Monitoring result for Babylon Trims Ltd on site
Babylon Trims Limited
Monitoring
Monitored Party : Babylon Trims Ltd
Site : Babylon Trims Limited
Address : Kandi Boilerpur, Horindhara, Union-
Tetulzhora, Hemayetpur,
: Savar,
: Dhaka
: Bangladesh
amfori ID : 050-000707-000
Site amfori ID : 050-000707-002
Monitoring Activity : amfori Social Audit - Manufacturing
Monitoring Type : Full Monitoring
Submission Date : 16/11/2021
Expiration Date : 16/11/2023

This is an extract of the online monitoring result, generated on 16/11/2021, and is only valid as an
acknowledgement of the result. To see all the details, review the full monitoring result, which is
available here - The English version is the legally binding one.
amfori does not assume any liability with regard to the compliance of this extract, or any versions of this extract, with the Regulation (EU) 2016/679
(General Data Protection Regulation).
All rights reserved. No part of this publication may be reproduced, translated, stored in a retrieval system, or transmitted, in any form or by any
means electronic, mechanical, photocopying, recording or otherwise, be lent, re-sold, hired out or otherwise circulated without the amfori consent.
© amfori, 2021
Overall rating
A B C D E None
Section rating
PA1: Social Management System C
PA 2: Workers Involvement and Protection A
PA 3: The Rights of Freedom of Association and Collective Bargaining A
PA 4: No Discrimination A
PA 5: Fair Remuneration A
PA 6: Decent Working Hours A
PA 7: Occupational Health and Safety A
PA 8: No Child Labour A
PA 9: Special Protection for Young Workers A
PA 10: No Precarious Employment A
PA 11: No Bonded Labour A
PA 12: Protection of the Environment C
PA 13: Ethical Business Behaviour A
- 1 / 7
General description
Babylon Trims Limited is a 100% export-oriented accessories manufacturing company, which is located at Kandi, Boilerpur,
Horindhara, Tetulzhora (Union), Hemayetpur, Savar, Dhaka, Bangladesh. Main production process of this facility is Die Cutting,
Poly, Offset, Carton, Ball Press. Production capacity of the audited facility is for poly: 7800000 pieces, Carton: 3000000 pieces,
Offset: 5000000 pieces, Ball press and plastic clip: 3100000 pieces, Gum tape: 65000 pieces per month. The total land area is
about 135000 square feet. Total production area is about 88000 square feet; warehouse area is about 38000 square feet. The
facility was established in the year of 2002 (As per incorporation certificate).
There are 02 buildings and 7 sheds in the facility. Details are given below:
Building 1(3 storied building)
Ground floor: Blower machine, Poly printing area, poly cutting area.
1st floor: Gum tape area, poly printing, office, conference room.
2nd floor: ball press area, plastic clip making area, die cutting section, offset print area.
Rooftop: Dining, Canteen rest 70% are vacant.
Building 2: (1 storied building)
Generator room, compressor room.
Shed 1: Auto carton machine section (corrugation section, pasting section, flexo area), slotting machine, cutting machine,
finishing area, finished goods keeping area, Paper roll go down, PVC store, maintenance room, boiler, Medical and childcare
room,
Shed 2: Manual carton machine area, slotting machine, cutting machine, finishing area, Top divider room, Screen print room,
wastage go down.
Shed 3: Chemical keeping area.
Shed 4: RMS room,
Shed 5 Substation.
Shed 6: Security post.
Shed 07: Control panel room.
Besides, facility uses ETP jointly with sisters concerned factory (Babylon Printers limited) which is located next to premises of
audited factory.
The facility has total 38 first aiders and 15 first aid boxes, 200 fire fighters, 35 hose pipes, 185 ABC fire extinguishers, 75 Co2
fire extinguishers, 54 fire alarms, 202 smoke detector, 62 emergency lights, 02 staircase are there in the factory.
There are total 708 employees in the facility with 613 male and 95 female employees. Facility runs In 02 shifts which starts
08:00 am to 05:00 pm and 08:00 pm to 05:00 am with one-hour meal break. They maintain attendance records through
Automatic record system (proximity card). Friday is their weekly holiday. Employees receive wages by monthly basis in local
currency.
Audit Process – This amfori BSCI full audit conducted in 02 days by four (04) Auditors 01 observer. On the first day of audit
02 auditors and 01 observer are present to conduct the audit and the 2nd day of audit same 02 auditors are conduct the audit.
An opening meeting was held on the day of assessment where S.M. Arief Raz Zaqre- COO, Md. Atiqul Islam Apu- AGM (HR,
