Public Health Engineering Department,
Govt of Bihar
Brief Overview
of
The Project
Construction of Mini Piped Water Supply Schemes
with provision of suitable Treatment Technology and
solar pumps in Fluoride affected habitations in Bihar
Arvind Kumar ( DFID- SWASTH)
Ground water is perhaps the most accepted
source particularly in areas where safe and
dependable surface water sources are not
available within easy reach or not available at
all.
Ground water is generally considered as a
safe source but in recent times research and
investigations have shown that quality of
ground water has deteriorated at many
locations thus making it unfit for use for
human consumption. In Bihar excessive
levels of arsenic and fluoride in ground water
have been noticed in many areas.
Public Health Engineering Department, being
conscious of this serious problem has decided
to install small water purification plants for
treating ground water drawn through tube
wells and supplying the treated safe water
local through stand posts to the consumers.
2
Objective of Scheme
SALIENT FEATURES OF THE SCHEME
• Capacity of Plant. - 40000 liters /day
• Borewell Discharge 5100/6000 liters/Hr
• Benefitted Population – 1000
• Per Capita per day Supply of Water- 40 liters
• Operation Time of Plant /day - 8 Hours
• Capacity of Overhead tank - 5000 liters
• Genset for Non Sun days Operation.
• Use of rustproof vessels & pipes.
• Three Months Trial Run , & thereafter Six Months of O& M
3
SEQUENCE OF THE PROJECT CONSTRUCTION
Marking of land
Bore well Construction
Testing of Raw water
Commencement of Civil Work
Completion of Civil Work
Solar Panel Installation
Pipe line & Stand Post Plant Installation
Commencement of Trial Run
Site Selection
5
MAJOR COMPONENTS OF THE PROJECT
SITE DEVELOPMENT & BOUNADRY WALL
WATER (BOREWELL)
TREATMENT PLANT BUILDING
ENERGY (SOLAR SYSTEM)
TREATMENT UNIT
DISTRIBUTION SYSTEM
STAND POSTS
SITE DEVELOPMENT & BOUNDARY WALL
• Plant Building
• Boundary Wall
• Storage System
• Gate
• Approach Road
• Landscaping
6
7
Tubewell
Schematic Drawing
BUILDING
One R.C.C/ Brick Masonary housing Treatment Plant and auxiliary
units. The building has one room Treatment Plant, one room for
Operator , one store and one Toilet with necessary facilities
8
Solar System
9
Submersible Pump
Security features:
• Protection against dry running
• Protection from Over/Under
Voltage
• Protection from Overload
• Protection from Over Temperature
Solar PV module array is of high efficiency Solar Modules utilizing
Crystalline Silicon Solar PV cells. The modules are warranted for power
output conforming to IEC-61215, ISPRA Italy, IECQ (PV-GAP), MNES &
BIS standards.
10
WATER TREATMENT PLANT
SOLAR OPERATED PUMP
OXIDATION CHAMBER
IRON REMOVAL FILTER
ALUM DOSER
FLUORIDE/ ARSENIC REMOVAL UNIT
CONTROL PANEL
SEQUENCE OF TREATMENT PROCESS
PUMPED BY SOLAR PUMP
OXIDATION CHAMBER
IRON REMOVAL FILTER
ALUM DOZER
FLUORIDE REMOVAL FILTER
OVER HEAD TANK
POTABLE WATER AT STANDPOST
FOR VILLAGERS
DISTRIBUTION SYSTEM
Raw water
12
The Treatment System
FLUORIDE
REMOVAL FILTER
IRON REMOVAL FILTER
OXIDATION
CHAMBER
ALUM
DOSING
UNIT
Treatment Plant : A Overview
Components of Treatment Plant…….
• One cylindrical MS/ FRP Vessel
(400 mm dia X 1200 mm) filled with
media
• For oxidizing & removal of Iron from
raw water.
• The high oxidizing capacity catalytic
media is Manganese Dioxide
Granules – 12 mm to 25 mm
(Natural Mineral) for oxidizing iron in
raw water for its quick precipitation in
IRF.
• The system provides for auto
backwash of the filter bed.
• No regular maintenance required
only media needs to be replaced
once in a year
13
Contd…
Oxidation Chamber :
14
 Iron Removal Filter (IRF)
Components of Treatment Plant.
Contd…
Process Flow Diagram:
One cylindrical FRP Vessel (Size – 36” x 72”) with Top & Bottom distribution Kit,
Air valve & 1.5" Side Mounted Multiport Valve (MPV-F).(Opening Pressure - 4–
