SlideShare une entreprise Scribd logo
1  sur  4
BALAMURUGAN.M
E-mail :-manickbaala@gmail.com
Telephone :- 00968-93003022
POST APPLIED
Sr. QS / Sr. Estimator.
CARRIER OBJECTIVE
To utilize the full potential of Sr. Quantity Surveyor / Estimation Engineer Role in the Building
Construction (Residential, Commercial & Industrial), Pipe line such as Water and Drain line
Projects (HDPE & PVC) as well as in Oil & Gas Industry while involving in most of the managerial
activities to realizes the Experiences, academic Qualifications and personal skills as well.
EDUCATIONAL QUALIFICATIONS
 B.Tech (Civil). Correspondence course with Karnataka University - Technical Education Approved
and
Conducted by AICTE in Bangalore, @ India. (Academic year 2013/2014) in First Class
 Completed my Technology Studies for Diploma in CIVIL ENGINEERING,
Technical Education Approved and Conducted by State Board of Technical Education in
Tamilnadu, @ India. (Academic year 2005/2006) in First Class
 Passed my Hr.Sec.Studies in Sacred Heart Higher Sec. School in Thiruvarangam @ Tamilnadu (During
the Period of Apr-2001)
Experience & Employment Summary (09Yrs & 7Months)
1. M/s. GALFAR Engineering & Contracting S.A.O.G, @ Oman. (AT PRESENT)
Client: Occidental Mukhaizna LLC, (OXY)
Project: OXY Mukhaizna - Civil work Services contract / Const. of New Airport / Substation buildings
Project Value: 52Million (USD)
Period: June 2013 - Present (Post Tendering) Sr. QS Cum. Estimator
2. M/s. Special Technical Services & Tebodin L.L.C., @ Oman.
Client: Petroleum Development of Oman (PDO)
Project: ODC - Off plot Delivery Contract
Project Value: 22Million (Omani Riyal)
Period: April 2012 - Till Jan 2013 (Pre & Post Tender) Sr. Quantity Surveyor
3. M/s. Towel Infrastructure Projects & CO (TIPCO) L.L.C., @ Oman.
Client: Public Authority of Electricity & Water Board (PAEW)
Project: 1. Sur - Construction of Reservoirs and Desalination plant (Reverse Osmosis Plant)
Project Value: 7.0Million (Omani Riyal)
Project: 2. Wilayat Mahdah - Construction of Reservoirs and Desalination plant (Reverse Osmosis Plant)
Project Value: 11.50Million (Omani Riyal)
Period: June 2010 - Jan 2012 (Pre & Post Tender) Sr. QS Cum. Estimator
4. M/s. GALFAR Engineering & Contracting S.A.O.G, @ Oman.
Client: 1. Saud Bhawan Group LLC, (SBG)
Project: SBG - Corporate centre @ wattayah - (Car Show room) & Construction of SERVICE ROADS around
Showroom complex
Project Value: 27Million (Omani Riyal)
Client: 2. Sultanate of Oman the ministry of royal affair court royal estate palace at Salalah (Ministry of
Royal affair court and Estate Palace - Salalah)
Project: Re-Development of Al-Shatti Palace
Project Value: 45Million (Omani Riyal)
Period: Nov 2007 - May 2010 (Post Tender) Quantity Surveyor
5. M/s. R.Rangasamy & Co. (Engineering & Contracting) (Pvt.) Ltd, @ India
Client: Indian Institute of Technology - Madras (IIT-M)
Project: IIT - Civil Annual Maintenance Contract (AMC - Contract)
Project Value: 5.4Crore (Indian Rupees)
Period: April 2006 - October 2007 (Post Tender) Site Supervisor (Civil)
RESPONSIBILITIES
A. PRE & POST TENDERING:
* Rate analysis for preparation of Bidding.
* Preparation and submission of Proposed Cost Estimation to obtain the PO and for further
Requirements to precede the job as per company’s requirement.
* Maintaining the proper records for Internal and External verifications related to QS for the
billing purpose.
* Cost analysis for Extra and Deviated Items.
* Detailed Study of B.O.Q, Technical Specifications and incorporating the various factors -
- coming out of Contracts
* Reconciliation of materials.
* Work done reconciliation & other documents.
* Checking and certifying the Invoices for the Subcontractor’s work done
* Preparation of subcontractor’s payment certificates.
* Regular Contractual Correspondence with Clients.
* Quantification of Acceleration measures taken and submitted to Client for extra billing.
* Maintaining Joint measurement with client and preparations of monthly bills.
* Preparation of Bar Bending schedules
* Preparing and maintaining the Sub contractor correspondence & Reconciliation.
* Preparation of work orders for Sub-Contractors.
* Preparation of Shop drawings by CADD
B. Off plot Delivery Contract (ODC):
Nature of job:
Well pad location preparation works, making access for Hoist moving activities, Oil
& Gas flow line routings, Civil, Mechanical, Electrical and Instrumentation works to the
Correspondence,
Responsibilities
* Preparation and submission of Proposed Cost Estimation to obtain the PO and for further
Requirements to precede the job as per company’s requirement.
* Maintaining the proper records for Internal and External verifications related to QS for the
billing purpose.
* Cost analysis for Extra and Deviated Items.
* Detailed Study of B.O.Q, Technical Specifications and incorporating the various factors -
- coming out of Contracts
* Reconciliation of materials.
* Work done reconciliation & other documents.
* Checking and certifying the Invoices for the Subcontractor’s work done
* Preparation of subcontractor’s payment certificates.
* Regular Contractual Correspondence with Clients.
* Quantification of Acceleration measures taken and submitted to Client for extra billing.
* Maintaining Joint measurement with client and preparations of monthly bills.
* Preparation of work orders for Sub-Contractors.
C. Annual Maintenance Contract (AMC):
Responsibilities
* Responsibilities include meeting prospective clients, establishing design requirements
And scope of work, Preparing of work schedules, co-ordinate with the site team.
* Co-ordination with external agencies.
* Knowledge of using right tools for inspection
* Optimum utilization of resources (materials, machines and workers)
* Check whether progress is in line with scheduled program and plan to make up for time
Loss if any
* Preparing material request as per the site req.
* Asserting extra works and prepares schedules, Coordinating works
Extra Skills in Site Execution:
Preparation of BBS, Land survey, Site Execution, Project Planning.,
COMPUTER LITERACY
* Fluency in Microsoft Office packages (Word, Excel, Access and PowerPoint).
* Primavera P6 (All packages)
* MSP (Microsoft Project),
* Auto CADD - 2010,
* ERP, IPMS, Internet & E-mail
PERSONAL DETAILS
Name : Balamurugan .M
Father’s Name : Manickam .P
Passport No : G-5292893
PP Valid till : 30/09/2017
Place of Issue : Tiruchirappalli
Nationality : Indian
Marital status : Married
Children : 01
Mother Tongue : Tamil
Contact (Home) : 0091-7401314664 (Brother)
Languages : Fluent in Tamil, English, Hindi, Malayalam & Arabic (Can be managed).
REFERENCE’S
* Will provide based on request
ACKNOWLEDGEMENT
I hereby acknowledge that the above information given is correct to the best of my knowledge.
………………………….… 12/01/2016
(Baalamurugan.M) (Date)

