Project Example: GSA Feasibility Study
Washington, D.C.




                                                                 Working closely with Jones Lang LaSalle and HOK, Beck Technology
                                                                 developed cost models to accompany a feasibility study for the General
                                                                 Services Administration (GSA) in Washington, D.C.

                                                                 Seven design concepts, multiple phases of construction, historic
                                                                 preservation, anti-force protection, renovation and rehabilitation were all
                                                                 expressed through the Macro Building Information Model produced by
                                                                 DProfiler. This tool enabled the team to track various construction and
                                                                 development cost utilizing only architectural and engineering programmatic
                                                                 narratives.

                                                                 The key to this project was the ability for Beck Technology and DProfiler to
                                                                 act in a cost information management capacity for the team, generating and
                                                                 collecting the cost data that would later be used in detailed phasing studies
                                                                 and reporting to the GSA.

                                                                 To accurately document and communicate the cost of the various design
                                                                 solutions, hundreds of pages of cost data were produced as backup to
                                                                 support higher level costing assumptions in the executive summary reporting
Name | GSA Feasibility Study                                     for the conclusion of the study.
Owner | GSA
Program Manager | Jones Lang LaSalle                             The models were also used for visualization of the concepts and phasing
A/E | HOK
Cost Consultant | Beck Technology, Ltd.                          plans. Utilizing simple massings and color coordination that mirrored the 2D
Scope | Feasibility Cost Modeling Services                       architectural feasibility sketches assisted in communicating the various
Cost | Undisclosed                                               components of the study.
Completion Date | February 2009

*Client Contact Information Can Be Provided


         Beck Technology, Ltd.   | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201   | p.214.303.6297   f.214.303.6300 | www.beck-technology.com
Project Example: Mary Shiels Hospital
Dallas, Texas




                                                                 In the early phases of the economic decline, the healthcare industry was still
                                                                 going strong and keen developers were able to take advantage of falling
                                                                 commodity prices. With minimal architectural information, limited to
                                                                 programming documents, floor plans, and elevations, Beck Technology was
                                                                 able to develop a Macro Building Information Model in DProfiler to assist this
                                                                 client in identifying the overall cost of this project.

                                                                 Upon submission of the cost model, the conceptual budget was within an
                                                                 unbelievable 1% of the client’s established budget, previously unknown to
                                                                 Beck Technology. Aside from the impressiveness of the accuracy of the cost
                                                                 model, what makes this extraordinary is that this client frequently manages
                                                                 and builds their own projects and is uniquely familiar with their product type
                                                                 and subsequent cost.

                                                                 To further ensure the accuracy of the cost estimate, an estimate review
                                                                 meeting was established to verify that the early cost assumptions were in
                                                                 alignment with the design intent of the project. The client and the team
                                                                 reviewed the estimate clarification documents which defined foundation,
                                                                 structural, architectural and MEP design assumptions down to a level of
                                                                 detail not always defined at such as early stage of estimating. Each room
                                                                 had a detailed finish schedule defining ceiling, floor, and wall finishes as well
Name | Mary Shiels Hospital                                      as a list of specialty items included in each room type. It was this level of
Owner | Duke Realty – Bremner Duke                               detail that enabled the client to proceed forward confidently that they would
A/E | Page Sutherland Page
Scope | Conceptual Cost Modeling Service                         be able to build this project within the established budget. Eight months later,
Cost | $17 Million                                               when the project was bid, the final cost came within 5%-10% under the
Completion Date | February 2009                                  original conceptual budget both in part due to further design revisions and an
                                                                 aggressively declining economy.
*Client Contact Information Can Be Provided


         Beck Technology, Ltd.   | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201   | p.214.303.6297   f.214.303.6300 | www.beck-technology.com
Project Example: Engineering & Research Bldg
Dallas/Fort Worth, Texas




                                                                 Designed to provide full-scale structural testing of heavy building materials
                                                                 such as precast concrete double tees and steel beams, this Structural
                                                                 Engineering Research Center would be the largest in the nation when
                                                                 constructed. DProfiler created the cost model that was used to confirm that
                                                                 the conceptual design could be built within the budget that was preliminarily
                                                                 established.

                                                                 From a technical standpoint the project is unique in that its design
                                                                 incorporates two 50 ton bridge cranes, a 3.5’ foot thick concrete reaction floor
                                                                 and a 4 story reaction wall. These features will enable load testing of full
                                                                 scale mock-ups for bridge and building components, empowering research
                                                                 teams to put mathematical calculations and theory through rigorous real life
                                                                 testing.