10 Bar)
The vessel is filled with gravel, course sand and green sand (natural mineral) for
further oxidation of residual iron and also filtration of water to make it free from
precipitated and deposited iron on filter bed.
The media needs to be replaced once in a year
• The Iron Removal Filter
(IRF) and the Fluoride
Removal Filter (FRF) are
equipped with a Multiport
Filter Valve (MPV-Filter
type) and a Multiport
Softener Valve (MPV-
Softener type) respectively.
15
Components of Treatment Plant…….
• The Multiport Valve (MPV)
controls the flow of water
through the granular media
of a filter. The handle on top
of the MPV can be set at any
of the slotted positions to
select the necessary
function of the valve.
Contd…
Multiport Valve :
16
Components of Treatment Plant…….
Contd…
Alum Dosing System
This purpose of this unit is for pH correction for adjustment of pH of water to the
range of 5.5 to 6.5 to suit filtering media in FRF/ARF
The system comprises of 8 gallons capacity MS Cast vessel with 50 mm Ventury
fitted with PVC flexible pipes and brass taps
It operates automatically and hydraulically for direct dosing of saturated alum
solution
No regular maintenance required other than replenishing of chemical once it gets
consumed.
17
Components of Treatment Plant…….
Contd…
Fluoride Removal Filter/ Media
• . One cylindrical FRP Vessel (Size – 36” x
72”) with Top & Bottom distribution Kit, air
valve & 1.5" Side Mounted Multiport Valve
(Opening Pressure : 4–10 Bar).
• The vessel is filled with gravel, course
sand and Activated Alumina Grade
AAFS50. (Certified by M/S Alcan U.S.A)
• It works on adsorption principle
• The greater adsorptive capacity of
Activated Alumina AAFS50 makes it
economical for one-time use and
disposal.
• Spent material has met the Toxicity
characteristic leaching procedure U.S.A
(TCLP) and California Waste Extraction
Test ( WET)Test
• Media Life 15/ 18 Months( expected )
depending on the concentration of
Fluoride in raw water
• Backwash of Media Once a Month
18
Components of Treatment Plant…….
Contd…
Internal Piping of the Treatment Plant :
uPVC Pipes and Fittings have been used as:
uPVC pipes being lead free so are non-toxic and
hence favoured for use in applications such as
potable water pipes. Selected and used
Do not corrode and are totally unaffected by Acids,
Alkalies and electrolytic corrosion from any source
Have extremely smooth bore due to which frictional
losses are at minimum and flow rates are at the
highest possible from any other pipe materials
Low friction loss & UV Resistant
Due to smoothness of inner surface of the pipe, it
prevents Algai, Bacteria and Fungi Formation inside
the pipe
Solvent joint plumbing system makes its pressure
bearing capacity twice than that of the threaded
pipe
The established aging factor of the commonly used
pipe are not applicable on uPVC Pipe thus providing
a very long life.
19
Distribution
Network
System…….
Contd…
Distribution Network comprises of
GI pipes of diameters ranging
between 65mm to 20mm,
covering an approximate total
length of 1000 metres conforming
to relevant standard and
specification in trenches.
20
Distribution
Network
System…….
Contd…
The system also includes 8
nos. of Stand Posts located at
strategic points of the villages.
The water being supplied from
the overhead tank constructed
on the roof of the treatment
plant building.
INNOVATIONS
 Unique & compact building design to meet
the specific purposes of rural water supply
scheme
 Use of latest technology for vessels and
internal plumbing to reduce maintenance
yet provide reliability and strength
 Solar panels requires minimum
maintenance .
21
• Village-Kolakhurd ,Block-Jagdishpur
08/06/15
Village-Jogibeer,Block-Jagdishpur
22
• Village –Rannuchak-1,Block-Nathnagar
Village-Rannuchak-2,Block-Nathnagar
23
• Village-Makandpur-1,Block-Sultanganj
08/06/15
Village-Makandpur-2,Block-Nathnagar
24

