R3MMP B1 September - November 2015
Agustus 2015
SMO BLOCK B1
Remain Reserve
SMO BLOCK B1
SPO
NO DESCRIPTION Sep-15 Oct-15 Nov-15 TOTAL
1 Calendar Day 30 31 30 122
2 Holiday Day 1.5 0 0 3
3 Available Day 29 31 30 119
4 Hour per day 720 744 720 2928
5 Available Hour 24.00 684 744 720 2856
6 Standby hour per day 7.19 197 224 218 856
S1 Rain/Smog/Fog 1.46 39 45 45 174
S2 Slippery 0.82 17 27 27 98
S3 Flood - - - - -
S4 Dust - - - - -
S5 Rest & meal 1.54 45 47 46 183
S6 Daily shift change 1.86 53 58 56 221
S7 Weekly Over Shift - - - - -
S8 Holiday 0.14 4 5 4 17
S9 No Operator - - - - -
S10 Operator Absen (Sakit, ijin, alpha) - - - - -
S11 No loader/No Hauler 0.53 16 16 16 63
S12 Hopper/Crusher shutdown - - - - -
S13 Stoppage - - - - -
S14 Front, Road, Disposal Maintenance - - - - -
S15 Wait for Blasting 0.53 15 16 16 64
S16 P5M, Safety Talk 0.15 4 5 5 18
S17 Production Re-schedulling - - - - -
S18 Pit, Front, Disposal Movement - - - - -
S19 Pre Use Check, Greasing, Refueling, Washing 0.15 4 5 5 18
S20 No Order, No Material (OB & Coal), No Area - - - - -
7 Breakdown Hour per day 3.12 89 97 94 371
8 Schedule Hour 13.69 487 520 502 1,629
SMO BLOCK B1
Production Detail
Seam Desc Sep-15 Oct-15 Nov-15 Total
All Pit Waste (Bcm) 2,425,635 2,509,689 2,322,236 7,257,560
Coal Exposed (MT) 289,096 272,745 254,808 816,649
Coal Getting (MT) 288,030 272,772 250,757 811,559
Mining Strip Ratio 8.39 9.17 9.08 8.89
Contract Strip Ratio 8.42 9.20 9.26 8.94
Opening Inventory 0 1,066 1,039 0
Closing Inventory 1,066 1,039 5,090 5,090
Waste Distance (m) 0 0 0 0
Coal Distance (m) 0 0 0 0
TM (ar) 21.29 21.57 21.26 21.37
IM (adb) 16.69 17.09 16.90 16.89
Ash (adb) 4.75 4.84 4.79 4.79
VM (adb) 38.34 37.99 37.95 38.10
FC (adb) 40.98 40.91 41.13 41.00
TS (adb) 0.61 0.49 0.54 0.55
CV (adb) 5,641 5,603 5,635 5,627
Na2O (%) 3.77 4.95 4.82 4.49
AFT IDT RED (deg) 1,112 1,113 1,101 1,109
AFT FLOW RED (deg) 1,242 1,232 1,224 1,233
Relative Density 1.25 1.25 1.25 1.25
Hardgrovability Index 47 47 48 47
SIS
SMO BLOCK B1
Land Clearing and Soil Removal
Sept Oct Nov
(Ha) (Ha) (Ha)
Blok B1
-Pit C2 - - -
-IPD C - - -
-OPD B14 - - -
Total land clearing area - - -
* boundary clearing 20 meter dari boundary desain
Land Clearing
2015
Sept Oct Nov
BCM BCM BCM
Pit C2 Volume 20,692 1,859 70
Lokasi Penimbunan
OPD B14 & OPD
B3
OPD B14 & OPD
B4
OPD B14 & OPD
B5
20,692 1,859 70Total volume soil removal
Soil Removal
Blok B1
2015
SMO BLOCK B1
Material Balance
Code Data Field Name Sep Oct Nov 2015 *
Sambarata Dump Report
B1 Sambarata B1
OPD_14 OPD14 - Out Pit Dump
Wst Total Insitu Waste 483,905 496,713 465,701 1,446,319
totptd Total Distance (Pit to Dump) During Schedule 2,525 2,714 2,704 2,648
IPD_C IPDC- In Pit Dump
Wst Total Insitu Waste 2,005,487 2,051,743 1,907,775 5,965,005
totptd Total Distance (Pit to Dump) During Schedule 2,637 2,791 2,845 2,756
Tot Total Dumping - Sambarata B1
WstD Total Insitu Waste Dumped on Dumps 2,489,392 2,548,456 2,373,476 7,411,324
IWstOF Insitu Dump Shortage(Overflow)
WstOF Dump Shortage(Overflow)
totptd Total Distance (Pit to Dump) During Schedule 2,615 2,776 2,817 2,735
VB Volume Balance 0 0 0 0
SMO BLOCK B1
Face Posisi EOP Sept
SMO BLOCK B1
Face Posisi EOP Okt
SMO BLOCK B1
Face Posisi EOP Nov
SMO BLOCK B1
Face Posisi EOP Des
SMO BLOCK B1
General Issue :
• Proses land compensation untuk area radius blasting di Enau harus sudah selesai pada awal tahun 2015 untuk menghindari
terjadinya issue masalah blasting dan menghindari turunnya productivity unit karena ketidaktersediaan material blasting.
(aktual blasting maks 50 hole)
• Rekomendasi IPD C 2015 masih menunggu kajian dan release GnH.
• Lokasi dumping material rawa/lunak diarea sump C.
• Pemotongan Mineout atau floor seam H 1 meter sesuai rekomendasi GnH.
• Performa slurry pump tidak maksimal pada pit G1 sehingga mengharuskan adanya manual handling, impactnya ada
kenaikan SR karena perhitungan material blending 1:1.5
• Start Pumping di Sed Pond WMP 29 ( Slurry pump ) dan kontinyu pembentukan WMP 33
PT. SIS - Pit C2
PT. SIS - Pit C2
Terima Kasih

