SlideShare une entreprise Scribd logo
1  sur  20
Triangulation Survey
Triangulation is a method of determining coordinates of a point fixed in the
field to be used as control point for survey work.
Triangulation is preferred for hills and undulating areas, since it is easy to
establish stations at reasonable distances apart, with inter-visibility. In plane and
crowded areas it is not suitable as the inter-visibility of stations is affected. The
difficulty is overcome by building towers which is quite expensive.
In triangulation, entire area to be surveyed is covered with a framework of
triangles. For the triangle, the length of the first line, which is measured
precisely is known as Base line.
Operation of Triangulation Survey
Steps for executing triangulation project
The field work of a triangulation project is carried out in the following
well defined operations:
1. Reconnaissance
2. Erection of Signals & Towers
3. Measurement of Horizontal Angles
4. Astronomical Observations Necessary to Determine the True
Meridian and the Absolute Positions of the Stations
5. Measurement of Baseline
6. Adjustment of observed Angles
7. Computations of Lengths of each side of each triangle
8. Computations of the Latitude and Longitude of ST
Conditions for selecting ground stations
Reconnaissance
1. Examination of the country to be surveyed.
2. Selection of most favorable sides for base lines
3. Selection of suitable positions of stations
2. Selection of Station:
The selection of station is based upon the following consideration.
1. The stations should be clearly visible from each other. For this purpose
highest commanding positions such as top of hills or mountains is selected.
2. They should form well shaped triangles (angles > 30 deg)
3. They should be easily accessible
4. They should be useful for detail survey
5. Thy should be so fixed that the length of sight is not too short or too long
Conditions for selecting ground stations
3. Inter-visibility and Heights of Stations:
For inter-visibility of two stations they should be fixed on highest available
ground. Such as mountain peaks rides or top of hills when the distance b/t the
two stations is great and the difference in elevation b/t them is small then it is
necessary to raise both the instrument and signal to overcome the curvature
of the earth and to clear all the intervening obstruction.
The height of both the instrument and signal above the ground depends upon.
1. Distance between the stations.
2. Relative elevations of stations.
3. The profile of intervening ground.
Applications of Triangulation Survey
Following are some applications of triangulation survey:
* Establishing accurately located control points for plane and geodetic
surveys of large areas.
* Establishing accurately located control points in connection with aerial
surveying
* Accurate location of engineering projects such as Centre lines, terminal
points and shafts for long tunnels, and Centre lines and abutments for long
span bridges.
Triangulation Systems
A system consisting of triangulation stations connected by a chain of
triangles. The complete fig is called triangulation system or triangulation
figure. The most common type of figures used in a triangulation system are
Triangles
Quadrilaterals
Polygons
Triangulation Systems
Triangles System: simple, economical but least accurate system.
Triangles
1. A chain of triangles is very rapid and economical when a narrow strip of
terrain is to be surveyed.
2. Angles less than 30o
or more than 120o
are not permitted
3. For well-conditioned triangles, angles should not be less than 30o
or more
than 120o
.