Contenu connexe

Tendances

Water demand and factor affecting water demand
Water demand and factor affecting water demandWater demand and factor affecting water demand
Water demand and factor affecting water demand
Ankit Gola
 
Chapter 8 water demand management.ppt
Chapter 8  water demand management.pptChapter 8  water demand management.ppt
Chapter 8 water demand management.ppt
Mohammed Salahat
 
Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer Appurtenances
Tulsiram Bhattarai
 

Tendances (20)

Water demand forecasting
Water demand forecastingWater demand forecasting
Water demand forecasting
 
Water demand/Waterrequirements
Water demand/Waterrequirements Water demand/Waterrequirements
Water demand/Waterrequirements
 
Sewerage System
Sewerage SystemSewerage System
Sewerage System
 
Greywater
GreywaterGreywater
Greywater
 
Water distribution system
Water distribution systemWater distribution system
Water distribution system
 
Design water supply scheme
Design water supply schemeDesign water supply scheme
Design water supply scheme
 
05 water supply system
05 water supply system05 water supply system
05 water supply system
 
02 water demand
02 water demand02 water demand
02 water demand
 
Water demand and factor affecting water demand
Water demand and factor affecting water demandWater demand and factor affecting water demand
Water demand and factor affecting water demand
 
Water demand and Population forecasting
Water demand and Population forecastingWater demand and Population forecasting
Water demand and Population forecasting
 
DESIGN OF A 30 MLD SEWAGE TREATMENT PLANT(PROJECT REPORT)
DESIGN OF A 30 MLD SEWAGE TREATMENT PLANT(PROJECT REPORT) DESIGN OF A 30 MLD SEWAGE TREATMENT PLANT(PROJECT REPORT)
DESIGN OF A 30 MLD SEWAGE TREATMENT PLANT(PROJECT REPORT)
 
Ground Water Recharge
Ground Water RechargeGround Water Recharge
Ground Water Recharge
 
Water distribution network design and analysis
Water distribution network design and analysisWater distribution network design and analysis
Water distribution network design and analysis
 
Water distribution system
Water distribution system Water distribution system
Water distribution system
 
Laying, jointing and testing of pipes
Laying, jointing and testing of pipesLaying, jointing and testing of pipes
Laying, jointing and testing of pipes
 
Chapter 8 water demand management.ppt
Chapter 8  water demand management.pptChapter 8  water demand management.ppt
Chapter 8 water demand management.ppt
 
Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer Appurtenances
 
Water demand
Water demandWater demand
Water demand
 
01 Sewage Generation, Collection and Conveyance
01 Sewage Generation, Collection and Conveyance01 Sewage Generation, Collection and Conveyance
01 Sewage Generation, Collection and Conveyance
 
L3 -Intake Structures.ppt
L3 -Intake Structures.pptL3 -Intake Structures.ppt
L3 -Intake Structures.ppt
 

En vedette

Powerpoint water supply
Powerpoint   water supplyPowerpoint   water supply
Powerpoint water supply
lvazquez101
 
Presentation plumbing
Presentation plumbingPresentation plumbing
Presentation plumbing
Liguidliguid
 
water treatment slides
water treatment slideswater treatment slides
water treatment slides
Anand Keshri
 