Contenu connexe

Tendances

Kombat Copper Presentaion
Kombat Copper PresentaionKombat Copper Presentaion
Kombat Copper Presentaionkombatcopper
 
Sample of Structural Steel Scheduling
Sample of Structural Steel SchedulingSample of Structural Steel Scheduling
Sample of Structural Steel SchedulingAllan Leyte
 
Overdrain sizing
Overdrain sizingOverdrain sizing
Overdrain sizingzain0315
 
Use of Integrated Modeling on Niger Delta Field - MICHAEL OWARUME
Use of Integrated Modeling on Niger Delta Field - MICHAEL OWARUMEUse of Integrated Modeling on Niger Delta Field - MICHAEL OWARUME
Use of Integrated Modeling on Niger Delta Field - MICHAEL OWARUMEMICHAEL OWARUME
 
Kombat copper feb 2014 corporate
Kombat copper feb 2014 corporateKombat copper feb 2014 corporate
Kombat copper feb 2014 corporatekombatcopper
 
Reaction Rate Graph Tutorial
Reaction Rate Graph TutorialReaction Rate Graph Tutorial
Reaction Rate Graph Tutorialpaulbhill
 
Kombat Copper Corporate Presentation
Kombat Copper Corporate PresentationKombat Copper Corporate Presentation
Kombat Copper Corporate Presentationkombatcopper
 

Tendances (12)

чертеж1
чертеж1чертеж1
чертеж1
 
Kombat Copper Presentaion
Kombat Copper PresentaionKombat Copper Presentaion
Kombat Copper Presentaion
 
Sample of Structural Steel Scheduling
Sample of Structural Steel SchedulingSample of Structural Steel Scheduling
Sample of Structural Steel Scheduling
 
Overdrain sizing
Overdrain sizingOverdrain sizing
Overdrain sizing
 
LINK
LINKLINK
LINK
 
Use of Integrated Modeling on Niger Delta Field - MICHAEL OWARUME
Use of Integrated Modeling on Niger Delta Field - MICHAEL OWARUMEUse of Integrated Modeling on Niger Delta Field - MICHAEL OWARUME
Use of Integrated Modeling on Niger Delta Field - MICHAEL OWARUME
 
Kombat copper feb 2014 corporate
Kombat copper feb 2014 corporateKombat copper feb 2014 corporate
Kombat copper feb 2014 corporate
 
3S technology
3S technology3S technology
3S technology
 
Reaction Rate Graph Tutorial
Reaction Rate Graph TutorialReaction Rate Graph Tutorial
Reaction Rate Graph Tutorial
 
Cal excavation work
Cal   excavation workCal   excavation work
Cal excavation work
 
Kombat Copper Corporate Presentation
Kombat Copper Corporate PresentationKombat Copper Corporate Presentation
Kombat Copper Corporate Presentation
 
Notam 16 out 15
Notam 16 out 15Notam 16 out 15
Notam 16 out 15
 

En vedette

bethany lilly reference form Tom Webb
bethany lilly reference form Tom Webbbethany lilly reference form Tom Webb
bethany lilly reference form Tom WebbBethany Lilly
 
