SlideShare une entreprise Scribd logo
1  sur  9
1. Objective:
A TelecomProfessional with a strong background in Managed Services, Implementation and Project
management,acquiredthroughmore thanSix yearsof local andinternational experience in the field.
To effectivelyserve the organizationtothe bestof myabilities,utilize my skills and knowledge to the
maximum and to constantly improve as a professional employee. Determined to deliver the job as
deemed fit and achieve the results as desired for the benefit of the company
2. PROFILE SUMMARY
6 Year’s expertise in service & maintenance engineering, Telecom engineering, preventive
maintenance.Resultdrivenprofessional with ability to master new technologies, apply full range of
technical capabilitiesandbuildexcellentrapportandworkrelationshipwithmanagement, colleagues
and clients.Holdsexcellenttechnical expertise,clienthandling,analytical, problem solving, planning,
organizing and supervision, communication and time management skills.
3. Worked On Below Projects:
 Managed Services Telecom (BSS&TXN) Team Leader for Seder In (Region-6 Zain-MS
Project) Saudi (KSA).
 STC 4G3 Swap Project in South Region Saudi (KSA).
 Managed Services Telecom Team Leader (Sr. Engineer) for Mobiserve Limited In
Pakistan (Center Region C-4).
 Managed Services Telecom (FME/Operation Engineer) For Egyptian Pakistani
Telecommunication Services Company (EPTSC ) In Pakistan (Center Region C-4).
Engr. Arslan Sarwar
Address: Near Utility Store Moh. Allahabad
Wazirabad
Contact # 00966559066045
# 00966590484885
engr.arslansarwar@gmail.com
Managed Services Telecom (BSS&TXN) Team Leader for Seder In (Region-6 Zain-MS Project)
Saudi (KSA).
Main job responsibilities are:
 24x7 coordinationwiththe FMEs(FieldMaintenance Engineer) tomake sure smooth runningof
operational activates innetwork ZainMSSouthProject.
 Monitorthrough Huawei WFMS/OWSandRTTS systemthe performance of eachFME and make sure
the clearance of networkrelatedoutageswithinSLA.
 Coordinate withourFME duringthere onsite trouble shootingof outagesof BTSand transmission
systemprovide themtechnical supportandguide theminresolvingthe issues.
 Do randomsite visittocheck if FME isdoingqualityPMRsand alsohelpFME in the fieldbygoingon
site incase of major outagesandcritical issues.
 Accesslettersfollow-upwithfiledTeamsandZainSMT till ensure the availability
 PlanPMR activitiesasperHuawei standardforeach MC andmake sure the completionof PMRwithin
the targetedtime andprovide PMRreport to Zainas perthere standardwiththe targetedtime.
 Coordinate withZainNOCandwithour Frontoffice andBack office Engineersondailybasisregarding
networkrelatedoutage andmake reportregardingNetworkavailabilityinmyregionondaily,weekly
and monthlybasis.
 Responsible tomaintainStandardStockLevel (SSL) in eachMC usingHuawei iCare systemand
coordinate withthe warehouse coordinatorstomake sure all StockTrackers (ST) andZero StockList
(ZSL) are available andupdatedondailyandweeklybasisandinsure all critical spare mustbe available
inall MCs incase if it isneededduringthe outages.
 Responsible toupdate NetworkDataTrackers(NDT) regardingBTSsite and transmissionsystemin
case of any change innetworkduringsite visits.
 Responsible forthe acceptance (PAT) of newlyimplementedsite throughFMEsineachMC as per
standardprovidedbythe operator.DuringPATcoordinate withothersubconandoperatorteamsto
resolve the snagsof site duringimplementation.
 AttendmeetingwithROteamsandVendersregardingROplansinstallationactivities andmake sure
qualityof installationmustbe aspercustomer slandered.
 Make plansforany emergency ROactivitiescustomerneedFLMsupportto resolve the issueon
urgentbasis
 Coordinate withthe fieldteamduringsurveyforthe accurate informationfromthe site.
 Complete targetedTaskof reportasper Assignbythe Huawei ondailybasis.
 Responsible forofflinesubmissionof TSSRto Huawei Technical surveyteam.
 Responsible forthe onlinesubmissionof TSSRonHuawei ServerandNew Huawei online SIDdatabase
software.
 Responsible forcoordinationwithHuaweiandSTCRF and MW technical teamincase of any query
regardingTSSRcorrectionand resubmission(onlineandoffline).
 Responsibletoprovide complete supporttoHuawei andSTC BSS andMW installationteamthrough
Huawei personincase of anyqueryregardingexistingandpropose database of anysurveyedsite.
 Responsible forthe submissionof FP(FloorPlan) asperSTCstandard forapproval whichwill be used
by installationteamduringswapornew site implementation.
 Make plansforthe fieldteamforthe implantation of site forSwapandFTK for STC 4G3 project.
 AttendmeetingwithVenderandoperatorqualityof workandtargetsneedtobe achieved daily
weeklyandmonthlybasis.
ZAIN R6 NOKIA & NEC / NSN (BSS-TL) In Hand Experience
 Commissioning&MaintainingNokia2GFlexi Multi RadioBTS(ESMB, ESMC & FXDB).
 CommissioningMaintainingNokia3G& 4G Flexi BTS(FSMF.FRGT,FXEB).
 TroubleshootingonNokiaflexi 2GEDGE BTS.
 Trouble shootingNOKIA FIU19Hooper.
 CommissioningandIntegratingSites.
 Systemmodule andRFmodule Software upgradation.
 Configurationof Site Externalalarmsphysicallyandlogically.
 Networkprotocol Analyze byusingWire sharkSoftware.
 PingtestfromBTS to BSCand RNC.
 TroubleshootingNOKIA internalAlarms.
 SolvingVSWRandRSSIissue.
 SolvingSectorswapandTX RX downissues.
 Networkprotocol Analyze byusingWire sharkSoftware.
 Installationandconfigurationof SBT,RCU and MHA.
 ConductingQC(qualitycontrol) of GSMsites&Microwave links.
 ConductingLOSsurveyforthe operatorof ZAIN.
 ConductingPATwithcustomersof ZAIN.
 TroubleshootingSiemensOptimizationAlarms,Swappingof VSWR,Call Drop,HighTCCH
 Installation&upgrade Microwave links(NECNEO&iPASOLINK200/400 & 1000).
 Upgrade NECMW links.
 CreatingMW linktopologyring,startand chain.
 Installing1+0,1+1, XPIC(2+0,2+2,4+0) & Space diversityLinks,
 ObtainingDesignedRSL.
 TestingandsolvingBERusingBER analyzer
 Making backto back connectionsbetweenIDU’s.
 Configure newVLAN andIPstomake linksvisible.
 Shiftingtrafficfrom1 IDU to anotherIDU.
 Configure PacketlayersandPhysical Layersfortraffic.
 Making E1 cross connections.
 TestingE1’s usingE1 analyzer.
 PerformingOAMtests, Continuitycheck,LoopBackand LinkTrace.
 Configure Aux interface toconnectHKInputand HK CTRL alarms.
STC 4G3 Swap Project in South Region Saudi (KSA).
 Performmore than1000 SitesSwapActivityof multipleVendors(ZTE,NSN) inthe SouthRegionof
Saudi Arabia(Jizan,Albaha,Assir,Makkah,Najran)
 ProjectManagement,RiskManagement,Planningandmanagingprojectdeliverables
 Guidesthe site engineersonsite implementation.Trouble shootingscenariosmake appropriate
resource arrangement.Coordinatetechnical detailswithcustomer
 Logisticsandmaterial monitoring.Make sure all site requirementsare metduringimplementation.
 Be a pointcontact withinProjectteams,Implementationpartnersandcustomersduring
implementation.
 Prepare the Swapplanand manage the site audit,migration,Swapsite schedulesandpartner
management.Evaluate Swapcapabilitiesof the projectteamandpartners
 PublishPlanandDailyProgressReporttothe CustomerandHuawei HigherManagement
 Regularmeetingwithcustomerforupdate,progressreportingandissuesthatwouldaffectthe built
plan.
 MonitoringPre-PAT&PATActivityforSwappedSites.Site Acceptance andhandovertocustomerfor
invoicingpurposes
Managed Services Telecom Team Leader (Sr. Engineer) for Mobiserve Limited In Pakistan
(Center Region C-4).
Working as a senior Engineer with having the following responsibilities
 As a POCof commercial power&logisticissuesforwholeC-IV.
 Responsible tomaintainthe smoothrunningof the workingwithnodelay of WAPDA relatedissues.
 As a Zonal Teamleadfor Zone0-09.
 Responsible tomaintainthe KPI’s ( CSSR,IHSR,TCH Unavailability&Call blocking) of the networkas
perthe standardssetby the clients.
 Fullyresponsibletomanage the physical resources& technical supporttofieldteams.
 Responsible toperformthe giventaskwithinthe minimumbudgetallocatedforthe specifictasks.
 To make sure the successful completionof PM/CMschedule every month.
Managed Services Telecom (FME/TL) For Egyptian Pakistani Telecommunication Services
Company (EPTSC ) In Pakistan (Center Region C-4).
 Responsible forall the Managementissuesincludingresources,spare,vehicle &manpower. Supervise
all the Generators& Overhaulingissues.Supervise preventive andCorrective maintenance.Attend
meetings onweeklybasis toCustomer(PMCL) regardingthe overallprogress&qualityof networkin
our domain.Take full responsibilitiesof regional teamlead duringhisleaves.