Hassan-Geo Water 21 July'15 Blore(sec)
Hassan-Geo Water 21 July'15 Blore(sec)Hassan-Geo Water 21 July'15 Blore(sec)
Hassan-Geo Water 21 July'15 Blore(sec)
Ajitadev Pandit
 
Waste water treatment processes
Waste water treatment processesWaste water treatment processes
Waste water treatment processes
Ashish Agarwal
 
WATER DISTRIBUTION SYSTEM DESIGN REPORT UET LAHORE by envian
WATER DISTRIBUTION SYSTEM DESIGN REPORT UET LAHORE by envianWATER DISTRIBUTION SYSTEM DESIGN REPORT UET LAHORE by envian
WATER DISTRIBUTION SYSTEM DESIGN REPORT UET LAHORE by envian
Muhammad Usman
 
purification of water using solar still
purification of water using solar stillpurification of water using solar still
purification of water using solar still
Mohamed Ahmed
 

En vedette (20)

Water supply system
Water supply systemWater supply system
Water supply system
 
WATER SUPPLY SYSTEM
WATER SUPPLY SYSTEM WATER SUPPLY SYSTEM
WATER SUPPLY SYSTEM
 
Sanitary and water supply
Sanitary and water supplySanitary and water supply
Sanitary and water supply
 
L 2 sources and water supply schemes
L 2 sources and water supply schemesL 2 sources and water supply schemes
L 2 sources and water supply schemes
 
Powerpoint water supply
Powerpoint   water supplyPowerpoint   water supply
Powerpoint water supply
 
Presentation plumbing
Presentation plumbingPresentation plumbing
Presentation plumbing
 
Water distribution system design report
Water distribution system design reportWater distribution system design report
Water distribution system design report
 
Solar still,A water Purifying Technique Project Report
Solar still,A water Purifying Technique Project ReportSolar still,A water Purifying Technique Project Report
Solar still,A water Purifying Technique Project Report
 
Basic Plumbing System
Basic Plumbing System Basic Plumbing System
Basic Plumbing System
 
water treatment slides
water treatment slideswater treatment slides
water treatment slides
 
Water Purification by Solar energy
Water Purification  by Solar energy Water Purification  by Solar energy
Water Purification by Solar energy
 
Main drinking water supply scheme
Main drinking water supply schemeMain drinking water supply scheme
Main drinking water supply scheme
 
Pipe network analysis with examples
Pipe network analysis with examplesPipe network analysis with examples
Pipe network analysis with examples
 
Hassan-Geo Water 21 July'15 Blore(sec)
Hassan-Geo Water 21 July'15 Blore(sec)Hassan-Geo Water 21 July'15 Blore(sec)
Hassan-Geo Water 21 July'15 Blore(sec)
 
Primotech solar water purifier
Primotech   solar water purifierPrimotech   solar water purifier
Primotech solar water purifier
 
Waste water treatment processes
Waste water treatment processesWaste water treatment processes
Waste water treatment processes
 
L 1 introduction
L 1 introductionL 1 introduction
L 1 introduction
 
Solar Water Distillation For Drinking Purposes
Solar Water Distillation For Drinking PurposesSolar Water Distillation For Drinking Purposes
Solar Water Distillation For Drinking Purposes
 
WATER DISTRIBUTION SYSTEM DESIGN REPORT UET LAHORE by envian
WATER DISTRIBUTION SYSTEM DESIGN REPORT UET LAHORE by envianWATER DISTRIBUTION SYSTEM DESIGN REPORT UET LAHORE by envian
WATER DISTRIBUTION SYSTEM DESIGN REPORT UET LAHORE by envian
 
purification of water using solar still
purification of water using solar stillpurification of water using solar still
purification of water using solar still
 

Similaire à PPT on Mini Water Supply Scheme

Operation Experience ARWADEX 2009
Operation Experience ARWADEX 2009Operation Experience ARWADEX 2009
Operation Experience ARWADEX 2009
Sami Ahmed Syed
 