Les a1 ms 1-2-2012
Les a1 ms 1-2-2012Les a1 ms 1-2-2012
Les a1 ms 1-2-2012SpaanIt
 
Joshua Ramsamooj - Technical Presentation
Joshua Ramsamooj - Technical PresentationJoshua Ramsamooj - Technical Presentation
Joshua Ramsamooj - Technical PresentationJoshua Ramsamooj
 
TК°Conf. Как оформить права на программный продукт, чтобы его не угнали конку...
TК°Conf. Как оформить права на программный продукт, чтобы его не угнали конку...TК°Conf. Как оформить права на программный продукт, чтобы его не угнали конку...
TК°Conf. Как оформить права на программный продукт, чтобы его не угнали конку...TKConf
 
Protocole ppcr---_de_nouveaux_decrets_pour_les_agents_territoriaux
Protocole  ppcr---_de_nouveaux_decrets_pour_les_agents_territoriauxProtocole  ppcr---_de_nouveaux_decrets_pour_les_agents_territoriaux
Protocole ppcr---_de_nouveaux_decrets_pour_les_agents_territoriauxDominique Gayraud
 
CV 2015_Oct., Naseem Ahmed, PhD.
CV 2015_Oct., Naseem Ahmed, PhD.CV 2015_Oct., Naseem Ahmed, PhD.
CV 2015_Oct., Naseem Ahmed, PhD.Naseem Ahmed
 
Immersive Virtual Body of Knowledge
Immersive Virtual Body of Knowledge Immersive Virtual Body of Knowledge
Immersive Virtual Body of Knowledge Michael DeMers
 
Kondrashev axelot ekbpromo_almaty_2016
Kondrashev axelot ekbpromo_almaty_2016Kondrashev axelot ekbpromo_almaty_2016
Kondrashev axelot ekbpromo_almaty_2016ekbpromo
 
Yoast SEO on WordPress - Nov 2016
Yoast SEO on WordPress -  Nov 2016Yoast SEO on WordPress -  Nov 2016
Yoast SEO on WordPress - Nov 2016David Mackey
 
Ташир Медиа на VI международной конференции «Digital Signage – альтернативы н...
Ташир Медиа на VI международной конференции «Digital Signage – альтернативы н...Ташир Медиа на VI международной конференции «Digital Signage – альтернативы н...
Ташир Медиа на VI международной конференции «Digital Signage – альтернативы н...Tashir Media
 
PR-SOCO Personality Recognition in SOurce COde (PAN@FIRE 2016)
PR-SOCO Personality Recognition in SOurce COde (PAN@FIRE 2016)PR-SOCO Personality Recognition in SOurce COde (PAN@FIRE 2016)
PR-SOCO Personality Recognition in SOurce COde (PAN@FIRE 2016)Francisco Manuel Rangel Pardo
 
STEPS Home Care ppt_New
STEPS Home Care ppt_NewSTEPS Home Care ppt_New
STEPS Home Care ppt_NewShan Wade
 

En vedette (15)

bethany lilly reference form Tom Webb
bethany lilly reference form Tom Webbbethany lilly reference form Tom Webb
bethany lilly reference form Tom Webb
 
Les a1 ms 1-2-2012
Les a1 ms 1-2-2012Les a1 ms 1-2-2012
Les a1 ms 1-2-2012
 
Joshua Ramsamooj - Technical Presentation
Joshua Ramsamooj - Technical PresentationJoshua Ramsamooj - Technical Presentation
Joshua Ramsamooj - Technical Presentation
 
TК°Conf. Как оформить права на программный продукт, чтобы его не угнали конку...
TК°Conf. Как оформить права на программный продукт, чтобы его не угнали конку...TК°Conf. Как оформить права на программный продукт, чтобы его не угнали конку...
TК°Conf. Как оформить права на программный продукт, чтобы его не угнали конку...
 
Protocole ppcr---_de_nouveaux_decrets_pour_les_agents_territoriaux
Protocole  ppcr---_de_nouveaux_decrets_pour_les_agents_territoriauxProtocole  ppcr---_de_nouveaux_decrets_pour_les_agents_territoriaux
Protocole ppcr---_de_nouveaux_decrets_pour_les_agents_territoriaux
 
Bridge the Gap
Bridge the GapBridge the Gap
Bridge the Gap
 
CV 2015_Oct., Naseem Ahmed, PhD.
CV 2015_Oct., Naseem Ahmed, PhD.CV 2015_Oct., Naseem Ahmed, PhD.
CV 2015_Oct., Naseem Ahmed, PhD.
 
