SlideShare une entreprise Scribd logo
1  sur  3
Télécharger pour lire hors ligne
CV - ANGELO MARK HELLAWELL
20 Hale End
The Warren
Bracknell
Berkshire RG12 9YH
Home : 01344 450299
Mobile 07554 161729 or 07803 168357
Email : hellawells@hotmail.com or
ascotdesigns@hotmail.com
Education
GCE O levels – English, Maths, Metalwork, Woodwork, Technical Drawing, Art
Other qualifications/courses attended : CITB, SMSTS Category 3, GE700, XA6, fork lift truck First aid at work. Fire
Marshal and various other health and safety courses. SG40 scaffolding.
Employment History
January 2014 – January 2015
Construction Manager : Private client Berkshire/Surrey border. Very high end residential Grade II refurb and new
build. Total value £3M. Complex scheme from beginning to end. Bespoke finishes – stone, ironmongery and joinery. I
pay careful attention to detail. The Client was very ‘hands on’, so there was close liaison between client and professional
teams and contractors.
January 2013 – December 2013
Construction Manager : Refurbishment of interior reception area for investment company client in The City, EC4.
Design and build within budget. Very high end finishes and detail to all areas [stone, marble, glass]. CDM project.
Building is fully tenanted and requires a good client relationship with the landlords and tenants relating to noise, access
restrictions [lifts]/health and safety matters.
March 2012 – current
Roehampton Gate, Richmond
ProjectManager
Substantial detached family house. [6 beds over 3 floors with basement accommodation comprising nanny suite,
swimming pool, gym/sauna/steam rooms, cinema]. Commenced this project at the ‘shell stage’. Extensive living
accommodation with feature glazing to kitchen/living area]. [photographs available]. Sale price is £8M. Very high
specification throughout including stone staircase [1st to basement], AC, AV, etc. as the client had a very high demand for
luxury finishes.
January 2012 – March 2012
North Audley Street, London W1
Project Manager : For Grosvenor Estates, an interior fit out of very high end residential house in Mayfair. Very difficult
site location due to highways restrictions for deliveries etc – extensive liaison with Westminster Council.
December 2010 – December 2011
One Hyde Park, SWI – Penthouse A
Construction Manager: Complete project supervision and to lead and motivate the team the deliver the project within
programme and budget. Ensuring quality, health and safety and company procedures were adhered to. Liaising with
Client and their consultants to ensure the project ran smoothly and developed a client focused approach. Valuation
£52Million. Exceptionally high fit out in various rooms leather, timber floors, book-match stone, fibrous plastering,
high-end joinery cabinetry, leather floor details, timber board details with silk inlay. veneer panellings in rooms.
Ascot Design and Project Management [self employed Contractor]
December 2009 – December 2010
Project consists of lower basement dig out, mezzanine floor and ground floor. Valuation £3.5M. Working in a very
restricted area, working with council liaising officers to co-ordinate the job. The finishes to the job are at the top end of
the market.
September 2006 – December 2009
Project Manager –new £18M family home in Golders Green Including stone and brick façade, different projections, hand
made clay tiled roof. Domed library, art room, 24-seater cinema, indoor pool. Bespoke joinery, American ash, back of
house joinery different veneers. Some internal finishes Crème de la Mer stone, Brasilian slate cladding to swimming
pool, egg and dart fibrous plastering, Gothic ceilings. Israelian style garden project.
Responsibilities
 Site set up
 Liaising with architects, quantity surveyors, interior designers
 Full on with client, including weekly meetings
 Organising labour workforce
 Working from drawings
 Health and safety enforcement
 Holding progress meetings
 Working to matrix planning
 Ordering of purchases
 Staff training and inductions
 Dealing with disputes and client complaints
 Sorting out sub-contractors issues
 Ongoing support to site managers
Holloway White Allom
43 Audley Street, Grosvenor Street, W1
