STACK MONITORING
PRESENTED BY
SRUTHEESH SOMANATH
NAMP OPERATOR 1
• The main pollutants are:-
• CO
• NOx
• CO2
• SOx
• SPM, etc.
• The gases emitted from the stack impair the
composition of the atmosphere. Thus causes
air pollution. Therefore, analysis & monitoring
of pollutants is done.
STACK
• A stack is a structure for venting hot flue gases or smoke
from a boiler, stove, furnace or fireplace to the outside
atmosphere.
• These are typically vertical to ensure that the gases flow
smoothly through them.
• The height of stack plays an important role in their ability to
transfer flue gases and it varies for different industries.
• The dispersion of pollutants at a higher altitude helps
reduce the influence of pollutants in the surroundings.
• In the case of chemically aggressive output, the tall stack
allows partial or complete self- neutralization of chemicals
in the air before they reach the ground.
• The dispersion of pollutants over a large area reduces their
concentration in compliance with regulatory limits.
STACK EMISSION MONITORING
• Stack monitoring is
performed by inserting a
measuring device into the
stack to obtain a sample of
fume.
• The purpose of stack
sampling is to determine
the quantity, quality & the
type of pollutants emitted
from a specific source,
efficiency of the pollutant
collector & to determine
an appropriate design for
air pollution control
equipment.
Devices for general use
Meters
• They are used to determine accurately the volume of
the gas collected. They are fitted with manometers and
thermometers to indicate the pressure and temperature
of the gas stream sampled.
Probes
• These are tubes suitable for penetrating into the gas
stream and should be constructed of materials which are
noncorrosive and which can withstand special
temperature conditions.
• Also, they should be constructed of materials which do
not react with the substances to be sampled.
Therefore, they should be made of stainless steel or
preferably of glass or quartz.
• A probe should have suitable length and diameter.
• To ensure isokinetic sampling conditions, the opening
of the probe should face the gas stream to be sampled.
Suction Devices
• Any suction device which has the required volumetric
capacity can be used. Vacuum pumps driven by electric
motors are very commonly used.
Selection of Sampling location and Minimum
Number of Traverse Points
• Select the sampling location at any cross section of the stack
at least eight stack diameters downstream (8D) and two stack
diameters upstream (2D) from any point of flow disturbance
(bend, expansion, contraction, visible flame, or stack exit)
• Cross section of stack is divided into a number of equal areas
where traverse points are located
• Determine the number of traverse points required.
Inside diameter of stack or duct (m) Number of points
I.D. ≤ 0.3 4
0.3 ≤ I.D. ≤ .6 8
0.6 ≤ I.D. ≤ 1.2 12
1.2 ≤ I.D. ≤ 2.4 20
2.4 ≤ I.D. ≤ 5 32 8
Location of traverse points on circular cross section
9
For circular stack divide the cross section into equal parts by two
right-angle diameters, locate half the traverse points symmetrically
along each diameter.
Location of traverse points on diameters of cross
section of circular stacks
10
Example showing circular stack cross section divided
into 12 equal areas, with location of traverse points
11
• For stack having dia. > than 0.61 m , no traverse point shall be
located within 2.5 cm of stack wall.
• For stack diameters < than 0.61 m , no traverse point shall be
located within 1.3 cm of stack wall.
• If any traverse points falls within 2.5/1.3 cm of stack wall,
relocate them away from stack wall.
• For elliptical stacks having unequal perpendicular diameter,
separate traverse points shall be calculated along each
diameter.
• Use same traverse points and locations for velocity and
particulate measurements.
12
Location of sampling port
• To ensure laminar flow, 8D- 2D
i. Number of sampling port – min. 2 ports are required, so that full
cross- sectional area of stack can be covered for measurements.
ii. Dimensions of sampling port – standard flanged pipe of 0.10 m
inside diameter with 0.15 m bolt circle diameter. Port should
extended outward from the exterior stack wall not less than
40mm, installed at height between 0.90 and 1.2 m above the
floor of working platform.
iii. Platform – If two ports are required at 90o , half of stack
circumference and If four ports are required, entire
circumference ; minimum platform width shall always be 1.2 m
iv. Platform access – caged ladder, stairway, rooftop
v. Platform loading – support load of at least three men and
equipments
vi. Power supply – At platform and stack base 13
14
˃
Position of sampling ports in a circular stack
Iso-kinetic sampling
• Obtaining representative particulate sample
• Kinetic energy of gas stream in stack should be equal to
