ANUJ PANDEY
Contact No.: +91- 7500669135 / +91-8720847502 E-Mail: anujpandey0605@hotmail.com
Mechanical Quality Engineer with ASNT Level-II certification in NDT, having 8 years of
Working Experience
Professional Snapshot
 A seasoned professional with nearly 08years’ experience in Quality Control & Assurance in EPC construction
Company.
 Associated with Isgec Heavy Engineering Ltd., Noida as Sr.Engineer- Quality Control & Assurance;
managing entire spectrum of Quality Assurance / Inspection activities at site.
 Adroit in managing overall inspections in construction of Boiler (Steam Generator) along with boiler auxiliaries
like fans, pumps, DG sets, compressors & pipe lines with a view to enhancing the construction quality,
eliminating obsolescence and achieving excellence through optimum utilisation of modern inspection tools &
Procedures.
 Thorough experience of inspections at Oil & Gas industry, Power Plant sector including Rotary &
static equipment.
 Well-versed with API, AWS, IBR & ASME guidelines for improving construction quality and approaches for
quality management & assurance.
 An ASNT level-II certified inspector for Radiography Test, Ultrasonic Test, Magnetic Particle Test & Dye
penetrant Test.
Occupational Contour
Since Oct’10 Isgec Heavy Engineering Ltd., Noida Sr.Engineer
Spearheading all the Quality Management activities at sites- NDT Inspections (RT, UT, MPT, PMI& DPT), Stage
inspections like Fit up, Welding, Hydro Test, Leak Test by Smoke, for Boiler Pressure Parts, Alignment of Rotary
& Static Equipments, Preparing Test Packs, Loop Files, Line History Sheets, NDT Reports like RT, UT, PT, MT
in prescribed formats, Welding Procedure Qualification & Welder Qualification and keeping records of the
same, Qualification of all NDT Procedures by PMC/Client.
Carried out In-Service tapping (Hot Tapping of Oil, Gas & Steam Pipe Lines) including angle tap of Flare piping.
Completed Projects with Isgec:-
• 2X300 TPH CFBC Boiler at HPCL-Mittal Refineries Ltd., Bathinda, Punjab (Since April 2015)
Scope of Project- Construction of Boiler, Economiser coils, Super Heater coils, Soot Blowers, ESP, De-Aerator, FD
Fans, SA Fans- 2 Nos., Boiler Feed Water Pumps, Burners- 4 nos., Air Heater- 2Nos., ESP- 2Nos., Deaerator- 1No.
• 1X160 TPH Oil/Gas Fired Boiler at Bharat Oman Refineries Ltd., Bina (Sep 2013 to April 2015)
Scope of Project- Construction of Boiler, Economiser coils, Super Heater coils, Soot Blowers, ESP, De-Aerator,
FD Fans- 2 Nos.(1 Motor & 1 Turbo Driven), SA Fans- 2 Nos.(1 Motor & 1 Turbo Driven), Boiler Feed Water
Pumps- 2 Nos (1 Motor & 1 Turbo Driven), Seal air fans- 2 nos., Scanner cooling fans- 2nos., Burners- 4 nos., Air
receivers- 2nos. (1 HP & 1 LP), Compressors- 3 Nos.(1 HP & 2 LP compressors), Knock Out Drum- 2Nos.(1 Flare
KOD & 1 fuel Gas KOD), RFO Transfer pump- 1 No., Fuel Oil transfer pump- 2Nos.(Motor & Turbo driven), Slop
transfer pump- 2Nos. Blow down transfer pump- 2Nos. DM Water transfer pump- 2Nos.(Motor & Turbo driven), Oil
& Gas pipe lines of approx. 8 Kms., Steam & Water pipe lines of approx. 6Kms., Day oil storage tank- 1No., DM
Water storage tank-1No., Deaerator- 1No., Cold tapping steam & water at existing pipelines- 26Nos., Hot tapping
of oil & gas at existing pipelines- 7 Nos.
Job Profile:- Taking over foundation from civil deptt. by mutual inspection, Ground inspection of structure column,
alignment check of column after erection, ground inspection of Pressure Parts with client & IBR and making IMR for
the same, fit-up & weld visual inspection along with IBR & client, raising daily inspection call to client, welding
procedure qualification & welders qualification with client, stage inspection during erection of rotary & static
equipments, final coupling alignment inspection, Smoke test of boiler, Leak test of Air pre-heater, kerosene test of
ducting & casing, boiler furnace alignment, stage inspection of LP, HP, MP & VHP piping, Hydro Test of boiler &
Piping after completion of loop files (mechanical & NDT clearance), Carrying out Radiography at site as per IBR /
Contract requirements, CARRYING OUR UT Test of welded joints, Carrying out stage Inspection during Refractory
application at site, Carrying our PMI for all alloy steel, PWHT as per WPS / code requirements, Hardness test as per
approved ITP / specification of EIL, all stage & final inspections as per ITPs, FQAP, making procedure for hot tapping,
welding during hot tapping, welder qualification for hot tapping as per API code, all stage & final inspections as per
ITPs, FQAP, preparing ITPs, preparing welding & NDT procedures, preparing formats for approval & qualification.
• 2X170 TPH Gas Fired Boiler at GAIL India, Pata, UP (may 2012 to Sep2013)
Scope of Project- Construction of Boiler, Economiser coils, Super Heater coils, Soot Blowers, ESP, De-Aerator,
FD Fans- 2 Nos. (Motor & Turbo Driven with clutching & declutching system) , SA Fans- 2 Nos. (Motor & Turbo
Driven with Clutching & Declutching system), Boiler Feed Water Pumps- 3 Nos (1 Motor & 2 Turbo Driven), Blow
down coolers- 2nos. (Heat Exchangers), Seal air fans- 4 nos., Scanner cooling fans- 4nos., Burners- 8 nos.,
Nitrogen vessel- 1No., Air receivers- 2nos., Dump condenser- 4Nos., Knock Out Drum- 1No.
Job Profile:- Taking over foundation from civil deptt. by mutual inspection, Ground inspection of structure column,
alignment check of column after erection, ground inspection of Pressure Parts with client & IBR and making IMR for