May 2005 – August 2006
Construction Manager – Ingliston House, Wentworth Estate, Virginia Water, Surrey
A new Palladian Manor [Total Value C£30M] Ingliston has been constructed using a reinforced concrete frame over a
waterproof construction reinforced basement. The frame is clad with solid load bearing masonry with ornate covings,
large columns and cornices. Internally it is fitted with sweeping and curved canilever stone staircases, ornate and grand
fibrous ceilings, niches, columns and pilasters, polished plaster walls, curved stone and marble flooring. Fine natural oak
flooring, fine carved fitted joinery and furniture. Fair faced stone cellars and a highly complex services installation
including underfloor heating, air conditioning, ducting, audio visual, light, security and control systems. Internal pool
with fountains external pool and gatehouse.
My main responsibility was the stone package [£7.5 million]. The stone cladding was Massangis limestone imported
from France.
I adopted a hands-on approach, with a team of 35 reporting to me – including masons, scaffolders, groundsmen,
carpenters as well as day to day liaison with architects, interior designers and surveyors and engineers.
Beechcroft Developments Limited
September 2003 – May 2005
Thameside Place, Hampton Wick – Project Manager
Refurbishment of 18th [Grade II] century riverside mansion into 10 flats and villas, prices ranging from £575K-£2.5M.
Strict planning requirements - working with Richmond on Thames planning department officers, principal landscapers
and tree protection offers on this challenging site set in mature landscaped gardens in a residential neighbourhood.
September 2002 – September 2003
Cobham Park, Cobham – Senior Site Manager
Refurbishment of 1872 mansion house with dairy, stable block, coach house, set in 12 acres of parkland. Grades I and II,
with strict planning restrictions English Heritage/Elmbridge Borough Council. 21 duplex apartments and mews houses
ranging between £450K - £4M.
Persimmon Homes {Thames Valley]
October 2000 – September 2002
Clewer Manor/Imperial Park, Imperial Road, Windsor, Berkshire - Senior Site Manager
Worked under strict guidelines with English Heritage on the conversation of a 1846 Grade II listed building into 10
luxury apartments. Conversion of stable block, coach house and other outbuildings. Set in a total of 27 acres, new builds
consisting of affordable housing, apartments, town houses up to executive 8 bedroom mansion houses. Including Section
106 works.
Fairbriar Homes
1998 – October 2000
Nanhurst School, Cranleigh, Surrey - Site Manager
Grade II former boarding school, complete with science laboratories, stables, laundry rooms set in extensive grounds.
Conversion of main house and outbuildings into 16 luxury apartments and new build comprising apartments and
cottages.
1996 – 1998
Nashdom Abbey, Taplow – Site Manager
Conversion of Lutyens mansion, originally built for Russian Prince. Latterly used by an Order of Monks as a monastry,
the building had been left empty for approx 7 years and was in a poor state of repair. Conversion of main house into 12
large apartments plus stables and coachhouse. Facilities included swimming pool, gym and jogging track around 17 Acre
site. Resales £350K - £895K.
1994 – 1996
Farley Castle, Reading, Berkshire - Site Manager
Grade II building complete with towers – converted into 15 luxury apartments.
General
I am very passionate and professional about work. I develop a good working relationship with the clients, designers and
all involved in the project to deliver a first class service.
I am honest, hardworking, conscientious and reliable. A good time keeper with good man management and
organisational skills. I believe my hands on work experience and within this field would be an asset to any future
employer.
I am a fit, healthy ex-rugby player and now enjoy horse riding, horse racing, travelling and hold a PADI diving certificate.
I am married with no children
I have a great passion for my work and take pride in delivering the completed project on time, on budget and to the
complete satisfaction of the client.
Angelo M Hellawell
January 2015