kinetic energy of gas stream through the sampling nozzle
• If sampling velocity is greater than velocity in duct tube will
suck extra particles, collecting higher percentage of smaller
particles, the sampling will have a lower mass concentration
• If the sampling velocity is less than velocity in duct then tube
will became pressurized and particles will want to be expelled
from the tube. The particles more easily dispelled are small
particles resulted into collection of larger particles ,PM has a
higher mass conc.
15
16
Stack Temperature and Velocity Measurement
• VVM-1
• Temperature- Has a digital pyrometer and thermocouple.
• Velocity- A digital pressure cell (for measurement of pressure
in mm of H2O) along with pitot tube.
17
Thermocouple
Inter-connection
tubings
Carrying
case
Extension for pitot
tube
Pitot tube
Pyrometer
Digital pressure
cell
Stack Temperature and Velocity Measurement
• APM 602
• Temperature- Has a digital pyrometer and thermocouple.
• Velocity- An inclined cum vertical manometer along with pitot
tube.
18
Pitot tube
Thermocouple
sensor
Manometer
Digital
pyrometer
Inter-connection
tubings
Spirit level
Temperature Measurement
• Thermocouple is connected with the Pyrometer
• Switch on the pyrometer to measure the Ambient
temperature (Tm)
• Insert the thermocouple sensor into the stack
through sampling port
• Allow the temperature to stabilize for atleast 10
minutes
• Record Stack temperature (Ts) from pyrometer
• Remove the thermocouple
• Hold the sensor by its handle, it is likely to be hot.
19
Stack gas velocity determination
• Connect two ends of the manometer marked “pitot” to ends
of Pitot tube (pitot end which has mark is connected to ‘+ve’
end of manometer)
• Manometer sets to zero before hoses are connected
• Insert pitot tube into stack keeping marked end of the tube
facing the air stream
• Plug the clearance between the port hole walls and pitot tube
with asbestos wool to prevent air flow through port hole
• Orient the pitot tube axis and search best alignment (highest
reading )
• Note the manometer reading at various traverse points
• Disconnect the pitot tube when entire cross-section of stack
has been traversed
20
Pitot tube with Manometer
21
Type S pitot tube
22
i. Stack gas velocity
V = k x (Stack Temperature x Pressure difference)1/2
where, V = Air velocity (m/sec)
k = Pitot tube constant (0.1973)
23
ii. Stack gas volumetric flow Rate
Qs = V x 60 x 1000 x Tm/Ts x A
where,
Qs = Flow rate (lpm)
V = Velocity of stack gases (m/sec)
A = Cross - sectional area of nozzle (m2)
Tm= Absolute ambient gas temperature (K)
Ts = Absolute stack gas temperature (K)
24
Nozzles
• Stainless steel (SS 304) with sharp tapered leading edges.
• Minimum recommended internal diameter is 7 mm.
• Select the nozzle size which provides meter sampling rate up
to 30 LPM.
• Nozzle Sizes :-
25
Nozzle
(inches)
Internal diameter
(mm)
Area
(m2)
1/2 12.58 12.4 x 10-5
3/8 8.60 5.8 x 10-5
1/4 6.32 3.1 x 10-5
1/8 3.10 7.5 x 10-6
Sampling Period for Particulate matter
• A minimum of 1 m3 of dry gas has been withdrawn
for sampling.
• The mass of particulate matter amounts to atleast 20
percent of the mass of the filtering medium in the
sampler.
• Sampling period should be of lesser duration in
heavy dust concentrations.
• Too short time may give unreliable results and too
long a time may cause resistance of sampling train to
exceeds capabilities of vacuum pump.
26
Handy Stack Sampler APM-620
• The SPM is trapped and collected in a Filter media
• Various gaseous pollutants are absorbed in suitable reagents,
then analysed subsequently by simple wet chemistry methods
to determine the concentrations.
27
Dry gas
meter
Vacuum
pump
Nozzle
Filter
holder
Probe
Sampler
Hose
pipes
Rotameter
Handy Stack Sampler APM-620
i. Nozzles : A set of 4 stainless steel nozzles with internal diameter of
12.5mm, 98.6 mm, 6.3 mm & 3.1 mm.
ii. Filter Holder : Stainless steel (SS 304), Suitable to hold (a) cellulose
filtration thimble (size 28mm lD X 100mm long) (b) glass micro fibre
thimble (size 19mm lD X 90mm long)
iii. Sampling Probe : Made from SS 304 , 0.3m and 1 m in length
iv. Impingers : 2 No. (240 ml) and 3 No. (120 ml) borosilicate glass
impingers with Ball socket joints accommodated in ice tray.
v. Rotameter : Used for flow measurement, Plastic body rotameter , 0
– 30 lpm for particulates and 0-3 lpm for gaseous pollutants
monitoring
vi. Dry Gas Meter : Mechanical Type with a range of 40 lpm flow rate.
vii.Vacuum Pump : Monoblock Rotary Vane type, oil lubricated, 0.5 HP
single phase motor (230V) with 50 lpm free flow capacity
28
Filter media - Thimbles
• Paper thimbles – used at temp. up to 150o C
• Alundum thimbles – able to withstand high temp. up to 550o C
high wet strength, chemical resistance
• Glass fibre thimbles – used in heavy dust loading conditions,
able to withstand 550o C of temperature
29
THANKYOU