Brochure pas
Brochure pasBrochure pas
Brochure pas
tecompk
 
Bio-Logic Ultraviolet Water Purifiers
Bio-Logic Ultraviolet Water PurifiersBio-Logic Ultraviolet Water Purifiers
Bio-Logic Ultraviolet Water Purifiers
Kelleen Guyer
 

Similaire à PPT on Mini Water Supply Scheme (20)

CMWSSB_Chennai_PPT_0.pdf
CMWSSB_Chennai_PPT_0.pdfCMWSSB_Chennai_PPT_0.pdf
CMWSSB_Chennai_PPT_0.pdf
 
Bs water-treatment-presentation-1-1 finals
Bs water-treatment-presentation-1-1 finalsBs water-treatment-presentation-1-1 finals
Bs water-treatment-presentation-1-1 finals
 
Bs water-treatment-presentation-1-1 finals
Bs water-treatment-presentation-1-1 finalsBs water-treatment-presentation-1-1 finals
Bs water-treatment-presentation-1-1 finals
 
Rooftop rainwater harvesting system.
Rooftop rainwater harvesting system.Rooftop rainwater harvesting system.
Rooftop rainwater harvesting system.
 
Operation Experience ARWADEX 2009
Operation Experience ARWADEX 2009Operation Experience ARWADEX 2009
Operation Experience ARWADEX 2009
 
Ashu kumar ppt
Ashu kumar pptAshu kumar ppt
Ashu kumar ppt
 
Brochure pas
Brochure pasBrochure pas
Brochure pas
 
Bio-Logic Ultraviolet Water Purifiers
Bio-Logic Ultraviolet Water PurifiersBio-Logic Ultraviolet Water Purifiers
Bio-Logic Ultraviolet Water Purifiers
 
anu
anuanu
anu
 
SEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOWSEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOW
 
Laboratory Water Purification Technology, Products and Water Quality Standards
Laboratory Water Purification Technology, Products and Water Quality StandardsLaboratory Water Purification Technology, Products and Water Quality Standards
Laboratory Water Purification Technology, Products and Water Quality Standards
 
Utilizing Tubular UF Membrane Filtration for Wastewater Reuse
Utilizing Tubular UF Membrane Filtration for Wastewater ReuseUtilizing Tubular UF Membrane Filtration for Wastewater Reuse
Utilizing Tubular UF Membrane Filtration for Wastewater Reuse
 
XtreamProtector
XtreamProtector   XtreamProtector
XtreamProtector
 
Hospital waste management system ppt presentation
Hospital waste management system ppt presentationHospital waste management system ppt presentation
Hospital waste management system ppt presentation
 
Apie kapiliarinį drėkinimą ir tręšimą skystomis trąšomis
Apie kapiliarinį drėkinimą ir tręšimą skystomis trąšomisApie kapiliarinį drėkinimą ir tręšimą skystomis trąšomis
Apie kapiliarinį drėkinimą ir tręšimą skystomis trąšomis
 
PVC Pipe Use in Water Management System.pptx
PVC Pipe Use in Water Management System.pptxPVC Pipe Use in Water Management System.pptx
PVC Pipe Use in Water Management System.pptx
 
DRIP IRRIGATION
DRIP IRRIGATIONDRIP IRRIGATION
DRIP IRRIGATION
 
Project Report
Project Report Project Report
Project Report
 
Waste water treatment process and plant performance at 20MLD STP
Waste water treatment process and plant performance at 20MLD STPWaste water treatment process and plant performance at 20MLD STP
Waste water treatment process and plant performance at 20MLD STP
 
Olivier amiot reverse_osmosis
Olivier amiot reverse_osmosisOlivier amiot reverse_osmosis
Olivier amiot reverse_osmosis
 

