This presentation explains how leveraging technology for complete site models to streamline site closure strategies leads to better business descisions and improved data quality by bridging abstract scienced for refined engineering design and enhanced data analytics for continuous quality performance.
This was presented by Joshua Orris at the Battelle 2018 Chlorinated Conference.
Global C4IR-1 MasterClass Cambridge - Bose Intellisense 2017Justin Hayward
Similaire à Using Data Management and 3-Dimensional Data Visualization to Generate More Complete Conceptual Site Models and Streamline Site Closure (20)
Using Data Management and 3-Dimensional Data Visualization to Generate More Complete Conceptual Site Models and Streamline Site Closure
1. Using Data Management and 3-Dimensional Data
Visualization to Generate More Complete Conceptual
Site Models and Streamline Site Closure
Battelle 2018 Chlorinated Conference
Palm Springs, CA
April 2018
3. Objective
Enhanced Data Management & 3DVA to Streamline Site Closure
Leveraging technology for complete site models to streamline site closure
strategies, leading to better business decisions. Data visualization is a solution to
bridge the abstract science for refined engineering design and enhanced data
analytics for continuous quality performance.
Purpose
• Data Quality & Management
• Data Analysis and Refined Decision Insights
• Investment(s) Evaluation and Validation
• Facilitates Stakeholder Engagement
4. Technical Management Challenges
• Complex data sets over several years
• Complex environmental systems
• Varied site investigation methods
• Performance Inconsistency
• Stakeholder engagement
• Receptors & third-party potential impacts
• Varied regulatory requirements for cleanup: numeric vs risk-based
Enhanced Data Management & 3DVA to Streamline Site Closure
Challenges to Enhance Better Business Decisions:
5. Strategic Management Challenges
Enhanced Data Management & 3DVA to Streamline Site Closure
Challenges to Enhance Better Business Decisions (Con’t):
Legal Regulatory Business/Real Estate AuditorsStakeholders:
6. Enhanced Data Management & 3DVA to Streamline Site Closure
Antea USA, Inc. 6
Not a Comprehensive Site
Model (CSM)!
(# Figures in SI/RI Report vs 1 CSM)
Traditional Workflow Challenges
7. Building the Conceptual Site Model (CSM)
Enhanced Data Management & 3DVA to Streamline Site Closure
Antea USA, Inc. 7
•Innovative Investigation Methods
•Direct Sensing
•Mobile Laboratories
•Real Estate - Current & Future Land Use
•Source Area Evaluation
•Contaminant Distribution
•Receptors
•Regulatory Drivers
•Site Investigation
•Geology/Hydrogeology
•Effective Remedy Selection, Engineering Design
•Performance Monitoring
Goal: Build All Relevant Site Knowledge into the CSM
8. Conceptual Site Model – Populating the Database
Enhanced Data Management & 3DVA to Streamline Site Closure
Antea USA, Inc. 8
Project Database
Well Log
Data
Fluid Level
Data
Analytical
Data
3D
Visualization
3D Analysis
Seismic
“Picks”
2D
Visualization
2D Analysis
Boring Log
Data
9. Conceptual Site Model – 3D Analytical Data Visualization
• Identifying data gaps
• Evaluate plume degradation
• Analyzing well network to determine
statistical significance of each well
• Refining GW monitoring well network
• Standardizing the calculation of mass and
volume of groundwater plumes
• Identifying targeted treatment areas (location
and depth)
• More precise reserve lifecycle cost modeling
Enhanced Data Management & 3DVA to Streamline Site Closure
A baseline CSM analysis of site conditions and remedial options provide strategic insights
for:
Focused Injection
Design
10. • Leverage Technology
• Field Services
• Office-based technology solutions
• High Resolution Site Characterization (HRSC)
• Enhanced data density
• Enhanced data quality
• Data Visualization and Analytics Provide:
• A communication tool
• Validation of strategies & investments that influences
stakeholders
• Reduction in project life cycle costs
• Enhanced reserve cost modeling
• Improvement to the bottom line
Reducing Environmental Liability Management
Enhanced Data Management & 3DVA to Streamline Site Closure
11. Best Management Practice 3D CSM
Enhanced Data Management & 3DVA to Streamline Site Closure
Provides a standardized solution process for the management and representation
of complex data sets leading to reduction of environmental liabilities & more