Contenu connexe

Tendances

Design & construction of secure waste landfill
Design & construction of secure waste landfillDesign & construction of secure waste landfill
Design & construction of secure waste landfillKezar Ali. Shah
 
Water Treatment Process (Screening)
Water Treatment Process (Screening)Water Treatment Process (Screening)
Water Treatment Process (Screening)Zairul Zaiky
 
chemical oxygen demand - akash
chemical oxygen demand - akash chemical oxygen demand - akash
chemical oxygen demand - akash akash kanani
 
Hazardous waste management
Hazardous waste managementHazardous waste management
Hazardous waste managementUgrasen Gulshan
 
Chemical oxygen demand(COD)
Chemical oxygen demand(COD)Chemical oxygen demand(COD)
Chemical oxygen demand(COD)CCSU
 
waste minimization techniques
waste minimization techniqueswaste minimization techniques
waste minimization techniquesAbuzer Ansari
 
Unit 3 control of particulate contaminants
Unit 3 control of particulate contaminantsUnit 3 control of particulate contaminants
Unit 3 control of particulate contaminantsChockalingam T
 
2. screen chamber
 2. screen chamber 2. screen chamber
2. screen chambervvsasane
 
Characteristics of Waste-Water (Unit-I)
Characteristics of Waste-Water (Unit-I)Characteristics of Waste-Water (Unit-I)
Characteristics of Waste-Water (Unit-I)GAURAV. H .TANDON
 
National ambient air quality standards 2009.pdf
National ambient air quality standards 2009.pdfNational ambient air quality standards 2009.pdf
National ambient air quality standards 2009.pdfShrenikMehar
 
EV5301- Environment Impact Assessment-previous year question paper
EV5301- Environment Impact Assessment-previous year question paperEV5301- Environment Impact Assessment-previous year question paper
EV5301- Environment Impact Assessment-previous year question paperRaj Kumar
 

Tendances (20)

Design & construction of secure waste landfill
Design & construction of secure waste landfillDesign & construction of secure waste landfill
Design & construction of secure waste landfill
 
cetp
cetpcetp
cetp
 
Mbbr
MbbrMbbr
Mbbr
 
Water Treatment Process (Screening)
Water Treatment Process (Screening)Water Treatment Process (Screening)
Water Treatment Process (Screening)
 
Module IV Wastewater treatment methods
Module IV Wastewater treatment methodsModule IV Wastewater treatment methods
Module IV Wastewater treatment methods
 
chemical oxygen demand - akash
chemical oxygen demand - akash chemical oxygen demand - akash
chemical oxygen demand - akash
 
Hazardous waste management
Hazardous waste managementHazardous waste management
Hazardous waste management
 
Chemical oxygen demand(COD)
Chemical oxygen demand(COD)Chemical oxygen demand(COD)
Chemical oxygen demand(COD)
 
