SlideShare une entreprise Scribd logo
1  sur  12
Télécharger pour lire hors ligne
RESUME 1 of 12
ASWADIMANOR SAFEIE ©®
 
PERSONAL DATA   : 
 
 
 
 
 
 
 
 
 
 
 
Name      :  ASWADIMANOR BIN SAFEIE 
I/C No.      :  720819‐08‐5619 (A 2194573) 
DOB      :  19 Aug 1972 
Age      :  44 years. 
Sex      :  Male 
Religion     :  Muslim 
Marital Status    :  Married 
Height      :  180 cm 
Weight      :  60 kg. 
Place of Birth    :  Taiping, Perak, Malaysia 
Nationality    :  Malaysian 
Driving License    :  B2 & D 
E.P.F. No.    :  12650854 
Income Tax No.    :  SG 5488672‐04 
Int. Passport No.    :  A 30080302 
CIDB Green Card No.    :  W 51240520010004 
Socso No    :  P6803564X 
PMI ID No.    :  1959367 
 
 
 
Permanent Address:    Current Address: 
No.47, Lorong LB 1/10, 
Lembah Beriah 1, 
34310 Bukit Merah, 
Bagan Serai, Perak, 
Malaysia. 
 
No. 59, Jalan USJ 13/1G, 
USJ 13, 
47630 Subang Jaya, 
Selangor, Malaysia. 
 
Contact Number: 
+60 12 3560337  
 
  Email Address: 
   
aswadimanor@gmail.com 
 
 
Sabah Address: 
D‐4‐37 
4th
 Floor, Studio Condominium, 
Taman Nelly Phase 8D, 
Jalan Nountun, Kolombong, 
88450 Kota Kinabalu, Sabah. 
 
   
RESUME 2 of 12
ASWADIMANOR SAFEIE ©®
SUMMARY OF CAREER 
 
Comprehensive  knowledge  of  project  planning,  cost,  contracts,  subcontracts,  tender  and 
documentation  with  19  years  working  experience  in  civil  engineering  and  oil  and  gas  industry, 
experience in pre and post contract function including tender / contract review, drafting agreement, 
procurement  and  award  of  subcontract  works,  negotiation  with  subcontractor  and  contract 
administration, experience in cost control, monitoring and forecast for large‐scale project, ability to 
prepare and present tender and project budget report to senior management, ability to evaluate and 
pre‐select subcontractor and suppliers, ability to review measurement of quantities, calculation and 
Bills of Quantities. 
 
And also have more than 18 years of experience in engineering, construction/fabrication, installation, 
hook‐up & commissioning (EPCC). 
 
PERSONAL TRAITS AND ATTITUDE 
 
Excellent cross‐cultural communication skills. 
International living experience and regional exposure. 
Passion for continuous learning and personal growth. 
Highly motivated and driven, with strong desire to excel.  
To  offer  quality  services  and  commitment  those  match  the  organization’s  hopes  and  aspiration 
intention of high standard of professional practice. 
 
EDUCATION BACKGROUND; 
 
July ’93 ‐ Apr. 97    :  University Science of Malaysia, Pulau Pinang, Malaysia. 
        Bachelor Science (Hon’s) of Housing, Building & Planning 
Major: Construction Management 
 
June ’90 ‐ April ’92  :  Ungku Omar Polytechnic, Ipoh, Perak, Malaysia. 
        Certificate of Architecture. 
 
COMPUTER SKILLS: 
 
 Primavera Project Management P6. Ver.8 
 Microsoft Office. 
 Microsoft Project. 
 Crystal Ball. 
 SAP System R/3. 
 Oracle. 
 Ripac (Quantity Surveyor Software). 
 
POSITION OF RESPONSIBILITY: 
 
 Member of Project Management Institute (PMI) 
 Scuba School International (SSI) 
 Committee Member of Offshore Structure Fabricators Association of Malaysia 
(OSFAM) 1999 ‐ 2000 
 ISO Committee Member for Stagno Tech Sdn Bhd. (2000 – 2003) 
 
LINGUISTIC ABILITIES: 
 
Bahasa Malaysia  :   Good in reading, writing and speaking. 
English    :   Fairly good in reading, writing and speaking. 
   
RESUME 3 of 12
ASWADIMANOR SAFEIE ©®
COURSE / WORKSHOP ATTENDED 
 
 Float over: Engineering to Execution (Dockwise): 14th
 June 2012. 
 Temana Redevelopment Project Concept Select Workshop (PCSB) – 29 – 30 Mac 2010. 
 Cost Control Process Training (PCSB) – 23 – 26 Mac 2010. 
 BOSIET refreshment training (28 – 30 Apr 2009) (Cert # : BEBS170964/09) (Valid : 29 Apr 
12) 
 International Standards Workshop for Oil & Gas Industry in Malaysia – 23 – 24 Feb 2009 
 Primavera Project Management P6 (PCSB) – 14 – 16 Jul 2008 
 Defensive Driving Training (PCSB) – Apr 2008 
 Project Risk Management (PCSB) – Mac 2008 
 Injury & Incident Free – (Qatar Gas & JMJ) 23rd
 July 2006 
 CTJV Safety Induction (CTJV) 7th
 July 2006 
 Working at Height (CTJV) 7th
 Sept 2006 
 H2S Safety (CTJV) 7th
 Sept 2006 
 Emergency Response (CTJV) 7th
 Sept 2006 
 CTJV Defensive Driving (CTJV) Feb 2007 
 Defensive Driving (Megamas, Brunei. 2004) 
 ISO 2000 (SIRIM, 2000) 
 TQM (Bovis, In house, 1998) 
 
 
CAREER ARCHIVEMENT 
 
 Achieve 1st
 Oil for BADP‐E Revisit 2 on 29th
 Jul 2009 (ahead of schedule) and within 
approve budget. 
 Committee for PCSB Planning Dept for preparing project planning guideline. 
 Convert existing and new projects schedule to Primavera P6 for Baram and Temana 
projects. 
 Standardize project management system in term of cost report and reporting. 
 Standardize system & format in term of MTO, Claims, Invoicing and other related to 
project (in software format). 
 
   
RESUME 4 of 12
ASWADIMANOR SAFEIE ©®
WORKING EXPERINCE: 
 
Apr ’16 – Sept ‘16     MUHIBBAH ENGINEERING (M) BHD 
      Kota Kinabalu, Sabah 
 
Position :    Project Control Manager (Contract) 
 
Projects:     PETRONAS Carigali New 11 Storey Office Building Project. 
 
Responsibility / Job Description 
 
To manage a team of project controls in order to provide overall support to proposals and project 
management  disciplines  working  on  project  bids  and  projects  in  execution.    Responsible  for  the 
management of the multi‐discipline project control activities including but not limiting to planning, 
document  control,  risk  management,  project  cost  control  (management  of  change),  materials  and 
resource planning. Support, mentor and develop the Project Controls staff in accordance with company 
policies and procedures. 
 
Duties and Scope of Works 
 
 Lead a team in a multi office organization. 
 Oversee the application of the company project reporting standards to the project portfolio. 
 Provide  standardized  project  planning  &  scheduling,  risk  management,  document  control, 
Change management, materials and resource planning. 
 Ensure that all project services disciplines are aligned with company policies and procedures. 
 Maintain effective interface between all project services related disciplines and the external 
disciplines they support. 
 Maintain appropriate staffing levels in order to adequately support the workload. 
 Ensure consistent and accurate project controls/services related reporting data.  
 Maintain an auditable database and reporting that supports the company stage gate process. 
 Set objectives for project control team members and ensure that those objectives are being 
met on a regular basis. 
 
 
 
Aug ’15 – Mar ‘16  Petrofac Malaysia Limited. 
      Kuala Lumpur 
 
Position:     Senior Cost Engineer (Contract Staff) 
 
Project:      Cendor Development Project Phase 2. 
 