Operation Engineer (FME) :
 Maintenance of all the sites whichare underEPTSC in CenterI.
 Attendance inmeetingstofulfill the customer’srequirements,any technical issue, andforthe
signature of Service CompletionCertificate(SCC).
 Personof Contact (POC) of all type of issuesBSS,Deployment,Operation, Fueling&Generator
OverhaulinginC-I.
 Workedas person of Contact (POC) of commercial power&Logisticissue inwhole Center- I.
 Analyzed the daily RSL, Continuous Fluctuation,Fueling,Security Reportsandforwardthe issue to
urgentrectificationsandtake feedbackfromClusterEngineers.
 Responsible forthe arrangementof resources,manpower&technical Sparestofulfillthe project
requirements inthe estimatedtimeline withthe approval of Regional Manger.
 Responsible formaking the Monthly Preventive Maintenance Plantovisit all the sitesinone cycle &
Corrective Maintenance ondailybasisincludingpendingcaseswith MTTRcases on Priority.
 Supervisionof PMto cover the maintenance of everyequipmentregarding Telco&NonTelco
includingGSMequipmentsuchasBTS Cabinets,Microwaves(ODUandIDU), Gen-sets, Rectifiers,
Propergrounding of everyElectrical Equipment&Patchingof DDF Panel foralarmsgenerationetc
withinthe GSMPowerstandards.
 Supervision maintenance of all kindof GeneratorsLP(17 KVA), CM(27 KVA),HP(20 KVA),JohnDeer
(31 KVA) andDJ (30 KVA),GJ(9 KVA).
 Supervision of Maintenance likeATSPanel,Rectifier,ACs if anyproblemOccurs.
 Knowledgeof Relay open/closepoints,timersopen/close points,CircuitBreakerof all kinduse inATS.
 Well knowledge of UVTrelaysettingandtheirconnectiontooperate the ATSasper requirementand
standardto keepthe equipmenthealthy.
 Supervisionof GeneratorsOverhaulingdue tohighConsumptionof Engine Oil,Smoke andabnormal
sound.
 Managing the one whole Region CI includingExpenditure,technical Issues, Official work,Spares&
dealingwith the Operator.
 Hands onexperienceof Huawei, Motorola, &Alcatel LucentBTSequipment’s &NECPASOLINK,NEC
NEO,iPASOLINK Microwave equipment.
 Troubleshooted anytype of problemsoccursonthese sites.
Power Systems:
 Stronggrip to rectifythe Rectifieralarmslike Major,Minor,Low Voltage,HighTemperature,
Temperature Coefficientsetc.
 Hands onexperienceonall type of rectifierslike Delta,Emerson,ELTEK(Flatpack),SaftPower&
ASCOM.
 Complete configuration&settingof Delta1200, 2000 & 2400 rectifiers.
 Complete configuration&settingof Emerson1500, 1800 rectifiers.
 Complete Voltage andampere settingof all type of rectifierinstalledonMOBILINKcell sites.
 Repairingof RectifierModulesof type Delta1200 & Delta2000.
 Complete LVDsettingof rectifier.
 Linkconnectionsbefore LVDtoavoidthe outagesof the linkedsites.
 Huawei Powercube necessarytroubleshootingandconfigurationsetting.
Power Cube Installation
 PowerCube installation,Configurationandtrouble shouting.
BSS & Transmission Engineer
 Installation &commissioningof NECMicrowave Equipments(PDH,SDH,Diversity) forMobilink.
 Performedconfigurationandtestingof NECPASOLINK transmissionequipmentusinghyperterminal,
PNMT & PNMTj software’s.
 Troubleshootingof all kindof SDHand PDH TransmissionEquipment
 Install andreplace all type of BTS and MW equipments.
 Install the Space Diversityand Frequency Diversity Microwave linksandcheckingthe complete path
till BSC.
 Performthe Surveyof Cell Sites.
 Loop back testingonthe BSC Transmission&cell sites.
 Resolvingtechnical issueatsite,andto maintainthe hardware installationqualitystandards.
Huawei BTS
 3G trouble shoutingatHuawei BTS
 Complete troubleshootingof BTS3900, BTS3900A, DBS3900.
 Alarmpatchingof BTS3900 internally&externally.
 Well familiarwiththe functionalityof GTMU, UPEU & UPIU cards in BTS 3900 BTS cabinet.
 Troubleshootingof available alarmswhicheffectthe communicationbetweensite&subscribers.
 Hands onexperienceonHuawei BTSsoftware toverifythe site alarmsstatus.
 Complete verificationandtroubleshootingof VSWRalarmson RRU.
Motorola BSS:
 Well familiarwiththe applicationsof H2SCcard, Alarm card, XMUX card, & CBC card.