Contenu connexe

Tendances

Karl Perry C.V.
Karl Perry C.V.Karl Perry C.V.
Karl Perry C.V.karl perry
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Mastersimon smith
 
Mark Resume 2013
Mark Resume 2013Mark Resume 2013
Mark Resume 2013Mark Radley
 
Introduction to The Elliott Thomas Group
Introduction to The Elliott Thomas GroupIntroduction to The Elliott Thomas Group
Introduction to The Elliott Thomas GroupJohn Self
 
Dinos Building Ltd Commercial Presentation
Dinos Building Ltd Commercial PresentationDinos Building Ltd Commercial Presentation
Dinos Building Ltd Commercial Presentationdinosbuilding
 
PN_RESUME_2015
PN_RESUME_2015PN_RESUME_2015
PN_RESUME_2015Peter Neve
 
Landmass London - Project Book
Landmass London - Project BookLandmass London - Project Book
Landmass London - Project BookRuth Soria
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder PortfolioDominic Holder
 
ICF Company Profile 2016
ICF Company Profile 2016ICF Company Profile 2016
ICF Company Profile 2016Michael Nolan
 
COMPANY PROFILE JJHC 2014
COMPANY PROFILE JJHC 2014COMPANY PROFILE JJHC 2014
COMPANY PROFILE JJHC 2014Louise Herbst
 
Bellerive House - progress case study
Bellerive House -  progress case studyBellerive House -  progress case study
Bellerive House - progress case studyAmanda Dunn
 
johncox resume
johncox resumejohncox resume
johncox resumeJohn Cox
 
Collins House Melbourne eBrochures - Call +65 9189 8321 for Booking
Collins House Melbourne eBrochures - Call +65 9189 8321 for BookingCollins House Melbourne eBrochures - Call +65 9189 8321 for Booking
Collins House Melbourne eBrochures - Call +65 9189 8321 for BookingJayson Ang
 
Kamal Mayne CV - 2016
Kamal Mayne CV - 2016Kamal Mayne CV - 2016
Kamal Mayne CV - 2016kamal mayne
 

Tendances (19)

Karl Perry C.V.
Karl Perry C.V.Karl Perry C.V.
Karl Perry C.V.
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Master
 
James Boyd resume 12.2015
James Boyd resume 12.2015James Boyd resume 12.2015
James Boyd resume 12.2015
 
PORTFOLIO-DCASSIANO
PORTFOLIO-DCASSIANOPORTFOLIO-DCASSIANO
PORTFOLIO-DCASSIANO
 
C.V. u
C.V. uC.V. u
C.V. u
 
Mark Resume 2013
Mark Resume 2013Mark Resume 2013
Mark Resume 2013
 
Introduction to The Elliott Thomas Group
Introduction to The Elliott Thomas GroupIntroduction to The Elliott Thomas Group
Introduction to The Elliott Thomas Group
 
Dinos Building Ltd Commercial Presentation
Dinos Building Ltd Commercial PresentationDinos Building Ltd Commercial Presentation
Dinos Building Ltd Commercial Presentation
 
PN_RESUME_2015
PN_RESUME_2015PN_RESUME_2015
PN_RESUME_2015
 
Landmass London - Project Book
Landmass London - Project BookLandmass London - Project Book
Landmass London - Project Book
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
ICF Company Profile 2016
ICF Company Profile 2016ICF Company Profile 2016
ICF Company Profile 2016
 
COMPANY PROFILE JJHC 2014
COMPANY PROFILE JJHC 2014COMPANY PROFILE JJHC 2014
COMPANY PROFILE JJHC 2014
 
Presentation 2016
Presentation 2016Presentation 2016
Presentation 2016
 
Hady Sawaya CV
Hady Sawaya CVHady Sawaya CV
Hady Sawaya CV
 
Bellerive House - progress case study
Bellerive House -  progress case studyBellerive House -  progress case study
Bellerive House - progress case study
 
johncox resume
johncox resumejohncox resume
johncox resume
 
Collins House Melbourne eBrochures - Call +65 9189 8321 for Booking
Collins House Melbourne eBrochures - Call +65 9189 8321 for BookingCollins House Melbourne eBrochures - Call +65 9189 8321 for Booking
Collins House Melbourne eBrochures - Call +65 9189 8321 for Booking
 
Kamal Mayne CV - 2016
Kamal Mayne CV - 2016Kamal Mayne CV - 2016
Kamal Mayne CV - 2016
 

En vedette

7. атестація кадрів
7. атестація кадрів7. атестація кадрів
7. атестація кадрівLyudmila Boyko
 