Primary duties and responsibilities: 
 
1. Study and understand all relevant project documents relating to the cost management of 
allocated project(s). 
2. Setting up project/projects within Computerized Cost System to agreed format 
3. Establishing project control budgets based on the client approved Project Control Estimate. 
4. Assisting Project Management in identifying and gaining approval of Estimates/ Change 
Requests 
5. Perform a variety of cost engineering functions including cost control, budget preparations, 
forecasting and cost reporting under limited supervision. 
6. Reviewing cost commitment and expenditure information (for all cost elements), for input to 
the computerized cost control and reporting system on a weekly basis. 
RESUME 5 of 12
ASWADIMANOR SAFEIE ©®
7. Producing regular cost reports and advising management of any forecast cost overruns, 
maintaining comprehensive accessible registers of financial approvals, variations and change 
orders. 
8. Establish Cost Breakdown Structure (CBS) and integrate with WBS. 
9. Review all PO’s as issued for cost committed. 
10. Any other duties appropriate to this position 
11. Report turnaround and project actual vs. baseline cost status as required. 
12. Report earned value and identify trends that impact the final cost projections. 
13. Prepare monthly cost report to management. 
14. Review proposed cost changes with project team, client and contractors. 
 
 
 
 
Feb ’15 – Jul ’15     Leadshine Sdn Bhd 
      Kota Kinabalu, Sabah 
 
Position:     Project Manager (Contract Staff) 
 
Project:       
‐ 132kv Transmission Line from MSS Tenom to PMU Nabawan, Sabah. 
‐ 33/11kv Line & Substation for Zone 1, BELB Project, Sabah. 
‐ Sugut Solar Hybrid, Kg Gugusan Sugut, Sabah. 
 
Responsibility / Job Description 
 
Primarily responsible for establishing, monitoring, and executing project plans. In charge of delivering 
projects that improve a client’s business applications, infrastructure and processes, and doing this 
within time, on budget and to the highest standards. Also involved in building relationships with 
clients, and maintaining liaison with them throughout each project. 
 
Duties 
  
 Leading, motivating and managing a team in all aspects of estimating, planning and resource 
evaluation.  
 Controlling the budget for each project, maintaining the agreed levels of expenditure.  
 Maintaining proper documentation (general project plans, action items, timelines, call notes, 
etc.) on all projects.  
 Managing project funding and resources, negotiating project changes, and adjusting resources 
across multiple projects.  
 Developing and managing KPIs to drive improvements and deliver performance.  
 Setting and driving project timelines, ensuring all deliverables are met and completed on time.  
 Coordinating work for and providing direction to staff to complete deliverables.  
 Autonomously devising solutions and taking ownership of situations to ensure a projects 
success.  
 
 
 
 
 
 
 
 
 
 
RESUME 6 of 12
ASWADIMANOR SAFEIE ©®
Mac ’14 – Jan ‘15   Misi Setia Oil & Gas Sdn Bhd 
      Kajang, Selangor 
 
Position :    Project Control Manager (Contract) 
 
Projects:     EPCC Dalak Pipeline Onshore Facilities Project. 
      EPCC Sipitang Tee‐off Metering Project. 
 
Responsibility / Job Description 
 
To manage a team of project controls in order to provide overall support to proposals and project 
management  disciplines  working  on  project  bids  and  projects  in  execution.    Responsible  for  the 
management of the multi‐discipline project control activities including but not limiting to planning, 
document  control,  risk  management,  project  cost  control  (management  of  change),  materials  and 
resource planning. Support, mentor and develop the Project Controls staff in accordance with company 
policies and procedures. 
 
Duties and Scope of Works 
 
 Lead a team in a multi office organization. 
 Oversee the application of the company project reporting standards to the project portfolio. 
 Provide  standardized  project  planning  &  scheduling,  risk  management,  document  control, 
Change management, materials and resource planning. 
 Ensure that all project services disciplines are aligned with company policies and procedures. 
 Maintain effective interface between all project services related disciplines and the external 
disciplines they support. 
 Maintain appropriate staffing levels in order to adequately support the workload. 
 Ensure consistent and accurate project controls/services related reporting data.  
 Maintain an auditable database and reporting that supports the company stage gate process. 
 Set objectives for project control team members and ensure that those objectives are being 
met on a regular basis. 
 
 
Apr ’13 – Feb ‘14.    PETRONAS LNG Train 9 
        Yokohama, Japan 
 
Position :      Project Control Manager (Contract) 
 
Projects:       LNG Train 9 Complex 
 
Responsibility / Job Description 
 
To manage a team of project controls in order to provide overall support to proposals and project 
management disciplines working on project in execution.  Responsible for the management of the 
multi‐discipline project control activities including but not limiting to planning, document control, risk 
management, project cost control (management of change), materials and resource planning. Support, 
mentor and develop the Project Controls staff in accordance with company policies and procedures for 
PETRONAS LNG 9 project. 
 
Duties and Scope of Works 
 Lead a team in a multi office organization. 
 Oversee the application of the company project reporting standards to the project portfolio. 
 Provide  standardized  project  planning  &  scheduling,  risk  management,  document  control, 
Change management, materials and resource planning. 
 Ensure that all project services disciplines are aligned with company policies and procedures. 
RESUME 7 of 12
ASWADIMANOR SAFEIE ©®
 Maintain effective interface between all project services related disciplines and the external 
disciplines they support. 
 Maintain appropriate staffing levels in order to adequately support the workload. 
 Ensure consistent and accurate project controls/services related reporting data.  
 Maintain an auditable database and reporting that supports the company stage gate process. 
 Set objectives for project control team members and ensure that those objectives are being 
met on a regular basis. 
 
i. Develop the Work Breakdown Structures (WBS) and prepare Control Estimate & Project 
Schedule. 
 Work breakdown structure detailed out at Control level. 
 Project Control Estimate. 
 
ii. Develop Cost Breakdown Structure (CBS) and Organization Breakdown Structure (OBS) based 
on WBS. 
 Cost Breakdown structure 
 Common Code Account assigned to each cost item 
 Organization Breakdown Structure with specific individual name 
 Manpower/Staffing Plan 
 
iii.Develop and prepare the Project Control Plan to outline the process that will be used to 
measure progress, control cost & schedule and analyze variances. 
 Project Control Plan outlining the progress that will be used to measure progress, 
control cost & schedule, change control, reporting and analyze variances. 
 
iv.Prepare and update the Total Project Cost against Estimate. Responsible to controlling and 
monitoring the details of the actual commitment, expenditures, trends and forecast in 
comparison to the approved budget. 
 Budget Performance (Calendar Year & Financial Year) 
 AFE (inclusive Structure) 
 Cost variance analysis 
 Forecast cost (Annual & Total) 
 Annual Budgeting (WPB) 
 Trend Register & Change Management. 
 
v. Update and analyze Project Schedule and Cost, highlight cost variance/issues, Critical path and 
make recommendations to the Project Managers on effective mitigation. 
 Earned Value Analysis 
 Productivity analysis of Productivity Index 
 
 
   
RESUME 8 of 12
ASWADIMANOR SAFEIE ©®
Sept ’11 – Mac’ 13.    PETRONAS Carigali Schlumberger Alliance 
        Samarang Project Management Team (SPMT). 
        Kuala Lumpur 
 
Position :      Senior Project Controller  (Contract Staff) 
 
Projects:       Samarang Field Development Phase 2,  
Field Improvement Project (FIP),  
Production Enhancement, Workovers Projects. 
 
Responsibility / Job Description 
 
Prepare and monitor package and control project execution with regards activities/tasks planned in 
approval planning package and update on status of project such as progress measurement and 
related works for Samarang Phase 2 and FIP projects by using Oracle Primavera Project Management 
P6. 
 