Triangulation Systems
Quadrilaterals System: most accurate system as the number of checks are
more.
Quadrilaterals
1. These afford an excellent system since the various combinations of sides and
angles can be used to compute the lengths of required sides, and checks can be
made frequently
2. The best quadrilateral is square. A quadrilateral with both diagonals having no
station at their intersection is usually employed.
3. This is best suited for hilly areas.
Triangulation Systems
Polygons: Accurate since more checks are there.
Polygons
1. When areas that are very wide in proportion to their lengths are to be
surveyed then pentagonal or hexagonal figures may be economical.
2. These may or may not have a central station.
Intersection Method
The triangle is the simplest unit of the triangulation net.
We start with a Base Line with known azimuth and precise length.
All angles of the triangle are measured and should be adjusted to sum to 180.
At least on end point of the base line should have known ground coordinates:
E and N or X and Y.
Intersection Solution
Given Coordinates of A and B; Observed angles α and ß:
To compute coordinates of point P: Xp and YP
Y, N P (XP, YP)?
B ß
α
A
X, E
Intersection Solution
1- Calculate departure and latitude of line AB
ΔXAB = XB – XA; ΔYAB = YB – YA, which are necessary for determining
bearing AZAB (ƟAB) and the length DAB of side AB:
1.1 DAB = √ (ΔXAB
2 + ΔYAB
2)
1.2 Azimuth of AB = AZAB or (ƟAB) = arctan (ΔXAB /ΔYAB);
2-Use the Sine rule to calculate the length DAP from triangle ABP:
DAP / sinβ = DAB / sin (α + β) ⇒ DAP = DAB•sinβ / sin (α + β)
3- Calculate the bearing (azimuth) of the side AP: AZAP = AZAB + α,
4- Calculate Northing and Easting differences (departure and latitudes) using
the length and bearing of the side AP:
ΔXAP = DAP cos AZAP ; ΔYAP = DAP sin AZAP
5-The final coordinates of point P:
XP = XA + ΔXAP and YP = YA + ΔYAP
Check Intersection Solution
Calculation of coordinates of P can be carried out using length and azimuth
of BP and coordinates of B to check the previous results:
1- Length of side BP:
DBP / sinα = DAB / sin(α + β)⇒ DBP = DAB•sinα / sin(α + β)
2- Bearing or Azimuth of side BP:
AZBP = AZBA – β; AZBA = AZAB – 180o
3- North and East differences using the length and bearing of the side BP:
ΔXBP = DBP cos AZBP ΔYBP = DBP sin AZBP
4- The final coordinates of point P:
XP = XB + ΔXBP and YP = YB + ΔYBP
This should be exactly equal to coordinates of P computed from station A
Intersection Formula
The following formulae are called intersection formula, used to calculate
coordinates of P by directly substituting the given and observed data:
NP = {EA – EB + NA cot β + NB cot α} / [cot α + cot β]
EP = {NB - NA + EA cot β + EB cot α} / [cot α + cot β]
NOTE: Direct substitution should be done when observing A and B from P
should be seen clockwise direction. This means standing at P observing A,
you have to turn clockwise to observe B.
Example:
A and B are ground control points of coordinates: A(200.00, 400.00)m and
B(500.00, 600.00)m. Angles observed at A and B towards station P (almost
east of A) are 65o 00’ 00” and 67o 00’ 00” respectively, compute coordinates
of P.
Resection Solution
When an unknown coordinates station (P) is occupied by an angle observation
instrument and directions to three control points are observed from this station, the
procedure to calculate coordinates of this point is known as Resection solution or
three points problem.
If coordinates of A, B and C are known
Directions PA, PB and PC are observed
to determine angles α and ß
Required are coordinates of P
Many solutions are available
One solution will be discussed here.