informed business decisions
Operations
Management
Real Estate /
Legal
Third Party
Stakeholders
Technical
Team
Regulatory
Oversight
1. Communication to Stakeholders
• 3DVA is a tool to communicate
technical data sets to all
stakeholders
• Facilitates collaborative
discussions with regulators
• Helps ownership team gain a
better understanding of
environmental drivers and risks
12. Best Management Practice 3D CSM (Cont’d)
Plume architecture credibility
Validation of mass and volume
estimates
Enhanced visualization of data sets
over time; predictive model
(simulations)
More targeted Investigation &
remediation solution strategies
Improved risk management
Lifecycle cost reductions
Enhanced Data Management & 3DVA to Streamline Site Closure
2. Technical Advantages
-100
-50
0
50
100
150
200
250
300
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
Jun-02 May-04 May-06 May-08 May-10 May-12 May-14
Mass(lbs)
Concentration(ug/L)
Date
1,1,1-Trichloroethane - Rock
Average
Concentration
Maximum
Concentration
13. Best Management Practice 3D CSM (Cont’d)
• Best-fit solution strategy
• Global Continuity
• Corporate reserve cost validation
• Refined targeted design and
implementation remedial
strategies
• Streamlines lifecycle
management sensitive receptor
risk-based assessment
Enhanced Data Management & 3DVA to Streamline Site Closure
3. Cultural Barriers Minimized by Technology-Data Visualization Model
14. Solution Advantages
Enhanced Data Management & 3DVA to Streamline Site Closure
Antea USA, Inc. 14
MODEL CALCULATIONS
“Garbage In – Garbage Out” Paradigm
Garbage
Data
Perfect
Model
Garbage
Results
Perfect
Data
Garbage
Model
Garbage
Results
15. Investing in technology-based solutions can
streamline site lifecycle closure strategies
Yields High Resolution Site
Characterization to maximize field data
density
Reduces labor & laboratory costs
Reduces engineering and field costs
Increases data QA/QC
Increases field quality performance
Confirms and reduces data gaps
Defines source areas
Reduces lifecycle and costs
Solution Advantages
Enhanced Data Management & 3DVA to Streamline Site Closure
16. Enhanced Data Visualization Leading to Best-in-Class Business Practices
Antea USA, Inc. 16
Case Study 1: 12-acre Former Specialty Chemical Manufacturer
• Late 1990’s NJDEP ISRA 7:26E
• Geology
• 0-6 ft bgs Fill/Weathered bedrock
• 6-60 ft bgs Brunswick shale-bedrock
• Hydrogeology
• Perched groundwater in overburden
• Fractured groundwater flow in bedrock
• Remediation
• Pump & Treat 2001-2006
• Pilot testing EVO/ZVI pneumatic injection
• Full scale injection 2007
• Excavation 240 tons 2011
• Lifecycle Value
• IRM shutdown - $180k per year / $2.1M to
date savings
• HRSC / 3D visualization - $300k savings in
remediation design & implementation
• MNA closure strategy $100k monitoring
reduction
https://youtu.be/DTrB_R6zAEU
17. Enhanced Data Visualization Leading to Best-in-Class Business Practices
Antea USA, Inc. 17
• 1992 – Original Release Date
• Remediation Strategies
• $1.0 MM lifecycle cost-to-date
• IRM GW Pump & Treat
• ZVI/EVO
• GW monitoring was $50k @
30-year lifecycle
• 2015 Project Transition
• Implemented 3DVA, data
management and CSM
development
• HRSC MIP program was scoped
but was deferred after 3DVA
was completed
• 2017 obtained FDEP Closure
NFA
• $100K 2-year lifecycle
Case Study 2: 1.6-acre Former Manufacturing Facility, Tampa, FL
https://youtu.be/ali4LT2Sz2w
18. Enhanced Data Visualization Leading to Best-in-Class Business Practices
Antea USA, Inc. 18
Case Study 3: 12-acre Former Manufacturing Facility, Sorocaba, Brazil
• 2003 Original Release Date
• Remediation Strategies
• BioStimulation
• GW monitoring $200k annual @ 30-year
lifecycle
• $2.0 MM lifecycle cost through 2011
• Project Transition 2011
• Implemented 3DVA and Data and CSM
Development
• $50k – 3DVA/Data management
• $60k annual GW monitoring
• 2 new source areas identified
• Targeted remediation strategies
implemented (2012 & 2014)
• Chemical Soil Mixing
• Source Area Excavation
• Permeable Reactive Barrier
• 2017 site reached commercial closure
levels
• $800k spent 2011-2017
https://youtu.be/QTaBqIeNPPY
19. Q&A
Special Thanks to
Jack Sheldon, Antea Group
Deborah Schnell, P.E., Panther Technologies
Joshua Orris
Antea Group
Joshua.Orris@anteagroup.com
717.712.5456
Jason Ruf
S2C2
Jason.Ruf@s2c2inc.com
908.256.2710
Contacts:
AnteaGroup
@AnteaGroup