Presentation1 7.12.2015
Presentation1 7.12.2015Presentation1 7.12.2015
Presentation1 7.12.2015
 
Immersive Virtual Body of Knowledge
Immersive Virtual Body of Knowledge Immersive Virtual Body of Knowledge
Immersive Virtual Body of Knowledge
 
Kondrashev axelot ekbpromo_almaty_2016
Kondrashev axelot ekbpromo_almaty_2016Kondrashev axelot ekbpromo_almaty_2016
Kondrashev axelot ekbpromo_almaty_2016
 
Yoast SEO on WordPress - Nov 2016
Yoast SEO on WordPress -  Nov 2016Yoast SEO on WordPress -  Nov 2016
Yoast SEO on WordPress - Nov 2016
 
Ташир Медиа на VI международной конференции «Digital Signage – альтернативы н...
Ташир Медиа на VI международной конференции «Digital Signage – альтернативы н...Ташир Медиа на VI международной конференции «Digital Signage – альтернативы н...
Ташир Медиа на VI международной конференции «Digital Signage – альтернативы н...
 
PR-SOCO Personality Recognition in SOurce COde (PAN@FIRE 2016)
PR-SOCO Personality Recognition in SOurce COde (PAN@FIRE 2016)PR-SOCO Personality Recognition in SOurce COde (PAN@FIRE 2016)
PR-SOCO Personality Recognition in SOurce COde (PAN@FIRE 2016)
 
Diana Brinsfield resume
Diana Brinsfield resumeDiana Brinsfield resume
Diana Brinsfield resume
 
STEPS Home Care ppt_New
STEPS Home Care ppt_NewSTEPS Home Care ppt_New
STEPS Home Care ppt_New
 

Similaire à Report R3MMP B1 SMO upload

Review Week_12_Customer_PulauPanggung (PT.BAS).pptx
Review Week_12_Customer_PulauPanggung (PT.BAS).pptxReview Week_12_Customer_PulauPanggung (PT.BAS).pptx
Review Week_12_Customer_PulauPanggung (PT.BAS).pptxnoelmanroe1
 
S106_Improvement_Presentation.pptx
S106_Improvement_Presentation.pptxS106_Improvement_Presentation.pptx
S106_Improvement_Presentation.pptxCCBProduction
 
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptxReview W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptxnoelmanroe1
 
Example kitchen ventilation calculation
Example kitchen ventilation calculationExample kitchen ventilation calculation
Example kitchen ventilation calculationwilliammana
 
LRT Line 3 Hishamuddin's concept design briefing for Underground Tunnel
LRT Line 3 Hishamuddin's  concept design briefing for Underground Tunnel LRT Line 3 Hishamuddin's  concept design briefing for Underground Tunnel
LRT Line 3 Hishamuddin's concept design briefing for Underground Tunnel Asiff Razif
 
Study project - Traffic engineering 2019
Study project - Traffic engineering 2019Study project - Traffic engineering 2019
Study project - Traffic engineering 2019Oleg Buyanov
 
CE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptxCE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptxSaketChandra4
 
Review W 26 & Plan Week 27 2022_MUM.pptx
Review W 26 & Plan Week 27 2022_MUM.pptxReview W 26 & Plan Week 27 2022_MUM.pptx
Review W 26 & Plan Week 27 2022_MUM.pptxssuserb71d4d
 
City council 8 6-13 ai 32 vv ground water group presentation
City council 8 6-13 ai 32 vv ground water group presentationCity council 8 6-13 ai 32 vv ground water group presentation
City council 8 6-13 ai 32 vv ground water group presentationCity of San Angelo Texas
 
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSOSPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSOSUMARDIONO .
 