Energiewendepresentation 150128054024-conversion-gate01 oz mark edits
Energiewendepresentation 150128054024-conversion-gate01 oz mark editsEnergiewendepresentation 150128054024-conversion-gate01 oz mark edits
Energiewendepresentation 150128054024-conversion-gate01 oz mark editsMark Francis
 
Аналіз методичної роботи
Аналіз методичної роботиАналіз методичної роботи
Аналіз методичної роботиLyudmila Boyko
 
Howden Group - petrochemical products
Howden Group - petrochemical productsHowden Group - petrochemical products
Howden Group - petrochemical productsAntoine Robillard
 
ESTÁNDARES ACICS: BIBLIOTECA
ESTÁNDARES ACICS: BIBLIOTECAESTÁNDARES ACICS: BIBLIOTECA
ESTÁNDARES ACICS: BIBLIOTECADiego Barreto
 
9. упровадження ікт
9. упровадження ікт9. упровадження ікт
9. упровадження іктLyudmila Boyko
 
OLD Buffalo brochure-Heavy-Duty Custom Centrif
OLD Buffalo brochure-Heavy-Duty Custom CentrifOLD Buffalo brochure-Heavy-Duty Custom Centrif
OLD Buffalo brochure-Heavy-Duty Custom CentrifAntoine Robillard
 
Nathan Telschow Resume Certification
Nathan Telschow Resume CertificationNathan Telschow Resume Certification
Nathan Telschow Resume CertificationNathan Telschow
 
Telecommunication Analysis(3 use-cases) with IBM cognos insight
Telecommunication Analysis(3 use-cases) with IBM cognos insightTelecommunication Analysis(3 use-cases) with IBM cognos insight
Telecommunication Analysis(3 use-cases) with IBM cognos insightsheetal sharma
 

En vedette (20)

7. атестація кадрів
7. атестація кадрів7. атестація кадрів
7. атестація кадрів
 
Energiewendepresentation 150128054024-conversion-gate01 oz mark edits
Energiewendepresentation 150128054024-conversion-gate01 oz mark editsEnergiewendepresentation 150128054024-conversion-gate01 oz mark edits
Energiewendepresentation 150128054024-conversion-gate01 oz mark edits
 
LR World 03/2015
LR World 03/2015LR World 03/2015
LR World 03/2015
 
Аналіз методичної роботи
Аналіз методичної роботиАналіз методичної роботи
Аналіз методичної роботи
 
Apache hive1
Apache hive1Apache hive1
Apache hive1
 
Howden Group - petrochemical products
Howden Group - petrochemical productsHowden Group - petrochemical products
Howden Group - petrochemical products
 
FaizalAziz
FaizalAzizFaizalAziz
FaizalAziz
 
ESTÁNDARES ACICS: BIBLIOTECA
ESTÁNDARES ACICS: BIBLIOTECAESTÁNDARES ACICS: BIBLIOTECA
ESTÁNDARES ACICS: BIBLIOTECA
 
Comma
CommaComma
Comma
 
9. упровадження ікт
9. упровадження ікт9. упровадження ікт
9. упровадження ікт
 
finalreport
finalreportfinalreport
finalreport
 
Teesdorf 2016 V3 FX Robosig
Teesdorf 2016 V3 FX RobosigTeesdorf 2016 V3 FX Robosig
Teesdorf 2016 V3 FX Robosig
 
OLD Buffalo brochure-Heavy-Duty Custom Centrif
OLD Buffalo brochure-Heavy-Duty Custom CentrifOLD Buffalo brochure-Heavy-Duty Custom Centrif
OLD Buffalo brochure-Heavy-Duty Custom Centrif
 
Turbines
TurbinesTurbines
Turbines
 
Maria mccabe cv_nov_15
Maria mccabe cv_nov_15Maria mccabe cv_nov_15
Maria mccabe cv_nov_15
 
Nathan Telschow Resume Certification
Nathan Telschow Resume CertificationNathan Telschow Resume Certification
Nathan Telschow Resume Certification
 