Admin and Compliance), Md. Mahmud Hossain- Deputy manager (HR, Admin and Compliance), Md. Sharif Tanik Arefin- Asst.
Manager (HR, Admin and Compliance), Md. Humayun Kabir- Sr. Executive (HR & Admin), Md. Ariful islam- Asst. Manager
(HR, Admin and Compliance), Md. Manzurul Islam- Factory Manager, Md. Abdul kader- Deputy Manager, Md. Shahidullah- Jr.
manager (IT), Saidur Rahman- Sr. Officer (HR, Admin and Compliance), Ms. Sabira Akhter Nishat (Welfare officer) and Ms.
Momena Khatun- President of Trade Union was present.
During opening meeting auditors explained about the audit scope and process and a detail description on amfori BSCI
requirement and approach. Immediate after the opening meeting a site visit was conducted with the factory management. A
general document checklist was provided to the management and supplied documents were reviewed. The auditors verified
documents from October 2020 to September 2021.
Closing meeting: At the end of the audit a closing meeting was held to discuss all the areas of improvement in the findings
report and positive notes with Md. Sharif Tanik Arefin- Asst. Manager (HR, Admin and Compliance) and with their team. Facility
management agreed on all findings and signed on it. Auditor informed the management regarding the submission of remediation
plan to the amfori BSCI participant through amfori BSCI platform against the findings raised on the audit within 60 days.
Audit Company name: SGS Bangladesh Limited. Auditors Name and APSCA Status: Asadur Rahman- RA 21701424, Md.
Mahmudur Rahman Shovon- RA- 21701562, Audit date: October 31 and November 1, 2021.
Overall Findings: Non-Compliance were noted in the area of “Social Management System and Cascade Effect”, “Workers
Involvement and Protection”, "Fair Remuneration”, “Occupational Health & Safety”, “Protection of Environment” For other areas,
no findings were observed.
Comments from auditor about Covid-19: Following measure has been taken by the facility during operation in every day to
protect their employees from #Covid-19: a) Arranging and ensuring hand washing facility for each employee at each entrance
of production floor when entering in the factory. b) The facility delivers awareness speech on Covid-19 through public address
(PA) system during working hours. c) Ensuring face mask for each employee. d) Maintaining same arrangement for visitors. e)
- 2 / 7
Having a reporting system to medical person or management if suspected or cases observed. f) Checking temperature for each
employee while entering in the morning. g) Posted awareness poster in the prominent places.
Remarks: As per written statement by facility management, factory address has been changed in the database.
- 3 / 7
Site Details
Site : Babylon Trims Limited Site amfori ID : 050-000707-002
GICS Classification
Sector : Industrials
Industry Group : Capital Goods
Industry : Industrial Conglomerates
Sub Industry : Industrial Conglomerates
GS1 Classifications Product Process Classifications
N.A. N.A.
- 4 / 7
Metrics
Key Metrics
Total workforce 439 Workers
Legal minimum wage in local currency 8000 Monthly
Lowest wage paid for regular work at the site 8000 Monthly
Calculated living wage in local currency 17926 Monthly
Total sample 26 Workers
Other Metrics
Male workers 380 Workers
Female workers 59 Workers
Permanent workers - Male 613 Workers
Permanent workers - Female 95 Workers
Temporary workers - Male 0 Workers
Temporary workers - Female 0 Workers
Seasonal workers - Male 0 Workers
Seasonal workers - Female 0 Workers
Management - Male 145 Workers
Management - Female 0 Workers
Apprentices - Male 0 Workers
Apprentices - Female 0 Workers
Workers on probation - Male 105 Workers
Workers on probation - Female 5 Workers
Workers with night shift - Male 85 Workers
Workers with night shift - Female 45 Workers
Workers with disabilities - Male 0 Workers
Workers with disabilities - Female 0 Workers
Domestic migrant workers - Male 0 Workers
Domestic migrant workers - Female 0 Workers
Foreign migrant workers - Male 0 Workers
Foreign migrant workers - Female 0 Workers
Workers hired directly - Male 613 Workers
Workers hired directly - Female 95 Workers
Workers hired indirectly - Male 0 Workers
Workers hired indirectly - Female 0 Workers
Unionised workers - Male 300 Workers
Unionised workers - Female 70 Workers
Workers under CBA - Male 0 Workers
Workers under CBA - Female 0 Workers
Pregnant workers 0 Workers
Workers on parental leave - Male 0 Workers
Workers on parental leave - Female 0 Workers
Sample - Male 16 Workers
Sample - Female 10 Workers
- 5 / 7
Findings
PA1: Social Management System
Facility is in process of implementation of amfori BSCI COC currently facility did not calculate living wage properly, sufficient