                                                                 DProfiler was utilized continually from the planning/programming phase of
                                                                 this project through Schematic Design to aid the design team in maintaining
                                                                 the relationship between the design and the client’s budget. By starting with
                                                                 simple, but intelligent, massing models at the programming stage and adding
                                                                 complexity to the model as detail was developed by the design team, the BIM
                                                                 produced by DProfiler provided a continuous “gut-check” capability for the
Name | Structural Engineering Research Center                    design team and client to monitor the project as the design progressed. This
Owner | University                                               included capturing accurate costs for the specialized floor and reaction wall
A/E | Halff Associates
Cost Consultant | Apex Cost Consultants
                                                                 by including specific assumptions regarding steel and concrete before any
Scope | Conceptual Cost Modeling Services                        design calculations had taken place. As the design of the slab, wall, and
Cost | $25 Million – Construction Cost                           structure unfolded, these assumptions were replaced with the real design
Completion Date | January 2009                                   specifications.
*Client Contact Information Can Be Provided


         Beck Technology, Ltd.   | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201   | p.214.303.6297   f.214.303.6300 | www.beck-technology.com
Project Example: Texas Army National Guard
Fort Bliss, Texas




                                                                 Rarely, if ever is the cost estimator the bearer of good news, or the glue that
                                                                 binds a team together. Yet cost is a key component to a project’s success.
                                                                 If the cost of components and building systems can become the focus of the
                                                                 team, rather than the overall cost of the project, teams have a unique
                                                                 opportunity to allow cost estimation to become a “value-add” process as
                                                                 opposed to a process that subtracts value from a project.

                                                                 Much the same way the Army utilizes parachute drops to deliver people,
                                                                 equipment, and supplies to challenging locations, DProfiler was parachuted
                                                                 into this Texas Army National Guard project to help track and allocate cost in
                                                                 ways that benefitted the project team. The team was charged with creating
                                                                 one architectural solution from two separate budgets and programs. This
                                                                 effort required the team to maintain separation and integrity between the two
                                                                 budgets, but deliver a concept that seamlessly blended the designs together
                                                                 in one package. From a cost estimating perspective, maintaining clear
                                                                 boundaries between the two cost estimates and being able to visually
                                                                 communicate these costs were the main objectives for their role. This
                                                                 challenging situation created the perfect scenario for DProfiler to demonstrate
                                                                 the effectiveness of Macro Building Information Modeling.

Name | Armed Forces Reserve Center                               Working together in real time with the BIM, the team was able to establish a
Owner | Texas Army National Guard                                baseline project that was within budget and exceeded the baseline
A/E | Jacobs Engineering
Cost Consultant | Apex Cost Consultants
                                                                 programming requirements. Months later, at bid day, the budget estimate
Scope | Conceptual Cost Modeling Services                        created at Schematic Design was within 5% of the awarded contract. The
Cost | $50 Million                                               ability to visually communicate cost in three-dimensional terms had been a
Completion Date | June 2008                                      valuable process change as compared to the traditional isolated cost
                                                                 estimating methodology.
*Client Contact Information Can Be Provided


         Beck Technology, Ltd.   | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201   | p.214.303.6297   f.214.303.6300 | www.beck-technology.com
Project Example: Mixed Use Office Park
Dallas/Fort Worth, Texas




                                                                 DProfiler, a Macro Building Information Modeling tool, played a key role in
                                                                 integrating multiple disciplines and various sources of information to deliver
                                                                 important, substantive data to the client to be used in determining the viability
                                                                 of this project.

                                                                 A unique and integrated team of disciplines including Architecture,
                                                                 Construction, Real Estate, and Development collaborated together to create
                                                                 a BIM for this project, responsible for evaluating a brown-field property
                                                                 situated in the heart of an historic downtown medical district. The client had
                                                                 charged the team with determining best use for the property, occupancy
                                                                 types, architectural concepts, cost estimates, and a project proforma to aid in
                                                                 the decision making process that would ultimately cost over $100 million
                                                                 dollars in private equity. Racing against a nation-wide faltering economy, the
                                                                 client had to make important decisions in a shortened time frame to ensure
                                                                 that other competitive ventures did not impede this specific opportunity.

                                                                 While Developers generated market analysis and comparable data for the
                                                                 property, the Architect and Contractor worked together to efficiently model
                                                                 and subsequently cost multiple early design concepts. Ultimately, the data
                                                                 was collected and input into the DProfiler model to generate project proforma,
Name | Rosedale Mixed Use                                        cost estimate, and other related information for the client. This data was
Owner | Undisclosed                                              used by the client to determine the viability of the project and ultimately
AE | Beck Architecture
Contractor | The Beck Group
                                                                 resulted in a “no-go” decision. Evaluating feasibility early and quickly with
Scope | Conceptual Cost Modeling Services                        minimal capital investment saved this client money and the fallout from a
Cost | $75 Million                                               risky real estate venture.
Completion Date | July 2008

*Client Contact Information Can Be Provided


         Beck Technology, Ltd.   | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201   | p.214.303.6297   f.214.303.6300 | www.beck-technology.com
Project Example: Paschal Elementary School
Fort Worth, TX




                                                                 Paschal Elementary School is a 92,000 SF educational facility located in the
                                                                 Fort Worth Independent School District. The project is two story, above
                                                                 grade structure. The building structure consisted of a drilled piers, a partial
                                                                 structured slab on a 4’ crawl space and carton forms, and a structural steel
                                                                 superstructure. The skin system consisted brick, metal panels, storefront
                                                                 windows and punched openings.

                                                                 For this project a unique Scope to Budget design phase was utilized, in which
                                                                 a simple design massing model is created and an architectural program in
                                                                 Excel defines the spaces and overall building square footage. This very early
                                                                 design phase is used as a benchmark for the school district and Program
                                                                 Manager to establish and confirm the budget for the project.