Water sampling ppt
Water sampling pptWater sampling ppt
Water sampling ppt
 
Treatment and disposal of sludge
Treatment and disposal of sludgeTreatment and disposal of sludge
Treatment and disposal of sludge
 
waste minimization techniques
waste minimization techniqueswaste minimization techniques
waste minimization techniques
 
Unit 3 control of particulate contaminants
Unit 3 control of particulate contaminantsUnit 3 control of particulate contaminants
Unit 3 control of particulate contaminants
 
2. screen chamber
 2. screen chamber 2. screen chamber
2. screen chamber
 
Characteristics of Waste-Water (Unit-I)
Characteristics of Waste-Water (Unit-I)Characteristics of Waste-Water (Unit-I)
Characteristics of Waste-Water (Unit-I)
 
Reverse osmosis module
Reverse osmosis moduleReverse osmosis module
Reverse osmosis module
 
National ambient air quality standards 2009.pdf
National ambient air quality standards 2009.pdfNational ambient air quality standards 2009.pdf
National ambient air quality standards 2009.pdf
 
Air sampling
Air samplingAir sampling
Air sampling
 
Municipal solid waste
Municipal solid waste Municipal solid waste
Municipal solid waste
 
EV5301- Environment Impact Assessment-previous year question paper
EV5301- Environment Impact Assessment-previous year question paperEV5301- Environment Impact Assessment-previous year question paper
EV5301- Environment Impact Assessment-previous year question paper
 
Activated sludge process
Activated sludge processActivated sludge process
Activated sludge process
 

Similaire à stack new.pdf

STACK ANALYSIS MONITORING STACK S AMPLING
STACK ANALYSIS MONITORING STACK S AMPLINGSTACK ANALYSIS MONITORING STACK S AMPLING
STACK ANALYSIS MONITORING STACK S AMPLINGSarangBonde2
 
GAS CHROMATOGRAPHY-Principle, Instrumentation Advantage and disadvantage appl...
GAS CHROMATOGRAPHY-Principle, Instrumentation Advantage and disadvantage appl...GAS CHROMATOGRAPHY-Principle, Instrumentation Advantage and disadvantage appl...
GAS CHROMATOGRAPHY-Principle, Instrumentation Advantage and disadvantage appl...DipeshGamare
 
final presentation edit.pptx
final presentation edit.pptxfinal presentation edit.pptx
final presentation edit.pptxssuser0ee912
 
Design and Fabrication of an In-Pipe Inspection Robot
Design and Fabrication of an In-Pipe Inspection RobotDesign and Fabrication of an In-Pipe Inspection Robot
Design and Fabrication of an In-Pipe Inspection Robotpaperpublications3
 
MANUALS FOR FLUID MECHANICS LAB.pdf
MANUALS FOR FLUID MECHANICS LAB.pdfMANUALS FOR FLUID MECHANICS LAB.pdf
MANUALS FOR FLUID MECHANICS LAB.pdfamgothusandeep
 
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...Gerard B. Hawkins
 
B3 Sverrir Þórhallsson Slim wells for geothermal exploration
B3 Sverrir Þórhallsson Slim wells for geothermal explorationB3 Sverrir Þórhallsson Slim wells for geothermal exploration
B3 Sverrir Þórhallsson Slim wells for geothermal explorationGEORG Geothermal Workshop 2016
 
Vortex Flow Meters- Badger Meter
Vortex Flow Meters- Badger MeterVortex Flow Meters- Badger Meter
Vortex Flow Meters- Badger MeterBell Flow Systems
 
Ch6_Flow Measurements.pdf
Ch6_Flow Measurements.pdfCh6_Flow Measurements.pdf
Ch6_Flow Measurements.pdfVamshi962726
 

Similaire à stack new.pdf (20)

STACK ANALYSIS MONITORING STACK S AMPLING
STACK ANALYSIS MONITORING STACK S AMPLINGSTACK ANALYSIS MONITORING STACK S AMPLING
STACK ANALYSIS MONITORING STACK S AMPLING
 
L 37 final
L 37 finalL 37 final
L 37 final
 
Ap ms l5
Ap ms l5Ap ms l5
Ap ms l5
 
Gas Chromatography (GC) By Faizan Akram
Gas Chromatography (GC) By Faizan Akram Gas Chromatography (GC) By Faizan Akram
Gas Chromatography (GC) By Faizan Akram
 
L 35 final
L 35 finalL 35 final
L 35 final
 
GAS CHROMATOGRAPHY-Principle, Instrumentation Advantage and disadvantage appl...
GAS CHROMATOGRAPHY-Principle, Instrumentation Advantage and disadvantage appl...GAS CHROMATOGRAPHY-Principle, Instrumentation Advantage and disadvantage appl...
GAS CHROMATOGRAPHY-Principle, Instrumentation Advantage and disadvantage appl...
 
