SlideShare une entreprise Scribd logo
1  sur  1
Télécharger pour lire hors ligne
Date : 7th Jan-2016
Mrs. ANUSHKA PRASAD, B.E. Electrical, B.E.E. Certified Energy Manager
E-mail:- anushka.prasad1410@gmail.com, Contact no. : +919924382823
PROFILE SUMMARY:
Comprehensive 7+ years of experience in planning & procurement process, evaluation of technical aspects,
inventory management under the premises of budgetary constraints. Responsible for vendor management, material
management, ISO & Energy 50001 Coordinator including 5MTPA Essar Steel Projects.
KEY SKILLS:
MATERIAL PLANNING
MATERIAL MANAGEMENT
VENDOR DEVELOPMENT
PROCUREMENT
ENERGY MANAGER
SAP MM, SAP PM
ISO & ENERGY 50001,
SUPPLY CHAIN MANAGEMENT
BUDGET_PLANNING
EMPLOYEMENT DETAILS:
MANAGER- ESSAR STEEL INDIA LIMITED (April 2014 - December 2015)
 Mechanical & Electrical Spare Material Planner- RMHS, Annual Budget planning.
 Negotiating with vendor for Technical Evaluation, Recommendation and Drawing approval.
 New vendor/contractors development, techno-commercial offer from vendors, coordination with vendor till final ordered
material received at site, budget allocation, follow up for payment, floating RFI/RFQ.
 SAP PM & MM- Notifications monitoring, auto generated Maintenance orders, Maintenance Scheduling
 IMS, HIRAC, SUJHAV Department Representative, Switchgear team Department Representative.
 Energy saving Initiatives, Energy review, CUSUM, successfully complied 20% energy cost reduction.
 Spare material planning & procurement, contract procurement
 Essar Manufacturing Excellence Department Representative
 Technical specification, Technical recommendation, Purchase requisitions.
DEPUTY MANAGER-ESSAR STEEL INDIA LIMITED (September 2010 - March 2014)
 Electrical Material Planner, Monthly Progress Report, Preventive Maintenance Scheduling, SAP PM & MM
 Subcontracting & Purchase requisitions, evaluation, , Shift Report, Belt Weigh Scale Calibration
 Vendor Site inspection- Transformer, Drive, PLC, LT Switchgear panels.
 Preventive Maintenance of 415V LT MCC Panels(L&T make) & 33kV, 6.6kV HT MCC, VFD, PLC
 Annual Budget Planning, LC co-ordination & prioritization.
 Safety Roaster Officer for RMHS Plant
ASSITANT MANAGER- ESSAR STEEL HAZIRA LIMITED (July 2008 - August 2010)
 Project Coordination, technical specifications, Procurement.
 Engineering & Procurement of RMHS project for 5 MTPA, Essar Steel Ltd. Expansion.
 Drawing modifications & approval of electrical circuitry and interlocks of HT & LT motors, HT & LT MCC Panels, HT & LT
Cables( Flexible, power & control), PLC, RIO panels, High Mast Tower, Composite & Auxiliary Panels, Conveyor Safety
switches, Neutral Earth Resistance, Belt Weigh Scale, Magnetic Separator &Variable Frequency Drives, Metal Detector, Cable
Drag Chain, Wireless Control signal communication, Conveyor belt, PU deck, Mats, Mesh, Actuator, Slip ring, dry type
transformer, Tools & Tackles, Hardware accessories.
 Procurement & Engineering of Stacker cum Reclaimer Electricals.
 Core member for central Spares-PLC, Lighting, Motors & Drive.
 Cable scheduling, PLC IO list, cable tray arrangement & Scheme finalization for raw material flow.
ACHIEVEMENTS & TRAININGS:
 Certified IMS & EnMS Internal Auditor, B.E.E. Certified Energy Manager.
 Achieved Best department representative for Sujhav FY12-13 & FY14-15 & won highest Sujhav registration.
 Two times positive action award achiever for Outperforming in arranging critical spares & energy saving project.
 Got 3 promotions in 7 year of experience, overall a good performer with rating exceeds expectation,
 MS OFFICE, SAP MM & PM, Adobe Photoshop, AutoCAD, FLASH presentation.
 NIIT CERTIFIED C# & C++ programing, Trained in Primavera, HT/LT Motor, LT Switch gear - L&T & ABB, Siemens PLC
hardware & logic, SAP implementation PM & MM, ARIBA Purchase management
 Training given on Energy Awareness system, SAP PM, MM & UPS .Trained & Nurtured ADDECO trainees.
 Induction training at INDUCTOTHERM Ahmedabad & Project on the study of Harmonics.
EDUCATIONAL QUALIFICATION:
National Productivity Council B.E.E. ENERGY MANAGER Certified August 2014
B.E. ELECTRICAL L.E College of Engineering, Morbi, Guj. First Class Distinction May 2008
AISSCE Kendriya Vidyalaya(Ahmedabad) CBSE 78.00% April 2004
AISSE Kendriya Vidyalaya (Punjab). CBSE 76.00% March 2002
PERSONAL DETAILS:
DATE OF BIRTH : 14th Oct, 1986
ADDRESS : SMQ M/1 Malhar Air Force Station Makarpura Vadodara, Gujarat
HOBBIES : Playing Table Tennis, Chess, listening to Music
STRENGTH : Adaptability, Active, Quick learner
LANGUAGES KNOWN : Hindi, English and Gujarati
REFERENCES : 1)Mr. Tarkeshwar Shahi- AVP JSPL 2)Mr.Sunil Kunnathully–GM & Head- RMHS Essar Steel

