2. Values
• High quality of our services
• Satisfaction of our partners
• Flexibility
• Transparency
• Team working
• Safety of our employees
• Environmentally-friendly
company
FL
OUR APPROACH
2
ETP’s goal is to become better and better at everything we do for our customers.
We believe in zero defect philosophy.We will always push ourselves for continuous improvement. Our dreams are to
become a worldwide company with a strong recognizable brand, providing great services to customers worldwide. At
the same time, we would like to take care of our employees and respect natural environment we operate in.
4. FL
OUR HISTORY
4
ELECTRO-TEAM
shipbuilding
projects in Norway
and Sweden
ISO 9001 granted
Quality
Management
System
ELECTRO-TEAM
Switchboard
department
Electro Team
Partners Sp. Z o.o.
AÜG license -
Arbeitnehmerüber
lassungsgesetz
license
ETP GmbH
Germany
ETP Purveyor Sp.
z o.o.
ETP Service AS
Norway
ETP Energy ApS
Denmark
ETP Marine &
Offshore
United Kingdom
2007 2008 2009 2012 2013 2014 2015 2017 2018
5. FL
OUR SERVICE
5
certificates: SEP VCA DSB GWO HUET BOSIET FSE MIG, MAG TIG MMA others
Marine & Offshore
Department
Onshore
Department
Switchboard
Department
Services
Department
Metal works:
•Preparation of Switchboard frames
•Cable trays, ladder assembly
•Foundation preparation and assembly
•Individual cable tray solution
•Grinding
•Service work
Welding
services:
•Preparing welding contact surfaces according to WPS
•(cutting, bevelling, grinding, cleaning)
•MIG, MAG, TIG
•Service work
Electrical
installations:
•Cable pulling
•Installation of electrical equipment
•Connection and initiation of electrical equipment
•Renovation, maintenance, inspections of electrical machines
•Servicee work
Mechanics
woks:
•mechanics and hydraulics part fitting
• installation of hydraulic components
• installation of hydraulic power systems
•mounting on devices
•bending and installation of pipelines
•service work
6. FL
OUR QUALITY SYSTEM
6
ISO 9001
ISOTS 16949 – PPAP, SPC, MSA, FMEA, CTQ, R&R, CTP, 8D, Control Plan, Flow Chart
PPM level monitoring
Code of Conduct,Corporate Social Responsibility
SIX SIGMA
Cause and Effect Analysis
Corporate Social Responsibility,Code of Conduct
8. FL
OUR PROJECTS 2013-2015
8
1. Oceanex – ConroVessel
2. 2x Rolldock- Special Cargo
Vessel
3. 2x SeismicVessels
4. Caledonian- Ropax Ferry
5. Ace – Megayacht
6. Quattroelle - Megayacht
7. Solandge – Megayacht
8. Kismet - Megayacht
9. Ester III – Megayacht
10. MY Sasha – Megayacht
11. MonteVideo Ecpress-
ContainerVessel
12. DANTYSK-Accomodation
platform
13. White Pearl- Megayacht
1. Panel building mechanics
2. OSX – Offshore Support
Vessel
3. Pioneering Spirit – Heavy
Lift ConstructionVessel
4. Multi PurposeTowers
1. Grand Canyon – Multi
PurposeOffshoreVessel
2. Main Switchboard
Production
1. R-15 Navy
9. FL
OUR PROJECTS 2016-2018
9
1. Color Fantasy –
CruiseFerry
2. DFDS – RoRo Ferry
3. Color Magic – Cruise Ferry
4. Siem Offshore Hilux I –
Offshore vessel
5. LNGVessel AnthonyVeder
6. Radiant – Megayacht
7. Rasinig Sun - Megayacht
8. Albatros - Megayacht
1. Multi PurposeTowers
2. Spartacus
1. Nordnorge – Cruise Ferry
2. West Hercules
1. Bleigh Bank platform
2. Maersk Guardian-
Accomodation platform
3. LNGVessel Coral
Methane
4. Nissum
5. Hornsea Project One – 3x
Substations , RCS
1. MaerskViking
2. Service Noble ReginaAllen
3. Maersk Developer
4. Maersk Drilling
10. FL
HORNSEA ONE - OFFSHORE PROJECT EXAMPLE
10
The electrical installation services required for completion of Hornsea One Project offshore platforms
being built at Bladt Industries yard facilities in Aalborg, Denmark, duration 13 months:
•Installation of cable ways and supports (FRP)
•Installation of standard electrical equipment such as lights, sockets, detectors, JB, heaters, switches etc.
•Preparation and mounting of steel supports for HV
•Closing of penetrations ROXTEC
•Pulling of LowVoltage cables
•Pulling of LAN cables
•Fastening of cables using cable ties
•Mounting of cable tray covers
•Mounting and connection of electrical panels, cabinets and switchboards
•Mounting and connection of earth cable, fire protection systems, PAGA, sensors, generators and motors
•Connection of HVAC systems
•Connection of LV rooms
•Connection of batteries, emergency power, 24V installation
•Commissioning of electrical connections and cables
11. FL
LNG VESSEL – NEW CONSTRUCTION PROJECT EXAMPLE
11
The electrical installation services required for completion of LNG vessel for AnthonyVeder being
built at NeptunWerft facilities in Rostock,Germany, duration 10 months :
• Installation of cable ways and supports ( SS, ALU )
•Installation of standard electrical equipment such as lights, sockets, detectors, JB, heaters, switches etc.
•Welding of penetrations
•Closing of penetrations ROXTEC
•Pulling of LowVoltage cables
•Pulling of LAN cables
•Fastening of cables using cable ties
•Mounting and connection of electrical panels, cabinets and switchboards
•Mounting and connection of earth cable, fire protection systems, PAGA, sensors, generators and motors
•Connection of main switchboard
•Connection of batteries, emergency power,
•Commissioning of electrical connections and cables
12. FL
MEARSK OFFSHORE PLATFORM - SERVICE PROJECT EXAMPLE
12
The electrical installation services required for analysis of the actual condition of the MearskViking Offshore
Platform, duration 1 month:
• Insulation resistance and electrical testing for all switchboards and transformers at an applied voltage of 500V
• Cleaning of switchboards and transformers
15. FL
WIND OFFSHORE MANPOWER
15
Our employees abilities: :
•Construction and switching of MV Switchgear incl. LOTTO and maintenance
•Installation of standard electrical equipment such as lights, sockets, detectors, JB, heaters, switches etc.
•Safe use equipment for the detection of deenergized state on MV and LV installations
•Electrical fields and stress control on MV cables up to 36kV
•Work on Pre-molded Tconnector and EndTerminations for XLPE (PEX) and EPR (Rubber) insulated cables
•Examination of transformers incl.Troubleshooting and Maintenance
•Insulation (Megger) test of cables andTransformer with test voltage up to 10kV
•Protection relays knowledge incl. primary and secondary test with Megger 75 relay tester
•Installation of wind turbines VESTAS Denmark, GE General Electric U.S
•Electrical installation low (690V) and medium (6kV) also Ethernet/Optical data connetions
17. FL
OUR CONTACT DETAILS
17
Further information available on ETP website :Electro Team Partners
Contact information available on ETP website: http://www.etpartners.pl/contact