                                                                 From a cost estimating perspective, DProfiler brings a tremendous value to
                                                                 the team in being able to generate a detailed cost model, based on intelligent
                                                                 assumptions that help to bridge the gap between concept level design
                                                                 documentation and a complete cost estimate that ensures 100% scope
                                                                 coverage.

Name | Paschal Elementary School                                 Since this first Scope to Budget design phase, the team has been able to
Owner | Fort Worth Independent School District
                                                                 proceed with their design through the Schematic Design and Design
Program Manager | DMJM / AECOM
A/E | Perkins + Will                                             Development phases while maintaining the prescribed budget. The value to
Cost Consultant | Apex Cost Consultants                          the client is that without DProfiler and the visual representation of cost that it
Scope | Conceptual Estimating Services                           provides, the team would not have been able to estimate and communicate
Cost | $17.1 Million – Construction Cost                         the cost of this project as effectively using traditional means and methods.
Completion Date | August 2009

*Client Contact Information Can Be Provided


         Beck Technology, Ltd.   | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201   | p.214.303.6297   f.214.303.6300 | www.beck-technology.com
Project Example: Oak Cliff Middle School
Dallas, Texas




                                                                 Oak Cliff Middle School is a 200,000 SF educational facility located in Dallas,
                                                                 TX. The project consists of new construction with three floors above grade
                                                                 and one floor partially below grade. Perkins+ Will began the Scope to
                                                                 Budget phase of design in the second quarter of 2009. Since this time, they
                                                                 have been able to proceed with their design through the Schematic Design
                                                                 and Design Development phases.

                                                                 The Dallas Independent School District has created and published
                                                                 standardized design guidelines, referenced as “TDG’s”, or “The Design
                                                                 Guidelines”. These documents establish consistent architectural and
                                                                 structural design specifications for all projects regardless of who the Architect
                                                                 of Record is for each project. This methodology allows for the individual
                                                                 design process to creatively evolve for each project, but ensures that similar
                                                                 materials and systems are utilized throughout the school system’s portfolio of
                                                                 projects. This also equates to efficiency for the facility management staff to
                                                                 effectively manage and maintain the buildings once they are turned over to
                                                                 the school system.

                                                                 The value for the project is that DProfiler can emulate these standards in the
Name | Oak Cliff Middle School                                   database and very accurate cost models can be built for each school early in
Owner | Dallas Independent School District                       the design process when very little design information has been developed
Program Manager | Jacobs                                         from the architect. This allows the team to identify areas of cost overruns
A/E | Perkins+Will Associates
Cost Consultant | Apex Cost Consultants                          early and enables course corrections in the design process without sacrificing
Scope | Conceptual Estimating Services                           the overall design intent of the project. It also eliminates hasty cost cutting
Cost | $38.7 Million – Construction Cost                         measures performed in the eleventh hour of design that often result in “value
Completion Date | December 2009                                  deducts” rather than “value adds”. In the end, the school system receives a
*Client Contact Information Can Be Provided
                                                                 high-value design within expected budget parameters.


         Beck Technology, Ltd.   | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201   | p.214.303.6297   f.214.303.6300 | www.beck-technology.com
Project Example: DISD High School
Dallas, Texas




                                                                 This High School is a 220,000 SF educational facility located in Dallas, TX.
                                                                 This project contains unique components such as an Automotive Technology
                                                                 Center and Youth & Family Center. Corgan & Associates began the Scope
                                                                 to Budget phase of design in the first quarter of 2009. Beginning with the
                                                                 Scope to Budget design phase, and moving through Design Development,
                                                                 this project has benefitted from a declining national economy and falling
                                                                 commodity prices. The construction industry in the DFW area is also at an
                                                                 unusually high level of competitiveness due to the fewer number of projects,
                                                                 and multiple number of contractors eager to begin new projects. The result
                                                                 has been lower overall pricing for projects, but a higher level of caution with
                                                                 respect to the risks of defaulting contractors, rises in litigation and lower
                                                                 quality of craftsmanship.

                                                                 DProfiler was utilized on this project to track cost through each of the design
                                                                 phases. Ultimately, as the year progressed, and as other projects in the
                                                                 DFW area were completing the buy-out process, DProfiler was able to
                                                                 account for the decline in pricing by de-escalating unit price values
                                                                 appropriately, while preventing a “false bottom” created by the competitive
                                                                 environment in the Metroplex.
Name | DISD High School
Owner | Dallas Independent School District                       To date the Architect has progressed through STB, Schematic Design and
Program Manager | Jacobs                                         the Design Development phases. The cost estimates created with DProfiler
A/E | Corgan & Associates
Cost Consultant | Apex Cost Consultants                          have given Corgan & Associates an independent cost check tied to a visual
Scope | Conceptual Estimating Services                           representation of the design intent throughout each of these design phases.
Cost | $43.2 Million – Construction Cost
Completion Date | December 2009

*Client Contact Information Can Be Provided


         Beck Technology, Ltd.   | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201   | p.214.303.6297   f.214.303.6300 | www.beck-technology.com
Project Example: Project Confidential
Washington, DC




                                                                 Beck Technology had a unique opportunity to utilize DProfiler in a role that
                                                                 emphasizes its ability to innovate the preconstruction process. The client was
                                                                 faced with a universally challenging situation: create a presentation to
                                                                 accurately depict construction sequencing on a renovation project for a
                                                                 Request for Proposal in less than 48 hours. Given the short time frame, the
                                                                 client reached out to Beck Technology for an innovative solution which led to
                                                                 DProfiler.