the same, fit-up & weld visual inspection along with IBR & client, raising daily inspection call to client, welding
procedure qualification & welders qualification with client, stage inspection during erection of rotary & static
equipments, final coupling alignment inspection, Smoke test of boiler, Leak test of Air pre-heater, kerosene test of
ducting & casing, boiler furnace alignment, stage inspection of LP, HP, MP & VHP piping including P91 material,
Hydro Test of boiler & Piping after completion of loop files (mechanical & NDT clearance), Carrying out Radiography
at site as per IBR / Contract requirements. Carrying out stage Inspection during Refractory application at site, Carrying
our PMI for all alloy steel, PWHT as per WPS / code requirements, Hardness test as per approved ITP / specification
of EIL, all stage & final inspections as per ITPs, FQAP, preparing ITPs, preparing welding & NDT procedures,
preparing formats for approval & qualification.
• 1X190 TPH Travelling Grate- Coal & Baggase fired boiler at Kesar Enterprises Ltd., Bareilly.
Scope of Project:- Construction of Boiler, Economiser coils, Super Heater coils, Soot Blowers, ESP, De-Aerator,
FD Fans- 2 Nos., ID Fans- 2 Nos., SA Fans- 2 Nos. & Boiler Feed Water Pumps- 2 Nos.
Job Profile:- Taking over foundation from client by mutual inspection, Ground inspection of structure column,
alignment check of column after erection, ground inspection of Pressure Parts with IBR, fit-up, weld visual
inspection along with IBR & client, raising daily inspection call to client, qualifying welding procedure as per ASME
section IX, welder qualification, stage inspection during erection of rotary & static equipments, final coupling
alignment inspection, Smoke test of boiler, kerosene test of ducting & casings, Leak test of Air pre-heater, boiler
furnace alignment, Hydro Test of boiler & Piping, Carrying out Radiography at site as per IBR / Contract
requirements. Carrying out stage Inspection during Refractory application at site
• 2X425 TPH CFBC Boiler at Bhushan Energy, Angul, Orissa
Scope of Project:- Construction of Boiler, Economiser coils, Super Heater coils, Soot Blowers, ESP, De-Aerator,
FD Fans- 2 Nos., ID Fans- 2 Nos., SA Fans- 2 Nos. & Boiler Feed Water Pumps- 2 Nos.
Job Profile:- Taking Over foundation from client by mutual inspection, Ground inspection of structure column,
alignment check of column after erection, ground inspection of Pressure Parts (Carbon Steel, Alloy Steel- P91)
with IBR, fit-up, weld visual inspection along with IBR & client, raising daily inspection call to client (FIN), qualifying
welders as per WPS.
• 1X50 TPH AFBC Boiler- Rice Husk Fired Boiler at Best Foods Ltd., Karnal, Haryana
Scope of Project:- Construction of Boiler, Economiser coils, Super Heater coils, Soot Blowers, ESP, De-Aerator,
FD Fans- 2 Nos., ID Fans- 2 Nos., SA Fans- 2 Nos. & Boiler Feed Water Pumps- 2 Nos.
Job Profile:- Taking over foundation from client by mutual inspection, Ground inspection of structure column,
alignment check of column after erection, ground inspection of Pressure Parts with IBR, fit-up, weld visual
inspection along with IBR & client, raising daily inspection call to client, welders qualification, stage inspection
during erection of rotary & static equipments, final coupling alignment inspection, Smoke test of boiler, Leak test of
Air pre-heater, kerosene test of ducting & casings, boiler furnace alignment, Hydro Test of boiler & Piping,
Carrying out Radiography at site as per IBR / Contract requirements. Carrying out stage Inspection during
Refractory application at site
• 1X250 TPH CFBC Boiler at Visa Steel Ltd., Jajpur Road, Orissa.
Scope of Projec:- Construction of Boiler, Economiser coils, Super Heater coils, Soot Blowers, ESP, De-Aerator,
FD Fans- 2 Nos., ID Fans- 2 Nos., SA Fans- 2 Nos. & Boiler Feed Water Pumps- 2 Nos.
Job Profile- Stage inspection during erection of rotary & static equipments, final coupling alignment inspection,
Hydro Test of Boiler & Piping, Carrying out Radiography at site as per IBR / Contract requirements, Leak test of
Air pre-heater, and Carrying out stage Inspection during Refractory application at site
Jul’07 to Sep’10 H.V.EquipmentsPvt Ltd., Noida Engineer
Company Profile:- H.V.Equipments carries out Engineering, manufacturing & construction of Pneumatic Ash Handling System,
Mill Reject Handling system, Dome valves, Steel Silos & Bag Filters
Job Profile:- Responsible for Quality Control activities at Noida workshop & sites. To carry out stage inspection as per approved
FQAP, ITP, and procedures at workshop. Raising inspection call to client for inspection at workshop & site as per FQAP, carry out
inspection at vendor shop for castings, machines material etc., developing QAPs & FQAPs for submission to client for approval,
making inspection reports & protocols for all inspections carried out. Preparing full quality dossier for submission.
Academic & Other Credentials
Academics
 B.E. in Mechanical with 63.1% marks from University of Rajasthan, Jaipur in 2007.
Others
 Completed Short term training program in Quality Management System conducted byDNV.
 Level – II Certification from ASNT for RT, UT, MPT, DPT
Personal Dossier
Date of Birth: 06th
May 1983
Permanent Address: 81, Asharfabad, Lucknow-226003, U.P.
Present Address: 20, HIG, SukhSagar, Ph.-I, Nizamuddin Colony, BHEL, Bhopal
Present CTC: Rs.7.9Lacs
Notice Period: 3 Months negotiable
ANUJ PANDEY