 Complete calibrationof MotorolaCTU’sby usingthe signal generatorandAnritsuSite Master.
 Troubleshootinganytype of problemsoccursonthese sites.
 Troubleshootingandrectificationof IASandDRI alarms.Compilingdailyactivityreportandshare with
management.
 Rectificationof QoSissues.Mainissuesare INHSR,CSSR,zerocall, HighIOI,BER and RF losseson
differentcells.
 Troubleshootingof all type of alarmsusingProcom& MERMER software’s byreviewingthe historyof
alarmsin logs.
 To performthe loop/breaktestfromthe site to BSC withoutthe NOCinterventionusingthe
ProComm& MermerV-6.04software’s.
 Complete statscheckingof traffic&callingcountinMotorola equipment.
Alcatel Lucent BSS:
 Complete offline commissioningof Alcatel BTSEvoliumseries.
 Hands onexperienceon Alcatel software’s B9& B10 series todiagnosingthe internal&external
alarmsappearingonterminals.
 Complete settingof TRE’sas perthe definedRSLvaluesinappropriateslots.
 Replacement&installationof the faultyormalfunctioninghardware’slike SUMA,Combiners,Fan
trays,TGT’s & TRE’
Microwave & TXN:
 Huawei RTN 310 and 910 and ATN
 Huawei RTN (600/900 Series) installation,commissionandMicrowave alignment
 Huawei RTN 900 series(910, 950) installationandCommissioningforTelenorswap
 Huawei BTS 3900, 3900A and DBS 3900 Installationandcommissioning
 VSWRTroubleshootingandD.T
 TelenorRadioSwap
 AlarmPatching/Testing
 DesignandSurveysfortransmissionshifting(TMCand Mini-shelter) andindoortooutdoorshifting
 Site integrationfromBSCto site usingphysical andlogical channels
 E1 patchingand sharing
 Implementationof APM200 of Huawei
 InstallationandCommissioningof APM200
 Installationandcommissioningof RRU
 Huawei BTS 3900 (DBS3900) InstallationandcommissioningforCMPAKROLLOUTsites
 Participated inHuawei trainingforRTN (900 series)
 BERT Testing
 RTN (600/900) installationandcommissioningforCMPAKRolloutsitesinNorthregion.
 Rectifierinstallationandcommissioning
 Sectorexpansionin900 and 1800 antennasinexistingsitesforCMPAKusing DRRUsandGRRUs
 FaultrectificationonLive site
 SweepTestusingSite analyzer(BIRD,Anritsu)
 Prepare sitesforacceptance
 ConductsurveysforMobilinkSwapPhase-IV
 Stronggrip on NECM/W links(NECPasolink-V4, SDH,PDH,NEC-NEO, NEC STM, NEC Compact,MX
link,iPASOLINK).
 Familiarwithall type of LinkalarmsinNEC & Alcatel equipmentlikethe critical are Low BER, HighBER,
DEM, Threshold,ChannelLossetc.
 ExperiencedonPNMSj terminal
 Experiencedon10G, 18G M/W links.
 ExperiencedonAlcatelM/Wlinks.
 ExperiencedonAlcatel NMS1353
 Hands onexperienceonall sortsof E1/T1 Testingprocesses.
 Hands on experience on Alcatel/LucentTechnologiesATMEquipment
 Resolvinginterference&fadingissuesinM/Wlinks indifferentenvironment&seasons.
 ProvidingTransmissionSupporttoLevel-1teamsthroughoutthe region,fortrouble shooting of
microwave equipment.
 Microwave complete healthcheckonmonthlybasis.
 Microwave interference checksandproposals fortheirsolutions.Complete weatherproofingof RF&
ODU connectorsas per Andrew’srule tomake itlongtime.
 Complete configuration&installationof all typesof NEC& Alcatel links.
Training & Workshops:
 Successful trainingof Huawei BTS3900/DBS3900 at Cityat TowerHuawei
 Successful trainingof Huawei RTN905/950/980 3G WCDMA RAN Cityat TowerHuawei
 Successful trainingof 3GWCDMA RAN Cityat TowerHuawei
 Successful trainingof NetworkSafety/CyberSecurityatCityTowerHuawei
 NEC TrainingCertificate fromNECCorporationSaudi Arabia
 iPASOLINK200/400/400A/1000
 EHS Trainings
 MM Certificate Trainings
 Huawei PassportTrainings
 PPE Toll Awareness
Personal Profile:
 Father’sName: Ch. GhulamSarwar
 Marital Status: Married
 Date of Birth: 02-01-88
 CNIC: 34104-7302804-5
 Nationality: Pakistani
 Religion: Islam
 LinguisticSkills: Urdu, English,Punjabi,Pashto,Hindko
 PEC Registration#: Telecom/4351
References:
 Bilal BashirHuawei National MangerKSA (00966594770300)
 AbidKamal Huawei National MangerKSA (009668438274)
 Ehsan Ali SederR-6Manager KSA (0966555962146)