                                                                 Using a combination of resources, starting with DProfiler and including
                                                                 Google Earth, Google Street View and Bing Maps, we were able to create a
                                                                 3D model and display it in such a way as to convey what the massive
                                                                 renovation and additions to the building would look like in concept.

                                                                 With an adaptive use of DProfiler’s Layer View, an animation of the
                                                                 construction sequence was created. This showed the different stages the
                                                                 project would evolve through from start to completion. From special
                                                                 waterproofing protection to ensure continuous operation of a datacenter on
                                                                 the first level to the relocation of RTU’s, the animation clearly articulated to
                                                                 the owner the different steps and sequence that needed to be occur to
                                                                 undertake this ambitious project.

                                                                 This project was a great example of how DProfiler can facilitate
                                                                 preconstruction activities other than costing such as the communication of
Name | Withheld                                                  site logistics plans, phasing and sequencing and site evaluations.
Owner | Confidential
Scope | Construction Sequencing Presentation
Cost | Confidential
Completion Date | 2010


         Beck Technology, Ltd.   | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201   | p.214.303.6297   f.214.303.6300 | www.beck-technology.com
Project Example: Tarleton State University Master Plan
Stephenville, Texas




                                                                  Beck Technology was brought onto the team to assist Apex Cost
                                                                  Consultants and Freese & Nichols develop budget cost estimates for this
                                                                  Master Plan. Traditionally, historical cost per square foot for similar
                                                                  building types are utilized to develop budget estimates for projects at the
                                                                  master planning phase of design. At this stage there simply is not
                                                                  enough design documentation to develop reliable, traditional cost
                                                                  estimates. However, because DProfiler is assumption driven and is
                                                                  effective in communicating and documenting these assumptions,
                                                                  accurate detailed cost estimating can occur at this stage and provide
                                                                  valuable planning information to the team.

                                                                  To support this design exercise, DProfiler was used to model the as-built
                                                                  condition of the campus, and the proposed construction. When
                                                                  compared, these models enabled the cost estimator to quickly develop
                                                                  appropriate budgets for sitework associated with phasing of the campus
                                                                  development as well as detailed building estimates for new projects.

                                                                  As the Master Plan is accepted and begins to be implemented, DProfiler
                                                                  will help the architect, the owners and campus leadership better plan for
                                                                  future development to correspond with future enrollment. Being able to
                                                                  visualize and understand the assumptions made in the creation of the
Name | Tarleton State University                                  cost estimate, will enable them to strategize how major capital projects
Scope | Master Planning Cost Model                                are deployed.
A/E | Freese & Nichols
Cost Consultant | Apex Cost Consultants
Completion Date | June 2011

*Client Contact Information Can Be Provided


         Beck Technology, Ltd.   | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201   | p.214.303.6297   f.214.303.6300 | www.beck-technology.com
Project Example: South Texas College Master Plan
McAllen, Texas




                                                                  South Texas College has five campuses in McAllen. These five
                                                                  campuses each serve a different aspect of academia. Freese & Nichols
                                                                  was hired to help the college deal with their growth expectations and to
                                                                  tie each of the campuses together through effective planning.

                                                                  Working with the College and Freese & Nichols, Beck Technology
                                                                  facilitated a Cost Estimating Workshop prior to starting the process to
                                                                  discuss the Master Plan. In the workshop, each new proposed
                                                                  construction project was discussed to capture high level assumptions
                                                                  about occupancy, use, and typical finishes. This data was stored in
                                                                  Project Data Sheets.

                                                                  Traditionally, historical $/SF for similar building types are utilized to
                                                                  develop budget estimates for projects at the master planning phase of
                                                                  design. At this stage there simply is not enough design documentation to
                                                                  develop reliable, traditional cost estimates. However, because DProfiler
                                                                  is assumption driven and is effective in communicating and documenting
                                                                  these assumptions, accurate detailed cost estimating can occur at this
                                                                  stage and provide valuable planning information to the team.