Contenu connexe

Tendances

Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Kamran Saeed
 
Piping material-specification
Piping material-specificationPiping material-specification
Piping material-specificationChiragShah127
 
ASPE CEU Pipe Hangers and Supports
ASPE CEU Pipe Hangers and SupportsASPE CEU Pipe Hangers and Supports
ASPE CEU Pipe Hangers and SupportsJim LeStage
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docMuthukumar RajaGounder
 
Piping sample report
Piping sample reportPiping sample report
Piping sample reportram111eg
 
Commissioning & Interface With Engineering
Commissioning & Interface With EngineeringCommissioning & Interface With Engineering
Commissioning & Interface With Engineeringasim569
 
Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015sathiya prabhu
 
Piping engineering guide
Piping engineering guidePiping engineering guide
Piping engineering guideram111eg
 
What's new in PASS/START-PROF v4.84 Pipe Stress Analysis Software
What's new in PASS/START-PROF v4.84 Pipe Stress Analysis SoftwareWhat's new in PASS/START-PROF v4.84 Pipe Stress Analysis Software
What's new in PASS/START-PROF v4.84 Pipe Stress Analysis SoftwareAlex Matveev
 
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...Britt Bettell
 
PASS/START-PROF What's new in 4.84 version
PASS/START-PROF What's new in 4.84 versionPASS/START-PROF What's new in 4.84 version
PASS/START-PROF What's new in 4.84 versionAlex Matveev
 