Duties and Scope of Works 
 
i. Develop the Work Breakdown Structures (WBS) and prepare Control Estimate & Project 
Schedule. 
 Work breakdown structure detailed out at Control level. 
 Project Control Estimate. 
 
ii. Develop Cost Breakdown Structure (CBS) and Organization Breakdown Structure (OBS) based 
on WBS. 
 Cost Breakdown structure 
 Common Code Account assigned to each cost item 
 Organization Breakdown Structure with specific individual name 
 Manpower/Staffing Plan 
 
iii.Develop and prepare the Project Control Plan to outline the process that will be used to 
measure progress, control cost & schedule and analyze variances. 
 Project Control Plan outlining the progress that will be used to measure progress, 
control cost & schedule, change control, reporting and analyze variances. 
 
iv.Prepare and update the Total Project Cost against Estimate. Responsible to controlling and 
monitoring the details of the actual commitment, expenditures, trends and forecast in 
comparison to the approved budget. 
 Budget Performance (Calendar Year & Financial Year) 
 AFE (inclusive Structure) 
 Cost variance analysis 
 Forecast cost (Annual & Total) 
 Annual Budgeting (WPB) 
 Trend Register & Change Management. 
 
v. Update and analyze Project Schedule and Cost, highlight cost variance/issues, Critical path and 
make recommendations to the Project Managers on effective mitigation. 
 Earned Value Analysis 
 Productivity analysis of Productivity Index 
 
   
RESUME 9 of 12
ASWADIMANOR SAFEIE ©®
Sept ’07 – Aug ‘11.    PETRONAS CARIGALI Sdn Bhd. 
        Development Division. 
        Kumang Baram Development Project (DKB). 
        Kuala Lumpur 
 
Position :      Senior Project Controller (Contract Staff) 
 
Current Projects:     BAJT‐H Revisit 1, Temana Redevelopment, Kumang Phase 1 
 
Completed Projects:    BADP‐E Revisit 2. 
 
Responsibility / Job Description 
 
Prepare and monitor package and control project execution with regards activities/tasks planned in 
approval planning package and update on status of project such as progress measurement, 
contractors claim (cost control) & etc. for Baram and Temana field. 
 
Duties and Scope of Works 
 
i. Develop the Work Breakdown Structures (WBS) and prepare Control Estimate & Project 
Schedule. 
 Work breakdown structure detailed out at Control level. 
 Project Control Estimate. 
 
ii. Develop Cost Breakdown Structure (CBS) and Organization Breakdown Structure (OBS) based 
on WBS. 
 Cost Breakdown structure 
 Common Code Account assigned to each cost item 
 Organization Breakdown Structure with specific individual name 
 Manpower/Staffing Plan 
 
iii.Develop and prepare the Project Control Plan to outline the process that will be used to 
measure progress, control cost & schedule and analyze variances. 
 Project Control Plan outlining the progress that will be used to measure progress, 
control cost & schedule, change control, reporting and analyze variances. 
 
iv.Prepare and update the Total Project Cost against Estimate. Responsible to controlling and 
monitoring the details of the actual commitment, expenditures, trends and forecast in 
comparison to the approved budget. 
 Budget Performance (Calendar Year & Financial Year) 
 AFE (inclusive Structure) 
 Cost variance analysis 
 Forecast cost (Annual & Total) 
 Annual Budgeting (WPB & CPB) 
 Trend Register & Change Management. 
 
v. Update and analyze Project Schedule and Cost, highlight cost variance/issues, Critical path and 
make recommendations to the Project Managers on effective mitigation. 
 Earned Value Analysis 
 Productivity analysis of Productivity Index 
 
vi.Prepare project reports and performance review inclusive of all packages including status, 
major highlights and cost control reports to Management. 
 Cost Report of each month. 
 
 
RESUME 10 of 12
ASWADIMANOR SAFEIE ©®
May ’06 – Aug’07.    Technip Corporation France 
 
Seconded to :      Chiyoda Technip Joint Venture ‐ QCS. 
Subcontracts Dept., Ras Laffan, Qatar. 
 
Project:  QG 3 & QG4 LNG Onshore Facilities Project  
Qatar Liquefied Gas Company Limited 3 & 4. 
Ras Laffan Industrial City, Qatar. 
 
Position :      Subcontracts Administrator (Contract Staff) 
 
Job Description   
 Formalise roles & responsibilities and line of communication for all 
who participate in the Contract / Subcontract execution and where 
applicable, review and recommend Contractor sub‐contracting and 
procurement procedures.  
 Review and verify Subcontractor progress payment certificate and 
invoice and ensure that the payment is correctly charged to the 
Contract whilst monitoring expenditure (including commitments) 
against  the  ACV  (Approve  Contract  Value)  and  initiate  approval 
requests.  
 Resolve disputes; handle claims by/against with the Subcontractor 
in  liaison  with  Company  Site  Representative  and  Company 
Representative. 
 Prepare, evaluate & recommend subcontract. 
 Prepare  tender  document,  tender  evaluation  and 
recommendation.  Prepare  service  agreement.  Prepare  financial 
report to management. 
 
Oct ’03 – Apr ’06.     Malaysia Marine Heavy Engineering Sdn Bhd 
Formerly known as Malaysia Shipyard & Engineering Sdn. Bhd. 
        Engineering Division / PMT, 
Brunei Site Office, Kuala Belait, Brunei. 
 
Position:       Cost & Contracts Engineer (Permanent staff) 
 
Project:  Champion West Phase III – EPF Project 
  Negara Brunei Darussalam 
Job Description 
 Formalise roles & responsibilities and line of communication for all 
who participate in the Contract execution (Company & Contractor) 
and  where  applicable,  review  and  approve  Contractor  sub‐
contracting and procurement procedures.  
 Review  and  verify  Contractor  progress  payment  certificate  and 
invoice and ensure that the payment is correctly charged to the 
Contract whilst monitoring expenditure (including commitments) 
against the ACV and initiate approval requests.  
 Initiate  any  requirement  for  Changes,  Extension,  and/or 
Amendments  to  the  Contract  and  obtain  necessary  approvals 
together  with  the  tender  holder.  Issue  Request  For  Quotation, 
Preliminary Change Order & Change Order and maintain up‐to‐date 
registers of the changes to contract.  
RESUME 11 of 12
ASWADIMANOR SAFEIE ©®
 Resolve disputes; handle claims by/against with the Contractor in 
liaison  with  Company  Site  Representative,  Contract  Holder, 
Company Representative, Tender Holder, and Legal Advisor.  
 
Aug ’00 – Sept 03.    Stagno Tech Sdn. Bhd. 
        Contract Dept. / Project Dept. 
 
Position:       Cost & Contracts Engineer. (Contract staff) 
Project:  Proposed Construction and Completion of SW1 project & 
Domestic Gas Pipelines for Putrajaya.  
 
Job Description   
Pre‐qualification  &  evaluation  of  contractors,  cost  checking 
development,  measurement  &  estimating  for  tender  estimates, 
preparation  of  contract  documents,  cost  control  during  the 
progress of works, preparation of interim valuation, preparation of 
variation  order,  preparation  of  cost  report  upon  alternative 
construction methods, financial progress monthly report. Prepare 
project financial report and budget. 
 
 
Aug’99 – Aug ’00.    Boustead Penang Shipyard Sdn. Bhd. (Oil & Gas) 
Formerly known as Penang Shipbuilding & Construction Sdn. Bhd. 
        Oil & Gas Division 
 
Position:       Technical Executive. (Permanent staff)  
 
Project:  Jana Manjung Power Plant, Manjung, Perak   (Steel Structure for 
Boiler House) 
 
Job Description  Pre‐qualification  &  evaluation  of  contractors,  cost  checking 
development,  measurement  &  estimating  for  tender  estimates, 
preparation  of  contract  documents,  cost  control  during  the 
progress of works, preparation of interim valuation, preparation of 
variation  order,  preparation  of  cost  report  upon  alternative 
construction methods, financial progress monthly report. Prepare 
project financial report and budget. 
 
 
Jun ’97 – Jul ’99.      KPK Quantity Surveyor (M) Sdn Bhd.  
KLIA, Sepang, Selangor. 
 
Position:       Quantity Surveyor. 
 
Project:  Kuala Lumpur International Airport (KLIA), Ground Support 
Facilities, Sepang, Malaysia. 
 
Job Description  Pre‐qualification & evaluation of contractors, cost checking during 
design development, measurement & estimating for pre‐tender 
estimates, preparation of contract documents, cost control during 
the progress of works, preparation of interim valuation, 
preparation of variation order, preparation of cost report upon 
alternative construction methods, financial progress monthly 
report, update database, project management and others which 
related to project. 
RESUME 12 of 12
ASWADIMANOR SAFEIE ©®
Apr ’96 ‐ Jul ’96.      Sikap Murni Sdn. Bhd. 
        Kuala Perlis, Perlis. 
 
Position:       Quantity Surveyor (Practical Trainee) 
 
Job Description  Assisted Project Co‐coordinator in doing costing, estimation, post 
contract, administration, supervise of a few project, 
 
Project:  Construction of Malaysia/Thailand International Boundary Wall 
from Kedah to Perlis. 
 