Contenu connexe

Tendances (20)

Sajeer mohmamed
Sajeer mohmamedSajeer mohmamed
Sajeer mohmamed
 
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CV
 
Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16
 
Zuher Mirza CV
Zuher Mirza CVZuher Mirza CV
Zuher Mirza CV
 
Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016
 
012741
012741012741
012741
 
CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.
 
cv 2015
cv 2015cv 2015
cv 2015
 
Mina Updated Resume
Mina Updated ResumeMina Updated Resume
Mina Updated Resume
 
CURRICULUM_VITAE_recent.PDF
CURRICULUM_VITAE_recent.PDFCURRICULUM_VITAE_recent.PDF
CURRICULUM_VITAE_recent.PDF
 
Mohamed Khaled 2
Mohamed Khaled 2Mohamed Khaled 2
Mohamed Khaled 2
 
Nady Boktor Resume
Nady Boktor ResumeNady Boktor Resume
Nady Boktor Resume
 
inayat ur rahman cv 1
inayat ur rahman cv 1inayat ur rahman cv 1
inayat ur rahman cv 1
 
Salah_C.V-2015
Salah_C.V-2015Salah_C.V-2015
Salah_C.V-2015
 
Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
Ibrahim_Abdelkhalig_Curriculum_vitae_(2) Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
 
Curriculum Vitae (Muzzafar)
Curriculum Vitae (Muzzafar)Curriculum Vitae (Muzzafar)
Curriculum Vitae (Muzzafar)
 
Resume copy jb 2015 16(1)
Resume copy jb 2015 16(1)Resume copy jb 2015 16(1)
Resume copy jb 2015 16(1)
 
Amr. 2015....
Amr. 2015....Amr. 2015....
Amr. 2015....
 