178680732 pipe-hanger-design
178680732 pipe-hanger-design178680732 pipe-hanger-design
178680732 pipe-hanger-designTiago Farinhas
 
Metalog Presentation 2015
Metalog Presentation 2015Metalog Presentation 2015
Metalog Presentation 2015Jaideep Paul
 
What Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning jobWhat Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning jobjoseph william
 
PASS/START-PROF capabilities for pipe stress analysis of power and process pi...
PASS/START-PROF capabilities for pipe stress analysis of power and process pi...PASS/START-PROF capabilities for pipe stress analysis of power and process pi...
PASS/START-PROF capabilities for pipe stress analysis of power and process pi...Alex Matveev
 

Tendances (20)

Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech
 
Piping material-specification
Piping material-specificationPiping material-specification
Piping material-specification
 
ASPE CEU Pipe Hangers and Supports
ASPE CEU Pipe Hangers and SupportsASPE CEU Pipe Hangers and Supports
ASPE CEU Pipe Hangers and Supports
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
 
Piping sample report
Piping sample reportPiping sample report
Piping sample report
 
Cv english
Cv englishCv english
Cv english
 
Pipe Clamp Design, Application & Installation - November
Pipe Clamp Design, Application & Installation - NovemberPipe Clamp Design, Application & Installation - November
Pipe Clamp Design, Application & Installation - November
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
Commissioning & Interface With Engineering
Commissioning & Interface With EngineeringCommissioning & Interface With Engineering
Commissioning & Interface With Engineering
 
Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015
 
Piping engineering guide
Piping engineering guidePiping engineering guide
Piping engineering guide
 
What's new in PASS/START-PROF v4.84 Pipe Stress Analysis Software
What's new in PASS/START-PROF v4.84 Pipe Stress Analysis SoftwareWhat's new in PASS/START-PROF v4.84 Pipe Stress Analysis Software
What's new in PASS/START-PROF v4.84 Pipe Stress Analysis Software
 
General Presentation Featuring Pipe Clamps - March
General Presentation Featuring Pipe Clamps - MarchGeneral Presentation Featuring Pipe Clamps - March
General Presentation Featuring Pipe Clamps - March
 
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
 
The GBHE Project Experience
The GBHE Project ExperienceThe GBHE Project Experience
The GBHE Project Experience
 
PASS/START-PROF What's new in 4.84 version
PASS/START-PROF What's new in 4.84 versionPASS/START-PROF What's new in 4.84 version
PASS/START-PROF What's new in 4.84 version
 
178680732 pipe-hanger-design
178680732 pipe-hanger-design178680732 pipe-hanger-design
178680732 pipe-hanger-design
 
Metalog Presentation 2015
Metalog Presentation 2015Metalog Presentation 2015
Metalog Presentation 2015
 
What Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning jobWhat Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning job
 
PASS/START-PROF capabilities for pipe stress analysis of power and process pi...
PASS/START-PROF capabilities for pipe stress analysis of power and process pi...PASS/START-PROF capabilities for pipe stress analysis of power and process pi...
PASS/START-PROF capabilities for pipe stress analysis of power and process pi...
 

Similaire à anuj cv

Raj kumar betala snr inspection engineer
Raj kumar betala snr inspection engineerRaj kumar betala snr inspection engineer
Raj kumar betala snr inspection engineerRajkumar Betala
 
Rajasekaran CV-updated
Rajasekaran CV-updatedRajasekaran CV-updated
Rajasekaran CV-updatedRaja Sekhar
 
MD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_originalMD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_originalM.Nafis Haque
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
 
Chidambaram_QAQC(Piping)
Chidambaram_QAQC(Piping)Chidambaram_QAQC(Piping)
Chidambaram_QAQC(Piping)CHIDAMBARAM S
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORMohsin Iqubal
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineerAhmed Hamdy
 
Venugopal revised Cv
Venugopal revised CvVenugopal revised Cv
Venugopal revised CvVenu Gopal
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEERnader rizq
 
Venugopal revised cv
Venugopal revised cvVenugopal revised cv
Venugopal revised cvVenu Gopal
 
QA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorQA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorAsad Ahsan
 