The key for this solution is to
calculate angles x (CAP) and y (PBC)
Resection Solution
* First step: Using coordinates of A, B and C solve triangle ABC
(Lengths of sides and angles of the triangle: AB, BC, CA, <ABC, <BCA and
<CAB)
Using Pythagoras theory for sides and cosine rule for angles
* To compute unknown angles x and y, two equations are needed:
Angle equation and side equation
First equation, Angle Equation
Denoting the (unknown) angles CAP as x and CBP as y, angle ACP = C, can be
determined from given coordinates of control points. From the angles of the
quadrilateral PACB,
x + y = 2π – α – β – C = k1 ………. (1)
k1 = 2π – α – β – C is thus a known value,
and we can write equation (1) as: y = k1 – x
Resection Solution
Second Equation: Side Equation
Applying the law of sine in triangles PAC and PCB we can express PC in two
different ways:
From the above relation:
sin x / sin y = BC sin α / AC sinβ = k2 (2)
K2 = BC sin α / AC sinβ is also a known value.
With this substitution the equation can be written: sin x = k2 sin y
We now need to solve these two equations in two unknowns. Once x and y are
known the various triangles can be solved straight forward and intersection
method can be used to determine the position of P.
Resection Solution
Solution of the two equations to give x and y:
1- compute constants k1 and k2
2- Substituting (1) in (2): sin x = k2 sin (k1 – x)
sin x = k2 [ sin k1 cos x - cos k1 sin x ]
Dividing both sides by cos x, tan x = k2 [sin k1 - cos k1 tan x],
hence:
tan x [1 + k2 cos k1] = k2 sin k1
tan x =k2 sin k1/[1 + k2 cos k1];
3- Substitute values of k1 and k2 to calculate x and y:
x = tan-1 {k2 sin k1/[1 + k2 cos k1]}
y = k1 –x
4- Check the solution:
In ∆ ACP, <ACP = C1; In ∆ BCP, <BCP = C2; C1 + C2 = C, already calculated in
∆ABC; also 180 – (α +C1) = x and 180 – (ß + C2
Resection Solution
5- In ∆APC, coordinates of A and C are known; angles x and C1 are known, use
intersection solution to solve for coordinates of P
6- Check:
In ∆BPC, coordinates of B and C are known; angles y and C2 are known, use
intersection solution to solve for coordinates of P
Example:
A theodolite was adjusted at station P and angles APC and CPB were observed and recorded as:
109.3045o and 115.0520o respectively. Ground coordinates of stations A, B and C are
respectively given as: A(1000.00, 5300.00); B(3100.00, 5000.00); C(2200.00, 6300.00)m
Compute the coordinates of station P.
C
P(E, N)?
y P x
A B
Trilateration Survey
* With the introduction of EDM it became more practical to measure lengths
of sides of triangles in triangulation nets rather than angles.
* The process will be faster and give accurate results.
This is called Trilateration.
* For a triangle ABC where AB is the base line (with length and azimuth
precisely known) sides BC and AC will be measured using EDM.
* Angles of triangle can be calculated using cosine
rule.
* Intersection solution can be applied to
Compute coordinates of station C.
Trilateration Survey
* Having calculated coordinates of C, length of BC can be computed and used as base
line for next triangle BCD.
* For a neighboring triangle BCD, sides BD and CD are measured.
* Angles of triangle BCD can be computed
using cosine rule.
* Again applying intersection solution will allow
computing coordinates of D.
Example
Trilateration was carried out to observe sides of triangulation
net ABQP, including Base line AB whose azimuth was known
to be 60o 00’ 00”. Observed sides lengths are:
AB = 360.00m; BP = 440.00m BQ = 320.00m;
QP = 480.00m; PA = 450.00m
Assuming control point A(100.00; 250.00)m, compute: coordinates of B, C and D.