RizwanKhan CV
RizwanKhan CVRizwanKhan CV
RizwanKhan CV
 
JBA_CV_updated
JBA_CV_updatedJBA_CV_updated
JBA_CV_updated
 

Similaire à Experienced Sr. QS Seeks New Opportunity

Similaire à Experienced Sr. QS Seeks New Opportunity (20)

CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineer
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
M.A.Iqbal C.V
M.A.Iqbal C.VM.A.Iqbal C.V
M.A.Iqbal C.V
 
sounder
soundersounder
sounder
 
CV_Cost Engineer
CV_Cost EngineerCV_Cost Engineer
CV_Cost Engineer
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
CV waqar Azeem QS
CV waqar Azeem QSCV waqar Azeem QS
CV waqar Azeem QS
 
K. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QSK. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QS
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CV
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
 
CV Amr Zaki - PMP®
CV Amr Zaki - PMP®CV Amr Zaki - PMP®
CV Amr Zaki - PMP®
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
Resume_Pramod Chaudhari
Resume_Pramod ChaudhariResume_Pramod Chaudhari
Resume_Pramod Chaudhari
 
CV_Ahmad_Eida final
CV_Ahmad_Eida finalCV_Ahmad_Eida final
CV_Ahmad_Eida final
 
Bonny Resume ( Proc)
Bonny Resume ( Proc)Bonny Resume ( Proc)
Bonny Resume ( Proc)
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 