Dewatering project pit alam 1 3
Dewatering project pit alam 1   3Dewatering project pit alam 1   3
Dewatering project pit alam 1 3Muhammad Ichsan
 
Field Development Project : Gelama Merah
Field Development Project : Gelama MerahField Development Project : Gelama Merah
Field Development Project : Gelama MerahHami Asma'i
 
Rallye du Condroz 2016 : le timing des spéciales
Rallye du Condroz 2016 : le timing des spécialesRallye du Condroz 2016 : le timing des spéciales
Rallye du Condroz 2016 : le timing des spécialeslavenir
 

Similaire à Report R3MMP B1 SMO upload (20)

Review Week_12_Customer_PulauPanggung (PT.BAS).pptx
Review Week_12_Customer_PulauPanggung (PT.BAS).pptxReview Week_12_Customer_PulauPanggung (PT.BAS).pptx
Review Week_12_Customer_PulauPanggung (PT.BAS).pptx
 
Notam
NotamNotam
Notam
 
S106_Improvement_Presentation.pptx
S106_Improvement_Presentation.pptxS106_Improvement_Presentation.pptx
S106_Improvement_Presentation.pptx
 
PPT JAN2013
PPT JAN2013PPT JAN2013
PPT JAN2013
 
Review Week 1 Oktober 2022.pptx
Review Week 1 Oktober 2022.pptxReview Week 1 Oktober 2022.pptx
Review Week 1 Oktober 2022.pptx
 
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptxReview W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
 
Example kitchen ventilation calculation
Example kitchen ventilation calculationExample kitchen ventilation calculation
Example kitchen ventilation calculation
 
LRT Line 3 Hishamuddin's concept design briefing for Underground Tunnel
LRT Line 3 Hishamuddin's  concept design briefing for Underground Tunnel LRT Line 3 Hishamuddin's  concept design briefing for Underground Tunnel
LRT Line 3 Hishamuddin's concept design briefing for Underground Tunnel
 
MIME 484-Final
MIME 484-FinalMIME 484-Final
MIME 484-Final
 
Study project - Traffic engineering 2019
Study project - Traffic engineering 2019Study project - Traffic engineering 2019
Study project - Traffic engineering 2019
 
CE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptxCE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptx
 
Review W 26 & Plan Week 27 2022_MUM.pptx
Review W 26 & Plan Week 27 2022_MUM.pptxReview W 26 & Plan Week 27 2022_MUM.pptx
Review W 26 & Plan Week 27 2022_MUM.pptx
 
City council 8 6-13 ai 32 vv ground water group presentation
City council 8 6-13 ai 32 vv ground water group presentationCity council 8 6-13 ai 32 vv ground water group presentation
City council 8 6-13 ai 32 vv ground water group presentation
 
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSOSPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
 
Dewatering project pit alam 1 3
Dewatering project pit alam 1   3Dewatering project pit alam 1   3
Dewatering project pit alam 1 3
 
Field Development Project : Gelama Merah
Field Development Project : Gelama MerahField Development Project : Gelama Merah
Field Development Project : Gelama Merah
 
1st Presentation NAME 338
1st Presentation NAME 338 1st Presentation NAME 338
1st Presentation NAME 338
 
NAME 338 , Presentation 1
NAME 338 , Presentation 1NAME 338 , Presentation 1
NAME 338 , Presentation 1
 
PROPOSED
PROPOSEDPROPOSED
PROPOSED
 
Rallye du Condroz 2016 : le timing des spéciales
Rallye du Condroz 2016 : le timing des spécialesRallye du Condroz 2016 : le timing des spéciales
Rallye du Condroz 2016 : le timing des spéciales
 