Similaire à anuj cv (20)

mohamed daowod cv
mohamed daowod cvmohamed daowod cv
mohamed daowod cv
 
Mithun Banjan CV
Mithun Banjan CVMithun Banjan CV
Mithun Banjan CV
 
Raj kumar betala snr inspection engineer
Raj kumar betala snr inspection engineerRaj kumar betala snr inspection engineer
Raj kumar betala snr inspection engineer
 
Rajasekaran CV-updated
Rajasekaran CV-updatedRajasekaran CV-updated
Rajasekaran CV-updated
 
Mechanical cv
Mechanical cvMechanical cv
Mechanical cv
 
MD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_originalMD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_original
 
Resume Khurshid
Resume KhurshidResume Khurshid
Resume Khurshid
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 
Siddharth_resume_Engg.
Siddharth_resume_Engg.Siddharth_resume_Engg.
Siddharth_resume_Engg.
 
Chidambaram_QAQC(Piping)
Chidambaram_QAQC(Piping)Chidambaram_QAQC(Piping)
Chidambaram_QAQC(Piping)
 
KUMARESH.CV
KUMARESH.CVKUMARESH.CV
KUMARESH.CV
 
Santhosh-CV
Santhosh-CVSanthosh-CV
Santhosh-CV
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTOR
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineer
 
Venugopal revised Cv
Venugopal revised CvVenugopal revised Cv
Venugopal revised Cv
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEER
 
LINGAM
LINGAMLINGAM
LINGAM
 
Venugopal revised cv
Venugopal revised cvVenugopal revised cv
Venugopal revised cv
 
Amar Resume
Amar ResumeAmar Resume
Amar Resume
 
QA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorQA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding Inspector
 