awareness was not found from the workers, production supervisors, workers’ representatives on training of amfori BSCI COC,
some gaps found in communicating amfori BSCI TOI with business partners, gap found in health & safety and environment
area. [ As per amfori BSCI COC check point 1.1]
Facility has developed supplier selection policy and procedures in line with amfori BSCI COC but communicated TOI is not
correct format. (as per amfori BSCI COC check point 1.5)
Facility management did not develop the necessary policies and processes to prevent and address any adverse human rights
impacts that may be detected in its supply chain. [As per amfori BSCI COC check point 1.6]
PA 2: Workers Involvement and Protection 
Facility management has provided training to the staff and workers on amfori BSCI code of conduct, but enough awareness was
not found from the workers, production supervisors, workers’ representatives regarding amfori BSCI COC. [As per amfori BSCI
COC check point 2.4]
PA 5: Fair Remuneration
After reviewing fair remuneration, it was noted that facility management is aware about collection and calculation of fair
remuneration. Facility has conducted general survey within workers of various grades, sections and several areas to identified
fair remuneration. Based on that, a living wage has been figured out by the management for surrounding areas of the factory.
However, no potential action has been taken to fill the gaps between actual remuneration and identified fair remuneration figure
yet. [As per amfori BSCI COC check point 5.4]
PA 7: Occupational Health and Safety
Factory management did not involve worker’s representatives and workers in the drifting and enforcement of the internal
procedure on occupational health and safety. [As per amfori BSCI COC check point no.7.1]
Though facility identify risk of waste store, paper roll godown but during audit excessive height was noted at paper roll godown,
waste godown which may cause of accident. [As per Bangladesh Labor Rules 2015, Schedule-4, Matters relating to safety
committee (2) and amfori BSCI COC checkpoint 7.3]
The following PPE related findings were noted during site visit: a. During plant tour it was noted that approximately 15% workers
at corrugation machine area were not using ear plug while working at shed 01. b. Randomly checked 03 out of 06 workers of
screen print section workers were using fabric mask instead of respiratory mask during work at shed 01. [As per amfori BSCI
COC check point no 7.6 and Bangladesh Labour Rules 2015, Rules 67 (2)]
No MSDS, labelling and secondary containment was found for chemical drum (gum), burnt Mobil and chemicals used for poly
located at shed 2, beside generator room and building 01. [As per amfori BSCI COC check point no.7.7 and Bangladesh Labour
Rules 2015, Rule 68 (10)
a. Facility management did not take building construction approval from concerned authority (e.g-LGED/PWD). Facility had
taken building construction approval from Chairman of Tetoljhara Union Parishad. However, facility has applied to the concerned
authority RAJUK on 27th November 20213. [As per amfori BSCI COC checkpoint no 7.11 and Building Construction Act-1952,
Section 3(1)] b. Facility management did not include rooftop of building 1 (worker dining, canteen) and shed 3 (chemical keeping
area) in their updated floor layout plan. [As per amfori BSCI COC checkpoint no 7.11 and Bangladesh Labor Rules 2015, Rule
353(1)]
During documents review and management interview it was noted that 01 out of 02 electricians had no competency certificate
from concern authority. [As per amfori BSCI COC checkpoint no 7.13 and Bangladesh Labor Rule 2015, Rule 58(9)]
PA 12: Protection of the Environment
Environment Clearance Certificate of the factory expired on April 5, 2021. However, factory management has applied and made
payment for the renewal for same on September 08, 2021. [ As per Bangladesh Environment Conservation Rules 1997, section
8 (1 & 2) and amfori BSCI COC check point no 12.3]
Waste like empty poly, carton, unused fire door, unused tiles, construction materials etc. were not segregated by type of hazard
and found at open air. [As per amfori BSCI COC check point no. 12.4 and Bangladesh Labor Law 2006, Section 54]
- 6 / 7
PA 12: Protection of the Environment
Though facility management provided awareness training on proper use of water to the workers, but they did not implement
significant programs to promote conservation of water and reduction of waste of water significantly. [As per amfori BSCI COC
check point no. 12.5]
- 7 / 7