AMAN PPT 4985 Assignment-1.pptx
AMAN PPT 4985 Assignment-1.pptxAMAN PPT 4985 Assignment-1.pptx
AMAN PPT 4985 Assignment-1.pptx
 
final presentation edit.pptx
final presentation edit.pptxfinal presentation edit.pptx
final presentation edit.pptx
 
Ap ms oe_l3
Ap ms oe_l3Ap ms oe_l3
Ap ms oe_l3
 
Design and Fabrication of an In-Pipe Inspection Robot
Design and Fabrication of an In-Pipe Inspection RobotDesign and Fabrication of an In-Pipe Inspection Robot
Design and Fabrication of an In-Pipe Inspection Robot
 
Venturi
VenturiVenturi
Venturi
 
Chapter4.pdf
Chapter4.pdfChapter4.pdf
Chapter4.pdf
 
Trenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe InstallationsTrenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe Installations
 
MANUALS FOR FLUID MECHANICS LAB.pdf
MANUALS FOR FLUID MECHANICS LAB.pdfMANUALS FOR FLUID MECHANICS LAB.pdf
MANUALS FOR FLUID MECHANICS LAB.pdf
 
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
 
GAS CHROMATOGRAPHY
GAS  CHROMATOGRAPHYGAS  CHROMATOGRAPHY
GAS CHROMATOGRAPHY
 
Unit v
Unit vUnit v
Unit v
 
B3 Sverrir Þórhallsson Slim wells for geothermal exploration
B3 Sverrir Þórhallsson Slim wells for geothermal explorationB3 Sverrir Þórhallsson Slim wells for geothermal exploration
B3 Sverrir Þórhallsson Slim wells for geothermal exploration
 
Vortex Flow Meters- Badger Meter
Vortex Flow Meters- Badger MeterVortex Flow Meters- Badger Meter
Vortex Flow Meters- Badger Meter
 
Ch6_Flow Measurements.pdf
Ch6_Flow Measurements.pdfCh6_Flow Measurements.pdf
Ch6_Flow Measurements.pdf
 

Dernier

Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxNazmusSakibNS
 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...MOHANI PANDEY
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxEdgar Hertwich
 
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...SUHANI PANDEY
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxhossanmdjobayer103
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionRocioDanicaCondorGol1
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedDelhi Call girls
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...tanu pandey
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...SUHANI PANDEY
 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
 
Plastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability ProgramsPlastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability Programsitadmin50
 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...SUHANI PANDEY
 

Dernier (20)

Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Water Pollution
Water Pollution Water Pollution
Water Pollution
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptx
 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptx
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Plastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability ProgramsPlastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability Programs
 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
 