Apr ’92 ‐ Aug ’93.     I.Z.A. Construction Co. Sdn Bhd 
        Jalan Lapangan Terbang of Jalan Gopeng, 
        Ipoh, Perak. 
 
Position:       Site Agent 
 
Job Description  Site co‐ordination, management & supervision, prepare progress 
claim, supervision of sub‐contractor’s contract works etc. 
 
Project  Projek Komplek Kraftangan Malaysia, 
Kepala Batas, Alor Setar, Kedah. 
 
 
Expected Salary: 
 
To be discuss 
 
Availability: 
 
Immediately (24 hours) 
 
REFERENCE: 
 
M Aimi Zaimi M Azhar 
 
Head of Service Section, 
Samarang Project Management Team (SPMT) 
7th Floor, West Wing, 
Rohas Perkasa 
No. 9, Jalan P. Ramlee  
50250 Kuala Lumpur, Malaysia 
 
Tel No.:  +60 3 2330 2150 
Email : aimia@petronas.com.my 
Ahmad Rashidi Sabudin
 
Manager, Planning & Scheduling, 
Petroleum Engineering Division 
Level 17, Tower 2, 
Petronas Twin Towers 
50088 Kuala Lumpur 
 
Tel No.: +603 2331 6134 
Email : rashidi_sabudin@petronas.com.my 
 
 
 

Contenu connexe

Tendances

Vipin mv civil engineer cv and coverletter
Vipin mv civil engineer cv and coverletterVipin mv civil engineer cv and coverletter
Vipin mv civil engineer cv and coverlettervipin m.v
 
Resume Atiqah Hani binti Mohd Ahsam
Resume Atiqah Hani binti Mohd AhsamResume Atiqah Hani binti Mohd Ahsam
Resume Atiqah Hani binti Mohd AhsamATIQAH HANI
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Hamdy hussien cv resident engineer
Hamdy hussien cv resident engineerHamdy hussien cv resident engineer
Hamdy hussien cv resident engineerhamdyhussien
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSOHAIL SHAH
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMUTHUKUMAR428109
 
Resume of Civil Engineer -Layal Sayah
Resume of Civil Engineer -Layal SayahResume of Civil Engineer -Layal Sayah
Resume of Civil Engineer -Layal SayahLayal Sayah
 
Civil engineer moustafa.elsisy-cv
Civil engineer moustafa.elsisy-cvCivil engineer moustafa.elsisy-cv
Civil engineer moustafa.elsisy-cvAhmed Salem
 
Profile_Pic_V4.1
Profile_Pic_V4.1Profile_Pic_V4.1
Profile_Pic_V4.1CK Lau
 
Curriculum vitae contractor civil engineer -
Curriculum vitae contractor   civil engineer - Curriculum vitae contractor   civil engineer -
Curriculum vitae contractor civil engineer - Amir Mohammed
 
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.Romy george
 
IJAZ MOHAMMED - Facilities Manager.
IJAZ MOHAMMED - Facilities Manager.IJAZ MOHAMMED - Facilities Manager.
IJAZ MOHAMMED - Facilities Manager.Ijaz Mohammed
 
Resume of Electrical Draughtsman
Resume of Electrical DraughtsmanResume of Electrical Draughtsman
Resume of Electrical DraughtsmanAromal V V
 

Tendances (20)

CV Site Engineer Civil
CV Site Engineer CivilCV Site Engineer Civil
CV Site Engineer Civil
 
Vipin mv civil engineer cv and coverletter
Vipin mv civil engineer cv and coverletterVipin mv civil engineer cv and coverletter
Vipin mv civil engineer cv and coverletter
 
Resume
ResumeResume
Resume
 
Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CV
 
Resume Atiqah Hani binti Mohd Ahsam
Resume Atiqah Hani binti Mohd AhsamResume Atiqah Hani binti Mohd Ahsam
Resume Atiqah Hani binti Mohd Ahsam
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Hamdy hussien cv resident engineer
Hamdy hussien cv resident engineerHamdy hussien cv resident engineer
Hamdy hussien cv resident engineer
 
CV Civil Eng..
CV Civil Eng..CV Civil Eng..
CV Civil Eng..
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdf
 
Resume of Civil Engineer -Layal Sayah
Resume of Civil Engineer -Layal SayahResume of Civil Engineer -Layal Sayah
Resume of Civil Engineer -Layal Sayah
 
Civil engineer moustafa.elsisy-cv
Civil engineer moustafa.elsisy-cvCivil engineer moustafa.elsisy-cv
Civil engineer moustafa.elsisy-cv
 
Profile_Pic_V4.1
Profile_Pic_V4.1Profile_Pic_V4.1
Profile_Pic_V4.1
 
CV CIVIL ENGINEER
CV CIVIL ENGINEERCV CIVIL ENGINEER
CV CIVIL ENGINEER
 
Curriculum vitae contractor civil engineer -
Curriculum vitae contractor   civil engineer - Curriculum vitae contractor   civil engineer -
Curriculum vitae contractor civil engineer -
 
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
 
IJAZ MOHAMMED - Facilities Manager.
IJAZ MOHAMMED - Facilities Manager.IJAZ MOHAMMED - Facilities Manager.
IJAZ MOHAMMED - Facilities Manager.
 
Resume of Electrical Draughtsman
Resume of Electrical DraughtsmanResume of Electrical Draughtsman
Resume of Electrical Draughtsman
 

En vedette

EPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group
 
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM Lenka Larson
 
Complexity - Advanced Engineering Project Management
Complexity - Advanced Engineering Project ManagementComplexity - Advanced Engineering Project Management
Complexity - Advanced Engineering Project ManagementMDCSystems
 
EPC Solutions - All About Substation
EPC Solutions - All About Substation EPC Solutions - All About Substation
EPC Solutions - All About Substation EPC Solutions LLP
 
ENGINEERING PROJECT MANAGEMENT PLANNING AND SCHEDULING
ENGINEERING PROJECT MANAGEMENT PLANNING AND SCHEDULINGENGINEERING PROJECT MANAGEMENT PLANNING AND SCHEDULING
ENGINEERING PROJECT MANAGEMENT PLANNING AND SCHEDULINGIAEME Publication
 
Project management in construction
Project management in constructionProject management in construction
Project management in constructionNAVNEET KUMAR JHA
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesMANTHAN CHAUHAN
 
Work Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management ProcessWork Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management ProcessDhawal Thakkar PMP
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.NAVNEET KUMAR JHA
 
The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies Capterra
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMPSubodh Kumar
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)Prateek Agarwal
 

En vedette (14)

Muhammad Danial CV
Muhammad Danial CVMuhammad Danial CV
Muhammad Danial CV
 
EPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s Methodology
 
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM
 
Complexity - Advanced Engineering Project Management
Complexity - Advanced Engineering Project ManagementComplexity - Advanced Engineering Project Management
Complexity - Advanced Engineering Project Management
 
EPC Solutions - All About Substation
EPC Solutions - All About Substation EPC Solutions - All About Substation
EPC Solutions - All About Substation
 
ENGINEERING PROJECT MANAGEMENT PLANNING AND SCHEDULING
ENGINEERING PROJECT MANAGEMENT PLANNING AND SCHEDULINGENGINEERING PROJECT MANAGEMENT PLANNING AND SCHEDULING
ENGINEERING PROJECT MANAGEMENT PLANNING AND SCHEDULING
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission Lines
 
Work Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management ProcessWork Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management Process
 
Overview of project management in engineering environment
Overview of project management in engineering environmentOverview of project management in engineering environment
Overview of project management in engineering environment
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
 

Similaire à Project controls manager, project management, project planner, cost controls resume

Similaire à Project controls manager, project management, project planner, cost controls resume (20)

QALBI AMRI AHMED BISTARI
QALBI AMRI AHMED BISTARIQALBI AMRI AHMED BISTARI
QALBI AMRI AHMED BISTARI
 
Curriculum Vitae Micheal Yii
Curriculum Vitae Micheal YiiCurriculum Vitae Micheal Yii
Curriculum Vitae Micheal Yii
 
Nikhil S George_CV 2016 new
Nikhil S George_CV 2016 newNikhil S George_CV 2016 new
Nikhil S George_CV 2016 new
 