Contenu connexe

Tendances

ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVAjith Chandramohan
 
CV- Electrical Tech.& Design With 4+ years of exp.
CV- Electrical Tech.& Design With 4+ years of exp.CV- Electrical Tech.& Design With 4+ years of exp.
CV- Electrical Tech.& Design With 4+ years of exp.Maharshi Joshi
 
Mohd ghazi credentials
Mohd ghazi credentialsMohd ghazi credentials
Mohd ghazi credentialsMohd Ghazi
 
Mohammad H. Mustafa(Electrical Site Engineer)
Mohammad H. Mustafa(Electrical Site Engineer)Mohammad H. Mustafa(Electrical Site Engineer)
Mohammad H. Mustafa(Electrical Site Engineer)Mohammad Mustafa
 
CV - Srinivas Reddy Nasirepally
CV - Srinivas Reddy NasirepallyCV - Srinivas Reddy Nasirepally
CV - Srinivas Reddy NasirepallySrinivas Reddy
 
Lakhdeep Singh CV
Lakhdeep Singh CVLakhdeep Singh CV
Lakhdeep Singh CVlucky singh
 
1. Ikram up date cv
1. Ikram up date cv1. Ikram up date cv
1. Ikram up date cvIkram ul haq
 
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
CV Electrical Engineer - Emad  Ahmed Mohamed SabekCV Electrical Engineer - Emad  Ahmed Mohamed Sabek
CV Electrical Engineer - Emad Ahmed Mohamed SabekEmad Ahmed Mohamed Sabek
 
jose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resumejose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resumejose varun
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 
Enaia electrical design. engineer cv
Enaia electrical design. engineer  cvEnaia electrical design. engineer  cv
Enaia electrical design. engineer cvEnaia Kamel
 

Tendances (20)

T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
 
CV bharat new
CV    bharat newCV    bharat new
CV bharat new
 
CV- Electrical Tech.& Design With 4+ years of exp.
CV- Electrical Tech.& Design With 4+ years of exp.CV- Electrical Tech.& Design With 4+ years of exp.
CV- Electrical Tech.& Design With 4+ years of exp.
 
Satish_Reddy_resume
Satish_Reddy_resumeSatish_Reddy_resume
Satish_Reddy_resume
 
Mohd ghazi credentials
Mohd ghazi credentialsMohd ghazi credentials
Mohd ghazi credentials
 
Mohammad H. Mustafa(Electrical Site Engineer)
Mohammad H. Mustafa(Electrical Site Engineer)Mohammad H. Mustafa(Electrical Site Engineer)
Mohammad H. Mustafa(Electrical Site Engineer)
 
CV - Srinivas Reddy Nasirepally
CV - Srinivas Reddy NasirepallyCV - Srinivas Reddy Nasirepally
CV - Srinivas Reddy Nasirepally
 
BIPIN KUMAR 97
BIPIN KUMAR 97BIPIN KUMAR 97
BIPIN KUMAR 97
 
Lakhdeep Singh CV
Lakhdeep Singh CVLakhdeep Singh CV
Lakhdeep Singh CV
 
Rahul Resume
Rahul ResumeRahul Resume
Rahul Resume
 
Ashraf - CV
Ashraf - CVAshraf - CV
Ashraf - CV
 
1. Ikram up date cv
1. Ikram up date cv1. Ikram up date cv
1. Ikram up date cv
 
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
CV Electrical Engineer - Emad  Ahmed Mohamed SabekCV Electrical Engineer - Emad  Ahmed Mohamed Sabek
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
 
jose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resumejose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resume
 
CV Vijay_Vora
CV Vijay_VoraCV Vijay_Vora
CV Vijay_Vora
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
AAmir PDF
AAmir PDFAAmir PDF
AAmir PDF
 
Enaia electrical design. engineer cv
Enaia electrical design. engineer  cvEnaia electrical design. engineer  cv
Enaia electrical design. engineer cv
 
