The document discusses various fabrication and installation projects for several clients. It describes projects including installing overhead cranes, rail systems, silos, drying systems and sprinkler systems. For each project, it lists the key activities like fabrication, installation, testing and commissioning. Contact details for project coordinators are also provided.
2. THAIMEX FACTORY
Machine and storage of materials in factory
Crane 10 TON Mobile Crane 12 TON Cut & Drill Shop
Folk Lift 3 TONStorage MaterialStorage Materials
5. YUSEN LOGISTIC ( CHONBURI ) 2012
3 x Runway beam 100 m. and 6 x double girder 5T-18 m. span
Contact person : Khun Misak (Alliance Engineering Solution) +668-1659-9302
Fabrication runway beam Fabrication runway beam Painting runway beam
Installation craneInstallation runway beam Installation crane
6. KERRY LOGISTIC ( SRIRACHA )
Upgrade gantry crane from 20T to 25T
Changing mounting support of wheel block and electrical control system
Contact person : Khun Misak (Alliance Engineering Solution) +668-1659-9302
Wheel box fabrication Sand blast Painting
InstallationPainting Installation
7. MAINTENANCE SHOP OF POST ENGINEER LOPBURI
fabrication & installation , commissioning & testing of crane ZVPE 10T-20M
Contact person : Khun Misak (Alliance Engineering Solution) +668-1659-9302
Installation Installation Installation
InstallationInstallation
8. Installation Installation Installation
InstallationInstallation Installation
MAINTENANCE SHOP OF POST ENGINEER SARABURI
fabrication & installation , commissioning & testing of crane ZVPE 10T-20M
Contact person : Khun Misak (Alliance Engineering Solution) +668-1659-9302
9. THAI NISHIMATSU
Fabrication and installation
-Fabrication of runway box girder and beam (588x300)
-Installation of engineering crane 15 set ( 15T - 80T )
Contact person : Khun Warachat +668-9075-6100 , Khun Naoyuki Mori +668-9204-3943
Fabrication runway beam Fabrication runway beam Fabrication runway beam
Fabrication runway beamFabrication runway beam Fabrication runway beam
10. THAI NISHIMATSU
Fabrication and installation
-Fabrication of runway box girder and beam (588x300)
-Installation of engineering crane 15 set ( 15T - 80T )
Contact person : Khun Warachat +668-9075-6100 , Khun Naoyuki Mori +668-9204-3943
Fabrication runway beam Installation runway beam Installation runway beam
Installation runway beamInstallation runway beam Installation runway beam
11. THAI NISHIMATSU
Fabrication and installation
-Fabrication of runway box girder and beam (588x300)
-Installation of engineering crane 15 set ( 15T - 80T )
Contact person : Khun Warachat +668-9075-6100 , Khun Naoyuki Mori +668-9204-3943
Installation runway beam Installation runway beam Installation runway beam
Installation runway beamInstallation runway beam Installation crane
12. THAI NISHIMATSU
Fabrication and installation
-Fabrication of runway box girder and beam (588x300)
-Installation of engineering crane 15 set ( 15T - 80T )
Contact person : Khun Warachat +668-9075-6100 , Khun Naoyuki Mori +668-9204-3943
Installation crane Installation crane Installation crane
Installation craneInstallation crane Installation crane
13. THAI COATED STEEL SHEET (TCS)New structure for double girder crane 20 Tons x 26.25 M span 2 set
Refurbishment of cabin , electrical accessories
Overhaul of motor gear 20T
Changing wheel block
Repair runway rail 37ST – 200 M
Changing of wire rope 25T (Double girder 25T)
Contact person :Khun Kasem +668-1923-6253 , Khun Chatchai +668-1942-4943
Cutting box girder Fabrication box girder Fabrication box girder
Fabrication box girderFabrication box girder Refurbishment end carriage
14. THAI COATED STEEL SHEET (TCS)New structure for double girder crane 20 Tons x 26.25 M span 2 set
Refurbishment of cabin , electrical accessories
Overhaul of motor gear 20T
Changing wheel block
Repair runway rail 37ST – 200 M
Changing of wire rope 25T (Double girder 25T)
Contact person :Khun Kasem +668-1923-6253 , Khun Chatchai +668-1942-4943
Refurbishment end carriage Sand brush Refurbishment cabin
TransportNDT test Transport
15. THAI COATED STEEL SHEET (TCS)New structure for double girder crane 20 Tons x 26.25 M span 2 set
Refurbishment of cabin , electrical accessories
Overhaul of motor gear 20T
Changing wheel block
Repair runway rail 37ST – 200 M
Changing of wire rope 25T (Double girder 25T)
Contact person :Khun Kasem +668-1923-6253 , Khun Chatchai +668-1942-4943
Fabrication box girder Fabrication box girder Fabrication box girder
Overhaul gear boxOverhaul gear box Overhaul gear box
16. NTEQ POLYMER
Free standing structure 5T-18M & 1T-12M
Preventive maintenance 10 set of crane (Mitsubishi , Black bare , NH Hoist, Kito , Nippon Hoist , Demag , Kone)
Refurbishment of gantry crane 5T-8M span
Installation commissioning and testing gantry crane 7T-32M span
Repair runway rail A75
Contact person :Khun Isaraphong +668-1968-1720
Installation Load test Load test
Electrical assemblyWiring Hoist testing
17. NTEQ POLYMER
Free standing structure 5T-18M & 1T-12M
Preventive maintenance 10 set of crane (Mitsubishi , Black bare , NH Hoist, Kito , Nippon Hoist , Demag , Kone)
Refurbishment of gantry crane 5T-8M span
Installation commissioning and testing gantry crane 7T-32M span
Repair runway rail A75
Contact person :Khun Isaraphong +668-1968-1720
Refurbishment Refurbishment Refurbishment
PaintingRefurbishment Delivery
18. NTEQ POLYMER
Free standing structure 5T-18M & 1T-12M
Preventive maintenance 10 set of crane (Mitsubishi , Black bare , NH Hoist, Kito , Nippon Hoist , Demag , Kone)
Refurbishment of gantry crane 5T-8M span
Installation commissioning and testing gantry crane 7T-32M span
Repair runway rail A75
Contact person :Khun Isaraphong +668-1968-1720
Installation Installation Installation
InstallationInstallation Site check & handover
19. NTEQ POLYMER
Free standing structure 5T-18M & 1T-12M
Preventive maintenance 10 set of crane (Mitsubishi , Black bare , NH Hoist, Kito , Nippon Hoist , Demag , Kone)