Barry Colin CV @ Resume
Barry Colin CV @ ResumeBarry Colin CV @ Resume
Barry Colin CV @ Resume
 
CV.mulwani new 1
CV.mulwani new 1CV.mulwani new 1
CV.mulwani new 1
 
SAMIM SIMUL
SAMIM SIMULSAMIM SIMUL
SAMIM SIMUL
 
Rizwan_Ahmed-CV_2017_01_01_19_38_32_660
Rizwan_Ahmed-CV_2017_01_01_19_38_32_660Rizwan_Ahmed-CV_2017_01_01_19_38_32_660
Rizwan_Ahmed-CV_2017_01_01_19_38_32_660
 
CV-Dr Naeem,DCM
CV-Dr Naeem,DCMCV-Dr Naeem,DCM
CV-Dr Naeem,DCM
 
RESUME FIKRI 2014 WELDER (1) (1)
RESUME FIKRI 2014 WELDER (1) (1)RESUME FIKRI 2014 WELDER (1) (1)
RESUME FIKRI 2014 WELDER (1) (1)
 
RIZWAN_AHMED-CV.PDF
RIZWAN_AHMED-CV.PDFRIZWAN_AHMED-CV.PDF
RIZWAN_AHMED-CV.PDF
 
Curiculum Vitae Muhammad Luthfi Attamimi
Curiculum Vitae Muhammad Luthfi AttamimiCuriculum Vitae Muhammad Luthfi Attamimi
Curiculum Vitae Muhammad Luthfi Attamimi
 
Resume-Sanjay Kumar
Resume-Sanjay KumarResume-Sanjay Kumar
Resume-Sanjay Kumar
 
Andri Yulianto 2016
Andri Yulianto 2016Andri Yulianto 2016
Andri Yulianto 2016
 
VINOD A CV
VINOD A CVVINOD A CV
VINOD A CV
 
ayum cv
ayum cvayum cv
ayum cv
 
app cv
app cvapp cv
app cv
 
NEW CURRICULUM VITAE ANDI M
NEW CURRICULUM VITAE ANDI MNEW CURRICULUM VITAE ANDI M
NEW CURRICULUM VITAE ANDI M
 
CIM D PG 17-20 R 1 2 - NEW CV FORM
CIM D PG 17-20 R 1 2 - NEW CV FORMCIM D PG 17-20 R 1 2 - NEW CV FORM
CIM D PG 17-20 R 1 2 - NEW CV FORM
 
02_Field HSE Mgr. - Jemmy V. Talatagod (Updated 2012.12.18
02_Field HSE Mgr. - Jemmy V. Talatagod (Updated 2012.12.1802_Field HSE Mgr. - Jemmy V. Talatagod (Updated 2012.12.18
02_Field HSE Mgr. - Jemmy V. Talatagod (Updated 2012.12.18
 
CV_Barakat Alkenani(DCNS)
CV_Barakat Alkenani(DCNS)CV_Barakat Alkenani(DCNS)
CV_Barakat Alkenani(DCNS)
 

Dernier

如何办理堪培拉大学毕业证(UC毕业证书)成绩单原版一比一
如何办理堪培拉大学毕业证(UC毕业证书)成绩单原版一比一如何办理堪培拉大学毕业证(UC毕业证书)成绩单原版一比一
如何办理堪培拉大学毕业证(UC毕业证书)成绩单原版一比一ozave
 
drug book file on obs. and gynae clinical pstings
drug book file on obs. and gynae clinical pstingsdrug book file on obs. and gynae clinical pstings
drug book file on obs. and gynae clinical pstingsKarishma7720
 
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...nirzagarg
 
Launch Your Research Career: A Beginner's Guide
Launch Your Research Career: A Beginner's GuideLaunch Your Research Career: A Beginner's Guide
Launch Your Research Career: A Beginner's GuideKaziFaisalAlam
 
B.tech Civil Engineering Major Project by Deepak Kumar ppt.pdf
B.tech Civil Engineering Major Project by Deepak Kumar ppt.pdfB.tech Civil Engineering Major Project by Deepak Kumar ppt.pdf
B.tech Civil Engineering Major Project by Deepak Kumar ppt.pdfDeepak15CivilEngg
 
UXPA Boston 2024 Maximize the Client Consultant Relationship.pdf
UXPA Boston 2024 Maximize the Client Consultant Relationship.pdfUXPA Boston 2024 Maximize the Client Consultant Relationship.pdf
UXPA Boston 2024 Maximize the Client Consultant Relationship.pdfDan Berlin
 
Joshua Minker Brand Exploration Sports Broadcaster .pptx
Joshua Minker Brand Exploration Sports Broadcaster .pptxJoshua Minker Brand Exploration Sports Broadcaster .pptx
Joshua Minker Brand Exploration Sports Broadcaster .pptxsportsworldproductio
 
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...gajnagarg
 
Top profile Call Girls In Agartala [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Agartala [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Agartala [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Agartala [ 7014168258 ] Call Me For Genuine Models ...gajnagarg
 
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...Juli Boned
 
Top profile Call Girls In daman [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In daman [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In daman [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In daman [ 7014168258 ] Call Me For Genuine Models We ...gajnagarg
 
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...nirzagarg
 
Top profile Call Girls In Raipur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Raipur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Raipur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Raipur [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
 
Brand Analysis for reggaeton artist Jahzel.
Brand Analysis for reggaeton artist Jahzel.Brand Analysis for reggaeton artist Jahzel.
Brand Analysis for reggaeton artist Jahzel.GabrielaMiletti
 
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...ZurliaSoop
 
K Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CVK Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CVK VENKAT NAVEEN KUMAR
 
一比一定(购)堪培拉大学毕业证(UC毕业证)成绩单学位证
一比一定(购)堪培拉大学毕业证(UC毕业证)成绩单学位证一比一定(购)堪培拉大学毕业证(UC毕业证)成绩单学位证
一比一定(购)堪培拉大学毕业证(UC毕业证)成绩单学位证eqaqen
 
Top profile Call Girls In chittoor [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In chittoor [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In chittoor [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In chittoor [ 7014168258 ] Call Me For Genuine Models ...gajnagarg
 
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制yynod
 

Dernier (20)

如何办理堪培拉大学毕业证(UC毕业证书)成绩单原版一比一
如何办理堪培拉大学毕业证(UC毕业证书)成绩单原版一比一如何办理堪培拉大学毕业证(UC毕业证书)成绩单原版一比一
如何办理堪培拉大学毕业证(UC毕业证书)成绩单原版一比一
 
drug book file on obs. and gynae clinical pstings
drug book file on obs. and gynae clinical pstingsdrug book file on obs. and gynae clinical pstings
drug book file on obs. and gynae clinical pstings
 
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...
 
Launch Your Research Career: A Beginner's Guide
Launch Your Research Career: A Beginner's GuideLaunch Your Research Career: A Beginner's Guide
Launch Your Research Career: A Beginner's Guide
 
B.tech Civil Engineering Major Project by Deepak Kumar ppt.pdf
B.tech Civil Engineering Major Project by Deepak Kumar ppt.pdfB.tech Civil Engineering Major Project by Deepak Kumar ppt.pdf
B.tech Civil Engineering Major Project by Deepak Kumar ppt.pdf
 
UXPA Boston 2024 Maximize the Client Consultant Relationship.pdf
UXPA Boston 2024 Maximize the Client Consultant Relationship.pdfUXPA Boston 2024 Maximize the Client Consultant Relationship.pdf
UXPA Boston 2024 Maximize the Client Consultant Relationship.pdf
 
Joshua Minker Brand Exploration Sports Broadcaster .pptx
Joshua Minker Brand Exploration Sports Broadcaster .pptxJoshua Minker Brand Exploration Sports Broadcaster .pptx
Joshua Minker Brand Exploration Sports Broadcaster .pptx
 
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...
 
Top profile Call Girls In Agartala [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Agartala [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Agartala [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Agartala [ 7014168258 ] Call Me For Genuine Models ...
 
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
 
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
 
Top profile Call Girls In daman [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In daman [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In daman [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In daman [ 7014168258 ] Call Me For Genuine Models We ...
 
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...
 
