SlideShare une entreprise Scribd logo
1  sur  5
Télécharger pour lire hors ligne
Page 1
Evaluation Result: KH:_______PS:_________ACC:________PTS:________SP:_______GRADE/BAND:_________
KRAFT FOODS DEVELOPING MARKETS / CEEMA REGION
POSITION DESCRIPTION
Position Title: Factory Services Engineer - Engineering Services, Supply Chain
Current Grade Level: 6
Incumbent’s Name: Babatunde A. Sofoluwe
Manager’s Title: Factory Services Manager (Mechanical)
Manager’s Name: Oluwasegun Olajide ODUOLA
Business Unit/Region: Ikeja/CEEMA
Function: Integrated Supply Chain Office Location: Ikeja, Lagos, Nigeria
Prepared By: Name/Signature: Babatunde A. Sofoluwe
Date:
Manager’s Approval: Name/Signature: Oluwasegun Olajide ODUOLA
Date:
Manager’s Manager
Approval:
Name/Signature: Olugbenga Ayokunle AKINBULE
Date:
HR Approval: Name/Signature:
Date:
1. Position Purpose Statement
Grow and develop people and aligning with departmental excellence in supporting all factories and ancillaries by
maintaining and ensuring consistent, uninterrupted supply of energy and utilities in achieving production targets.
 Steam
 Water
 Compressed air
Page 2
Also under the purview of this role is the SAP 730 maintenance planner, creation of maintenance work orders,
planning, requisition of items and spare parts. Training and ensuring compliance to standards of working using SAP.
2. Knowledge, Skills and Experience Required
(a) Knowledge including: education, qualifications and training
• University degree, Engineering discipline.
• Fluent English, good PC knowledge (MS Office)
• Understanding of organisational and individual development
• Use of AutoCAD is an added advantage
• Use of SAP 730 is an added advantage
(b) Skills
• Strategic, conceptual and analytical skills, ability to drive continuous improvement
• High emotional intelligence, good Managerial Skills
• Self driven and motivated
• Effective communication and presentation skills
• Organisation, facilitation and training skills
• Planning, priority setting, problem solving and monitoring skills
• Resounding Knowledge of Engineering Design and drawings
• Creating Team Work and ability to work under pressure with less supervision good grasp of
good Engineering practices and codes of conduct.
(c) Experience
• Minimum of two years post NYSC experience in an FMCG company, display a high level of
customer-focused orientation, and be able to take responsibility for actions taken. Some level of
experience in Project Management and the execution of capital projects would be an advantage.
3. Principal Accountabilities / Responsibilities
Technical Services
 Ensuring consistent uninterrupted supply of steam, compressed air, and water supply to all factories on
Cadbury Nigeria plc. site
 Training, planning, performance development reviews, management and supervision and ensuring compliance
to safety procedures of Technicians, Operators.
 Ensuring Planned Preventive Maintenance, Corrective maintenance, installation of equipment and machines in
Factory Services, Supply chain
 Weekly reports and presentations at operations meetings
 Managerial and Technical Skills in Boilers, Chillers, Compressors Operations and Water Management Systems
And not limited to the following;
 Coordinate the planned mechanical maintenance activities of production machines, Design, interpret and
implement equipment-monitoring strategies for the plants.
Page 3
 Follow up with the procurement team to achieve quick turnaround time of spare parts procurement.
 Coordinate the activities of supervisors and resolve issues that come up in the course of production
 Coordinate preventive maintenance, repairs, servicing and replacement to maintain optimum performance
 Manage all the mechanical systems in the factory to ensure optimum performance.
 Ensure mechanical safety of the plants
 SAP 730 maintenance planner site wide trainings and planner for the Engineering Services team.
Trainings
 Ensure proper safety, GMP and awareness trainings in accordance with internal policies/procedures
 SAP trainings
4. Operating Environment
In a typical Manufacturing set up, utilities such as steam, water, chilled water and compressed air are not just required