Contenu connexe

Tendances

Audit_4801 Safety Management Systems_Report Example
Audit_4801 Safety Management Systems_Report ExampleAudit_4801 Safety Management Systems_Report Example
Audit_4801 Safety Management Systems_Report Example
Ian Munro
 
[Letter of Appointment] Chemsain Konsultant Sdn. Bhd. - Member of the Health,...
[Letter of Appointment] Chemsain Konsultant Sdn. Bhd. - Member of the Health,...[Letter of Appointment] Chemsain Konsultant Sdn. Bhd. - Member of the Health,...
[Letter of Appointment] Chemsain Konsultant Sdn. Bhd. - Member of the Health,...
Olivean Anthony
 
Walmart CTPAT Audit Report
Walmart CTPAT Audit ReportWalmart CTPAT Audit Report
Walmart CTPAT Audit Report
Manoj Dnyanmothe
 
Factory Profile for oli group
Factory Profile for oli groupFactory Profile for oli group
Factory Profile for oli group
Ali Azam
 
Factory compliance check_list_163
Factory compliance check_list_163Factory compliance check_list_163
Factory compliance check_list_163
CMDubey
 

Tendances (20)

ISO 45001:2018 slide show
ISO 45001:2018 slide show ISO 45001:2018 slide show
ISO 45001:2018 slide show
 
BSCI -01-2020.pptx
BSCI -01-2020.pptxBSCI -01-2020.pptx
BSCI -01-2020.pptx
 
Audit_4801 Safety Management Systems_Report Example
Audit_4801 Safety Management Systems_Report ExampleAudit_4801 Safety Management Systems_Report Example
Audit_4801 Safety Management Systems_Report Example
 
Social compliance issues in the apparel sector of Bangladesh
Social compliance issues in the apparel sector of BangladeshSocial compliance issues in the apparel sector of Bangladesh
Social compliance issues in the apparel sector of Bangladesh
 
BSCI Guideline
BSCI GuidelineBSCI Guideline
BSCI Guideline
 
Sop (textile finishing)
Sop (textile finishing)Sop (textile finishing)
Sop (textile finishing)
 
How to Develop Compliance with Sustainable Practice in RMG Industry
How to Develop Compliance with Sustainable Practice in  RMG IndustryHow to Develop Compliance with Sustainable Practice in  RMG Industry
How to Develop Compliance with Sustainable Practice in RMG Industry
 
[Letter of Appointment] Chemsain Konsultant Sdn. Bhd. - Member of the Health,...
[Letter of Appointment] Chemsain Konsultant Sdn. Bhd. - Member of the Health,...[Letter of Appointment] Chemsain Konsultant Sdn. Bhd. - Member of the Health,...
[Letter of Appointment] Chemsain Konsultant Sdn. Bhd. - Member of the Health,...
 
ISO 45001 Employee Awareness Training
ISO 45001 Employee Awareness TrainingISO 45001 Employee Awareness Training
ISO 45001 Employee Awareness Training
 
Walmart CTPAT Audit Report
Walmart CTPAT Audit ReportWalmart CTPAT Audit Report
Walmart CTPAT Audit Report
 
SA 8000 Training Material Latest
SA 8000 Training Material LatestSA 8000 Training Material Latest
SA 8000 Training Material Latest
 
Fire extinguisher monthly checklist report
Fire extinguisher monthly checklist reportFire extinguisher monthly checklist report
Fire extinguisher monthly checklist report
 
Primark social audit check list
Primark social audit check listPrimark social audit check list
Primark social audit check list
 
Factory Profile for oli group
Factory Profile for oli groupFactory Profile for oli group
Factory Profile for oli group
 
Schedule waste management in Malaysia
Schedule waste management in Malaysia Schedule waste management in Malaysia
Schedule waste management in Malaysia
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentation
 
Waste Management .pptx
Waste Management .pptxWaste Management .pptx
Waste Management .pptx
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
Environmental regulations 2009
Environmental regulations 2009Environmental regulations 2009
Environmental regulations 2009
 
Factory compliance check_list_163
Factory compliance check_list_163Factory compliance check_list_163
Factory compliance check_list_163
 

Similaire à amfori BSCI.pdf

BSCI CERTIFICATE OF MANCHENG QINGSHAN STONE FACTORY
BSCI CERTIFICATE OF MANCHENG QINGSHAN STONE FACTORYBSCI CERTIFICATE OF MANCHENG QINGSHAN STONE FACTORY
BSCI CERTIFICATE OF MANCHENG QINGSHAN STONE FACTORY
kevin feng
 
BSCI证书
BSCI证书BSCI证书
BSCI证书
妮 安
 
BSCI Audit Report Haoshun
BSCI Audit Report HaoshunBSCI Audit Report Haoshun
BSCI Audit Report Haoshun
Simon .
 