Apache hadoop
Apache hadoopApache hadoop
Apache hadoop
 
Team Financial Group
Team Financial GroupTeam Financial Group
Team Financial Group
 
Ganslandt dcd 2 nov 2016
Ganslandt dcd 2 nov 2016Ganslandt dcd 2 nov 2016
Ganslandt dcd 2 nov 2016
 
Telecommunication Analysis(3 use-cases) with IBM cognos insight
Telecommunication Analysis(3 use-cases) with IBM cognos insightTelecommunication Analysis(3 use-cases) with IBM cognos insight
Telecommunication Analysis(3 use-cases) with IBM cognos insight
 

Similaire à Angelo_Hellawell_CV_January 15

Richard bartlett 2017 july
Richard bartlett 2017 julyRichard bartlett 2017 july
Richard bartlett 2017 julyRichard Bartlett
 
Pedder and Scampton Mini Brochure Domestic 23.03.09
Pedder and Scampton  Mini Brochure Domestic 23.03.09Pedder and Scampton  Mini Brochure Domestic 23.03.09
Pedder and Scampton Mini Brochure Domestic 23.03.09Gill_Scampton
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1Eamon Hannaway
 
John Pattison CV 2016 for web
John Pattison CV 2016 for webJohn Pattison CV 2016 for web
John Pattison CV 2016 for webJohn Pattison
 
15-6-9 DH Development CV
15-6-9 DH Development CV15-6-9 DH Development CV
15-6-9 DH Development CVDavid Hunt
 
15-6-9 DH Development CV
15-6-9 DH Development CV15-6-9 DH Development CV
15-6-9 DH Development CVDavid Hunt
 
09 flagship education projects 2012
09 flagship education projects 201209 flagship education projects 2012
09 flagship education projects 2012JerramFalkus
 
GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014GNA Surveyors Ltd
 
Combination Club_Redrow_Oct 15
Combination Club_Redrow_Oct 15Combination Club_Redrow_Oct 15
Combination Club_Redrow_Oct 15Ron O'Connor
 
Mountford Pigott LLP Residential Portfolio 2013
Mountford Pigott LLP Residential Portfolio 2013Mountford Pigott LLP Residential Portfolio 2013
Mountford Pigott LLP Residential Portfolio 2013mountfordpigott
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016Tim Read
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016Tim Read
 
Macdonell Williams - Architecture, sustainability & design
Macdonell Williams - Architecture, sustainability & designMacdonell Williams - Architecture, sustainability & design
Macdonell Williams - Architecture, sustainability & designMacdonellWilliams
 

Similaire à Angelo_Hellawell_CV_January 15 (20)

Richard bartlett 2017 july
Richard bartlett 2017 julyRichard bartlett 2017 july
Richard bartlett 2017 july
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
Barwin profile
Barwin profileBarwin profile
Barwin profile
 
Pedder and Scampton Mini Brochure Domestic 23.03.09
Pedder and Scampton  Mini Brochure Domestic 23.03.09Pedder and Scampton  Mini Brochure Domestic 23.03.09
Pedder and Scampton Mini Brochure Domestic 23.03.09
 
JG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our ReputationJG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our Reputation
 
Adrian Johnson CV
Adrian Johnson CVAdrian Johnson CV
Adrian Johnson CV
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1
 
John Pattison CV 2016 for web
John Pattison CV 2016 for webJohn Pattison CV 2016 for web
John Pattison CV 2016 for web
 
15-6-9 DH Development CV
15-6-9 DH Development CV15-6-9 DH Development CV
15-6-9 DH Development CV
 
15-6-9 DH Development CV
15-6-9 DH Development CV15-6-9 DH Development CV
15-6-9 DH Development CV
 
newestcv
newestcvnewestcv
newestcv
 
09 flagship education projects 2012
09 flagship education projects 201209 flagship education projects 2012
09 flagship education projects 2012
 
GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014
 
Combination Club_Redrow_Oct 15
Combination Club_Redrow_Oct 15Combination Club_Redrow_Oct 15
Combination Club_Redrow_Oct 15
 