anuj cv

  • 1. ANUJ PANDEY Contact No.: +91- 7500669135 / +91-8720847502 E-Mail: anujpandey0605@hotmail.com Mechanical Quality Engineer with ASNT Level-II certification in NDT, having 8 years of Working Experience Professional Snapshot  A seasoned professional with nearly 08years’ experience in Quality Control & Assurance in EPC construction Company.  Associated with Isgec Heavy Engineering Ltd., Noida as Sr.Engineer- Quality Control & Assurance; managing entire spectrum of Quality Assurance / Inspection activities at site.  Adroit in managing overall inspections in construction of Boiler (Steam Generator) along with boiler auxiliaries like fans, pumps, DG sets, compressors & pipe lines with a view to enhancing the construction quality, eliminating obsolescence and achieving excellence through optimum utilisation of modern inspection tools & Procedures.  Thorough experience of inspections at Oil & Gas industry, Power Plant sector including Rotary & static equipment.  Well-versed with API, AWS, IBR & ASME guidelines for improving construction quality and approaches for quality management & assurance.  An ASNT level-II certified inspector for Radiography Test, Ultrasonic Test, Magnetic Particle Test & Dye penetrant Test. Occupational Contour Since Oct’10 Isgec Heavy Engineering Ltd., Noida Sr.Engineer Spearheading all the Quality Management activities at sites- NDT Inspections (RT, UT, MPT, PMI& DPT), Stage inspections like Fit up, Welding, Hydro Test, Leak Test by Smoke, for Boiler Pressure Parts, Alignment of Rotary & Static Equipments, Preparing Test Packs, Loop Files, Line History Sheets, NDT Reports like RT, UT, PT, MT in prescribed formats, Welding Procedure Qualification & Welder Qualification and keeping records of the same, Qualification of all NDT Procedures by PMC/Client. Carried out In-Service tapping (Hot Tapping of Oil, Gas & Steam Pipe Lines) including angle tap of Flare piping. Completed Projects with Isgec:- • 2X300 TPH CFBC Boiler at HPCL-Mittal Refineries Ltd., Bathinda, Punjab (Since April 2015) Scope of Project- Construction of Boiler, Economiser coils, Super Heater coils, Soot Blowers, ESP, De-Aerator, FD Fans, SA Fans- 2 Nos., Boiler Feed Water Pumps, Burners- 4 nos., Air Heater- 2Nos., ESP- 2Nos., Deaerator- 1No. • 1X160 TPH Oil/Gas Fired Boiler at Bharat Oman Refineries Ltd., Bina (Sep 2013 to April 2015) Scope of Project- Construction of Boiler, Economiser coils, Super Heater coils, Soot Blowers, ESP, De-Aerator, FD Fans- 2 Nos.(1 Motor & 1 Turbo Driven), SA Fans- 2 Nos.(1 Motor & 1 Turbo Driven), Boiler Feed Water Pumps- 2 Nos (1 Motor & 1 Turbo Driven), Seal air fans- 2 nos., Scanner cooling fans- 2nos., Burners- 4 nos., Air receivers- 2nos. (1 HP & 1 LP), Compressors- 3 Nos.(1 HP & 2 LP compressors), Knock Out Drum- 2Nos.(1 Flare KOD & 1 fuel Gas KOD), RFO Transfer pump- 1 No., Fuel Oil transfer pump- 2Nos.(Motor & Turbo driven), Slop transfer pump- 2Nos. Blow down transfer pump- 2Nos. DM Water transfer pump- 2Nos.(Motor & Turbo driven), Oil & Gas pipe lines of approx. 8 Kms., Steam & Water pipe lines of approx. 6Kms., Day oil storage tank- 1No., DM
  • 2. Water storage tank-1No., Deaerator- 1No., Cold tapping steam & water at existing pipelines- 26Nos., Hot tapping of oil & gas at existing pipelines- 7 Nos. Job Profile:- Taking over foundation from civil deptt. by mutual inspection, Ground inspection of structure column, alignment check of column after erection, ground inspection of Pressure Parts with client & IBR and making IMR for the same, fit-up & weld visual inspection along with IBR & client, raising daily inspection call to client, welding procedure qualification & welders qualification with client, stage inspection during erection of rotary & static equipments, final coupling alignment inspection, Smoke test of boiler, Leak test of Air pre-heater, kerosene test of ducting & casing, boiler furnace alignment, stage inspection of LP, HP, MP & VHP piping, Hydro Test of boiler & Piping after completion of loop files (mechanical & NDT clearance), Carrying out Radiography at site as per IBR / Contract requirements, CARRYING OUR UT Test of welded joints, Carrying out stage Inspection during Refractory application at site, Carrying our PMI for all alloy steel, PWHT as per WPS / code requirements, Hardness test as per approved ITP / specification of EIL, all stage & final inspections as per ITPs, FQAP, making procedure for hot tapping, welding during hot tapping, welder qualification for hot tapping as per API code, all stage & final inspections as per ITPs, FQAP, preparing ITPs, preparing welding & NDT procedures, preparing formats for approval & qualification. • 2X170 TPH Gas Fired Boiler at GAIL India, Pata, UP (may 2012 to Sep2013) Scope of Project- Construction of Boiler, Economiser coils, Super Heater coils, Soot Blowers, ESP, De-Aerator, FD Fans- 2 Nos. (Motor & Turbo Driven with clutching & declutching system) , SA Fans- 2 Nos. (Motor & Turbo Driven with Clutching & Declutching system), Boiler Feed Water Pumps- 3 Nos (1 Motor & 2 Turbo Driven), Blow down coolers- 2nos. (Heat Exchangers), Seal air fans- 4 nos., Scanner cooling fans- 4nos., Burners- 8 nos., Nitrogen vessel- 1No., Air receivers- 2nos., Dump condenser- 4Nos., Knock Out Drum- 1No. Job Profile:- Taking over foundation from civil deptt. by mutual inspection, Ground inspection of structure column, alignment check of column after erection, ground inspection of Pressure Parts with client & IBR and making IMR for the same, fit-up & weld visual inspection along with IBR & client, raising daily inspection call to client, welding procedure qualification & welders qualification with client, stage inspection during erection of rotary & static equipments, final coupling alignment inspection, Smoke test of boiler, Leak test of Air pre-heater, kerosene test of ducting & casing, boiler furnace alignment, stage inspection of LP, HP, MP & VHP piping including P91 material, Hydro Test of boiler & Piping after completion of loop files (mechanical & NDT clearance), Carrying out Radiography at site as per IBR / Contract requirements. Carrying out stage Inspection during Refractory application at site, Carrying our PMI for all alloy steel, PWHT as per WPS / code requirements, Hardness test as per approved ITP / specification of EIL, all stage & final inspections as per ITPs, FQAP, preparing ITPs, preparing welding & NDT procedures, preparing formats for approval & qualification. • 1X190 TPH Travelling Grate- Coal & Baggase fired boiler at Kesar Enterprises Ltd., Bareilly. Scope of Project:- Construction of Boiler, Economiser coils, Super Heater coils, Soot Blowers, ESP, De-Aerator, FD Fans- 2 Nos., ID Fans- 2 Nos., SA Fans- 2 Nos. & Boiler Feed Water Pumps- 2 Nos. Job Profile:- Taking over foundation from client by mutual inspection, Ground inspection of structure column, alignment check of column after erection, ground inspection of Pressure Parts with IBR, fit-up, weld visual inspection along with IBR & client, raising daily inspection call to client, qualifying welding procedure as per ASME section IX, welder qualification, stage inspection during erection of rotary & static equipments, final coupling alignment inspection, Smoke test of boiler, kerosene test of ducting & casings, Leak test of Air pre-heater, boiler furnace alignment, Hydro Test of boiler & Piping, Carrying out Radiography at site as per IBR / Contract requirements. Carrying out stage Inspection during Refractory application at site • 2X425 TPH CFBC Boiler at Bhushan Energy, Angul, Orissa Scope of Project:- Construction of Boiler, Economiser coils, Super Heater coils, Soot Blowers, ESP, De-Aerator, FD Fans- 2 Nos., ID Fans- 2 Nos., SA Fans- 2 Nos. & Boiler Feed Water Pumps- 2 Nos. Job Profile:- Taking Over foundation from client by mutual inspection, Ground inspection of structure column, alignment check of column after erection, ground inspection of Pressure Parts (Carbon Steel, Alloy Steel- P91) with IBR, fit-up, weld visual inspection along with IBR & client, raising daily inspection call to client (FIN), qualifying welders as per WPS. • 1X50 TPH AFBC Boiler- Rice Husk Fired Boiler at Best Foods Ltd., Karnal, Haryana Scope of Project:- Construction of Boiler, Economiser coils, Super Heater coils, Soot Blowers, ESP, De-Aerator, FD Fans- 2 Nos., ID Fans- 2 Nos., SA Fans- 2 Nos. & Boiler Feed Water Pumps- 2 Nos. Job Profile:- Taking over foundation from client by mutual inspection, Ground inspection of structure column, alignment check of column after erection, ground inspection of Pressure Parts with IBR, fit-up, weld visual inspection along with IBR & client, raising daily inspection call to client, welders qualification, stage inspection during erection of rotary & static equipments, final coupling alignment inspection, Smoke test of boiler, Leak test of Air pre-heater, kerosene test of ducting & casings, boiler furnace alignment, Hydro Test of boiler & Piping,
  • 3. Carrying out Radiography at site as per IBR / Contract requirements. Carrying out stage Inspection during Refractory application at site • 1X250 TPH CFBC Boiler at Visa Steel Ltd., Jajpur Road, Orissa. Scope of Projec:- Construction of Boiler, Economiser coils, Super Heater coils, Soot Blowers, ESP, De-Aerator, FD Fans- 2 Nos., ID Fans- 2 Nos., SA Fans- 2 Nos. & Boiler Feed Water Pumps- 2 Nos. Job Profile- Stage inspection during erection of rotary & static equipments, final coupling alignment inspection, Hydro Test of Boiler & Piping, Carrying out Radiography at site as per IBR / Contract requirements, Leak test of Air pre-heater, and Carrying out stage Inspection during Refractory application at site Jul’07 to Sep’10 H.V.EquipmentsPvt Ltd., Noida Engineer Company Profile:- H.V.Equipments carries out Engineering, manufacturing & construction of Pneumatic Ash Handling System, Mill Reject Handling system, Dome valves, Steel Silos & Bag Filters Job Profile:- Responsible for Quality Control activities at Noida workshop & sites. To carry out stage inspection as per approved FQAP, ITP, and procedures at workshop. Raising inspection call to client for inspection at workshop & site as per FQAP, carry out inspection at vendor shop for castings, machines material etc., developing QAPs & FQAPs for submission to client for approval, making inspection reports & protocols for all inspections carried out. Preparing full quality dossier for submission. Academic & Other Credentials Academics  B.E. in Mechanical with 63.1% marks from University of Rajasthan, Jaipur in 2007. Others  Completed Short term training program in Quality Management System conducted byDNV.  Level – II Certification from ASNT for RT, UT, MPT, DPT Personal Dossier Date of Birth: 06th May 1983 Permanent Address: 81, Asharfabad, Lucknow-226003, U.P. Present Address: 20, HIG, SukhSagar, Ph.-I, Nizamuddin Colony, BHEL, Bhopal Present CTC: Rs.7.9Lacs Notice Period: 3 Months negotiable ANUJ PANDEY