Plus de Arvind kumar

Namami gange in bihar
Namami gange in biharNamami gange in bihar
Namami gange in bihar
Arvind kumar
 

Plus de Arvind kumar (20)

Patna City Plastic Waste Management brochure
Patna  City Plastic Waste Management   brochure Patna  City Plastic Waste Management   brochure
Patna City Plastic Waste Management brochure
 
Plastic Lao, Thaila Pao at Guruparva,Patna city
Plastic Lao, Thaila Pao at Guruparva,Patna cityPlastic Lao, Thaila Pao at Guruparva,Patna city
Plastic Lao, Thaila Pao at Guruparva,Patna city
 
Plasti lao, Thail Pao in Patna, Bihar
Plasti lao, Thail Pao in Patna, BiharPlasti lao, Thail Pao in Patna, Bihar
Plasti lao, Thail Pao in Patna, Bihar
 
Namami gange in bihar
Namami gange in biharNamami gange in bihar
Namami gange in bihar
 
Fssm in bihar
Fssm in  biharFssm in  bihar
Fssm in bihar
 
Ganga river cleaning schemes
Ganga  river cleaning schemesGanga  river cleaning schemes
Ganga river cleaning schemes
 
Future of drinking_water_sector_in_india
Future of drinking_water_sector_in_indiaFuture of drinking_water_sector_in_india
Future of drinking_water_sector_in_india
 
Kariyawa a odf s ( open defecation free sustainable village )
Kariyawa a  odf s ( open defecation free sustainable village )Kariyawa a  odf s ( open defecation free sustainable village )
Kariyawa a odf s ( open defecation free sustainable village )
 
Maa mangla basti__urbanization_leads_the_ecological_disruption
Maa mangla basti__urbanization_leads_the_ecological_disruptionMaa mangla basti__urbanization_leads_the_ecological_disruption
Maa mangla basti__urbanization_leads_the_ecological_disruption
 
Future of drinking water sector in india
Future of drinking water sector in indiaFuture of drinking water sector in india
Future of drinking water sector in india
 
Design of logo, kiosk, apron cap crwon stcicker
Design of logo,  kiosk, apron cap crwon stcicker Design of logo,  kiosk, apron cap crwon stcicker
Design of logo, kiosk, apron cap crwon stcicker
 
Open defecation free clinic
Open defecation free clinicOpen defecation free clinic
Open defecation free clinic
 
Open defecation free clinic.docx
Open defecation free clinic.docxOpen defecation free clinic.docx
Open defecation free clinic.docx
 
Design of logo, kiosk, apron cap crwon stcicker
Design of logo,  kiosk, apron cap crwon stcicker Design of logo,  kiosk, apron cap crwon stcicker
Design of logo, kiosk, apron cap crwon stcicker
 
Open defecation free clinic
Open defecation free clinicOpen defecation free clinic
Open defecation free clinic
 
Way forwards for urban sanitation in uttar pradesh.docx
Way forwards for urban sanitation in uttar pradesh.docxWay forwards for urban sanitation in uttar pradesh.docx
Way forwards for urban sanitation in uttar pradesh.docx
 
Odf cinic picture
Odf cinic pictureOdf cinic picture
Odf cinic picture
 
SBCC to Sustain ODF
SBCC to Sustain ODFSBCC to Sustain ODF
SBCC to Sustain ODF
 
Godam sahi : Community decides to bring sanitation closure to Home
Godam sahi  : Community decides to bring sanitation closure to Home Godam sahi  : Community decides to bring sanitation closure to Home
Godam sahi : Community decides to bring sanitation closure to Home
 
1st Cluster Septic Tank in BBSR Urban Sanitation
1st Cluster Septic Tank in BBSR Urban Sanitation1st Cluster Septic Tank in BBSR Urban Sanitation
1st Cluster Septic Tank in BBSR Urban Sanitation
 