for the production areas, but also other associated areas such as other business support utilities (e.g. Power
Generation). These services are not provided by the government and are generated in-house
In a drive for high efficiencies (e.g. Global Efficiency and Overall Equipment Effectiveness) by the production teams,
reliable supply of utilities is critical as it contributes to the achievement of rated throughput of production equipment
and also has a role to play in guaranteeing product quality and food safety.
Capacity headroom is not always available for all the service equipment; maintaining the equipment in an environment
of tight production schedules is often quite challenging.
The majority of Nigerian consumers are very price sensitive, and it is therefore important that the generation of all
utilities is done efficiently in order to minimise the contribution to the cost profile of the organisation’s products. There
is also constant pressure on the operating budget of the team, meaning that it is not always possible to execute all the
plans on the wish list of the team. CAPEX budgets are also under similar constraints.
One must often face the challenge of balancing demands from regular work activities with the demands of executing
CAPEX projects
The generation of the utilities must also be done in a green way, i.e. it must have a minimal negative impact on the
environment. Ensuring that Waste Water Treatment Plant runs reliably is therefore high on the priority agenda of the
team.
By nature, the operation of some of the equipment (e.g. steam generating equipment) can be dangerous to operate if
safety protocols are not strictly adhered to. This brings activities of the team constantly under the close scrutiny of the
site EHS team, regional/global company EHS officials, and local regulatory officials.
The pressures from demanding end-users can take its toll. It is therefore important that an enabling environment that
facilitates the achievement of these demands is provided by setting high standards, motivating team members and
aligning their individual objectives to that of the organisation.
5. Dimensions
Dimension Input/Description
Site Ikeja plant
Page 4
Annual Repair & Maintenance (R&M) Budget In excess of N165,000,000 (USD 1m @ N165 : 1 USD)
Capital Projects In excess of N200,000,000 (USD 1.2m @ N165 : 1 USD)
Assets Utilised  5 steam generating plants (boilers)
 6 chilled water generating equipment (chillers)
 > 200 comfort air conditioners
 3 cold stores/rooms
 6 water boreholes
 6 air compressors
 16 cooling towers
 16 air dehumidifiers
 14 air handling units
 1 Waste Water Treatment Plant
Number of Direct Reports 14
Number of Indirect Reports 12
Total Headcount under the position’s management
Other Dimensions:
Computer/information exchange systems supporting
operations
Windows Operating System; Microsoft Office; SAP Plant
Maintenance software; AUTOCAD software
6. Other Comments / Relevant Information
In terms of reporting and analysis of equipment performance, the lack of some software has forced the team to develop
reporting and analysis tools using spreadsheets. This exercise encourages creativity in the use of computer software.
7. Organizational Chart
Page 5
8. Direct Reports
Please describe the basic purpose/scope of each direct report.
Position Title of Direct Report Basic Purpose/Scope
HVAC Sectional Engineer To ensure 90% availability of HVAC equipment (chillers, air
handling equipment, etc.) through execution of an effective
Planned Preventive Maintenance Programme (PPM) for
generation and distribution equipment.
Utilities Sectional Engineer To ensure 90% availability of Utilities equipment (boilers, air
compressors, water generation etc.) through execution of an
effective Planned Preventive Maintenance Programme (PPM)
for generation and distribution equipment.
Factory Services Engineer Management of shift teams that operate the equipment in the
Utilities and HVAC sections in order to ensure that end-users
have the services delivered to them as per their requirements.