Report R3MMP B1 SMO upload

  • 1. R3MMP B1 September - November 2015 Agustus 2015
  • 3. SMO BLOCK B1 SPO NO DESCRIPTION Sep-15 Oct-15 Nov-15 TOTAL 1 Calendar Day 30 31 30 122 2 Holiday Day 1.5 0 0 3 3 Available Day 29 31 30 119 4 Hour per day 720 744 720 2928 5 Available Hour 24.00 684 744 720 2856 6 Standby hour per day 7.19 197 224 218 856 S1 Rain/Smog/Fog 1.46 39 45 45 174 S2 Slippery 0.82 17 27 27 98 S3 Flood - - - - - S4 Dust - - - - - S5 Rest & meal 1.54 45 47 46 183 S6 Daily shift change 1.86 53 58 56 221 S7 Weekly Over Shift - - - - - S8 Holiday 0.14 4 5 4 17 S9 No Operator - - - - - S10 Operator Absen (Sakit, ijin, alpha) - - - - - S11 No loader/No Hauler 0.53 16 16 16 63 S12 Hopper/Crusher shutdown - - - - - S13 Stoppage - - - - - S14 Front, Road, Disposal Maintenance - - - - - S15 Wait for Blasting 0.53 15 16 16 64 S16 P5M, Safety Talk 0.15 4 5 5 18 S17 Production Re-schedulling - - - - - S18 Pit, Front, Disposal Movement - - - - - S19 Pre Use Check, Greasing, Refueling, Washing 0.15 4 5 5 18 S20 No Order, No Material (OB & Coal), No Area - - - - - 7 Breakdown Hour per day 3.12 89 97 94 371 8 Schedule Hour 13.69 487 520 502 1,629
  • 4. SMO BLOCK B1 Production Detail Seam Desc Sep-15 Oct-15 Nov-15 Total All Pit Waste (Bcm) 2,425,635 2,509,689 2,322,236 7,257,560 Coal Exposed (MT) 289,096 272,745 254,808 816,649 Coal Getting (MT) 288,030 272,772 250,757 811,559 Mining Strip Ratio 8.39 9.17 9.08 8.89 Contract Strip Ratio 8.42 9.20 9.26 8.94 Opening Inventory 0 1,066 1,039 0 Closing Inventory 1,066 1,039 5,090 5,090 Waste Distance (m) 0 0 0 0 Coal Distance (m) 0 0 0 0 TM (ar) 21.29 21.57 21.26 21.37 IM (adb) 16.69 17.09 16.90 16.89 Ash (adb) 4.75 4.84 4.79 4.79 VM (adb) 38.34 37.99 37.95 38.10 FC (adb) 40.98 40.91 41.13 41.00 TS (adb) 0.61 0.49 0.54 0.55 CV (adb) 5,641 5,603 5,635 5,627 Na2O (%) 3.77 4.95 4.82 4.49 AFT IDT RED (deg) 1,112 1,113 1,101 1,109 AFT FLOW RED (deg) 1,242 1,232 1,224 1,233 Relative Density 1.25 1.25 1.25 1.25 Hardgrovability Index 47 47 48 47 SIS
  • 5. SMO BLOCK B1 Land Clearing and Soil Removal Sept Oct Nov (Ha) (Ha) (Ha) Blok B1 -Pit C2 - - - -IPD C - - - -OPD B14 - - - Total land clearing area - - - * boundary clearing 20 meter dari boundary desain Land Clearing 2015 Sept Oct Nov BCM BCM BCM Pit C2 Volume 20,692 1,859 70 Lokasi Penimbunan OPD B14 & OPD B3 OPD B14 & OPD B4 OPD B14 & OPD B5 20,692 1,859 70Total volume soil removal Soil Removal Blok B1 2015
  • 6. SMO BLOCK B1 Material Balance Code Data Field Name Sep Oct Nov 2015 * Sambarata Dump Report B1 Sambarata B1 OPD_14 OPD14 - Out Pit Dump Wst Total Insitu Waste 483,905 496,713 465,701 1,446,319 totptd Total Distance (Pit to Dump) During Schedule 2,525 2,714 2,704 2,648 IPD_C IPDC- In Pit Dump Wst Total Insitu Waste 2,005,487 2,051,743 1,907,775 5,965,005 totptd Total Distance (Pit to Dump) During Schedule 2,637 2,791 2,845 2,756 Tot Total Dumping - Sambarata B1 WstD Total Insitu Waste Dumped on Dumps 2,489,392 2,548,456 2,373,476 7,411,324 IWstOF Insitu Dump Shortage(Overflow) WstOF Dump Shortage(Overflow) totptd Total Distance (Pit to Dump) During Schedule 2,615 2,776 2,817 2,735 VB Volume Balance 0 0 0 0
  • 7. SMO BLOCK B1 Face Posisi EOP Sept
  • 8. SMO BLOCK B1 Face Posisi EOP Okt
  • 9. SMO BLOCK B1 Face Posisi EOP Nov
  • 10. SMO BLOCK B1 Face Posisi EOP Des
  • 11. SMO BLOCK B1 General Issue : • Proses land compensation untuk area radius blasting di Enau harus sudah selesai pada awal tahun 2015 untuk menghindari terjadinya issue masalah blasting dan menghindari turunnya productivity unit karena ketidaktersediaan material blasting. (aktual blasting maks 50 hole) • Rekomendasi IPD C 2015 masih menunggu kajian dan release GnH. • Lokasi dumping material rawa/lunak diarea sump C. • Pemotongan Mineout atau floor seam H 1 meter sesuai rekomendasi GnH. • Performa slurry pump tidak maksimal pada pit G1 sehingga mengharuskan adanya manual handling, impactnya ada kenaikan SR karena perhitungan material blending 1:1.5 • Start Pumping di Sed Pond WMP 29 ( Slurry pump ) dan kontinyu pembentukan WMP 33
  • 12. PT. SIS - Pit C2
  • 13. PT. SIS - Pit C2