Experienced Sr. QS Seeks New Opportunity

  • 1. BALAMURUGAN.M E-mail :-manickbaala@gmail.com Telephone :- 00968-93003022 POST APPLIED Sr. QS / Sr. Estimator. CARRIER OBJECTIVE To utilize the full potential of Sr. Quantity Surveyor / Estimation Engineer Role in the Building Construction (Residential, Commercial & Industrial), Pipe line such as Water and Drain line Projects (HDPE & PVC) as well as in Oil & Gas Industry while involving in most of the managerial activities to realizes the Experiences, academic Qualifications and personal skills as well. EDUCATIONAL QUALIFICATIONS  B.Tech (Civil). Correspondence course with Karnataka University - Technical Education Approved and Conducted by AICTE in Bangalore, @ India. (Academic year 2013/2014) in First Class  Completed my Technology Studies for Diploma in CIVIL ENGINEERING, Technical Education Approved and Conducted by State Board of Technical Education in Tamilnadu, @ India. (Academic year 2005/2006) in First Class  Passed my Hr.Sec.Studies in Sacred Heart Higher Sec. School in Thiruvarangam @ Tamilnadu (During the Period of Apr-2001) Experience & Employment Summary (09Yrs & 7Months) 1. M/s. GALFAR Engineering & Contracting S.A.O.G, @ Oman. (AT PRESENT) Client: Occidental Mukhaizna LLC, (OXY) Project: OXY Mukhaizna - Civil work Services contract / Const. of New Airport / Substation buildings Project Value: 52Million (USD) Period: June 2013 - Present (Post Tendering) Sr. QS Cum. Estimator 2. M/s. Special Technical Services & Tebodin L.L.C., @ Oman. Client: Petroleum Development of Oman (PDO) Project: ODC - Off plot Delivery Contract Project Value: 22Million (Omani Riyal) Period: April 2012 - Till Jan 2013 (Pre & Post Tender) Sr. Quantity Surveyor
  • 2. 3. M/s. Towel Infrastructure Projects & CO (TIPCO) L.L.C., @ Oman. Client: Public Authority of Electricity & Water Board (PAEW) Project: 1. Sur - Construction of Reservoirs and Desalination plant (Reverse Osmosis Plant) Project Value: 7.0Million (Omani Riyal) Project: 2. Wilayat Mahdah - Construction of Reservoirs and Desalination plant (Reverse Osmosis Plant) Project Value: 11.50Million (Omani Riyal) Period: June 2010 - Jan 2012 (Pre & Post Tender) Sr. QS Cum. Estimator 4. M/s. GALFAR Engineering & Contracting S.A.O.G, @ Oman. Client: 1. Saud Bhawan Group LLC, (SBG) Project: SBG - Corporate centre @ wattayah - (Car Show room) & Construction of SERVICE ROADS around Showroom complex Project Value: 27Million (Omani Riyal) Client: 2. Sultanate of Oman the ministry of royal affair court royal estate palace at Salalah (Ministry of Royal affair court and Estate Palace - Salalah) Project: Re-Development of Al-Shatti Palace Project Value: 45Million (Omani Riyal) Period: Nov 2007 - May 2010 (Post Tender) Quantity Surveyor 5. M/s. R.Rangasamy & Co. (Engineering & Contracting) (Pvt.) Ltd, @ India Client: Indian Institute of Technology - Madras (IIT-M) Project: IIT - Civil Annual Maintenance Contract (AMC - Contract) Project Value: 5.4Crore (Indian Rupees) Period: April 2006 - October 2007 (Post Tender) Site Supervisor (Civil) RESPONSIBILITIES A. PRE & POST TENDERING: * Rate analysis for preparation of Bidding. * Preparation and submission of Proposed Cost Estimation to obtain the PO and for further Requirements to precede the job as per company’s requirement. * Maintaining the proper records for Internal and External verifications related to QS for the billing purpose. * Cost analysis for Extra and Deviated Items. * Detailed Study of B.O.Q, Technical Specifications and incorporating the various factors - - coming out of Contracts * Reconciliation of materials.
  • 3. * Work done reconciliation & other documents. * Checking and certifying the Invoices for the Subcontractor’s work done * Preparation of subcontractor’s payment certificates. * Regular Contractual Correspondence with Clients. * Quantification of Acceleration measures taken and submitted to Client for extra billing. * Maintaining Joint measurement with client and preparations of monthly bills. * Preparation of Bar Bending schedules * Preparing and maintaining the Sub contractor correspondence & Reconciliation. * Preparation of work orders for Sub-Contractors. * Preparation of Shop drawings by CADD B. Off plot Delivery Contract (ODC): Nature of job: Well pad location preparation works, making access for Hoist moving activities, Oil & Gas flow line routings, Civil, Mechanical, Electrical and Instrumentation works to the Correspondence, Responsibilities * Preparation and submission of Proposed Cost Estimation to obtain the PO and for further Requirements to precede the job as per company’s requirement. * Maintaining the proper records for Internal and External verifications related to QS for the billing purpose. * Cost analysis for Extra and Deviated Items. * Detailed Study of B.O.Q, Technical Specifications and incorporating the various factors - - coming out of Contracts * Reconciliation of materials. * Work done reconciliation & other documents. * Checking and certifying the Invoices for the Subcontractor’s work done * Preparation of subcontractor’s payment certificates. * Regular Contractual Correspondence with Clients. * Quantification of Acceleration measures taken and submitted to Client for extra billing. * Maintaining Joint measurement with client and preparations of monthly bills. * Preparation of work orders for Sub-Contractors. C. Annual Maintenance Contract (AMC): Responsibilities * Responsibilities include meeting prospective clients, establishing design requirements And scope of work, Preparing of work schedules, co-ordinate with the site team.
  • 4. * Co-ordination with external agencies. * Knowledge of using right tools for inspection * Optimum utilization of resources (materials, machines and workers) * Check whether progress is in line with scheduled program and plan to make up for time Loss if any * Preparing material request as per the site req. * Asserting extra works and prepares schedules, Coordinating works Extra Skills in Site Execution: Preparation of BBS, Land survey, Site Execution, Project Planning., COMPUTER LITERACY * Fluency in Microsoft Office packages (Word, Excel, Access and PowerPoint). * Primavera P6 (All packages) * MSP (Microsoft Project), * Auto CADD - 2010, * ERP, IPMS, Internet & E-mail PERSONAL DETAILS Name : Balamurugan .M Father’s Name : Manickam .P Passport No : G-5292893 PP Valid till : 30/09/2017 Place of Issue : Tiruchirappalli Nationality : Indian Marital status : Married Children : 01 Mother Tongue : Tamil Contact (Home) : 0091-7401314664 (Brother) Languages : Fluent in Tamil, English, Hindi, Malayalam & Arabic (Can be managed). REFERENCE’S * Will provide based on request ACKNOWLEDGEMENT I hereby acknowledge that the above information given is correct to the best of my knowledge. ………………………….… 12/01/2016 (Baalamurugan.M) (Date)