stack new.pdf

  • 1. STACK MONITORING PRESENTED BY SRUTHEESH SOMANATH NAMP OPERATOR 1
  • 2. • The main pollutants are:- • CO • NOx • CO2 • SOx • SPM, etc. • The gases emitted from the stack impair the composition of the atmosphere. Thus causes air pollution. Therefore, analysis & monitoring of pollutants is done.
  • 3. STACK • A stack is a structure for venting hot flue gases or smoke from a boiler, stove, furnace or fireplace to the outside atmosphere. • These are typically vertical to ensure that the gases flow smoothly through them. • The height of stack plays an important role in their ability to transfer flue gases and it varies for different industries. • The dispersion of pollutants at a higher altitude helps reduce the influence of pollutants in the surroundings. • In the case of chemically aggressive output, the tall stack allows partial or complete self- neutralization of chemicals in the air before they reach the ground. • The dispersion of pollutants over a large area reduces their concentration in compliance with regulatory limits.
  • 4. STACK EMISSION MONITORING • Stack monitoring is performed by inserting a measuring device into the stack to obtain a sample of fume. • The purpose of stack sampling is to determine the quantity, quality & the type of pollutants emitted from a specific source, efficiency of the pollutant collector & to determine an appropriate design for air pollution control equipment.
  • 5. Devices for general use Meters • They are used to determine accurately the volume of the gas collected. They are fitted with manometers and thermometers to indicate the pressure and temperature of the gas stream sampled. Probes • These are tubes suitable for penetrating into the gas stream and should be constructed of materials which are noncorrosive and which can withstand special temperature conditions. • Also, they should be constructed of materials which do not react with the substances to be sampled.
  • 6. Therefore, they should be made of stainless steel or preferably of glass or quartz. • A probe should have suitable length and diameter. • To ensure isokinetic sampling conditions, the opening of the probe should face the gas stream to be sampled. Suction Devices • Any suction device which has the required volumetric capacity can be used. Vacuum pumps driven by electric motors are very commonly used.
  • 7.
  • 8. Selection of Sampling location and Minimum Number of Traverse Points • Select the sampling location at any cross section of the stack at least eight stack diameters downstream (8D) and two stack diameters upstream (2D) from any point of flow disturbance (bend, expansion, contraction, visible flame, or stack exit) • Cross section of stack is divided into a number of equal areas where traverse points are located • Determine the number of traverse points required. Inside diameter of stack or duct (m) Number of points I.D. ≤ 0.3 4 0.3 ≤ I.D. ≤ .6 8 0.6 ≤ I.D. ≤ 1.2 12 1.2 ≤ I.D. ≤ 2.4 20 2.4 ≤ I.D. ≤ 5 32 8
  • 9. Location of traverse points on circular cross section 9 For circular stack divide the cross section into equal parts by two right-angle diameters, locate half the traverse points symmetrically along each diameter.
  • 10. Location of traverse points on diameters of cross section of circular stacks 10
  • 11. Example showing circular stack cross section divided into 12 equal areas, with location of traverse points 11
  • 12. • For stack having dia. > than 0.61 m , no traverse point shall be located within 2.5 cm of stack wall. • For stack diameters < than 0.61 m , no traverse point shall be located within 1.3 cm of stack wall. • If any traverse points falls within 2.5/1.3 cm of stack wall, relocate them away from stack wall. • For elliptical stacks having unequal perpendicular diameter, separate traverse points shall be calculated along each diameter. • Use same traverse points and locations for velocity and particulate measurements. 12
  • 13. Location of sampling port • To ensure laminar flow, 8D- 2D i. Number of sampling port – min. 2 ports are required, so that full cross- sectional area of stack can be covered for measurements. ii. Dimensions of sampling port – standard flanged pipe of 0.10 m inside diameter with 0.15 m bolt circle diameter. Port should extended outward from the exterior stack wall not less than 40mm, installed at height between 0.90 and 1.2 m above the floor of working platform. iii. Platform – If two ports are required at 90o , half of stack circumference and If four ports are required, entire circumference ; minimum platform width shall always be 1.2 m iv. Platform access – caged ladder, stairway, rooftop v. Platform loading – support load of at least three men and equipments vi. Power supply – At platform and stack base 13
  • 14. 14 ˃ Position of sampling ports in a circular stack