Contenu connexe

Similaire à se_312_ch_3_-triangulation_survey.pptx

5. AREAS AND VOLUMES (SUR) 3140601 GTU
5. AREAS AND VOLUMES (SUR) 3140601 GTU5. AREAS AND VOLUMES (SUR) 3140601 GTU
5. AREAS AND VOLUMES (SUR) 3140601 GTUVATSAL PATEL
 
traversing survey principles.docx
traversing survey principles.docxtraversing survey principles.docx
traversing survey principles.docxalexandermwaura
 
Traversing Practical part 1
Traversing Practical part 1Traversing Practical part 1
Traversing Practical part 1Bahzad5
 
Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying SHAMJITH KM
 
Radiacion poligonal abierta
Radiacion   poligonal abiertaRadiacion   poligonal abierta
Radiacion poligonal abiertaJeanCordova7
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying TraversingDarren Lee
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversingseenyee
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversingseenyee
 
Contour & Contouring Surveying
Contour & Contouring SurveyingContour & Contouring Surveying
Contour & Contouring SurveyingBahzad5
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2Doreen Yeo
 
Surveying sample questions and answers
Surveying sample questions and answersSurveying sample questions and answers
Surveying sample questions and answersELDARUS SALUMU
 
Tacheometric-Surveying.ppt
Tacheometric-Surveying.pptTacheometric-Surveying.ppt
Tacheometric-Surveying.pptADCET, Ashta
 
Surveying
SurveyingSurveying
Surveyingredaasd
 

Similaire à se_312_ch_3_-triangulation_survey.pptx (20)

levelling survey
levelling surveylevelling survey
levelling survey
 
5. AREAS AND VOLUMES (SUR) 3140601 GTU
5. AREAS AND VOLUMES (SUR) 3140601 GTU5. AREAS AND VOLUMES (SUR) 3140601 GTU
5. AREAS AND VOLUMES (SUR) 3140601 GTU
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
surveying ii
surveying iisurveying ii
surveying ii
 
traversing survey principles.docx
traversing survey principles.docxtraversing survey principles.docx
traversing survey principles.docx
 
Traversing Practical part 1
Traversing Practical part 1Traversing Practical part 1
Traversing Practical part 1
 
Triangulation survey
Triangulation surveyTriangulation survey
Triangulation survey
 
Laboratory manual surveying_ii
Laboratory manual surveying_iiLaboratory manual surveying_ii
Laboratory manual surveying_ii
 
Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying
 
Radiacion poligonal abierta
Radiacion   poligonal abiertaRadiacion   poligonal abierta
Radiacion poligonal abierta
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
Contour & Contouring Surveying
Contour & Contouring SurveyingContour & Contouring Surveying
Contour & Contouring Surveying
 
Lecture 17 M4.pdf
Lecture 17 M4.pdfLecture 17 M4.pdf
Lecture 17 M4.pdf
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
Surveying sample questions and answers
Surveying sample questions and answersSurveying sample questions and answers
Surveying sample questions and answers
 
tacheometry surveying
tacheometry surveyingtacheometry surveying
tacheometry surveying
 
Tacheometric-Surveying.ppt
Tacheometric-Surveying.pptTacheometric-Surveying.ppt
Tacheometric-Surveying.ppt
 
Surveying
SurveyingSurveying
Surveying
 

Plus de ArisamTom

3, PLANNING.ppt
3,  PLANNING.ppt3,  PLANNING.ppt
3, PLANNING.pptArisamTom
 
Triangulation.ppt
Triangulation.pptTriangulation.ppt
Triangulation.pptArisamTom
 
se_312_ch_3_-triangulation_survey.pptx
se_312_ch_3_-triangulation_survey.pptxse_312_ch_3_-triangulation_survey.pptx
se_312_ch_3_-triangulation_survey.pptxArisamTom
 
Triangulation.ppt
Triangulation.pptTriangulation.ppt
Triangulation.pptArisamTom
 
lecture_1a.ppt
lecture_1a.pptlecture_1a.ppt
lecture_1a.pptArisamTom
 
TECHNIQUES IN BASIC SURVEYING.ppt
TECHNIQUES IN BASIC SURVEYING.pptTECHNIQUES IN BASIC SURVEYING.ppt
TECHNIQUES IN BASIC SURVEYING.pptArisamTom
 

Plus de ArisamTom (6)

3, PLANNING.ppt
3,  PLANNING.ppt3,  PLANNING.ppt
3, PLANNING.ppt
 
Triangulation.ppt
Triangulation.pptTriangulation.ppt
Triangulation.ppt
 
se_312_ch_3_-triangulation_survey.pptx
se_312_ch_3_-triangulation_survey.pptxse_312_ch_3_-triangulation_survey.pptx
se_312_ch_3_-triangulation_survey.pptx
 
Triangulation.ppt
Triangulation.pptTriangulation.ppt
Triangulation.ppt
 
lecture_1a.ppt
lecture_1a.pptlecture_1a.ppt
lecture_1a.ppt
 
TECHNIQUES IN BASIC SURVEYING.ppt
TECHNIQUES IN BASIC SURVEYING.pptTECHNIQUES IN BASIC SURVEYING.ppt
TECHNIQUES IN BASIC SURVEYING.ppt
 