                                                                  By integrating cost knowledge with the massing models, the DProfiler
Name | South Texas College                                        model also enables the team to better visualize the phasing and
Scope | Master Planning Cost Model                                sequencing impacts caused by major master planning decisions such as
A/E | Freese & Nichols                                            infrastructure and utility upgrades and installations.
Cost Consultant | Beck Technology, Ltd.
Completion Date | December 2009

*Client Contact Information Can Be Provided


         Beck Technology, Ltd.   | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201   | p.214.303.6297   f.214.303.6300 | www.beck-technology.com

Contenu connexe

En vedette (9)

Alleria's Botique
Alleria's BotiqueAlleria's Botique
Alleria's Botique
 
Boutique business
Boutique businessBoutique business
Boutique business
 
Willa boutique
Willa boutique Willa boutique
Willa boutique
 
Technical Textiles Presentation
Technical Textiles PresentationTechnical Textiles Presentation
Technical Textiles Presentation
 
Marketing aspects of Feasibility Study
Marketing aspects of Feasibility StudyMarketing aspects of Feasibility Study
Marketing aspects of Feasibility Study
 
Feasibility Study- Bakery
Feasibility Study- BakeryFeasibility Study- Bakery
Feasibility Study- Bakery
 
Feasibility Study
Feasibility StudyFeasibility Study
Feasibility Study
 
Feasibility Study (Veggie Bread)
Feasibility Study (Veggie Bread)Feasibility Study (Veggie Bread)
Feasibility Study (Veggie Bread)
 
Feasibility Study: Marketing , Technical and Management Aspect
Feasibility Study: Marketing , Technical and Management AspectFeasibility Study: Marketing , Technical and Management Aspect
Feasibility Study: Marketing , Technical and Management Aspect
 

Similaire à 5D Macro BIM Project Profiles Using DProfiler

Smarter Oil and Gas - IBM Rational Point of View
Smarter Oil and Gas - IBM Rational Point of ViewSmarter Oil and Gas - IBM Rational Point of View
Smarter Oil and Gas - IBM Rational Point of View
Derek Newton
 
Conceptual estimating, design-build_and_the_steel_fabricator
Conceptual estimating, design-build_and_the_steel_fabricatorConceptual estimating, design-build_and_the_steel_fabricator
Conceptual estimating, design-build_and_the_steel_fabricator
PT.DYKA Sarana Teknikatama
 
092811 updated contech brochure
092811 updated contech brochure092811 updated contech brochure
092811 updated contech brochure
Paul Smith
 
092811 updated contech brochure
092811 updated contech brochure092811 updated contech brochure
092811 updated contech brochure
Paul Smith
 
Power Point For Cmgt 410
Power Point For Cmgt 410Power Point For Cmgt 410
Power Point For Cmgt 410
steffiann88
 
010212 updated contech brochure cta
010212 updated contech brochure cta010212 updated contech brochure cta
010212 updated contech brochure cta
Paul Smith
 
010212 updated contech brochure cta
010212 updated contech brochure cta010212 updated contech brochure cta
010212 updated contech brochure cta
Paul Smith
 
Chris Rohn - Architectural Professional
Chris Rohn - Architectural ProfessionalChris Rohn - Architectural Professional
Chris Rohn - Architectural Professional
chrisrohn
 

Similaire à 5D Macro BIM Project Profiles Using DProfiler (20)

Smarter Oil and Gas - IBM Rational Point of View
Smarter Oil and Gas - IBM Rational Point of ViewSmarter Oil and Gas - IBM Rational Point of View
Smarter Oil and Gas - IBM Rational Point of View
 
Aiab089228
Aiab089228Aiab089228
Aiab089228
 
2008 Fiatech Ceti Awards Smccv
2008   Fiatech Ceti Awards   Smccv2008   Fiatech Ceti Awards   Smccv
2008 Fiatech Ceti Awards Smccv
 
Brittain Hadley Brochure
Brittain Hadley BrochureBrittain Hadley Brochure
Brittain Hadley Brochure
 
Exploration Production Portals
Exploration Production Portals Exploration Production Portals
Exploration Production Portals
 
Conceptual estimating, design-build_and_the_steel_fabricator
Conceptual estimating, design-build_and_the_steel_fabricatorConceptual estimating, design-build_and_the_steel_fabricator
Conceptual estimating, design-build_and_the_steel_fabricator
 
Estimation
EstimationEstimation
Estimation
 
092811 updated contech brochure
092811 updated contech brochure092811 updated contech brochure
092811 updated contech brochure
 
092811 updated contech brochure
092811 updated contech brochure092811 updated contech brochure
092811 updated contech brochure
 
Value Engineering for Roads & Highways Project
Value Engineering for Roads & Highways ProjectValue Engineering for Roads & Highways Project
Value Engineering for Roads & Highways Project
 
collaborative.pptx
collaborative.pptxcollaborative.pptx
collaborative.pptx
 
Power Point For Cmgt 410
Power Point For Cmgt 410Power Point For Cmgt 410
Power Point For Cmgt 410
 
010212 updated contech brochure cta
010212 updated contech brochure cta010212 updated contech brochure cta
010212 updated contech brochure cta
 
010212 updated contech brochure cta
010212 updated contech brochure cta010212 updated contech brochure cta
010212 updated contech brochure cta
 
Whitfield resume
Whitfield   resume Whitfield   resume
Whitfield resume
 
Role of Project Management Through IT for "Construction and EPC World"
Role of Project Management Through IT for "Construction and EPC World"Role of Project Management Through IT for "Construction and EPC World"
Role of Project Management Through IT for "Construction and EPC World"
 
Project delivery strategy
Project delivery strategyProject delivery strategy
Project delivery strategy
 
Getting it-right
Getting it-rightGetting it-right
Getting it-right
 
Chris Rohn - Architectural Professional
Chris Rohn - Architectural ProfessionalChris Rohn - Architectural Professional
Chris Rohn - Architectural Professional
 