Contenu connexe

Tendances

Tendances (20)

Anthony gachie c.v
Anthony gachie c.v Anthony gachie c.v
Anthony gachie c.v
 
UDAY Rsm-16
UDAY Rsm-16UDAY Rsm-16
UDAY Rsm-16
 
Royster menezes - Mechanical Engineer
Royster menezes - Mechanical EngineerRoyster menezes - Mechanical Engineer
Royster menezes - Mechanical Engineer
 
Maintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryMaintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive Industry
 
Resume new
Resume newResume new
Resume new
 
Mohammad Bahafzalla CV
Mohammad Bahafzalla CVMohammad Bahafzalla CV
Mohammad Bahafzalla CV
 
Dharmesh CV
Dharmesh CVDharmesh CV
Dharmesh CV
 
C.V. William 15
C.V. William 15C.V. William 15
C.V. William 15
 
Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
 
Naveesh Kapoor - resume
Naveesh Kapoor - resumeNaveesh Kapoor - resume
Naveesh Kapoor - resume
 
Maintenance Manager - CV
Maintenance Manager - CVMaintenance Manager - CV
Maintenance Manager - CV
 
JDKeller vitae 2015
JDKeller vitae 2015JDKeller vitae 2015
JDKeller vitae 2015
 
RCG resume 2016 IE (2)
RCG resume 2016 IE (2)RCG resume 2016 IE (2)
RCG resume 2016 IE (2)
 
Updated resume
Updated resumeUpdated resume
Updated resume
 
Linked in attach
Linked in attachLinked in attach
Linked in attach
 
Wesley H. Riopel - Resume 2017
Wesley H. Riopel - Resume 2017Wesley H. Riopel - Resume 2017
Wesley H. Riopel - Resume 2017
 
JADESH CV
JADESH CVJADESH CV
JADESH CV
 
Yusuff- CV
Yusuff- CVYusuff- CV
Yusuff- CV
 
Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933
 

Similaire à Job description factory services engineer

Similaire à Job description factory services engineer (20)

SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
 
GNB LATEST
GNB LATESTGNB LATEST
GNB LATEST
 
GNB LATEST
GNB LATESTGNB LATEST
GNB LATEST
 
praveen
praveenpraveen
praveen
 
Deepak- Resume
Deepak- ResumeDeepak- Resume
Deepak- Resume
 
Resume Suresh Patel
Resume Suresh PatelResume Suresh Patel
Resume Suresh Patel
 
CV-SHEIK UNDERGOING
CV-SHEIK UNDERGOINGCV-SHEIK UNDERGOING
CV-SHEIK UNDERGOING
 
HPAC article_AUG2015_CP Optimization
HPAC article_AUG2015_CP OptimizationHPAC article_AUG2015_CP Optimization
HPAC article_AUG2015_CP Optimization
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining Cell
 
vijendra resume
vijendra resumevijendra resume
vijendra resume
 
CV CS
CV CSCV CS
CV CS
 
Viresh Jugali CV
Viresh Jugali CVViresh Jugali CV
Viresh Jugali CV
 
CV
CVCV
CV
 
Senior management professional technical
Senior management professional  technicalSenior management professional  technical
Senior management professional technical
 
Kanwaljit.doc
Kanwaljit.docKanwaljit.doc
Kanwaljit.doc
 
LinggamResume2015M
LinggamResume2015MLinggamResume2015M
LinggamResume2015M
 
CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23
 
kashif( 23-2-15)
kashif( 23-2-15)kashif( 23-2-15)
kashif( 23-2-15)
 
Report for COOP PUPR without fusion
Report for COOP PUPR without fusionReport for COOP PUPR without fusion
Report for COOP PUPR without fusion
 
TCN_CV_R3ap
TCN_CV_R3apTCN_CV_R3ap
TCN_CV_R3ap
 

Plus de Babatunde Sofoluwe (11)

Sofoluwe, babatunde a
Sofoluwe, babatunde aSofoluwe, babatunde a
Sofoluwe, babatunde a
 
Babatunde.sofoluwe passport
Babatunde.sofoluwe passportBabatunde.sofoluwe passport
Babatunde.sofoluwe passport
 
Autocad 2009 3 d modeling
Autocad 2009 3 d modelingAutocad 2009 3 d modeling
Autocad 2009 3 d modeling
 