Dernier

PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentationamedia6
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back17lcow074
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Yantram Animation Studio Corporation
 
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...Pooja Nehwal
 
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,bhuyansuprit
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130Suhani Kapoor
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`dajasot375
 
A level Digipak development Presentation
A level Digipak development PresentationA level Digipak development Presentation
A level Digipak development Presentationamedia6
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Servicejennyeacort
 
Kieran Salaria Graphic Design PDF Portfolio
Kieran Salaria Graphic Design PDF PortfolioKieran Salaria Graphic Design PDF Portfolio
Kieran Salaria Graphic Design PDF Portfolioktksalaria
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130Suhani Kapoor
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfAmirYakdi
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonDelhi Call girls
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...Call Girls in Nagpur High Profile
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130Suhani Kapoor
 

Dernier (20)

PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentation
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
 
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
 
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
 
A level Digipak development Presentation
A level Digipak development PresentationA level Digipak development Presentation
A level Digipak development Presentation
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
 
Kieran Salaria Graphic Design PDF Portfolio
Kieran Salaria Graphic Design PDF PortfolioKieran Salaria Graphic Design PDF Portfolio
Kieran Salaria Graphic Design PDF Portfolio
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
 
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 

se_312_ch_3_-triangulation_survey.pptx

  • 1. Triangulation Survey Triangulation is a method of determining coordinates of a point fixed in the field to be used as control point for survey work. Triangulation is preferred for hills and undulating areas, since it is easy to establish stations at reasonable distances apart, with inter-visibility. In plane and crowded areas it is not suitable as the inter-visibility of stations is affected. The difficulty is overcome by building towers which is quite expensive. In triangulation, entire area to be surveyed is covered with a framework of triangles. For the triangle, the length of the first line, which is measured precisely is known as Base line.
  • 2. Operation of Triangulation Survey Steps for executing triangulation project The field work of a triangulation project is carried out in the following well defined operations: 1. Reconnaissance 2. Erection of Signals & Towers 3. Measurement of Horizontal Angles 4. Astronomical Observations Necessary to Determine the True Meridian and the Absolute Positions of the Stations 5. Measurement of Baseline 6. Adjustment of observed Angles 7. Computations of Lengths of each side of each triangle 8. Computations of the Latitude and Longitude of ST
  • 3. Conditions for selecting ground stations Reconnaissance 1. Examination of the country to be surveyed. 2. Selection of most favorable sides for base lines 3. Selection of suitable positions of stations 2. Selection of Station: The selection of station is based upon the following consideration. 1. The stations should be clearly visible from each other. For this purpose highest commanding positions such as top of hills or mountains is selected. 2. They should form well shaped triangles (angles > 30 deg) 3. They should be easily accessible 4. They should be useful for detail survey 5. Thy should be so fixed that the length of sight is not too short or too long
  • 4. Conditions for selecting ground stations 3. Inter-visibility and Heights of Stations: For inter-visibility of two stations they should be fixed on highest available ground. Such as mountain peaks rides or top of hills when the distance b/t the two stations is great and the difference in elevation b/t them is small then it is necessary to raise both the instrument and signal to overcome the curvature of the earth and to clear all the intervening obstruction. The height of both the instrument and signal above the ground depends upon. 1. Distance between the stations. 2. Relative elevations of stations. 3. The profile of intervening ground.