Hashim Ibnauf Resume
Hashim Ibnauf ResumeHashim Ibnauf Resume
Hashim Ibnauf Resume
 

Dernier

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Dernier (20)

Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 

5D Macro BIM Project Profiles Using DProfiler

  • 1. Project Example: GSA Feasibility Study Washington, D.C. Working closely with Jones Lang LaSalle and HOK, Beck Technology developed cost models to accompany a feasibility study for the General Services Administration (GSA) in Washington, D.C. Seven design concepts, multiple phases of construction, historic preservation, anti-force protection, renovation and rehabilitation were all expressed through the Macro Building Information Model produced by DProfiler. This tool enabled the team to track various construction and development cost utilizing only architectural and engineering programmatic narratives. The key to this project was the ability for Beck Technology and DProfiler to act in a cost information management capacity for the team, generating and collecting the cost data that would later be used in detailed phasing studies and reporting to the GSA. To accurately document and communicate the cost of the various design solutions, hundreds of pages of cost data were produced as backup to support higher level costing assumptions in the executive summary reporting Name | GSA Feasibility Study for the conclusion of the study. Owner | GSA Program Manager | Jones Lang LaSalle The models were also used for visualization of the concepts and phasing A/E | HOK Cost Consultant | Beck Technology, Ltd. plans. Utilizing simple massings and color coordination that mirrored the 2D Scope | Feasibility Cost Modeling Services architectural feasibility sketches assisted in communicating the various Cost | Undisclosed components of the study. Completion Date | February 2009 *Client Contact Information Can Be Provided Beck Technology, Ltd. | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201 | p.214.303.6297 f.214.303.6300 | www.beck-technology.com
  • 2. Project Example: Mary Shiels Hospital Dallas, Texas In the early phases of the economic decline, the healthcare industry was still going strong and keen developers were able to take advantage of falling commodity prices. With minimal architectural information, limited to programming documents, floor plans, and elevations, Beck Technology was able to develop a Macro Building Information Model in DProfiler to assist this client in identifying the overall cost of this project. Upon submission of the cost model, the conceptual budget was within an unbelievable 1% of the client’s established budget, previously unknown to Beck Technology. Aside from the impressiveness of the accuracy of the cost model, what makes this extraordinary is that this client frequently manages and builds their own projects and is uniquely familiar with their product type and subsequent cost. To further ensure the accuracy of the cost estimate, an estimate review meeting was established to verify that the early cost assumptions were in alignment with the design intent of the project. The client and the team reviewed the estimate clarification documents which defined foundation, structural, architectural and MEP design assumptions down to a level of detail not always defined at such as early stage of estimating. Each room had a detailed finish schedule defining ceiling, floor, and wall finishes as well Name | Mary Shiels Hospital as a list of specialty items included in each room type. It was this level of Owner | Duke Realty – Bremner Duke detail that enabled the client to proceed forward confidently that they would A/E | Page Sutherland Page Scope | Conceptual Cost Modeling Service be able to build this project within the established budget. Eight months later, Cost | $17 Million when the project was bid, the final cost came within 5%-10% under the Completion Date | February 2009 original conceptual budget both in part due to further design revisions and an aggressively declining economy. *Client Contact Information Can Be Provided Beck Technology, Ltd. | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201 | p.214.303.6297 f.214.303.6300 | www.beck-technology.com
  • 3. Project Example: Engineering & Research Bldg Dallas/Fort Worth, Texas Designed to provide full-scale structural testing of heavy building materials such as precast concrete double tees and steel beams, this Structural Engineering Research Center would be the largest in the nation when constructed. DProfiler created the cost model that was used to confirm that the conceptual design could be built within the budget that was preliminarily established. From a technical standpoint the project is unique in that its design incorporates two 50 ton bridge cranes, a 3.5’ foot thick concrete reaction floor and a 4 story reaction wall. These features will enable load testing of full scale mock-ups for bridge and building components, empowering research teams to put mathematical calculations and theory through rigorous real life testing. DProfiler was utilized continually from the planning/programming phase of this project through Schematic Design to aid the design team in maintaining the relationship between the design and the client’s budget. By starting with simple, but intelligent, massing models at the programming stage and adding complexity to the model as detail was developed by the design team, the BIM produced by DProfiler provided a continuous “gut-check” capability for the Name | Structural Engineering Research Center design team and client to monitor the project as the design progressed. This Owner | University included capturing accurate costs for the specialized floor and reaction wall A/E | Halff Associates Cost Consultant | Apex Cost Consultants by including specific assumptions regarding steel and concrete before any Scope | Conceptual Cost Modeling Services design calculations had taken place. As the design of the slab, wall, and Cost | $25 Million – Construction Cost structure unfolded, these assumptions were replaced with the real design Completion Date | January 2009 specifications. *Client Contact Information Can Be Provided Beck Technology, Ltd. | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201 | p.214.303.6297 f.214.303.6300 | www.beck-technology.com