Contenu connexe

Tendances (19)

Sachin_Makwana
Sachin_MakwanaSachin_Makwana
Sachin_Makwana
 
RESUME Falcone_Ronald.MAR2016
RESUME  Falcone_Ronald.MAR2016RESUME  Falcone_Ronald.MAR2016
RESUME Falcone_Ronald.MAR2016
 
BI CV 6 June 2016 [448161]
BI CV 6 June 2016 [448161]BI CV 6 June 2016 [448161]
BI CV 6 June 2016 [448161]
 
FRANK BALLESTERO Resume 3-5-2015
FRANK BALLESTERO Resume 3-5-2015FRANK BALLESTERO Resume 3-5-2015
FRANK BALLESTERO Resume 3-5-2015
 
Sanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTESanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTE
 
ATUL.DOC
ATUL.DOCATUL.DOC
ATUL.DOC
 
PREETHI_4.5yrs Exp
PREETHI_4.5yrs ExpPREETHI_4.5yrs Exp
PREETHI_4.5yrs Exp
 
Joseph Kuttemperoor Jan2011 New
Joseph  Kuttemperoor Jan2011 NewJoseph  Kuttemperoor Jan2011 New
Joseph Kuttemperoor Jan2011 New
 
zia_mehdi_cv
zia_mehdi_cvzia_mehdi_cv
zia_mehdi_cv
 
SK_RF ENGR@NETKOM 2016
SK_RF ENGR@NETKOM 2016SK_RF ENGR@NETKOM 2016
SK_RF ENGR@NETKOM 2016
 
Archana Mishra Resume
Archana Mishra ResumeArchana Mishra Resume
Archana Mishra Resume
 
Resume
ResumeResume
Resume
 
Ibrahim AlGhamdi CV
Ibrahim AlGhamdi CVIbrahim AlGhamdi CV
Ibrahim AlGhamdi CV
 
Shiv CV
Shiv CVShiv CV
Shiv CV
 
Amith Kumar S N_BE_4.10Years_IMS and SIP Testing
Amith Kumar S N_BE_4.10Years_IMS and SIP TestingAmith Kumar S N_BE_4.10Years_IMS and SIP Testing
Amith Kumar S N_BE_4.10Years_IMS and SIP Testing
 
Sabir Ahmed Khan_Tech_Lead_Updated
Sabir Ahmed Khan_Tech_Lead_UpdatedSabir Ahmed Khan_Tech_Lead_Updated
Sabir Ahmed Khan_Tech_Lead_Updated
 
Jeff Moffett Resume SEPT 2015
Jeff Moffett Resume SEPT 2015Jeff Moffett Resume SEPT 2015
Jeff Moffett Resume SEPT 2015
 
Thomas Hooton Resume
Thomas Hooton ResumeThomas Hooton Resume
Thomas Hooton Resume
 
tahir.resume
tahir.resumetahir.resume
tahir.resume
 

En vedette

Antonio Mims Slide Show
Antonio Mims Slide ShowAntonio Mims Slide Show
Antonio Mims Slide Show
guest4842f99
 
26º domingo tob 2015 bene pagola
26º domingo tob 2015 bene pagola26º domingo tob 2015 bene pagola
26º domingo tob 2015 bene pagola
nuria04
 
ChemBio Hub demostration guide
ChemBio Hub demostration guideChemBio Hub demostration guide
ChemBio Hub demostration guide
Adam Hendry
 
iiDの日本企業のグローバルサイトケーススタディー
iiDの日本企業のグローバルサイトケーススタディー iiDの日本企業のグローバルサイトケーススタディー
iiDの日本企業のグローバルサイトケーススタディー
ideas in digital
 
Haus gasteinertal-restaurant
Haus gasteinertal-restaurantHaus gasteinertal-restaurant
Haus gasteinertal-restaurant
alberat22
 