Resume
ResumeResume
Resume
 

En vedette

Суд. Абсурдопедия против Роспотребнадзора и Роскомнадзора (заявление об обжал...
Суд. Абсурдопедия против Роспотребнадзора и Роскомнадзора (заявление об обжал...Суд. Абсурдопедия против Роспотребнадзора и Роскомнадзора (заявление об обжал...
Суд. Абсурдопедия против Роспотребнадзора и Роскомнадзора (заявление об обжал...Artem Kozlyuk
 
Case overview google april 13
Case overview google april 13Case overview google april 13
Case overview google april 13rbiederman
 
Mobile Innovations Workshop
Mobile Innovations WorkshopMobile Innovations Workshop
Mobile Innovations WorkshopResearch Now
 
Central Place Theory
Central Place TheoryCentral Place Theory
Central Place Theorycindipatten
 
Software testing presentation
Software testing presentationSoftware testing presentation
Software testing presentationNikolas Vourlakis
 
A deficiência de hormônio de crescimento isolado é a deficiência hormonal mai...
A deficiência de hormônio de crescimento isolado é a deficiência hormonal mai...A deficiência de hormônio de crescimento isolado é a deficiência hormonal mai...
A deficiência de hormônio de crescimento isolado é a deficiência hormonal mai...Van Der Häägen Brazil
 

En vedette (6)

Суд. Абсурдопедия против Роспотребнадзора и Роскомнадзора (заявление об обжал...
Суд. Абсурдопедия против Роспотребнадзора и Роскомнадзора (заявление об обжал...Суд. Абсурдопедия против Роспотребнадзора и Роскомнадзора (заявление об обжал...
Суд. Абсурдопедия против Роспотребнадзора и Роскомнадзора (заявление об обжал...
 
Case overview google april 13
Case overview google april 13Case overview google april 13
Case overview google april 13
 
Mobile Innovations Workshop
Mobile Innovations WorkshopMobile Innovations Workshop
Mobile Innovations Workshop
 
Central Place Theory
Central Place TheoryCentral Place Theory
Central Place Theory
 
Software testing presentation
Software testing presentationSoftware testing presentation
Software testing presentation
 
A deficiência de hormônio de crescimento isolado é a deficiência hormonal mai...
A deficiência de hormônio de crescimento isolado é a deficiência hormonal mai...A deficiência de hormônio de crescimento isolado é a deficiência hormonal mai...
A deficiência de hormônio de crescimento isolado é a deficiência hormonal mai...
 

Similaire à Resume_ANUSHKA_PRASAD_____

Similaire à Resume_ANUSHKA_PRASAD_____ (20)

Jituranjan lenka
Jituranjan lenkaJituranjan lenka
Jituranjan lenka
 
CV_Tamal Kanti Paul
CV_Tamal Kanti PaulCV_Tamal Kanti Paul
CV_Tamal Kanti Paul
 
KJVYAS_SCL
KJVYAS_SCLKJVYAS_SCL
KJVYAS_SCL
 
SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11
 
Radhe_Resume
Radhe_ResumeRadhe_Resume
Radhe_Resume
 
SRao_cv
SRao_cvSRao_cv
SRao_cv
 
SUDHAKAR DIVYAPATI
SUDHAKAR DIVYAPATISUDHAKAR DIVYAPATI
SUDHAKAR DIVYAPATI
 
Cv (5) converted
Cv (5) convertedCv (5) converted
Cv (5) converted
 
Resume
ResumeResume
Resume
 
syed Raza _CV
syed Raza _CVsyed Raza _CV
syed Raza _CV
 
Resume updated
Resume updatedResume updated
Resume updated
 
Resume
ResumeResume
Resume
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.
 
CV updated G
CV updated GCV updated G
CV updated G
 
Resume_Kailash Kumar Jain
Resume_Kailash Kumar JainResume_Kailash Kumar Jain
Resume_Kailash Kumar Jain
 
New Resume Ajay
New Resume AjayNew Resume Ajay
New Resume Ajay
 
SER Infrastructure Private Limited (2).pptx
SER Infrastructure Private Limited (2).pptxSER Infrastructure Private Limited (2).pptx
SER Infrastructure Private Limited (2).pptx
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 