Top profile Call Girls In Raipur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Raipur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Raipur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Raipur [ 7014168258 ] Call Me For Genuine Models We...
 
Brand Analysis for reggaeton artist Jahzel.
Brand Analysis for reggaeton artist Jahzel.Brand Analysis for reggaeton artist Jahzel.
Brand Analysis for reggaeton artist Jahzel.
 
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
 
K Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CVK Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CV
 
一比一定(购)堪培拉大学毕业证(UC毕业证)成绩单学位证
一比一定(购)堪培拉大学毕业证(UC毕业证)成绩单学位证一比一定(购)堪培拉大学毕业证(UC毕业证)成绩单学位证
一比一定(购)堪培拉大学毕业证(UC毕业证)成绩单学位证
 
Top profile Call Girls In chittoor [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In chittoor [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In chittoor [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In chittoor [ 7014168258 ] Call Me For Genuine Models ...
 
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制
 

Project controls manager, project management, project planner, cost controls resume

  • 1. RESUME 1 of 12 ASWADIMANOR SAFEIE ©®   PERSONAL DATA   :                        Name      :  ASWADIMANOR BIN SAFEIE  I/C No.      :  720819‐08‐5619 (A 2194573)  DOB      :  19 Aug 1972  Age      :  44 years.  Sex      :  Male  Religion     :  Muslim  Marital Status    :  Married  Height      :  180 cm  Weight      :  60 kg.  Place of Birth    :  Taiping, Perak, Malaysia  Nationality    :  Malaysian  Driving License    :  B2 & D  E.P.F. No.    :  12650854  Income Tax No.    :  SG 5488672‐04  Int. Passport No.    :  A 30080302  CIDB Green Card No.    :  W 51240520010004  Socso No    :  P6803564X  PMI ID No.    :  1959367        Permanent Address:    Current Address:  No.47, Lorong LB 1/10,  Lembah Beriah 1,  34310 Bukit Merah,  Bagan Serai, Perak,  Malaysia.    No. 59, Jalan USJ 13/1G,  USJ 13,  47630 Subang Jaya,  Selangor, Malaysia.    Contact Number:  +60 12 3560337       Email Address:      aswadimanor@gmail.com      Sabah Address:  D‐4‐37  4th  Floor, Studio Condominium,  Taman Nelly Phase 8D,  Jalan Nountun, Kolombong,  88450 Kota Kinabalu, Sabah.       
  • 2. RESUME 2 of 12 ASWADIMANOR SAFEIE ©® SUMMARY OF CAREER    Comprehensive  knowledge  of  project  planning,  cost,  contracts,  subcontracts,  tender  and  documentation  with  19  years  working  experience  in  civil  engineering  and  oil  and  gas  industry,  experience in pre and post contract function including tender / contract review, drafting agreement,  procurement  and  award  of  subcontract  works,  negotiation  with  subcontractor  and  contract  administration, experience in cost control, monitoring and forecast for large‐scale project, ability to  prepare and present tender and project budget report to senior management, ability to evaluate and  pre‐select subcontractor and suppliers, ability to review measurement of quantities, calculation and  Bills of Quantities.    And also have more than 18 years of experience in engineering, construction/fabrication, installation,  hook‐up & commissioning (EPCC).    PERSONAL TRAITS AND ATTITUDE    Excellent cross‐cultural communication skills.  International living experience and regional exposure.  Passion for continuous learning and personal growth.  Highly motivated and driven, with strong desire to excel.   To  offer  quality  services  and  commitment  those  match  the  organization’s  hopes  and  aspiration  intention of high standard of professional practice.    EDUCATION BACKGROUND;    July ’93 ‐ Apr. 97    :  University Science of Malaysia, Pulau Pinang, Malaysia.          Bachelor Science (Hon’s) of Housing, Building & Planning  Major: Construction Management    June ’90 ‐ April ’92  :  Ungku Omar Polytechnic, Ipoh, Perak, Malaysia.          Certificate of Architecture.    COMPUTER SKILLS:     Primavera Project Management P6. Ver.8   Microsoft Office.   Microsoft Project.   Crystal Ball.   SAP System R/3.   Oracle.   Ripac (Quantity Surveyor Software).    POSITION OF RESPONSIBILITY:     Member of Project Management Institute (PMI)   Scuba School International (SSI)   Committee Member of Offshore Structure Fabricators Association of Malaysia  (OSFAM) 1999 ‐ 2000   ISO Committee Member for Stagno Tech Sdn Bhd. (2000 – 2003)    LINGUISTIC ABILITIES:    Bahasa Malaysia  :   Good in reading, writing and speaking.  English    :   Fairly good in reading, writing and speaking.     
  • 3. RESUME 3 of 12 ASWADIMANOR SAFEIE ©® COURSE / WORKSHOP ATTENDED     Float over: Engineering to Execution (Dockwise): 14th  June 2012.   Temana Redevelopment Project Concept Select Workshop (PCSB) – 29 – 30 Mac 2010.   Cost Control Process Training (PCSB) – 23 – 26 Mac 2010.   BOSIET refreshment training (28 – 30 Apr 2009) (Cert # : BEBS170964/09) (Valid : 29 Apr  12)   International Standards Workshop for Oil & Gas Industry in Malaysia – 23 – 24 Feb 2009   Primavera Project Management P6 (PCSB) – 14 – 16 Jul 2008   Defensive Driving Training (PCSB) – Apr 2008   Project Risk Management (PCSB) – Mac 2008   Injury & Incident Free – (Qatar Gas & JMJ) 23rd  July 2006   CTJV Safety Induction (CTJV) 7th  July 2006   Working at Height (CTJV) 7th  Sept 2006   H2S Safety (CTJV) 7th  Sept 2006   Emergency Response (CTJV) 7th  Sept 2006   CTJV Defensive Driving (CTJV) Feb 2007   Defensive Driving (Megamas, Brunei. 2004)   ISO 2000 (SIRIM, 2000)   TQM (Bovis, In house, 1998)      CAREER ARCHIVEMENT     Achieve 1st  Oil for BADP‐E Revisit 2 on 29th  Jul 2009 (ahead of schedule) and within  approve budget.   Committee for PCSB Planning Dept for preparing project planning guideline.   Convert existing and new projects schedule to Primavera P6 for Baram and Temana  projects.   Standardize project management system in term of cost report and reporting.   Standardize system & format in term of MTO, Claims, Invoicing and other related to  project (in software format).       
  • 4. RESUME 4 of 12 ASWADIMANOR SAFEIE ©® WORKING EXPERINCE:    Apr ’16 – Sept ‘16     MUHIBBAH ENGINEERING (M) BHD        Kota Kinabalu, Sabah    Position :    Project Control Manager (Contract)    Projects:     PETRONAS Carigali New 11 Storey Office Building Project.    Responsibility / Job Description    To manage a team of project controls in order to provide overall support to proposals and project  management  disciplines  working  on  project  bids  and  projects  in  execution.    Responsible  for  the  management of the multi‐discipline project control activities including but not limiting to planning,  document  control,  risk  management,  project  cost  control  (management  of  change),  materials  and  resource planning. Support, mentor and develop the Project Controls staff in accordance with company  policies and procedures.    Duties and Scope of Works     Lead a team in a multi office organization.   Oversee the application of the company project reporting standards to the project portfolio.   Provide  standardized  project  planning  &  scheduling,  risk  management,  document  control,  Change management, materials and resource planning.   Ensure that all project services disciplines are aligned with company policies and procedures.   Maintain effective interface between all project services related disciplines and the external  disciplines they support.   Maintain appropriate staffing levels in order to adequately support the workload.   Ensure consistent and accurate project controls/services related reporting data.    Maintain an auditable database and reporting that supports the company stage gate process.   Set objectives for project control team members and ensure that those objectives are being  met on a regular basis.        Aug ’15 – Mar ‘16  Petrofac Malaysia Limited.        Kuala Lumpur    Position:     Senior Cost Engineer (Contract Staff)    Project:      Cendor Development Project Phase 2.    Primary duties and responsibilities:    1. Study and understand all relevant project documents relating to the cost management of  allocated project(s).  2. Setting up project/projects within Computerized Cost System to agreed format  3. Establishing project control budgets based on the client approved Project Control Estimate.  4. Assisting Project Management in identifying and gaining approval of Estimates/ Change  Requests  5. Perform a variety of cost engineering functions including cost control, budget preparations,  forecasting and cost reporting under limited supervision.  6. Reviewing cost commitment and expenditure information (for all cost elements), for input to  the computerized cost control and reporting system on a weekly basis. 