En vedette (14)

BULDAN TUGAS SITK
BULDAN TUGAS SITKBULDAN TUGAS SITK
BULDAN TUGAS SITK
 
Antonio Mims Slide Show
Antonio Mims Slide ShowAntonio Mims Slide Show
Antonio Mims Slide Show
 
26º domingo tob 2015 bene pagola
26º domingo tob 2015 bene pagola26º domingo tob 2015 bene pagola
26º domingo tob 2015 bene pagola
 
CMOA This Season_MayAug12
CMOA This Season_MayAug12CMOA This Season_MayAug12
CMOA This Season_MayAug12
 
Branding 07152010
Branding 07152010Branding 07152010
Branding 07152010
 
Foshay Social Media Basics
Foshay   Social Media BasicsFoshay   Social Media Basics
Foshay Social Media Basics
 
Deferimento
DeferimentoDeferimento
Deferimento
 
Verboden Tranen 5
Verboden Tranen 5Verboden Tranen 5
Verboden Tranen 5
 
Тәуелсіз елге – білімді ұрпақ
Тәуелсіз елге – білімді ұрпақТәуелсіз елге – білімді ұрпақ
Тәуелсіз елге – білімді ұрпақ
 
ChemBio Hub demostration guide
ChemBio Hub demostration guideChemBio Hub demostration guide
ChemBio Hub demostration guide
 
Membrana y transporte celular
Membrana  y transporte celularMembrana  y transporte celular
Membrana y transporte celular
 
iiDの日本企業のグローバルサイトケーススタディー
iiDの日本企業のグローバルサイトケーススタディー iiDの日本企業のグローバルサイトケーススタディー
iiDの日本企業のグローバルサイトケーススタディー
 
Fun Fitness Globetrotters -- Group Tours
Fun Fitness Globetrotters -- Group ToursFun Fitness Globetrotters -- Group Tours
Fun Fitness Globetrotters -- Group Tours
 
Haus gasteinertal-restaurant
Haus gasteinertal-restaurantHaus gasteinertal-restaurant
Haus gasteinertal-restaurant
 

Similaire à Arslan Sarwar_CV (20)

CV - Rashid
CV - RashidCV - Rashid
CV - Rashid
 
Sanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTESanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTE
 
Waqas_Abbasi
Waqas_AbbasiWaqas_Abbasi
Waqas_Abbasi
 
CV (Glemm R. Ambubuyog)
CV (Glemm R. Ambubuyog)CV (Glemm R. Ambubuyog)
CV (Glemm R. Ambubuyog)
 
Arshad Masih -Resume
Arshad Masih -ResumeArshad Masih -Resume
Arshad Masih -Resume
 
Tanveer iqbal mohammad_cv
Tanveer iqbal mohammad_cv Tanveer iqbal mohammad_cv
Tanveer iqbal mohammad_cv
 
Mir Ahmed Raza
Mir Ahmed RazaMir Ahmed Raza
Mir Ahmed Raza
 
GOPALAKRISHNAN
GOPALAKRISHNANGOPALAKRISHNAN
GOPALAKRISHNAN
 
CV Hamed Sabbah
CV Hamed SabbahCV Hamed Sabbah
CV Hamed Sabbah
 
priyank _cv
priyank _cvpriyank _cv
priyank _cv
 
LOKESH YADAV RESUME
LOKESH YADAV  RESUMELOKESH YADAV  RESUME
LOKESH YADAV RESUME
 
Sanjer Jilani (CV)(1)
Sanjer Jilani (CV)(1)Sanjer Jilani (CV)(1)
Sanjer Jilani (CV)(1)
 
Sajal CV
Sajal CVSajal CV
Sajal CV
 
CV_A_Fawad_Siddiqui
CV_A_Fawad_SiddiquiCV_A_Fawad_Siddiqui
CV_A_Fawad_Siddiqui
 
Resume
ResumeResume
Resume
 
Biswadeepaka Tripathy my new CV
Biswadeepaka Tripathy my new CVBiswadeepaka Tripathy my new CV
Biswadeepaka Tripathy my new CV
 
CV_Anuj Nagar_V4
CV_Anuj Nagar_V4CV_Anuj Nagar_V4
CV_Anuj Nagar_V4
 
Prabal_CV
Prabal_CVPrabal_CV
Prabal_CV
 
CV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHITCV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHIT
 