Mountford Pigott LLP Residential Portfolio 2013
Mountford Pigott LLP Residential Portfolio 2013Mountford Pigott LLP Residential Portfolio 2013
Mountford Pigott LLP Residential Portfolio 2013
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
Macdonell Williams - Architecture, sustainability & design
Macdonell Williams - Architecture, sustainability & designMacdonell Williams - Architecture, sustainability & design
Macdonell Williams - Architecture, sustainability & design
 
rgb up to date cv
rgb up to date cvrgb up to date cv
rgb up to date cv
 
Howsham Mill - North Yorkshire
Howsham Mill - North YorkshireHowsham Mill - North Yorkshire
Howsham Mill - North Yorkshire
 

Angelo_Hellawell_CV_January 15

  • 1. CV - ANGELO MARK HELLAWELL 20 Hale End The Warren Bracknell Berkshire RG12 9YH Home : 01344 450299 Mobile 07554 161729 or 07803 168357 Email : hellawells@hotmail.com or ascotdesigns@hotmail.com Education GCE O levels – English, Maths, Metalwork, Woodwork, Technical Drawing, Art Other qualifications/courses attended : CITB, SMSTS Category 3, GE700, XA6, fork lift truck First aid at work. Fire Marshal and various other health and safety courses. SG40 scaffolding. Employment History January 2014 – January 2015 Construction Manager : Private client Berkshire/Surrey border. Very high end residential Grade II refurb and new build. Total value £3M. Complex scheme from beginning to end. Bespoke finishes – stone, ironmongery and joinery. I pay careful attention to detail. The Client was very ‘hands on’, so there was close liaison between client and professional teams and contractors. January 2013 – December 2013 Construction Manager : Refurbishment of interior reception area for investment company client in The City, EC4. Design and build within budget. Very high end finishes and detail to all areas [stone, marble, glass]. CDM project. Building is fully tenanted and requires a good client relationship with the landlords and tenants relating to noise, access restrictions [lifts]/health and safety matters. March 2012 – current Roehampton Gate, Richmond ProjectManager Substantial detached family house. [6 beds over 3 floors with basement accommodation comprising nanny suite, swimming pool, gym/sauna/steam rooms, cinema]. Commenced this project at the ‘shell stage’. Extensive living accommodation with feature glazing to kitchen/living area]. [photographs available]. Sale price is £8M. Very high specification throughout including stone staircase [1st to basement], AC, AV, etc. as the client had a very high demand for luxury finishes. January 2012 – March 2012 North Audley Street, London W1 Project Manager : For Grosvenor Estates, an interior fit out of very high end residential house in Mayfair. Very difficult site location due to highways restrictions for deliveries etc – extensive liaison with Westminster Council. December 2010 – December 2011 One Hyde Park, SWI – Penthouse A Construction Manager: Complete project supervision and to lead and motivate the team the deliver the project within programme and budget. Ensuring quality, health and safety and company procedures were adhered to. Liaising with Client and their consultants to ensure the project ran smoothly and developed a client focused approach. Valuation £52Million. Exceptionally high fit out in various rooms leather, timber floors, book-match stone, fibrous plastering, high-end joinery cabinetry, leather floor details, timber board details with silk inlay. veneer panellings in rooms. Ascot Design and Project Management [self employed Contractor] December 2009 – December 2010 Project consists of lower basement dig out, mezzanine floor and ground floor. Valuation £3.5M. Working in a very restricted area, working with council liaising officers to co-ordinate the job. The finishes to the job are at the top end of the market. September 2006 – December 2009 Project Manager –new £18M family home in Golders Green Including stone and brick façade, different projections, hand made clay tiled roof. Domed library, art room, 24-seater cinema, indoor pool. Bespoke joinery, American ash, back of house joinery different veneers. Some internal finishes Crème de la Mer stone, Brasilian slate cladding to swimming pool, egg and dart fibrous plastering, Gothic ceilings. Israelian style garden project. Responsibilities