  • 5. Applications of Triangulation Survey Following are some applications of triangulation survey: * Establishing accurately located control points for plane and geodetic surveys of large areas. * Establishing accurately located control points in connection with aerial surveying * Accurate location of engineering projects such as Centre lines, terminal points and shafts for long tunnels, and Centre lines and abutments for long span bridges. Triangulation Systems A system consisting of triangulation stations connected by a chain of triangles. The complete fig is called triangulation system or triangulation figure. The most common type of figures used in a triangulation system are Triangles Quadrilaterals Polygons
  • 6. Triangulation Systems Triangles System: simple, economical but least accurate system. Triangles 1. A chain of triangles is very rapid and economical when a narrow strip of terrain is to be surveyed. 2. Angles less than 30o or more than 120o are not permitted 3. For well-conditioned triangles, angles should not be less than 30o or more than 120o .
  • 7. Triangulation Systems Quadrilaterals System: most accurate system as the number of checks are more. Quadrilaterals 1. These afford an excellent system since the various combinations of sides and angles can be used to compute the lengths of required sides, and checks can be made frequently 2. The best quadrilateral is square. A quadrilateral with both diagonals having no station at their intersection is usually employed. 3. This is best suited for hilly areas.
  • 8. Triangulation Systems Polygons: Accurate since more checks are there. Polygons 1. When areas that are very wide in proportion to their lengths are to be surveyed then pentagonal or hexagonal figures may be economical. 2. These may or may not have a central station.
  • 9. Intersection Method The triangle is the simplest unit of the triangulation net. We start with a Base Line with known azimuth and precise length. All angles of the triangle are measured and should be adjusted to sum to 180. At least on end point of the base line should have known ground coordinates: E and N or X and Y.
  • 10. Intersection Solution Given Coordinates of A and B; Observed angles α and ß: To compute coordinates of point P: Xp and YP Y, N P (XP, YP)? B ß α A X, E
  • 11. Intersection Solution 1- Calculate departure and latitude of line AB ΔXAB = XB – XA; ΔYAB = YB – YA, which are necessary for determining bearing AZAB (ƟAB) and the length DAB of side AB: 1.1 DAB = √ (ΔXAB 2 + ΔYAB 2) 1.2 Azimuth of AB = AZAB or (ƟAB) = arctan (ΔXAB /ΔYAB); 2-Use the Sine rule to calculate the length DAP from triangle ABP: DAP / sinβ = DAB / sin (α + β) ⇒ DAP = DAB•sinβ / sin (α + β) 3- Calculate the bearing (azimuth) of the side AP: AZAP = AZAB + α, 4- Calculate Northing and Easting differences (departure and latitudes) using the length and bearing of the side AP: ΔXAP = DAP cos AZAP ; ΔYAP = DAP sin AZAP 5-The final coordinates of point P: XP = XA + ΔXAP and YP = YA + ΔYAP
  • 12. Check Intersection Solution Calculation of coordinates of P can be carried out using length and azimuth of BP and coordinates of B to check the previous results: 1- Length of side BP: DBP / sinα = DAB / sin(α + β)⇒ DBP = DAB•sinα / sin(α + β) 2- Bearing or Azimuth of side BP: AZBP = AZBA – β; AZBA = AZAB – 180o 3- North and East differences using the length and bearing of the side BP: ΔXBP = DBP cos AZBP ΔYBP = DBP sin AZBP 4- The final coordinates of point P: XP = XB + ΔXBP and YP = YB + ΔYBP This should be exactly equal to coordinates of P computed from station A
  • 13. Intersection Formula The following formulae are called intersection formula, used to calculate coordinates of P by directly substituting the given and observed data: NP = {EA – EB + NA cot β + NB cot α} / [cot α + cot β] EP = {NB - NA + EA cot β + EB cot α} / [cot α + cot β] NOTE: Direct substitution should be done when observing A and B from P should be seen clockwise direction. This means standing at P observing A, you have to turn clockwise to observe B. Example: A and B are ground control points of coordinates: A(200.00, 400.00)m and B(500.00, 600.00)m. Angles observed at A and B towards station P (almost east of A) are 65o 00’ 00” and 67o 00’ 00” respectively, compute coordinates of P.