Certificate first degree
Certificate first degreeCertificate first degree
Certificate first degree
 
Cover letter
Cover letterCover letter
Cover letter
 
Ielts test report (sofoluwe babatunde)
Ielts test report (sofoluwe babatunde)Ielts test report (sofoluwe babatunde)
Ielts test report (sofoluwe babatunde)
 
MBA Certificate
MBA CertificateMBA Certificate
MBA Certificate
 
WAEC Certificate
WAEC CertificateWAEC Certificate
WAEC Certificate
 
NIIT
NIITNIIT
NIIT
 
NYSC
NYSCNYSC
NYSC
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 

Dernier

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 

Dernier (20)

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 

Job description factory services engineer

  • 1. Page 1 Evaluation Result: KH:_______PS:_________ACC:________PTS:________SP:_______GRADE/BAND:_________ KRAFT FOODS DEVELOPING MARKETS / CEEMA REGION POSITION DESCRIPTION Position Title: Factory Services Engineer - Engineering Services, Supply Chain Current Grade Level: 6 Incumbent’s Name: Babatunde A. Sofoluwe Manager’s Title: Factory Services Manager (Mechanical) Manager’s Name: Oluwasegun Olajide ODUOLA Business Unit/Region: Ikeja/CEEMA Function: Integrated Supply Chain Office Location: Ikeja, Lagos, Nigeria Prepared By: Name/Signature: Babatunde A. Sofoluwe Date: Manager’s Approval: Name/Signature: Oluwasegun Olajide ODUOLA Date: Manager’s Manager Approval: Name/Signature: Olugbenga Ayokunle AKINBULE Date: HR Approval: Name/Signature: Date: 1. Position Purpose Statement Grow and develop people and aligning with departmental excellence in supporting all factories and ancillaries by maintaining and ensuring consistent, uninterrupted supply of energy and utilities in achieving production targets.  Steam  Water  Compressed air
  • 2. Page 2 Also under the purview of this role is the SAP 730 maintenance planner, creation of maintenance work orders, planning, requisition of items and spare parts. Training and ensuring compliance to standards of working using SAP. 2. Knowledge, Skills and Experience Required (a) Knowledge including: education, qualifications and training • University degree, Engineering discipline. • Fluent English, good PC knowledge (MS Office) • Understanding of organisational and individual development • Use of AutoCAD is an added advantage • Use of SAP 730 is an added advantage (b) Skills • Strategic, conceptual and analytical skills, ability to drive continuous improvement • High emotional intelligence, good Managerial Skills • Self driven and motivated • Effective communication and presentation skills • Organisation, facilitation and training skills • Planning, priority setting, problem solving and monitoring skills • Resounding Knowledge of Engineering Design and drawings • Creating Team Work and ability to work under pressure with less supervision good grasp of good Engineering practices and codes of conduct. (c) Experience • Minimum of two years post NYSC experience in an FMCG company, display a high level of customer-focused orientation, and be able to take responsibility for actions taken. Some level of experience in Project Management and the execution of capital projects would be an advantage. 3. Principal Accountabilities / Responsibilities Technical Services  Ensuring consistent uninterrupted supply of steam, compressed air, and water supply to all factories on Cadbury Nigeria plc. site  Training, planning, performance development reviews, management and supervision and ensuring compliance to safety procedures of Technicians, Operators.  Ensuring Planned Preventive Maintenance, Corrective maintenance, installation of equipment and machines in Factory Services, Supply chain  Weekly reports and presentations at operations meetings  Managerial and Technical Skills in Boilers, Chillers, Compressors Operations and Water Management Systems And not limited to the following;  Coordinate the planned mechanical maintenance activities of production machines, Design, interpret and implement equipment-monitoring strategies for the plants.