  • 4. Project Example: Texas Army National Guard Fort Bliss, Texas Rarely, if ever is the cost estimator the bearer of good news, or the glue that binds a team together. Yet cost is a key component to a project’s success. If the cost of components and building systems can become the focus of the team, rather than the overall cost of the project, teams have a unique opportunity to allow cost estimation to become a “value-add” process as opposed to a process that subtracts value from a project. Much the same way the Army utilizes parachute drops to deliver people, equipment, and supplies to challenging locations, DProfiler was parachuted into this Texas Army National Guard project to help track and allocate cost in ways that benefitted the project team. The team was charged with creating one architectural solution from two separate budgets and programs. This effort required the team to maintain separation and integrity between the two budgets, but deliver a concept that seamlessly blended the designs together in one package. From a cost estimating perspective, maintaining clear boundaries between the two cost estimates and being able to visually communicate these costs were the main objectives for their role. This challenging situation created the perfect scenario for DProfiler to demonstrate the effectiveness of Macro Building Information Modeling. Name | Armed Forces Reserve Center Working together in real time with the BIM, the team was able to establish a Owner | Texas Army National Guard baseline project that was within budget and exceeded the baseline A/E | Jacobs Engineering Cost Consultant | Apex Cost Consultants programming requirements. Months later, at bid day, the budget estimate Scope | Conceptual Cost Modeling Services created at Schematic Design was within 5% of the awarded contract. The Cost | $50 Million ability to visually communicate cost in three-dimensional terms had been a Completion Date | June 2008 valuable process change as compared to the traditional isolated cost estimating methodology. *Client Contact Information Can Be Provided Beck Technology, Ltd. | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201 | p.214.303.6297 f.214.303.6300 | www.beck-technology.com
  • 5. Project Example: Mixed Use Office Park Dallas/Fort Worth, Texas DProfiler, a Macro Building Information Modeling tool, played a key role in integrating multiple disciplines and various sources of information to deliver important, substantive data to the client to be used in determining the viability of this project. A unique and integrated team of disciplines including Architecture, Construction, Real Estate, and Development collaborated together to create a BIM for this project, responsible for evaluating a brown-field property situated in the heart of an historic downtown medical district. The client had charged the team with determining best use for the property, occupancy types, architectural concepts, cost estimates, and a project proforma to aid in the decision making process that would ultimately cost over $100 million dollars in private equity. Racing against a nation-wide faltering economy, the client had to make important decisions in a shortened time frame to ensure that other competitive ventures did not impede this specific opportunity. While Developers generated market analysis and comparable data for the property, the Architect and Contractor worked together to efficiently model and subsequently cost multiple early design concepts. Ultimately, the data was collected and input into the DProfiler model to generate project proforma, Name | Rosedale Mixed Use cost estimate, and other related information for the client. This data was Owner | Undisclosed used by the client to determine the viability of the project and ultimately AE | Beck Architecture Contractor | The Beck Group resulted in a “no-go” decision. Evaluating feasibility early and quickly with Scope | Conceptual Cost Modeling Services minimal capital investment saved this client money and the fallout from a Cost | $75 Million risky real estate venture. Completion Date | July 2008 *Client Contact Information Can Be Provided Beck Technology, Ltd. | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201 | p.214.303.6297 f.214.303.6300 | www.beck-technology.com
  • 6. Project Example: Paschal Elementary School Fort Worth, TX Paschal Elementary School is a 92,000 SF educational facility located in the Fort Worth Independent School District. The project is two story, above grade structure. The building structure consisted of a drilled piers, a partial structured slab on a 4’ crawl space and carton forms, and a structural steel superstructure. The skin system consisted brick, metal panels, storefront windows and punched openings. For this project a unique Scope to Budget design phase was utilized, in which a simple design massing model is created and an architectural program in Excel defines the spaces and overall building square footage. This very early design phase is used as a benchmark for the school district and Program Manager to establish and confirm the budget for the project. From a cost estimating perspective, DProfiler brings a tremendous value to the team in being able to generate a detailed cost model, based on intelligent assumptions that help to bridge the gap between concept level design documentation and a complete cost estimate that ensures 100% scope coverage. Name | Paschal Elementary School Since this first Scope to Budget design phase, the team has been able to Owner | Fort Worth Independent School District proceed with their design through the Schematic Design and Design Program Manager | DMJM / AECOM A/E | Perkins + Will Development phases while maintaining the prescribed budget. The value to Cost Consultant | Apex Cost Consultants the client is that without DProfiler and the visual representation of cost that it Scope | Conceptual Estimating Services provides, the team would not have been able to estimate and communicate Cost | $17.1 Million – Construction Cost the cost of this project as effectively using traditional means and methods. Completion Date | August 2009 *Client Contact Information Can Be Provided Beck Technology, Ltd. | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201 | p.214.303.6297 f.214.303.6300 | www.beck-technology.com