  • 5. RESUME 5 of 12 ASWADIMANOR SAFEIE ©® 7. Producing regular cost reports and advising management of any forecast cost overruns,  maintaining comprehensive accessible registers of financial approvals, variations and change  orders.  8. Establish Cost Breakdown Structure (CBS) and integrate with WBS.  9. Review all PO’s as issued for cost committed.  10. Any other duties appropriate to this position  11. Report turnaround and project actual vs. baseline cost status as required.  12. Report earned value and identify trends that impact the final cost projections.  13. Prepare monthly cost report to management.  14. Review proposed cost changes with project team, client and contractors.          Feb ’15 – Jul ’15     Leadshine Sdn Bhd        Kota Kinabalu, Sabah    Position:     Project Manager (Contract Staff)    Project:        ‐ 132kv Transmission Line from MSS Tenom to PMU Nabawan, Sabah.  ‐ 33/11kv Line & Substation for Zone 1, BELB Project, Sabah.  ‐ Sugut Solar Hybrid, Kg Gugusan Sugut, Sabah.    Responsibility / Job Description    Primarily responsible for establishing, monitoring, and executing project plans. In charge of delivering  projects that improve a client’s business applications, infrastructure and processes, and doing this  within time, on budget and to the highest standards. Also involved in building relationships with  clients, and maintaining liaison with them throughout each project.    Duties      Leading, motivating and managing a team in all aspects of estimating, planning and resource  evaluation.    Controlling the budget for each project, maintaining the agreed levels of expenditure.    Maintaining proper documentation (general project plans, action items, timelines, call notes,  etc.) on all projects.    Managing project funding and resources, negotiating project changes, and adjusting resources  across multiple projects.    Developing and managing KPIs to drive improvements and deliver performance.    Setting and driving project timelines, ensuring all deliverables are met and completed on time.    Coordinating work for and providing direction to staff to complete deliverables.    Autonomously devising solutions and taking ownership of situations to ensure a projects  success.                      
  • 6. RESUME 6 of 12 ASWADIMANOR SAFEIE ©® Mac ’14 – Jan ‘15   Misi Setia Oil & Gas Sdn Bhd        Kajang, Selangor    Position :    Project Control Manager (Contract)    Projects:     EPCC Dalak Pipeline Onshore Facilities Project.        EPCC Sipitang Tee‐off Metering Project.    Responsibility / Job Description    To manage a team of project controls in order to provide overall support to proposals and project  management  disciplines  working  on  project  bids  and  projects  in  execution.    Responsible  for  the  management of the multi‐discipline project control activities including but not limiting to planning,  document  control,  risk  management,  project  cost  control  (management  of  change),  materials  and  resource planning. Support, mentor and develop the Project Controls staff in accordance with company  policies and procedures.    Duties and Scope of Works     Lead a team in a multi office organization.   Oversee the application of the company project reporting standards to the project portfolio.   Provide  standardized  project  planning  &  scheduling,  risk  management,  document  control,  Change management, materials and resource planning.   Ensure that all project services disciplines are aligned with company policies and procedures.   Maintain effective interface between all project services related disciplines and the external  disciplines they support.   Maintain appropriate staffing levels in order to adequately support the workload.   Ensure consistent and accurate project controls/services related reporting data.    Maintain an auditable database and reporting that supports the company stage gate process.   Set objectives for project control team members and ensure that those objectives are being  met on a regular basis.      Apr ’13 – Feb ‘14.    PETRONAS LNG Train 9          Yokohama, Japan    Position :      Project Control Manager (Contract)    Projects:       LNG Train 9 Complex    Responsibility / Job Description    To manage a team of project controls in order to provide overall support to proposals and project  management disciplines working on project in execution.  Responsible for the management of the  multi‐discipline project control activities including but not limiting to planning, document control, risk  management, project cost control (management of change), materials and resource planning. Support,  mentor and develop the Project Controls staff in accordance with company policies and procedures for  PETRONAS LNG 9 project.    Duties and Scope of Works   Lead a team in a multi office organization.   Oversee the application of the company project reporting standards to the project portfolio.   Provide  standardized  project  planning  &  scheduling,  risk  management,  document  control,  Change management, materials and resource planning.   Ensure that all project services disciplines are aligned with company policies and procedures. 
  • 7. RESUME 7 of 12 ASWADIMANOR SAFEIE ©®  Maintain effective interface between all project services related disciplines and the external  disciplines they support.   Maintain appropriate staffing levels in order to adequately support the workload.   Ensure consistent and accurate project controls/services related reporting data.    Maintain an auditable database and reporting that supports the company stage gate process.   Set objectives for project control team members and ensure that those objectives are being  met on a regular basis.    i. Develop the Work Breakdown Structures (WBS) and prepare Control Estimate & Project  Schedule.   Work breakdown structure detailed out at Control level.   Project Control Estimate.    ii. Develop Cost Breakdown Structure (CBS) and Organization Breakdown Structure (OBS) based  on WBS.   Cost Breakdown structure   Common Code Account assigned to each cost item   Organization Breakdown Structure with specific individual name   Manpower/Staffing Plan    iii.Develop and prepare the Project Control Plan to outline the process that will be used to  measure progress, control cost & schedule and analyze variances.   Project Control Plan outlining the progress that will be used to measure progress,  control cost & schedule, change control, reporting and analyze variances.    iv.Prepare and update the Total Project Cost against Estimate. Responsible to controlling and  monitoring the details of the actual commitment, expenditures, trends and forecast in  comparison to the approved budget.   Budget Performance (Calendar Year & Financial Year)   AFE (inclusive Structure)   Cost variance analysis   Forecast cost (Annual & Total)   Annual Budgeting (WPB)   Trend Register & Change Management.    v. Update and analyze Project Schedule and Cost, highlight cost variance/issues, Critical path and  make recommendations to the Project Managers on effective mitigation.   Earned Value Analysis   Productivity analysis of Productivity Index         
  • 8. RESUME 8 of 12 ASWADIMANOR SAFEIE ©® Sept ’11 – Mac’ 13.    PETRONAS Carigali Schlumberger Alliance          Samarang Project Management Team (SPMT).          Kuala Lumpur    Position :      Senior Project Controller  (Contract Staff)    Projects:       Samarang Field Development Phase 2,   Field Improvement Project (FIP),   Production Enhancement, Workovers Projects.    Responsibility / Job Description    Prepare and monitor package and control project execution with regards activities/tasks planned in  approval planning package and update on status of project such as progress measurement and  related works for Samarang Phase 2 and FIP projects by using Oracle Primavera Project Management  P6.    Duties and Scope of Works    i. Develop the Work Breakdown Structures (WBS) and prepare Control Estimate & Project  Schedule.   Work breakdown structure detailed out at Control level.   Project Control Estimate.    ii. Develop Cost Breakdown Structure (CBS) and Organization Breakdown Structure (OBS) based  on WBS.   Cost Breakdown structure   Common Code Account assigned to each cost item   Organization Breakdown Structure with specific individual name   Manpower/Staffing Plan    iii.Develop and prepare the Project Control Plan to outline the process that will be used to  measure progress, control cost & schedule and analyze variances.   Project Control Plan outlining the progress that will be used to measure progress,  control cost & schedule, change control, reporting and analyze variances.    iv.Prepare and update the Total Project Cost against Estimate. Responsible to controlling and  monitoring the details of the actual commitment, expenditures, trends and forecast in  comparison to the approved budget.   Budget Performance (Calendar Year & Financial Year)   AFE (inclusive Structure)   Cost variance analysis   Forecast cost (Annual & Total)   Annual Budgeting (WPB)   Trend Register & Change Management.    v. Update and analyze Project Schedule and Cost, highlight cost variance/issues, Critical path and  make recommendations to the Project Managers on effective mitigation.   Earned Value Analysis   Productivity analysis of Productivity Index       
