how the team interacts to draw on the strengths of its constituent parts (the individual members). The way people work in a group depends upon their ‘Task focus’ – the specialist knowledge, qualifications, experience, the team members bring and their ‘Team focus’ - the way they work with and contribute to the group, thereby enhancing its effectiveness. Design Teams are often hampered by ‘group think’ and conflict often results. The Design Manager must maintain the team (promote teamwork) though effective leadership, social maintenance and team selection. Defining the Design Process It is crucial that the design process is defined, both in terms of the high-level project stages, and the detailed scope of each of the design team members involved. Creating a high-level design process definition involves setting high level project milestones or gateways that the team can work towards. There are a number of well recognised definitions or descriptions of the building design process, such as the Architect’s Plan of Work published by the RIBA that help the Design Manager define this high level route map through the design process. Prior to any design being undertaken, it is important that the Design Manager works with the team to fully define and document the scope of work for each design discipline. This will both form part of the Consultant’s Contract of Appointment and act as a precursor to any Integrated Design Planning activity. Integrated Design Planning Planning design is often ignored as the design process is poorly understood and poorly defined, making the planning of the process virtually impossible. Planning of design must be based on a detailed definition of the design process and a detailed understanding of the information flow between all parties. Techniques such as ‘ADePT’ can then be used to optimise the design process, understand the critical decisions required and plan out the design in an integrated fashion between designers and also with procurement. The ADePT Design Builder software is an invaluable tool for enabling this. Process Control It is essential that the Design Manager controls the completion of activities, the associated production of information, and the release of Design Deliverable in line with the Integrated Design Programme. Process control must not just concentrate on backward looking performance and progress reporting; it must instead look ahead and proactively remove any barriers and constraints that could stop the design team performing. The ADePT Design Manager software is an invaluable tool for enabling this. Design Development & Control Ensuring that the design being developed is technically compliant is clearly the responsibility of the design team. However, it is essential that the Design Manager has an understanding of these requirements and ensures that technical reviews and audits take place at key intervention points within the design process. Also essential is an effective design change control procedure. © Adept Management Ltd, 2008 6
  • 7. The Need for More Effective Design Management Commercial Control To ensure project success, it is essential that design is developed in line with agreed affordability criteria. All too often, however, a lack of commercial awareness amongst the design team members leads to unrealistic and unworkable solutions being produced. Thus, another critical function of the Design Manager is to introduce and maintain commercial control over the evolving design. There are many simple approaches to ensuring that this happens e.g., sharing the cost plan with the design team or ensuring that key cost drivers on the project are explored fully and the best value solution adopted by the design team. The Design Manager needs to be capable of introducing and facilitating these approaches throughout the design delivery process. About Adept Management Adept Management is a design management & project services consultancy with core expertise in the management of design across all sectors and scales of projects. Working with our customers, Adept Management reduce the risk from poorly managed and co-ordinated design by using the Design Management Framework described above to plan and manage design teams, project processes and design development more effectively. We have a number of unique methods of planning and managing projects that we collectively call ADePT (the Analytical Design Planning Technique), and we are confident that our methods and experience provides greater predictability to projects and, in many cases, lead to reductions in project costs and timescales. How can we help? We pride ourselves on our ability to make a positive difference on projects and this is reflected in the high proportion of repeat work and the frequency with which customers expand our commissions. We offer complete flexibility in our approach to supporting customers in all aspects of the Adept Management Way: • We can provide interim design or bid managers into your projects for any period of time, providing any of the services described above. • We can provide discrete services such as the production of integrated design programmes or work flow using our ADePT approach; & • We can provide specific consultancy advice or training on any aspect of the Design Management Frameworks; Our Team The majority of our staff have trained as designers which, allied to extensive project management skills, provides the perfect skill set to plan and manage the work of design and project teams. © Adept Management Ltd, 2008 7