SummaryAuditReport
SummaryAuditReportSummaryAuditReport
SummaryAuditReport
Fion Ray
 
SummaryAuditReport
SummaryAuditReportSummaryAuditReport
SummaryAuditReport
Jimmy Lin
 
Domijump BSCI certificate
Domijump BSCI certificateDomijump BSCI certificate
Domijump BSCI certificate
Dan wang
 
SummaryAuditReport
SummaryAuditReportSummaryAuditReport
SummaryAuditReport
jenny wong
 
Esprit apparels ltd 2015 - BSCI Audit report
Esprit apparels ltd  2015 - BSCI Audit reportEsprit apparels ltd  2015 - BSCI Audit report
Esprit apparels ltd 2015 - BSCI Audit report
Khalid Latif
 
#PRESENTATION by AKSHAY JANGID (Trainee)
#PRESENTATION by AKSHAY JANGID (Trainee)#PRESENTATION by AKSHAY JANGID (Trainee)
#PRESENTATION by AKSHAY JANGID (Trainee)
AKSHAY JANGID
 
WCA_STD_2-173854-20141009132021 from QVC
WCA_STD_2-173854-20141009132021 from QVCWCA_STD_2-173854-20141009132021 from QVC
WCA_STD_2-173854-20141009132021 from QVC
Nick Yang
 

Similaire à amfori BSCI.pdf (20)

Bsci summary auditreport
Bsci summary auditreportBsci summary auditreport
Bsci summary auditreport
 
BSCI CERTIFICATE OF MANCHENG QINGSHAN STONE FACTORY
BSCI CERTIFICATE OF MANCHENG QINGSHAN STONE FACTORYBSCI CERTIFICATE OF MANCHENG QINGSHAN STONE FACTORY
BSCI CERTIFICATE OF MANCHENG QINGSHAN STONE FACTORY
 
FUSHENG BSCI CERTIFICATE
FUSHENG BSCI CERTIFICATE FUSHENG BSCI CERTIFICATE
FUSHENG BSCI CERTIFICATE
 
Is lack of SEDEX/ WRAP/SA 8000 certification hurting your business?
Is lack of SEDEX/ WRAP/SA 8000 certification hurting your business?Is lack of SEDEX/ WRAP/SA 8000 certification hurting your business?
Is lack of SEDEX/ WRAP/SA 8000 certification hurting your business?
 
BSCI证书
BSCI证书BSCI证书
BSCI证书
 
BSCI Audit Report Haoshun
BSCI Audit Report HaoshunBSCI Audit Report Haoshun
BSCI Audit Report Haoshun
 
SummaryAuditReport
SummaryAuditReportSummaryAuditReport
SummaryAuditReport
 
Resume of shameem ahamed
Resume of shameem ahamedResume of shameem ahamed
Resume of shameem ahamed
 
UMS BSCI Report 2016
UMS BSCI Report 2016UMS BSCI Report 2016
UMS BSCI Report 2016
 
SummaryAuditReport
SummaryAuditReportSummaryAuditReport
SummaryAuditReport
 
Domijump BSCI certificate
Domijump BSCI certificateDomijump BSCI certificate
Domijump BSCI certificate
 
Sedex
SedexSedex
Sedex
 
SummaryAuditReport
SummaryAuditReportSummaryAuditReport
SummaryAuditReport
 
SummaryAuditReport
SummaryAuditReportSummaryAuditReport
SummaryAuditReport
 
OKTL BY SHIHAB
OKTL BY SHIHABOKTL BY SHIHAB
OKTL BY SHIHAB
 
Esprit apparels ltd 2015 - BSCI Audit report
Esprit apparels ltd  2015 - BSCI Audit reportEsprit apparels ltd  2015 - BSCI Audit report
Esprit apparels ltd 2015 - BSCI Audit report
 
Quanzhou guanghui bags co., ltd BSCI summary audit report
Quanzhou guanghui bags co., ltd BSCI summary audit reportQuanzhou guanghui bags co., ltd BSCI summary audit report
Quanzhou guanghui bags co., ltd BSCI summary audit report
 
#PRESENTATION by AKSHAY JANGID (Trainee)
#PRESENTATION by AKSHAY JANGID (Trainee)#PRESENTATION by AKSHAY JANGID (Trainee)
#PRESENTATION by AKSHAY JANGID (Trainee)
 