shajeer cv
shajeer cvshajeer cv
shajeer cv
 

Arslan Sarwar_CV

  • 1. 1. Objective: A TelecomProfessional with a strong background in Managed Services, Implementation and Project management,acquiredthroughmore thanSix yearsof local andinternational experience in the field. To effectivelyserve the organizationtothe bestof myabilities,utilize my skills and knowledge to the maximum and to constantly improve as a professional employee. Determined to deliver the job as deemed fit and achieve the results as desired for the benefit of the company 2. PROFILE SUMMARY 6 Year’s expertise in service & maintenance engineering, Telecom engineering, preventive maintenance.Resultdrivenprofessional with ability to master new technologies, apply full range of technical capabilitiesandbuildexcellentrapportandworkrelationshipwithmanagement, colleagues and clients.Holdsexcellenttechnical expertise,clienthandling,analytical, problem solving, planning, organizing and supervision, communication and time management skills. 3. Worked On Below Projects:  Managed Services Telecom (BSS&TXN) Team Leader for Seder In (Region-6 Zain-MS Project) Saudi (KSA).  STC 4G3 Swap Project in South Region Saudi (KSA).  Managed Services Telecom Team Leader (Sr. Engineer) for Mobiserve Limited In Pakistan (Center Region C-4).  Managed Services Telecom (FME/Operation Engineer) For Egyptian Pakistani Telecommunication Services Company (EPTSC ) In Pakistan (Center Region C-4). Engr. Arslan Sarwar Address: Near Utility Store Moh. Allahabad Wazirabad Contact # 00966559066045 # 00966590484885 engr.arslansarwar@gmail.com
  • 2. Managed Services Telecom (BSS&TXN) Team Leader for Seder In (Region-6 Zain-MS Project) Saudi (KSA). Main job responsibilities are:  24x7 coordinationwiththe FMEs(FieldMaintenance Engineer) tomake sure smooth runningof operational activates innetwork ZainMSSouthProject.  Monitorthrough Huawei WFMS/OWSandRTTS systemthe performance of eachFME and make sure the clearance of networkrelatedoutageswithinSLA.  Coordinate withourFME duringthere onsite trouble shootingof outagesof BTSand transmission systemprovide themtechnical supportandguide theminresolvingthe issues.  Do randomsite visittocheck if FME isdoingqualityPMRsand alsohelpFME in the fieldbygoingon site incase of major outagesandcritical issues.  Accesslettersfollow-upwithfiledTeamsandZainSMT till ensure the availability  PlanPMR activitiesasperHuawei standardforeach MC andmake sure the completionof PMRwithin the targetedtime andprovide PMRreport to Zainas perthere standardwiththe targetedtime.  Coordinate withZainNOCandwithour Frontoffice andBack office Engineersondailybasisregarding networkrelatedoutage andmake reportregardingNetworkavailabilityinmyregionondaily,weekly and monthlybasis.  Responsible tomaintainStandardStockLevel (SSL) in eachMC usingHuawei iCare systemand coordinate withthe warehouse coordinatorstomake sure all StockTrackers (ST) andZero StockList (ZSL) are available andupdatedondailyandweeklybasisandinsure all critical spare mustbe available inall MCs incase if it isneededduringthe outages.  Responsible toupdate NetworkDataTrackers(NDT) regardingBTSsite and transmissionsystemin case of any change innetworkduringsite visits.  Responsible forthe acceptance (PAT) of newlyimplementedsite throughFMEsineachMC as per standardprovidedbythe operator.DuringPATcoordinate withothersubconandoperatorteamsto resolve the snagsof site duringimplementation.  AttendmeetingwithROteamsandVendersregardingROplansinstallationactivities andmake sure qualityof installationmustbe aspercustomer slandered.  Make plansforany emergency ROactivitiescustomerneedFLMsupportto resolve the issueon urgentbasis  Coordinate withthe fieldteamduringsurveyforthe accurate informationfromthe site.  Complete targetedTaskof reportasper Assignbythe Huawei ondailybasis.  Responsible forofflinesubmissionof TSSRto Huawei Technical surveyteam.  Responsible forthe onlinesubmissionof TSSRonHuawei ServerandNew Huawei online SIDdatabase software.  Responsible forcoordinationwithHuaweiandSTCRF and MW technical teamincase of any query regardingTSSRcorrectionand resubmission(onlineandoffline).  Responsibletoprovide complete supporttoHuawei andSTC BSS andMW installationteamthrough Huawei personincase of anyqueryregardingexistingandpropose database of anysurveyedsite.
  • 3.  Responsible forthe submissionof FP(FloorPlan) asperSTCstandard forapproval whichwill be used by installationteamduringswapornew site implementation.  Make plansforthe fieldteamforthe implantation of site forSwapandFTK for STC 4G3 project.  AttendmeetingwithVenderandoperatorqualityof workandtargetsneedtobe achieved daily weeklyandmonthlybasis. ZAIN R6 NOKIA & NEC / NSN (BSS-TL) In Hand Experience  Commissioning&MaintainingNokia2GFlexi Multi RadioBTS(ESMB, ESMC & FXDB).  CommissioningMaintainingNokia3G& 4G Flexi BTS(FSMF.FRGT,FXEB).  TroubleshootingonNokiaflexi 2GEDGE BTS.  Trouble shootingNOKIA FIU19Hooper.  CommissioningandIntegratingSites.  Systemmodule andRFmodule Software upgradation.  Configurationof Site Externalalarmsphysicallyandlogically.  Networkprotocol Analyze byusingWire sharkSoftware.  PingtestfromBTS to BSCand RNC.  TroubleshootingNOKIA internalAlarms.  SolvingVSWRandRSSIissue.  SolvingSectorswapandTX RX downissues.  Networkprotocol Analyze byusingWire sharkSoftware.  Installationandconfigurationof SBT,RCU and MHA.  ConductingQC(qualitycontrol) of GSMsites&Microwave links.  ConductingLOSsurveyforthe operatorof ZAIN.  ConductingPATwithcustomersof ZAIN.  TroubleshootingSiemensOptimizationAlarms,Swappingof VSWR,Call Drop,HighTCCH  Installation&upgrade Microwave links(NECNEO&iPASOLINK200/400 & 1000).  Upgrade NECMW links.  CreatingMW linktopologyring,startand chain.  Installing1+0,1+1, XPIC(2+0,2+2,4+0) & Space diversityLinks,  ObtainingDesignedRSL.  TestingandsolvingBERusingBER analyzer  Making backto back connectionsbetweenIDU’s.  Configure newVLAN andIPstomake linksvisible.  Shiftingtrafficfrom1 IDU to anotherIDU.  Configure PacketlayersandPhysical Layersfortraffic.  Making E1 cross connections.  TestingE1’s usingE1 analyzer.  PerformingOAMtests, Continuitycheck,LoopBackand LinkTrace.  Configure Aux interface toconnectHKInputand HK CTRL alarms.