  • 2.  Site set up  Liaising with architects, quantity surveyors, interior designers  Full on with client, including weekly meetings  Organising labour workforce  Working from drawings  Health and safety enforcement  Holding progress meetings  Working to matrix planning  Ordering of purchases  Staff training and inductions  Dealing with disputes and client complaints  Sorting out sub-contractors issues  Ongoing support to site managers Holloway White Allom 43 Audley Street, Grosvenor Street, W1 May 2005 – August 2006 Construction Manager – Ingliston House, Wentworth Estate, Virginia Water, Surrey A new Palladian Manor [Total Value C£30M] Ingliston has been constructed using a reinforced concrete frame over a waterproof construction reinforced basement. The frame is clad with solid load bearing masonry with ornate covings, large columns and cornices. Internally it is fitted with sweeping and curved canilever stone staircases, ornate and grand fibrous ceilings, niches, columns and pilasters, polished plaster walls, curved stone and marble flooring. Fine natural oak flooring, fine carved fitted joinery and furniture. Fair faced stone cellars and a highly complex services installation including underfloor heating, air conditioning, ducting, audio visual, light, security and control systems. Internal pool with fountains external pool and gatehouse. My main responsibility was the stone package [£7.5 million]. The stone cladding was Massangis limestone imported from France. I adopted a hands-on approach, with a team of 35 reporting to me – including masons, scaffolders, groundsmen, carpenters as well as day to day liaison with architects, interior designers and surveyors and engineers. Beechcroft Developments Limited September 2003 – May 2005 Thameside Place, Hampton Wick – Project Manager Refurbishment of 18th [Grade II] century riverside mansion into 10 flats and villas, prices ranging from £575K-£2.5M. Strict planning requirements - working with Richmond on Thames planning department officers, principal landscapers and tree protection offers on this challenging site set in mature landscaped gardens in a residential neighbourhood. September 2002 – September 2003 Cobham Park, Cobham – Senior Site Manager Refurbishment of 1872 mansion house with dairy, stable block, coach house, set in 12 acres of parkland. Grades I and II, with strict planning restrictions English Heritage/Elmbridge Borough Council. 21 duplex apartments and mews houses ranging between £450K - £4M. Persimmon Homes {Thames Valley] October 2000 – September 2002 Clewer Manor/Imperial Park, Imperial Road, Windsor, Berkshire - Senior Site Manager Worked under strict guidelines with English Heritage on the conversation of a 1846 Grade II listed building into 10 luxury apartments. Conversion of stable block, coach house and other outbuildings. Set in a total of 27 acres, new builds consisting of affordable housing, apartments, town houses up to executive 8 bedroom mansion houses. Including Section 106 works. Fairbriar Homes 1998 – October 2000 Nanhurst School, Cranleigh, Surrey - Site Manager Grade II former boarding school, complete with science laboratories, stables, laundry rooms set in extensive grounds. Conversion of main house and outbuildings into 16 luxury apartments and new build comprising apartments and cottages. 1996 – 1998 Nashdom Abbey, Taplow – Site Manager Conversion of Lutyens mansion, originally built for Russian Prince. Latterly used by an Order of Monks as a monastry, the building had been left empty for approx 7 years and was in a poor state of repair. Conversion of main house into 12 large apartments plus stables and coachhouse. Facilities included swimming pool, gym and jogging track around 17 Acre site. Resales £350K - £895K. 1994 – 1996 Farley Castle, Reading, Berkshire - Site Manager
  • 3. Grade II building complete with towers – converted into 15 luxury apartments. General I am very passionate and professional about work. I develop a good working relationship with the clients, designers and all involved in the project to deliver a first class service. I am honest, hardworking, conscientious and reliable. A good time keeper with good man management and organisational skills. I believe my hands on work experience and within this field would be an asset to any future employer. I am a fit, healthy ex-rugby player and now enjoy horse riding, horse racing, travelling and hold a PADI diving certificate. I am married with no children I have a great passion for my work and take pride in delivering the completed project on time, on budget and to the complete satisfaction of the client. Angelo M Hellawell January 2015