How to Develop Compliance with Sustainable Practice in RMG Industry
How to Develop Compliance with Sustainable Practice in  RMG IndustryHow to Develop Compliance with Sustainable Practice in  RMG Industry
How to Develop Compliance with Sustainable Practice in RMG Industry
 
WCA_STD_2-173854-20141009132021 from QVC
WCA_STD_2-173854-20141009132021 from QVCWCA_STD_2-173854-20141009132021 from QVC
WCA_STD_2-173854-20141009132021 from QVC
 

Dernier

Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 

Dernier (20)

Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 

amfori BSCI.pdf

  • 1. Monitoring result for Babylon Trims Ltd on site Babylon Trims Limited Monitoring Monitored Party : Babylon Trims Ltd Site : Babylon Trims Limited Address : Kandi Boilerpur, Horindhara, Union- Tetulzhora, Hemayetpur, : Savar, : Dhaka : Bangladesh amfori ID : 050-000707-000 Site amfori ID : 050-000707-002 Monitoring Activity : amfori Social Audit - Manufacturing Monitoring Type : Full Monitoring Submission Date : 16/11/2021 Expiration Date : 16/11/2023  This is an extract of the online monitoring result, generated on 16/11/2021, and is only valid as an acknowledgement of the result. To see all the details, review the full monitoring result, which is available here - The English version is the legally binding one. amfori does not assume any liability with regard to the compliance of this extract, or any versions of this extract, with the Regulation (EU) 2016/679 (General Data Protection Regulation). All rights reserved. No part of this publication may be reproduced, translated, stored in a retrieval system, or transmitted, in any form or by any means electronic, mechanical, photocopying, recording or otherwise, be lent, re-sold, hired out or otherwise circulated without the amfori consent. © amfori, 2021 Overall rating A B C D E None Section rating PA1: Social Management System C PA 2: Workers Involvement and Protection A PA 3: The Rights of Freedom of Association and Collective Bargaining A PA 4: No Discrimination A PA 5: Fair Remuneration A PA 6: Decent Working Hours A PA 7: Occupational Health and Safety A PA 8: No Child Labour A PA 9: Special Protection for Young Workers A PA 10: No Precarious Employment A PA 11: No Bonded Labour A PA 12: Protection of the Environment C PA 13: Ethical Business Behaviour A - 1 / 7
  • 2. General description Babylon Trims Limited is a 100% export-oriented accessories manufacturing company, which is located at Kandi, Boilerpur, Horindhara, Tetulzhora (Union), Hemayetpur, Savar, Dhaka, Bangladesh. Main production process of this facility is Die Cutting, Poly, Offset, Carton, Ball Press. Production capacity of the audited facility is for poly: 7800000 pieces, Carton: 3000000 pieces, Offset: 5000000 pieces, Ball press and plastic clip: 3100000 pieces, Gum tape: 65000 pieces per month. The total land area is about 135000 square feet. Total production area is about 88000 square feet; warehouse area is about 38000 square feet. The facility was established in the year of 2002 (As per incorporation certificate). There are 02 buildings and 7 sheds in the facility. Details are given below: Building 1(3 storied building) Ground floor: Blower machine, Poly printing area, poly cutting area. 1st floor: Gum tape area, poly printing, office, conference room. 2nd floor: ball press area, plastic clip making area, die cutting section, offset print area. Rooftop: Dining, Canteen rest 70% are vacant. Building 2: (1 storied building) Generator room, compressor room. Shed 1: Auto carton machine section (corrugation section, pasting section, flexo area), slotting machine, cutting machine, finishing area, finished goods keeping area, Paper roll go down, PVC store, maintenance room, boiler, Medical and childcare room, Shed 2: Manual carton machine area, slotting machine, cutting machine, finishing area, Top divider room, Screen print room, wastage go down. Shed 3: Chemical keeping area. Shed 4: RMS room, Shed 5 Substation. Shed 6: Security post. Shed 07: Control panel room. Besides, facility uses ETP jointly with sisters concerned factory (Babylon Printers limited) which is located next to premises of audited factory. The facility has total 38 first aiders and 15 first aid boxes, 200 fire fighters, 35 hose pipes, 185 ABC fire extinguishers, 75 Co2 fire extinguishers, 54 fire alarms, 202 smoke detector, 62 emergency lights, 02 staircase are there in the factory. There are total 708 employees in the facility with 613 male and 95 female employees. Facility runs In 02 shifts which starts 08:00 am to 05:00 pm and 08:00 pm to 05:00 am with one-hour meal break. They maintain attendance records through Automatic record system (proximity card). Friday is their weekly holiday. Employees receive wages by monthly basis in local currency. Audit Process – This amfori BSCI