PPT on Mini Water Supply Scheme

  • 1. 1 Public Health Engineering Department, Govt of Bihar Brief Overview of The Project Construction of Mini Piped Water Supply Schemes with provision of suitable Treatment Technology and solar pumps in Fluoride affected habitations in Bihar Arvind Kumar ( DFID- SWASTH)
  • 2. Ground water is perhaps the most accepted source particularly in areas where safe and dependable surface water sources are not available within easy reach or not available at all. Ground water is generally considered as a safe source but in recent times research and investigations have shown that quality of ground water has deteriorated at many locations thus making it unfit for use for human consumption. In Bihar excessive levels of arsenic and fluoride in ground water have been noticed in many areas. Public Health Engineering Department, being conscious of this serious problem has decided to install small water purification plants for treating ground water drawn through tube wells and supplying the treated safe water local through stand posts to the consumers. 2 Objective of Scheme
  • 3. SALIENT FEATURES OF THE SCHEME • Capacity of Plant. - 40000 liters /day • Borewell Discharge 5100/6000 liters/Hr • Benefitted Population – 1000 • Per Capita per day Supply of Water- 40 liters • Operation Time of Plant /day - 8 Hours • Capacity of Overhead tank - 5000 liters • Genset for Non Sun days Operation. • Use of rustproof vessels & pipes. • Three Months Trial Run , & thereafter Six Months of O& M 3
  • 4. SEQUENCE OF THE PROJECT CONSTRUCTION Marking of land Bore well Construction Testing of Raw water Commencement of Civil Work Completion of Civil Work Solar Panel Installation Pipe line & Stand Post Plant Installation Commencement of Trial Run Site Selection
  • 5. 5 MAJOR COMPONENTS OF THE PROJECT SITE DEVELOPMENT & BOUNADRY WALL WATER (BOREWELL) TREATMENT PLANT BUILDING ENERGY (SOLAR SYSTEM) TREATMENT UNIT DISTRIBUTION SYSTEM STAND POSTS
  • 6. SITE DEVELOPMENT & BOUNDARY WALL • Plant Building • Boundary Wall • Storage System • Gate • Approach Road • Landscaping 6
  • 8. BUILDING One R.C.C/ Brick Masonary housing Treatment Plant and auxiliary units. The building has one room Treatment Plant, one room for Operator , one store and one Toilet with necessary facilities 8
  • 9. Solar System 9 Submersible Pump Security features: • Protection against dry running • Protection from Over/Under Voltage • Protection from Overload • Protection from Over Temperature Solar PV module array is of high efficiency Solar Modules utilizing Crystalline Silicon Solar PV cells. The modules are warranted for power output conforming to IEC-61215, ISPRA Italy, IECQ (PV-GAP), MNES & BIS standards.
  • 10. 10 WATER TREATMENT PLANT SOLAR OPERATED PUMP OXIDATION CHAMBER IRON REMOVAL FILTER ALUM DOSER FLUORIDE/ ARSENIC REMOVAL UNIT CONTROL PANEL
  • 11. SEQUENCE OF TREATMENT PROCESS PUMPED BY SOLAR PUMP OXIDATION CHAMBER IRON REMOVAL FILTER ALUM DOZER FLUORIDE REMOVAL FILTER OVER HEAD TANK POTABLE WATER AT STANDPOST FOR VILLAGERS DISTRIBUTION SYSTEM Raw water
  • 12. 12 The Treatment System FLUORIDE REMOVAL FILTER IRON REMOVAL FILTER OXIDATION CHAMBER ALUM DOSING UNIT Treatment Plant : A Overview
  • 13. Components of Treatment Plant……. • One cylindrical MS/ FRP Vessel (400 mm dia X 1200 mm) filled with media • For oxidizing & removal of Iron from raw water. • The high oxidizing capacity catalytic media is Manganese Dioxide Granules – 12 mm to 25 mm (Natural Mineral) for oxidizing iron in raw water for its quick precipitation in IRF. • The system provides for auto backwash of the filter bed. • No regular maintenance required only media needs to be replaced once in a year 13 Contd… Oxidation Chamber :