  • 4. STC 4G3 Swap Project in South Region Saudi (KSA).  Performmore than1000 SitesSwapActivityof multipleVendors(ZTE,NSN) inthe SouthRegionof Saudi Arabia(Jizan,Albaha,Assir,Makkah,Najran)  ProjectManagement,RiskManagement,Planningandmanagingprojectdeliverables  Guidesthe site engineersonsite implementation.Trouble shootingscenariosmake appropriate resource arrangement.Coordinatetechnical detailswithcustomer  Logisticsandmaterial monitoring.Make sure all site requirementsare metduringimplementation.  Be a pointcontact withinProjectteams,Implementationpartnersandcustomersduring implementation.  Prepare the Swapplanand manage the site audit,migration,Swapsite schedulesandpartner management.Evaluate Swapcapabilitiesof the projectteamandpartners  PublishPlanandDailyProgressReporttothe CustomerandHuawei HigherManagement  Regularmeetingwithcustomerforupdate,progressreportingandissuesthatwouldaffectthe built plan.  MonitoringPre-PAT&PATActivityforSwappedSites.Site Acceptance andhandovertocustomerfor invoicingpurposes Managed Services Telecom Team Leader (Sr. Engineer) for Mobiserve Limited In Pakistan (Center Region C-4). Working as a senior Engineer with having the following responsibilities  As a POCof commercial power&logisticissuesforwholeC-IV.  Responsible tomaintainthe smoothrunningof the workingwithnodelay of WAPDA relatedissues.  As a Zonal Teamleadfor Zone0-09.  Responsible tomaintainthe KPI’s ( CSSR,IHSR,TCH Unavailability&Call blocking) of the networkas perthe standardssetby the clients.  Fullyresponsibletomanage the physical resources& technical supporttofieldteams.  Responsible toperformthe giventaskwithinthe minimumbudgetallocatedforthe specifictasks.  To make sure the successful completionof PM/CMschedule every month. Managed Services Telecom (FME/TL) For Egyptian Pakistani Telecommunication Services Company (EPTSC ) In Pakistan (Center Region C-4).  Responsible forall the Managementissuesincludingresources,spare,vehicle &manpower. Supervise all the Generators& Overhaulingissues.Supervise preventive andCorrective maintenance.Attend meetings onweeklybasis toCustomer(PMCL) regardingthe overallprogress&qualityof networkin our domain.Take full responsibilitiesof regional teamlead duringhisleaves.  
  • 5. Operation Engineer (FME) :  Maintenance of all the sites whichare underEPTSC in CenterI.  Attendance inmeetingstofulfill the customer’srequirements,any technical issue, andforthe signature of Service CompletionCertificate(SCC).  Personof Contact (POC) of all type of issuesBSS,Deployment,Operation, Fueling&Generator OverhaulinginC-I.  Workedas person of Contact (POC) of commercial power&Logisticissue inwhole Center- I.  Analyzed the daily RSL, Continuous Fluctuation,Fueling,Security Reportsandforwardthe issue to urgentrectificationsandtake feedbackfromClusterEngineers.  Responsible forthe arrangementof resources,manpower&technical Sparestofulfillthe project requirements inthe estimatedtimeline withthe approval of Regional Manger.  Responsible formaking the Monthly Preventive Maintenance Plantovisit all the sitesinone cycle & Corrective Maintenance ondailybasisincludingpendingcaseswith MTTRcases on Priority.  Supervisionof PMto cover the maintenance of everyequipmentregarding Telco&NonTelco includingGSMequipmentsuchasBTS Cabinets,Microwaves(ODUandIDU), Gen-sets, Rectifiers, Propergrounding of everyElectrical Equipment&Patchingof DDF Panel foralarmsgenerationetc withinthe GSMPowerstandards.  Supervision maintenance of all kindof GeneratorsLP(17 KVA), CM(27 KVA),HP(20 KVA),JohnDeer (31 KVA) andDJ (30 KVA),GJ(9 KVA).  Supervision of Maintenance likeATSPanel,Rectifier,ACs if anyproblemOccurs.  Knowledgeof Relay open/closepoints,timersopen/close points,CircuitBreakerof all kinduse inATS.  Well knowledge of UVTrelaysettingandtheirconnectiontooperate the ATSasper requirementand standardto keepthe equipmenthealthy.  Supervisionof GeneratorsOverhaulingdue tohighConsumptionof Engine Oil,Smoke andabnormal sound.  Managing the one whole Region CI includingExpenditure,technical Issues, Official work,Spares& dealingwith the Operator.  Hands onexperienceof Huawei, Motorola, &Alcatel LucentBTSequipment’s &NECPASOLINK,NEC NEO,iPASOLINK Microwave equipment.  Troubleshooted anytype of problemsoccursonthese sites. Power Systems:  Stronggrip to rectifythe Rectifieralarmslike Major,Minor,Low Voltage,HighTemperature, Temperature Coefficientsetc.  Hands onexperienceonall type of rectifierslike Delta,Emerson,ELTEK(Flatpack),SaftPower& ASCOM.  Complete configuration&settingof Delta1200, 2000 & 2400 rectifiers.  Complete configuration&settingof Emerson1500, 1800 rectifiers.  Complete Voltage andampere settingof all type of rectifierinstalledonMOBILINKcell sites.