  • 9. RESUME 9 of 12 ASWADIMANOR SAFEIE ©® Sept ’07 – Aug ‘11.    PETRONAS CARIGALI Sdn Bhd.          Development Division.          Kumang Baram Development Project (DKB).          Kuala Lumpur    Position :      Senior Project Controller (Contract Staff)    Current Projects:     BAJT‐H Revisit 1, Temana Redevelopment, Kumang Phase 1    Completed Projects:    BADP‐E Revisit 2.    Responsibility / Job Description    Prepare and monitor package and control project execution with regards activities/tasks planned in  approval planning package and update on status of project such as progress measurement,  contractors claim (cost control) & etc. for Baram and Temana field.    Duties and Scope of Works    i. Develop the Work Breakdown Structures (WBS) and prepare Control Estimate & Project  Schedule.   Work breakdown structure detailed out at Control level.   Project Control Estimate.    ii. Develop Cost Breakdown Structure (CBS) and Organization Breakdown Structure (OBS) based  on WBS.   Cost Breakdown structure   Common Code Account assigned to each cost item   Organization Breakdown Structure with specific individual name   Manpower/Staffing Plan    iii.Develop and prepare the Project Control Plan to outline the process that will be used to  measure progress, control cost & schedule and analyze variances.   Project Control Plan outlining the progress that will be used to measure progress,  control cost & schedule, change control, reporting and analyze variances.    iv.Prepare and update the Total Project Cost against Estimate. Responsible to controlling and  monitoring the details of the actual commitment, expenditures, trends and forecast in  comparison to the approved budget.   Budget Performance (Calendar Year & Financial Year)   AFE (inclusive Structure)   Cost variance analysis   Forecast cost (Annual & Total)   Annual Budgeting (WPB & CPB)   Trend Register & Change Management.    v. Update and analyze Project Schedule and Cost, highlight cost variance/issues, Critical path and  make recommendations to the Project Managers on effective mitigation.   Earned Value Analysis   Productivity analysis of Productivity Index    vi.Prepare project reports and performance review inclusive of all packages including status,  major highlights and cost control reports to Management.   Cost Report of each month.     
  • 10. RESUME 10 of 12 ASWADIMANOR SAFEIE ©® May ’06 – Aug’07.    Technip Corporation France    Seconded to :      Chiyoda Technip Joint Venture ‐ QCS.  Subcontracts Dept., Ras Laffan, Qatar.    Project:  QG 3 & QG4 LNG Onshore Facilities Project   Qatar Liquefied Gas Company Limited 3 & 4.  Ras Laffan Industrial City, Qatar.    Position :      Subcontracts Administrator (Contract Staff)    Job Description     Formalise roles & responsibilities and line of communication for all  who participate in the Contract / Subcontract execution and where  applicable, review and recommend Contractor sub‐contracting and  procurement procedures.    Review and verify Subcontractor progress payment certificate and  invoice and ensure that the payment is correctly charged to the  Contract whilst monitoring expenditure (including commitments)  against  the  ACV  (Approve  Contract  Value)  and  initiate  approval  requests.    Resolve disputes; handle claims by/against with the Subcontractor  in  liaison  with  Company  Site  Representative  and  Company  Representative.   Prepare, evaluate & recommend subcontract.   Prepare  tender  document,  tender  evaluation  and  recommendation.  Prepare  service  agreement.  Prepare  financial  report to management.    Oct ’03 – Apr ’06.     Malaysia Marine Heavy Engineering Sdn Bhd  Formerly known as Malaysia Shipyard & Engineering Sdn. Bhd.          Engineering Division / PMT,  Brunei Site Office, Kuala Belait, Brunei.    Position:       Cost & Contracts Engineer (Permanent staff)    Project:  Champion West Phase III – EPF Project    Negara Brunei Darussalam  Job Description   Formalise roles & responsibilities and line of communication for all  who participate in the Contract execution (Company & Contractor)  and  where  applicable,  review  and  approve  Contractor  sub‐ contracting and procurement procedures.    Review  and  verify  Contractor  progress  payment  certificate  and  invoice and ensure that the payment is correctly charged to the  Contract whilst monitoring expenditure (including commitments)  against the ACV and initiate approval requests.    Initiate  any  requirement  for  Changes,  Extension,  and/or  Amendments  to  the  Contract  and  obtain  necessary  approvals  together  with  the  tender  holder.  Issue  Request  For  Quotation,  Preliminary Change Order & Change Order and maintain up‐to‐date  registers of the changes to contract.  
  • 11. RESUME 11 of 12 ASWADIMANOR SAFEIE ©®  Resolve disputes; handle claims by/against with the Contractor in  liaison  with  Company  Site  Representative,  Contract  Holder,  Company Representative, Tender Holder, and Legal Advisor.     Aug ’00 – Sept 03.    Stagno Tech Sdn. Bhd.          Contract Dept. / Project Dept.    Position:       Cost & Contracts Engineer. (Contract staff)  Project:  Proposed Construction and Completion of SW1 project &  Domestic Gas Pipelines for Putrajaya.     Job Description    Pre‐qualification  &  evaluation  of  contractors,  cost  checking  development,  measurement  &  estimating  for  tender  estimates,  preparation  of  contract  documents,  cost  control  during  the  progress of works, preparation of interim valuation, preparation of  variation  order,  preparation  of  cost  report  upon  alternative  construction methods, financial progress monthly report. Prepare  project financial report and budget.      Aug’99 – Aug ’00.    Boustead Penang Shipyard Sdn. Bhd. (Oil & Gas)  Formerly known as Penang Shipbuilding & Construction Sdn. Bhd.          Oil & Gas Division    Position:       Technical Executive. (Permanent staff)     Project:  Jana Manjung Power Plant, Manjung, Perak   (Steel Structure for  Boiler House)    Job Description  Pre‐qualification  &  evaluation  of  contractors,  cost  checking  development,  measurement  &  estimating  for  tender  estimates,  preparation  of  contract  documents,  cost  control  during  the  progress of works, preparation of interim valuation, preparation of  variation  order,  preparation  of  cost  report  upon  alternative  construction methods, financial progress monthly report. Prepare  project financial report and budget.      Jun ’97 – Jul ’99.      KPK Quantity Surveyor (M) Sdn Bhd.   KLIA, Sepang, Selangor.    Position:       Quantity Surveyor.    Project:  Kuala Lumpur International Airport (KLIA), Ground Support  Facilities, Sepang, Malaysia.    Job Description  Pre‐qualification & evaluation of contractors, cost checking during  design development, measurement & estimating for pre‐tender  estimates, preparation of contract documents, cost control during  the progress of works, preparation of interim valuation,  preparation of variation order, preparation of cost report upon  alternative construction methods, financial progress monthly  report, update database, project management and others which  related to project. 
  • 12. RESUME 12 of 12 ASWADIMANOR SAFEIE ©® Apr ’96 ‐ Jul ’96.      Sikap Murni Sdn. Bhd.          Kuala Perlis, Perlis.    Position:       Quantity Surveyor (Practical Trainee)    Job Description  Assisted Project Co‐coordinator in doing costing, estimation, post  contract, administration, supervise of a few project,    Project:  Construction of Malaysia/Thailand International Boundary Wall  from Kedah to Perlis.    Apr ’92 ‐ Aug ’93.     I.Z.A. Construction Co. Sdn Bhd          Jalan Lapangan Terbang of Jalan Gopeng,          Ipoh, Perak.    Position:       Site Agent    Job Description  Site co‐ordination, management & supervision, prepare progress  claim, supervision of sub‐contractor’s contract works etc.    Project  Projek Komplek Kraftangan Malaysia,  Kepala Batas, Alor Setar, Kedah.      Expected Salary:    To be discuss    Availability:    Immediately (24 hours)    REFERENCE:    M Aimi Zaimi M Azhar    Head of Service Section,  Samarang Project Management Team (SPMT)  7th Floor, West Wing,  Rohas Perkasa  No. 9, Jalan P. Ramlee   50250 Kuala Lumpur, Malaysia    Tel No.:  +60 3 2330 2150  Email : aimia@petronas.com.my  Ahmad Rashidi Sabudin   Manager, Planning & Scheduling,  Petroleum Engineering Division  Level 17, Tower 2,  Petronas Twin Towers  50088 Kuala Lumpur    Tel No.: +603 2331 6134  Email : rashidi_sabudin@petronas.com.my