  • 14. 14  Iron Removal Filter (IRF) Components of Treatment Plant. Contd… Process Flow Diagram: One cylindrical FRP Vessel (Size – 36” x 72”) with Top & Bottom distribution Kit, Air valve & 1.5" Side Mounted Multiport Valve (MPV-F).(Opening Pressure - 4– 10 Bar) The vessel is filled with gravel, course sand and green sand (natural mineral) for further oxidation of residual iron and also filtration of water to make it free from precipitated and deposited iron on filter bed. The media needs to be replaced once in a year
  • 15. • The Iron Removal Filter (IRF) and the Fluoride Removal Filter (FRF) are equipped with a Multiport Filter Valve (MPV-Filter type) and a Multiport Softener Valve (MPV- Softener type) respectively. 15 Components of Treatment Plant……. • The Multiport Valve (MPV) controls the flow of water through the granular media of a filter. The handle on top of the MPV can be set at any of the slotted positions to select the necessary function of the valve. Contd… Multiport Valve :
  • 16. 16 Components of Treatment Plant……. Contd… Alum Dosing System This purpose of this unit is for pH correction for adjustment of pH of water to the range of 5.5 to 6.5 to suit filtering media in FRF/ARF The system comprises of 8 gallons capacity MS Cast vessel with 50 mm Ventury fitted with PVC flexible pipes and brass taps It operates automatically and hydraulically for direct dosing of saturated alum solution No regular maintenance required other than replenishing of chemical once it gets consumed.
  • 17. 17 Components of Treatment Plant……. Contd… Fluoride Removal Filter/ Media • . One cylindrical FRP Vessel (Size – 36” x 72”) with Top & Bottom distribution Kit, air valve & 1.5" Side Mounted Multiport Valve (Opening Pressure : 4–10 Bar). • The vessel is filled with gravel, course sand and Activated Alumina Grade AAFS50. (Certified by M/S Alcan U.S.A) • It works on adsorption principle • The greater adsorptive capacity of Activated Alumina AAFS50 makes it economical for one-time use and disposal. • Spent material has met the Toxicity characteristic leaching procedure U.S.A (TCLP) and California Waste Extraction Test ( WET)Test • Media Life 15/ 18 Months( expected ) depending on the concentration of Fluoride in raw water • Backwash of Media Once a Month
  • 18. 18 Components of Treatment Plant……. Contd… Internal Piping of the Treatment Plant : uPVC Pipes and Fittings have been used as: uPVC pipes being lead free so are non-toxic and hence favoured for use in applications such as potable water pipes. Selected and used Do not corrode and are totally unaffected by Acids, Alkalies and electrolytic corrosion from any source Have extremely smooth bore due to which frictional losses are at minimum and flow rates are at the highest possible from any other pipe materials Low friction loss & UV Resistant Due to smoothness of inner surface of the pipe, it prevents Algai, Bacteria and Fungi Formation inside the pipe Solvent joint plumbing system makes its pressure bearing capacity twice than that of the threaded pipe The established aging factor of the commonly used pipe are not applicable on uPVC Pipe thus providing a very long life.
  • 19. 19 Distribution Network System……. Contd… Distribution Network comprises of GI pipes of diameters ranging between 65mm to 20mm, covering an approximate total length of 1000 metres conforming to relevant standard and specification in trenches.
  • 20. 20 Distribution Network System……. Contd… The system also includes 8 nos. of Stand Posts located at strategic points of the villages. The water being supplied from the overhead tank constructed on the roof of the treatment plant building.
  • 21. INNOVATIONS  Unique & compact building design to meet the specific purposes of rural water supply scheme  Use of latest technology for vessels and internal plumbing to reduce maintenance yet provide reliability and strength  Solar panels requires minimum maintenance . 21