full audit conducted in 02 days by four (04) Auditors 01 observer. On the first day of audit 02 auditors and 01 observer are present to conduct the audit and the 2nd day of audit same 02 auditors are conduct the audit. An opening meeting was held on the day of assessment where S.M. Arief Raz Zaqre- COO, Md. Atiqul Islam Apu- AGM (HR, Admin and Compliance), Md. Mahmud Hossain- Deputy manager (HR, Admin and Compliance), Md. Sharif Tanik Arefin- Asst. Manager (HR, Admin and Compliance), Md. Humayun Kabir- Sr. Executive (HR & Admin), Md. Ariful islam- Asst. Manager (HR, Admin and Compliance), Md. Manzurul Islam- Factory Manager, Md. Abdul kader- Deputy Manager, Md. Shahidullah- Jr. manager (IT), Saidur Rahman- Sr. Officer (HR, Admin and Compliance), Ms. Sabira Akhter Nishat (Welfare officer) and Ms. Momena Khatun- President of Trade Union was present. During opening meeting auditors explained about the audit scope and process and a detail description on amfori BSCI requirement and approach. Immediate after the opening meeting a site visit was conducted with the factory management. A general document checklist was provided to the management and supplied documents were reviewed. The auditors verified documents from October 2020 to September 2021. Closing meeting: At the end of the audit a closing meeting was held to discuss all the areas of improvement in the findings report and positive notes with Md. Sharif Tanik Arefin- Asst. Manager (HR, Admin and Compliance) and with their team. Facility management agreed on all findings and signed on it. Auditor informed the management regarding the submission of remediation plan to the amfori BSCI participant through amfori BSCI platform against the findings raised on the audit within 60 days. Audit Company name: SGS Bangladesh Limited. Auditors Name and APSCA Status: Asadur Rahman- RA 21701424, Md. Mahmudur Rahman Shovon- RA- 21701562, Audit date: October 31 and November 1, 2021. Overall Findings: Non-Compliance were noted in the area of “Social Management System and Cascade Effect”, “Workers Involvement and Protection”, "Fair Remuneration”, “Occupational Health & Safety”, “Protection of Environment” For other areas, no findings were observed. Comments from auditor about Covid-19: Following measure has been taken by the facility during operation in every day to protect their employees from #Covid-19: a) Arranging and ensuring hand washing facility for each employee at each entrance of production floor when entering in the factory. b) The facility delivers awareness speech on Covid-19 through public address (PA) system during working hours. c) Ensuring face mask for each employee. d) Maintaining same arrangement for visitors. e) - 2 / 7
  • 3. Having a reporting system to medical person or management if suspected or cases observed. f) Checking temperature for each employee while entering in the morning. g) Posted awareness poster in the prominent places. Remarks: As per written statement by facility management, factory address has been changed in the database. - 3 / 7
  • 4. Site Details Site : Babylon Trims Limited Site amfori ID : 050-000707-002 GICS Classification Sector : Industrials Industry Group : Capital Goods Industry : Industrial Conglomerates Sub Industry : Industrial Conglomerates GS1 Classifications Product Process Classifications N.A. N.A. - 4 / 7
  • 5. Metrics Key Metrics Total workforce 439 Workers Legal minimum wage in local currency 8000 Monthly Lowest wage paid for regular work at the site 8000 Monthly Calculated living wage in local currency 17926 Monthly Total sample 26 Workers Other Metrics Male workers 380 Workers Female workers 59 Workers Permanent workers - Male 613 Workers Permanent workers - Female 95 Workers Temporary workers - Male 0 Workers Temporary workers - Female 0 Workers Seasonal workers - Male 0 Workers Seasonal workers - Female 0 Workers Management - Male 145 Workers Management - Female 0 Workers Apprentices - Male 0 Workers Apprentices - Female 0 Workers Workers on probation - Male 105 Workers Workers on probation - Female 5 Workers Workers with night shift - Male 85 Workers Workers with night shift - Female 45 Workers Workers with disabilities - Male 0 Workers Workers with disabilities - Female 0 Workers Domestic migrant workers - Male 0 Workers Domestic migrant workers - Female 0 Workers Foreign migrant workers - Male 0 Workers Foreign migrant workers - Female 0 Workers Workers hired directly - Male 613 Workers Workers hired directly - Female 95 Workers Workers hired indirectly - Male 0 Workers Workers hired indirectly - Female 0 Workers Unionised workers - Male 300 Workers Unionised workers - Female 70 Workers Workers under CBA - Male 0 Workers Workers under CBA - Female 0 Workers Pregnant workers 0 Workers Workers on parental leave - Male 0 Workers Workers on parental leave - Female 0 Workers Sample - Male 16 Workers Sample - Female 10 Workers - 5 / 7