  • 6.  Repairingof RectifierModulesof type Delta1200 & Delta2000.  Complete LVDsettingof rectifier.  Linkconnectionsbefore LVDtoavoidthe outagesof the linkedsites.  Huawei Powercube necessarytroubleshootingandconfigurationsetting. Power Cube Installation  PowerCube installation,Configurationandtrouble shouting. BSS & Transmission Engineer  Installation &commissioningof NECMicrowave Equipments(PDH,SDH,Diversity) forMobilink.  Performedconfigurationandtestingof NECPASOLINK transmissionequipmentusinghyperterminal, PNMT & PNMTj software’s.  Troubleshootingof all kindof SDHand PDH TransmissionEquipment  Install andreplace all type of BTS and MW equipments.  Install the Space Diversityand Frequency Diversity Microwave linksandcheckingthe complete path till BSC.  Performthe Surveyof Cell Sites.  Loop back testingonthe BSC Transmission&cell sites.  Resolvingtechnical issueatsite,andto maintainthe hardware installationqualitystandards. Huawei BTS  3G trouble shoutingatHuawei BTS  Complete troubleshootingof BTS3900, BTS3900A, DBS3900.  Alarmpatchingof BTS3900 internally&externally.  Well familiarwiththe functionalityof GTMU, UPEU & UPIU cards in BTS 3900 BTS cabinet.  Troubleshootingof available alarmswhicheffectthe communicationbetweensite&subscribers.  Hands onexperienceonHuawei BTSsoftware toverifythe site alarmsstatus.  Complete verificationandtroubleshootingof VSWRalarmson RRU. Motorola BSS:  Well familiarwiththe applicationsof H2SCcard, Alarm card, XMUX card, & CBC card.  Complete calibrationof MotorolaCTU’sby usingthe signal generatorandAnritsuSite Master.  Troubleshootinganytype of problemsoccursonthese sites.  Troubleshootingandrectificationof IASandDRI alarms.Compilingdailyactivityreportandshare with management.  Rectificationof QoSissues.Mainissuesare INHSR,CSSR,zerocall, HighIOI,BER and RF losseson differentcells.
  • 7.  Troubleshootingof all type of alarmsusingProcom& MERMER software’s byreviewingthe historyof alarmsin logs.  To performthe loop/breaktestfromthe site to BSC withoutthe NOCinterventionusingthe ProComm& MermerV-6.04software’s.  Complete statscheckingof traffic&callingcountinMotorola equipment. Alcatel Lucent BSS:  Complete offline commissioningof Alcatel BTSEvoliumseries.  Hands onexperienceon Alcatel software’s B9& B10 series todiagnosingthe internal&external alarmsappearingonterminals.  Complete settingof TRE’sas perthe definedRSLvaluesinappropriateslots.  Replacement&installationof the faultyormalfunctioninghardware’slike SUMA,Combiners,Fan trays,TGT’s & TRE’ Microwave & TXN:  Huawei RTN 310 and 910 and ATN  Huawei RTN (600/900 Series) installation,commissionandMicrowave alignment  Huawei RTN 900 series(910, 950) installationandCommissioningforTelenorswap  Huawei BTS 3900, 3900A and DBS 3900 Installationandcommissioning  VSWRTroubleshootingandD.T  TelenorRadioSwap  AlarmPatching/Testing  DesignandSurveysfortransmissionshifting(TMCand Mini-shelter) andindoortooutdoorshifting  Site integrationfromBSCto site usingphysical andlogical channels  E1 patchingand sharing  Implementationof APM200 of Huawei  InstallationandCommissioningof APM200  Installationandcommissioningof RRU  Huawei BTS 3900 (DBS3900) InstallationandcommissioningforCMPAKROLLOUTsites  Participated inHuawei trainingforRTN (900 series)  BERT Testing  RTN (600/900) installationandcommissioningforCMPAKRolloutsitesinNorthregion.  Rectifierinstallationandcommissioning  Sectorexpansionin900 and 1800 antennasinexistingsitesforCMPAKusing DRRUsandGRRUs  FaultrectificationonLive site  SweepTestusingSite analyzer(BIRD,Anritsu)  Prepare sitesforacceptance  ConductsurveysforMobilinkSwapPhase-IV  Stronggrip on NECM/W links(NECPasolink-V4, SDH,PDH,NEC-NEO, NEC STM, NEC Compact,MX link,iPASOLINK).
  • 8.  Familiarwithall type of LinkalarmsinNEC & Alcatel equipmentlikethe critical are Low BER, HighBER, DEM, Threshold,ChannelLossetc.  ExperiencedonPNMSj terminal  Experiencedon10G, 18G M/W links.  ExperiencedonAlcatelM/Wlinks.  ExperiencedonAlcatel NMS1353  Hands onexperienceonall sortsof E1/T1 Testingprocesses.  Hands on experience on Alcatel/LucentTechnologiesATMEquipment  Resolvinginterference&fadingissuesinM/Wlinks indifferentenvironment&seasons.  ProvidingTransmissionSupporttoLevel-1teamsthroughoutthe region,fortrouble shooting of microwave equipment.  Microwave complete healthcheckonmonthlybasis.  Microwave interference checksandproposals fortheirsolutions.Complete weatherproofingof RF& ODU connectorsas per Andrew’srule tomake itlongtime.  Complete configuration&installationof all typesof NEC& Alcatel links. Training & Workshops:  Successful trainingof Huawei BTS3900/DBS3900 at Cityat TowerHuawei  Successful trainingof Huawei RTN905/950/980 3G WCDMA RAN Cityat TowerHuawei  Successful trainingof 3GWCDMA RAN Cityat TowerHuawei  Successful trainingof NetworkSafety/CyberSecurityatCityTowerHuawei  NEC TrainingCertificate fromNECCorporationSaudi Arabia  iPASOLINK200/400/400A/1000  EHS Trainings  MM Certificate Trainings  Huawei PassportTrainings  PPE Toll Awareness Personal Profile:  Father’sName: Ch. GhulamSarwar  Marital Status: Married  Date of Birth: 02-01-88  CNIC: 34104-7302804-5  Nationality: Pakistani  Religion: Islam  LinguisticSkills: Urdu, English,Punjabi,Pashto,Hindko
  • 9.  PEC Registration#: Telecom/4351 References:  Bilal BashirHuawei National MangerKSA (00966594770300)  AbidKamal Huawei National MangerKSA (009668438274)  Ehsan Ali SederR-6Manager KSA (0966555962146)