  • 15. Iso-kinetic sampling • Obtaining representative particulate sample • Kinetic energy of gas stream in stack should be equal to kinetic energy of gas stream through the sampling nozzle • If sampling velocity is greater than velocity in duct tube will suck extra particles, collecting higher percentage of smaller particles, the sampling will have a lower mass concentration • If the sampling velocity is less than velocity in duct then tube will became pressurized and particles will want to be expelled from the tube. The particles more easily dispelled are small particles resulted into collection of larger particles ,PM has a higher mass conc. 15
  • 16. 16
  • 17. Stack Temperature and Velocity Measurement • VVM-1 • Temperature- Has a digital pyrometer and thermocouple. • Velocity- A digital pressure cell (for measurement of pressure in mm of H2O) along with pitot tube. 17 Thermocouple Inter-connection tubings Carrying case Extension for pitot tube Pitot tube Pyrometer Digital pressure cell
  • 18. Stack Temperature and Velocity Measurement • APM 602 • Temperature- Has a digital pyrometer and thermocouple. • Velocity- An inclined cum vertical manometer along with pitot tube. 18 Pitot tube Thermocouple sensor Manometer Digital pyrometer Inter-connection tubings Spirit level
  • 19. Temperature Measurement • Thermocouple is connected with the Pyrometer • Switch on the pyrometer to measure the Ambient temperature (Tm) • Insert the thermocouple sensor into the stack through sampling port • Allow the temperature to stabilize for atleast 10 minutes • Record Stack temperature (Ts) from pyrometer • Remove the thermocouple • Hold the sensor by its handle, it is likely to be hot. 19
  • 20. Stack gas velocity determination • Connect two ends of the manometer marked “pitot” to ends of Pitot tube (pitot end which has mark is connected to ‘+ve’ end of manometer) • Manometer sets to zero before hoses are connected • Insert pitot tube into stack keeping marked end of the tube facing the air stream • Plug the clearance between the port hole walls and pitot tube with asbestos wool to prevent air flow through port hole • Orient the pitot tube axis and search best alignment (highest reading ) • Note the manometer reading at various traverse points • Disconnect the pitot tube when entire cross-section of stack has been traversed 20
  • 21. Pitot tube with Manometer 21
  • 22. Type S pitot tube 22
  • 23. i. Stack gas velocity V = k x (Stack Temperature x Pressure difference)1/2 where, V = Air velocity (m/sec) k = Pitot tube constant (0.1973) 23
  • 24. ii. Stack gas volumetric flow Rate Qs = V x 60 x 1000 x Tm/Ts x A where, Qs = Flow rate (lpm) V = Velocity of stack gases (m/sec) A = Cross - sectional area of nozzle (m2) Tm= Absolute ambient gas temperature (K) Ts = Absolute stack gas temperature (K) 24
  • 25. Nozzles • Stainless steel (SS 304) with sharp tapered leading edges. • Minimum recommended internal diameter is 7 mm. • Select the nozzle size which provides meter sampling rate up to 30 LPM. • Nozzle Sizes :- 25 Nozzle (inches) Internal diameter (mm) Area (m2) 1/2 12.58 12.4 x 10-5 3/8 8.60 5.8 x 10-5 1/4 6.32 3.1 x 10-5 1/8 3.10 7.5 x 10-6
  • 26. Sampling Period for Particulate matter • A minimum of 1 m3 of dry gas has been withdrawn for sampling. • The mass of particulate matter amounts to atleast 20 percent of the mass of the filtering medium in the sampler. • Sampling period should be of lesser duration in heavy dust concentrations. • Too short time may give unreliable results and too long a time may cause resistance of sampling train to exceeds capabilities of vacuum pump. 26
  • 27. Handy Stack Sampler APM-620 • The SPM is trapped and collected in a Filter media • Various gaseous pollutants are absorbed in suitable reagents, then analysed subsequently by simple wet chemistry methods to determine the concentrations. 27 Dry gas meter Vacuum pump Nozzle Filter holder Probe Sampler Hose pipes Rotameter
  • 28. Handy Stack Sampler APM-620 i. Nozzles : A set of 4 stainless steel nozzles with internal diameter of 12.5mm, 98.6 mm, 6.3 mm & 3.1 mm. ii. Filter Holder : Stainless steel (SS 304), Suitable to hold (a) cellulose filtration thimble (size 28mm lD X 100mm long) (b) glass micro fibre thimble (size 19mm lD X 90mm long) iii. Sampling Probe : Made from SS 304 , 0.3m and 1 m in length iv. Impingers : 2 No. (240 ml) and 3 No. (120 ml) borosilicate glass impingers with Ball socket joints accommodated in ice tray. v. Rotameter : Used for flow measurement, Plastic body rotameter , 0 – 30 lpm for particulates and 0-3 lpm for gaseous pollutants monitoring vi. Dry Gas Meter : Mechanical Type with a range of 40 lpm flow rate. vii.Vacuum Pump : Monoblock Rotary Vane type, oil lubricated, 0.5 HP single phase motor (230V) with 50 lpm free flow capacity 28
  • 29. Filter media - Thimbles • Paper thimbles – used at temp. up to 150o C • Alundum thimbles – able to withstand high temp. up to 550o C high wet strength, chemical resistance • Glass fibre thimbles – used in heavy dust loading conditions, able to withstand 550o C of temperature 29