  • 3. Page 3  Follow up with the procurement team to achieve quick turnaround time of spare parts procurement.  Coordinate the activities of supervisors and resolve issues that come up in the course of production  Coordinate preventive maintenance, repairs, servicing and replacement to maintain optimum performance  Manage all the mechanical systems in the factory to ensure optimum performance.  Ensure mechanical safety of the plants  SAP 730 maintenance planner site wide trainings and planner for the Engineering Services team. Trainings  Ensure proper safety, GMP and awareness trainings in accordance with internal policies/procedures  SAP trainings 4. Operating Environment In a typical Manufacturing set up, utilities such as steam, water, chilled water and compressed air are not just required for the production areas, but also other associated areas such as other business support utilities (e.g. Power Generation). These services are not provided by the government and are generated in-house In a drive for high efficiencies (e.g. Global Efficiency and Overall Equipment Effectiveness) by the production teams, reliable supply of utilities is critical as it contributes to the achievement of rated throughput of production equipment and also has a role to play in guaranteeing product quality and food safety. Capacity headroom is not always available for all the service equipment; maintaining the equipment in an environment of tight production schedules is often quite challenging. The majority of Nigerian consumers are very price sensitive, and it is therefore important that the generation of all utilities is done efficiently in order to minimise the contribution to the cost profile of the organisation’s products. There is also constant pressure on the operating budget of the team, meaning that it is not always possible to execute all the plans on the wish list of the team. CAPEX budgets are also under similar constraints. One must often face the challenge of balancing demands from regular work activities with the demands of executing CAPEX projects The generation of the utilities must also be done in a green way, i.e. it must have a minimal negative impact on the environment. Ensuring that Waste Water Treatment Plant runs reliably is therefore high on the priority agenda of the team. By nature, the operation of some of the equipment (e.g. steam generating equipment) can be dangerous to operate if safety protocols are not strictly adhered to. This brings activities of the team constantly under the close scrutiny of the site EHS team, regional/global company EHS officials, and local regulatory officials. The pressures from demanding end-users can take its toll. It is therefore important that an enabling environment that facilitates the achievement of these demands is provided by setting high standards, motivating team members and aligning their individual objectives to that of the organisation. 5. Dimensions Dimension Input/Description Site Ikeja plant
  • 4. Page 4 Annual Repair & Maintenance (R&M) Budget In excess of N165,000,000 (USD 1m @ N165 : 1 USD) Capital Projects In excess of N200,000,000 (USD 1.2m @ N165 : 1 USD) Assets Utilised  5 steam generating plants (boilers)  6 chilled water generating equipment (chillers)  > 200 comfort air conditioners  3 cold stores/rooms  6 water boreholes  6 air compressors  16 cooling towers  16 air dehumidifiers  14 air handling units  1 Waste Water Treatment Plant Number of Direct Reports 14 Number of Indirect Reports 12 Total Headcount under the position’s management Other Dimensions: Computer/information exchange systems supporting operations Windows Operating System; Microsoft Office; SAP Plant Maintenance software; AUTOCAD software 6. Other Comments / Relevant Information In terms of reporting and analysis of equipment performance, the lack of some software has forced the team to develop reporting and analysis tools using spreadsheets. This exercise encourages creativity in the use of computer software. 7. Organizational Chart
  • 5. Page 5 8. Direct Reports Please describe the basic purpose/scope of each direct report. Position Title of Direct Report Basic Purpose/Scope HVAC Sectional Engineer To ensure 90% availability of HVAC equipment (chillers, air handling equipment, etc.) through execution of an effective Planned Preventive Maintenance Programme (PPM) for generation and distribution equipment. Utilities Sectional Engineer To ensure 90% availability of Utilities equipment (boilers, air compressors, water generation etc.) through execution of an effective Planned Preventive Maintenance Programme (PPM) for generation and distribution equipment. Factory Services Engineer Management of shift teams that operate the equipment in the Utilities and HVAC sections in order to ensure that end-users have the services delivered to them as per their requirements.