Refurbishment of gantry crane 5T-8M span
Installation commissioning and testing gantry crane 7T-32M span
Repair runway rail A75
Contact person :Khun Isaraphong +668-1968-1720
Preventive maintenance Preventive maintenance Preventive maintenance
Preventive maintenancePreventive maintenance Preventive maintenance
20. STRABAG (PROJECT OF MHE-DEMAG (T) LTD.)
Fabrication and Installation
Gantry crane 5+5T 4+32+6M span
Contact person :Khun Pantasak+668-1985-7984 , Khun Chaiwat +668-3975-8549
Fabrication box girder Fabrication box girder Fabrication pipe leg
Welding QCWheel block assembly Fabrication cabin
21. STRABAG (PROJECT OF MHE-DEMAG (T) LTD.)
Fabrication and Installation
Gantry crane 5+5T 4+32+6M span
Contact person :Khun Pantasak+668-1985-7984 , Khun Chaiwat +668-3975-8549
Unloading Box girder unloading Installation
InstallationInstallation Installation
22. STRABAG (PROJECT OF MHE-DEMAG (T) LTD.)
Fabrication and Installation
Gantry crane 5+5T 4+32+6M span
Contact person :Khun Pantasak+668-1985-7984 , Khun Chaiwat +668-3975-8549
Installation pipe leg Installation pipe leg Installation pipe leg
Installation crabInstallation cabin Installation
29. SKAKO
Fabrication and installation silo
Ranco1,2 – Saudi Arabia , Skanska - Sweden , LOR England - England
Contact person : Mr.Claus Hounsen +45 6363 7000
Fabrication Fabrication Fabrication
InstallationFabrication Installation
30. SKAKO
Fabrication and installation silo
Ranco1,2 – Saudi Arabia , Skanska - Sweden , LOR England - England
Contact person : Mr.Claus Hounsen +45 6363 7000
Installation Installation Installation
InstallationInstallation Installation
31. THE INFINITY ENGINEERING CO.,LTD.
Automatic Drying Longan
Fabrication and installation of fresh silos 8 unit , automatic drying system for longan
Contact person : Mr.Uten +6683 483 9884
Fabrication Fabrication Fabrication
PaintingPainting Packing
32. THE INFINITY ENGINEERING CO.,LTD.
Automatic Drying Longan
Fabrication and installation of fresh silos 8 unit , automatic drying system for longan
Contact person : Mr.Uten +6683 483 9884
Transport Transport Transport
InstallationInstallation Installation
33. THE INFINITY ENGINEERING CO.,LTD.
Automatic Drying Longan
Fabrication and installation of drying oven, automatic drying system for longan
Contact person : Mr.Uten +6683 483 9884
Fabrication Fabrication Fabrication
FabricationFabrication Fabrication
34. THE INFINITY ENGINEERING CO.,LTD.
Automatic Drying Longan
Fabrication and installation of drying oven, automatic drying system for longan
Contact person : Mr.Uten +6683 483 9884
Painting Painting Paint Q.C.
TransportTransport Transport
35. THE INFINITY ENGINEERING CO.,LTD.
Automatic Drying Longan
Fabrication and installation of drying oven, automatic drying system for longan
Contact person : Mr.Uten +6683 483 9884
Installation Installation Installation
InstallationInstallation Installation
36. BOTICARIO
Camacari Bahia - Brazil
Fabrication and installation sprinkler system
Contact person : Mr.Pedro
Cutting Cutting Drilling
ThreadingPipe grooved Threaded
37. BOTICARIO
Camacari Bahia - Brazil
fabrication of piping for fire protection (Sprinkler system)
Contact person : Mr.Pedro
Assembly Assembly
Hydro static TestHydro static Test Painting
Welding
38. BOTICARIO
Camacari Bahia - Brazil
fabrication of piping for fire protection (Sprinkler system)
Contact person : Mr.Pedro
Painting Label Finish
Packing & Loading Packing & LoadingRacking
39. SGM MEXICO
Installation
trans elevators
Installation
trans elevators Installation
Drive unit
Installation Rail
Installation automatic warehouse , trans elevators and rail systems , commissioning
and testing
Contact person :Mr.Ermano +52-161-413-18531