  • 6. Findings PA1: Social Management System Facility is in process of implementation of amfori BSCI COC currently facility did not calculate living wage properly, sufficient awareness was not found from the workers, production supervisors, workers’ representatives on training of amfori BSCI COC, some gaps found in communicating amfori BSCI TOI with business partners, gap found in health & safety and environment area. [ As per amfori BSCI COC check point 1.1] Facility has developed supplier selection policy and procedures in line with amfori BSCI COC but communicated TOI is not correct format. (as per amfori BSCI COC check point 1.5) Facility management did not develop the necessary policies and processes to prevent and address any adverse human rights impacts that may be detected in its supply chain. [As per amfori BSCI COC check point 1.6] PA 2: Workers Involvement and Protection  Facility management has provided training to the staff and workers on amfori BSCI code of conduct, but enough awareness was not found from the workers, production supervisors, workers’ representatives regarding amfori BSCI COC. [As per amfori BSCI COC check point 2.4] PA 5: Fair Remuneration After reviewing fair remuneration, it was noted that facility management is aware about collection and calculation of fair remuneration. Facility has conducted general survey within workers of various grades, sections and several areas to identified fair remuneration. Based on that, a living wage has been figured out by the management for surrounding areas of the factory. However, no potential action has been taken to fill the gaps between actual remuneration and identified fair remuneration figure yet. [As per amfori BSCI COC check point 5.4] PA 7: Occupational Health and Safety Factory management did not involve worker’s representatives and workers in the drifting and enforcement of the internal procedure on occupational health and safety. [As per amfori BSCI COC check point no.7.1] Though facility identify risk of waste store, paper roll godown but during audit excessive height was noted at paper roll godown, waste godown which may cause of accident. [As per Bangladesh Labor Rules 2015, Schedule-4, Matters relating to safety committee (2) and amfori BSCI COC checkpoint 7.3] The following PPE related findings were noted during site visit: a. During plant tour it was noted that approximately 15% workers at corrugation machine area were not using ear plug while working at shed 01. b. Randomly checked 03 out of 06 workers of screen print section workers were using fabric mask instead of respiratory mask during work at shed 01. [As per amfori BSCI COC check point no 7.6 and Bangladesh Labour Rules 2015, Rules 67 (2)] No MSDS, labelling and secondary containment was found for chemical drum (gum), burnt Mobil and chemicals used for poly located at shed 2, beside generator room and building 01. [As per amfori BSCI COC check point no.7.7 and Bangladesh Labour Rules 2015, Rule 68 (10) a. Facility management did not take building construction approval from concerned authority (e.g-LGED/PWD). Facility had taken building construction approval from Chairman of Tetoljhara Union Parishad. However, facility has applied to the concerned authority RAJUK on 27th November 20213. [As per amfori BSCI COC checkpoint no 7.11 and Building Construction Act-1952, Section 3(1)] b. Facility management did not include rooftop of building 1 (worker dining, canteen) and shed 3 (chemical keeping area) in their updated floor layout plan. [As per amfori BSCI COC checkpoint no 7.11 and Bangladesh Labor Rules 2015, Rule 353(1)] During documents review and management interview it was noted that 01 out of 02 electricians had no competency certificate from concern authority. [As per amfori BSCI COC checkpoint no 7.13 and Bangladesh Labor Rule 2015, Rule 58(9)] PA 12: Protection of the Environment Environment Clearance Certificate of the factory expired on April 5, 2021. However, factory management has applied and made payment for the renewal for same on September 08, 2021. [ As per Bangladesh Environment Conservation Rules 1997, section 8 (1 & 2) and amfori BSCI COC check point no 12.3] Waste like empty poly, carton, unused fire door, unused tiles, construction materials etc. were not segregated by type of hazard and found at open air. [As per amfori BSCI COC check point no. 12.4 and Bangladesh Labor Law 2006, Section 54] - 6 / 7
  • 7. PA 12: Protection of the Environment Though facility management provided awareness training on proper use of water to the workers, but they did not implement significant programs to promote conservation of water and reduction of waste of water significantly. [As per amfori BSCI COC check point no. 12.5] - 7 / 7