Resume_ANUSHKA_PRASAD_____

  • 1. Date : 7th Jan-2016 Mrs. ANUSHKA PRASAD, B.E. Electrical, B.E.E. Certified Energy Manager E-mail:- anushka.prasad1410@gmail.com, Contact no. : +919924382823 PROFILE SUMMARY: Comprehensive 7+ years of experience in planning & procurement process, evaluation of technical aspects, inventory management under the premises of budgetary constraints. Responsible for vendor management, material management, ISO & Energy 50001 Coordinator including 5MTPA Essar Steel Projects. KEY SKILLS: MATERIAL PLANNING MATERIAL MANAGEMENT VENDOR DEVELOPMENT PROCUREMENT ENERGY MANAGER SAP MM, SAP PM ISO & ENERGY 50001, SUPPLY CHAIN MANAGEMENT BUDGET_PLANNING EMPLOYEMENT DETAILS: MANAGER- ESSAR STEEL INDIA LIMITED (April 2014 - December 2015)  Mechanical & Electrical Spare Material Planner- RMHS, Annual Budget planning.  Negotiating with vendor for Technical Evaluation, Recommendation and Drawing approval.  New vendor/contractors development, techno-commercial offer from vendors, coordination with vendor till final ordered material received at site, budget allocation, follow up for payment, floating RFI/RFQ.  SAP PM & MM- Notifications monitoring, auto generated Maintenance orders, Maintenance Scheduling  IMS, HIRAC, SUJHAV Department Representative, Switchgear team Department Representative.  Energy saving Initiatives, Energy review, CUSUM, successfully complied 20% energy cost reduction.  Spare material planning & procurement, contract procurement  Essar Manufacturing Excellence Department Representative  Technical specification, Technical recommendation, Purchase requisitions. DEPUTY MANAGER-ESSAR STEEL INDIA LIMITED (September 2010 - March 2014)  Electrical Material Planner, Monthly Progress Report, Preventive Maintenance Scheduling, SAP PM & MM  Subcontracting & Purchase requisitions, evaluation, , Shift Report, Belt Weigh Scale Calibration  Vendor Site inspection- Transformer, Drive, PLC, LT Switchgear panels.  Preventive Maintenance of 415V LT MCC Panels(L&T make) & 33kV, 6.6kV HT MCC, VFD, PLC  Annual Budget Planning, LC co-ordination & prioritization.  Safety Roaster Officer for RMHS Plant ASSITANT MANAGER- ESSAR STEEL HAZIRA LIMITED (July 2008 - August 2010)  Project Coordination, technical specifications, Procurement.  Engineering & Procurement of RMHS project for 5 MTPA, Essar Steel Ltd. Expansion.  Drawing modifications & approval of electrical circuitry and interlocks of HT & LT motors, HT & LT MCC Panels, HT & LT Cables( Flexible, power & control), PLC, RIO panels, High Mast Tower, Composite & Auxiliary Panels, Conveyor Safety switches, Neutral Earth Resistance, Belt Weigh Scale, Magnetic Separator &Variable Frequency Drives, Metal Detector, Cable Drag Chain, Wireless Control signal communication, Conveyor belt, PU deck, Mats, Mesh, Actuator, Slip ring, dry type transformer, Tools & Tackles, Hardware accessories.  Procurement & Engineering of Stacker cum Reclaimer Electricals.  Core member for central Spares-PLC, Lighting, Motors & Drive.  Cable scheduling, PLC IO list, cable tray arrangement & Scheme finalization for raw material flow. ACHIEVEMENTS & TRAININGS:  Certified IMS & EnMS Internal Auditor, B.E.E. Certified Energy Manager.  Achieved Best department representative for Sujhav FY12-13 & FY14-15 & won highest Sujhav registration.  Two times positive action award achiever for Outperforming in arranging critical spares & energy saving project.  Got 3 promotions in 7 year of experience, overall a good performer with rating exceeds expectation,  MS OFFICE, SAP MM & PM, Adobe Photoshop, AutoCAD, FLASH presentation.  NIIT CERTIFIED C# & C++ programing, Trained in Primavera, HT/LT Motor, LT Switch gear - L&T & ABB, Siemens PLC hardware & logic, SAP implementation PM & MM, ARIBA Purchase management  Training given on Energy Awareness system, SAP PM, MM & UPS .Trained & Nurtured ADDECO trainees.  Induction training at INDUCTOTHERM Ahmedabad & Project on the study of Harmonics. EDUCATIONAL QUALIFICATION: National Productivity Council B.E.E. ENERGY MANAGER Certified August 2014 B.E. ELECTRICAL L.E College of Engineering, Morbi, Guj. First Class Distinction May 2008 AISSCE Kendriya Vidyalaya(Ahmedabad) CBSE 78.00% April 2004 AISSE Kendriya Vidyalaya (Punjab). CBSE 76.00% March 2002 PERSONAL DETAILS: DATE OF BIRTH : 14th Oct, 1986 ADDRESS : SMQ M/1 Malhar Air Force Station Makarpura Vadodara, Gujarat HOBBIES : Playing Table Tennis, Chess, listening to Music STRENGTH : Adaptability, Active, Quick learner LANGUAGES KNOWN : Hindi, English and Gujarati REFERENCES : 1)Mr. Tarkeshwar Shahi- AVP JSPL 2)Mr.Sunil Kunnathully–GM & Head- RMHS Essar Steel