  • 14. Resection Solution When an unknown coordinates station (P) is occupied by an angle observation instrument and directions to three control points are observed from this station, the procedure to calculate coordinates of this point is known as Resection solution or three points problem. If coordinates of A, B and C are known Directions PA, PB and PC are observed to determine angles α and ß Required are coordinates of P Many solutions are available One solution will be discussed here. The key for this solution is to calculate angles x (CAP) and y (PBC)
  • 15. Resection Solution * First step: Using coordinates of A, B and C solve triangle ABC (Lengths of sides and angles of the triangle: AB, BC, CA, <ABC, <BCA and <CAB) Using Pythagoras theory for sides and cosine rule for angles * To compute unknown angles x and y, two equations are needed: Angle equation and side equation First equation, Angle Equation Denoting the (unknown) angles CAP as x and CBP as y, angle ACP = C, can be determined from given coordinates of control points. From the angles of the quadrilateral PACB, x + y = 2π – α – β – C = k1 ………. (1) k1 = 2π – α – β – C is thus a known value, and we can write equation (1) as: y = k1 – x
  • 16. Resection Solution Second Equation: Side Equation Applying the law of sine in triangles PAC and PCB we can express PC in two different ways: From the above relation: sin x / sin y = BC sin α / AC sinβ = k2 (2) K2 = BC sin α / AC sinβ is also a known value. With this substitution the equation can be written: sin x = k2 sin y We now need to solve these two equations in two unknowns. Once x and y are known the various triangles can be solved straight forward and intersection method can be used to determine the position of P.
  • 17. Resection Solution Solution of the two equations to give x and y: 1- compute constants k1 and k2 2- Substituting (1) in (2): sin x = k2 sin (k1 – x) sin x = k2 [ sin k1 cos x - cos k1 sin x ] Dividing both sides by cos x, tan x = k2 [sin k1 - cos k1 tan x], hence: tan x [1 + k2 cos k1] = k2 sin k1 tan x =k2 sin k1/[1 + k2 cos k1]; 3- Substitute values of k1 and k2 to calculate x and y: x = tan-1 {k2 sin k1/[1 + k2 cos k1]} y = k1 –x 4- Check the solution: In ∆ ACP, <ACP = C1; In ∆ BCP, <BCP = C2; C1 + C2 = C, already calculated in ∆ABC; also 180 – (α +C1) = x and 180 – (ß + C2
  • 18. Resection Solution 5- In ∆APC, coordinates of A and C are known; angles x and C1 are known, use intersection solution to solve for coordinates of P 6- Check: In ∆BPC, coordinates of B and C are known; angles y and C2 are known, use intersection solution to solve for coordinates of P Example: A theodolite was adjusted at station P and angles APC and CPB were observed and recorded as: 109.3045o and 115.0520o respectively. Ground coordinates of stations A, B and C are respectively given as: A(1000.00, 5300.00); B(3100.00, 5000.00); C(2200.00, 6300.00)m Compute the coordinates of station P. C P(E, N)? y P x A B
  • 19. Trilateration Survey * With the introduction of EDM it became more practical to measure lengths of sides of triangles in triangulation nets rather than angles. * The process will be faster and give accurate results. This is called Trilateration. * For a triangle ABC where AB is the base line (with length and azimuth precisely known) sides BC and AC will be measured using EDM. * Angles of triangle can be calculated using cosine rule. * Intersection solution can be applied to Compute coordinates of station C.
  • 20. Trilateration Survey * Having calculated coordinates of C, length of BC can be computed and used as base line for next triangle BCD. * For a neighboring triangle BCD, sides BD and CD are measured. * Angles of triangle BCD can be computed using cosine rule. * Again applying intersection solution will allow computing coordinates of D. Example Trilateration was carried out to observe sides of triangulation net ABQP, including Base line AB whose azimuth was known to be 60o 00’ 00”. Observed sides lengths are: AB = 360.00m; BP = 440.00m BQ = 320.00m; QP = 480.00m; PA = 450.00m Assuming control point A(100.00; 250.00)m, compute: coordinates of B, C and D.