  • 7. Project Example: Oak Cliff Middle School Dallas, Texas Oak Cliff Middle School is a 200,000 SF educational facility located in Dallas, TX. The project consists of new construction with three floors above grade and one floor partially below grade. Perkins+ Will began the Scope to Budget phase of design in the second quarter of 2009. Since this time, they have been able to proceed with their design through the Schematic Design and Design Development phases. The Dallas Independent School District has created and published standardized design guidelines, referenced as “TDG’s”, or “The Design Guidelines”. These documents establish consistent architectural and structural design specifications for all projects regardless of who the Architect of Record is for each project. This methodology allows for the individual design process to creatively evolve for each project, but ensures that similar materials and systems are utilized throughout the school system’s portfolio of projects. This also equates to efficiency for the facility management staff to effectively manage and maintain the buildings once they are turned over to the school system. The value for the project is that DProfiler can emulate these standards in the Name | Oak Cliff Middle School database and very accurate cost models can be built for each school early in Owner | Dallas Independent School District the design process when very little design information has been developed Program Manager | Jacobs from the architect. This allows the team to identify areas of cost overruns A/E | Perkins+Will Associates Cost Consultant | Apex Cost Consultants early and enables course corrections in the design process without sacrificing Scope | Conceptual Estimating Services the overall design intent of the project. It also eliminates hasty cost cutting Cost | $38.7 Million – Construction Cost measures performed in the eleventh hour of design that often result in “value Completion Date | December 2009 deducts” rather than “value adds”. In the end, the school system receives a *Client Contact Information Can Be Provided high-value design within expected budget parameters. Beck Technology, Ltd. | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201 | p.214.303.6297 f.214.303.6300 | www.beck-technology.com
  • 8. Project Example: DISD High School Dallas, Texas This High School is a 220,000 SF educational facility located in Dallas, TX. This project contains unique components such as an Automotive Technology Center and Youth & Family Center. Corgan & Associates began the Scope to Budget phase of design in the first quarter of 2009. Beginning with the Scope to Budget design phase, and moving through Design Development, this project has benefitted from a declining national economy and falling commodity prices. The construction industry in the DFW area is also at an unusually high level of competitiveness due to the fewer number of projects, and multiple number of contractors eager to begin new projects. The result has been lower overall pricing for projects, but a higher level of caution with respect to the risks of defaulting contractors, rises in litigation and lower quality of craftsmanship. DProfiler was utilized on this project to track cost through each of the design phases. Ultimately, as the year progressed, and as other projects in the DFW area were completing the buy-out process, DProfiler was able to account for the decline in pricing by de-escalating unit price values appropriately, while preventing a “false bottom” created by the competitive environment in the Metroplex. Name | DISD High School Owner | Dallas Independent School District To date the Architect has progressed through STB, Schematic Design and Program Manager | Jacobs the Design Development phases. The cost estimates created with DProfiler A/E | Corgan & Associates Cost Consultant | Apex Cost Consultants have given Corgan & Associates an independent cost check tied to a visual Scope | Conceptual Estimating Services representation of the design intent throughout each of these design phases. Cost | $43.2 Million – Construction Cost Completion Date | December 2009 *Client Contact Information Can Be Provided Beck Technology, Ltd. | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201 | p.214.303.6297 f.214.303.6300 | www.beck-technology.com
  • 9. Project Example: Project Confidential Washington, DC Beck Technology had a unique opportunity to utilize DProfiler in a role that emphasizes its ability to innovate the preconstruction process. The client was faced with a universally challenging situation: create a presentation to accurately depict construction sequencing on a renovation project for a Request for Proposal in less than 48 hours. Given the short time frame, the client reached out to Beck Technology for an innovative solution which led to DProfiler. Using a combination of resources, starting with DProfiler and including Google Earth, Google Street View and Bing Maps, we were able to create a 3D model and display it in such a way as to convey what the massive renovation and additions to the building would look like in concept. With an adaptive use of DProfiler’s Layer View, an animation of the construction sequence was created. This showed the different stages the project would evolve through from start to completion. From special waterproofing protection to ensure continuous operation of a datacenter on the first level to the relocation of RTU’s, the animation clearly articulated to the owner the different steps and sequence that needed to be occur to undertake this ambitious project. This project was a great example of how DProfiler can facilitate preconstruction activities other than costing such as the communication of Name | Withheld site logistics plans, phasing and sequencing and site evaluations. Owner | Confidential Scope | Construction Sequencing Presentation Cost | Confidential Completion Date | 2010 Beck Technology, Ltd. | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201 | p.214.303.6297 f.214.303.6300 | www.beck-technology.com
  • 10. Project Example: Tarleton State University Master Plan Stephenville, Texas Beck Technology was brought onto the team to assist Apex Cost Consultants and Freese & Nichols develop budget cost estimates for this Master Plan. Traditionally, historical cost per square foot for similar building types are utilized to develop budget estimates for projects at the master planning phase of design. At this stage there simply is not enough design documentation to develop reliable, traditional cost estimates. However, because DProfiler is assumption driven and is effective in communicating and documenting these assumptions, accurate detailed cost estimating can occur at this stage and provide valuable planning information to the team. To support this design exercise, DProfiler was used to model the as-built condition of the campus, and the proposed construction. When compared, these models enabled the cost estimator to quickly develop appropriate budgets for sitework associated with phasing of the campus development as well as detailed building estimates for new projects. As the Master Plan is accepted and begins to be implemented, DProfiler will help the architect, the owners and campus leadership better plan for future development to correspond with future enrollment. Being able to visualize and understand the assumptions made in the creation of the Name | Tarleton State University cost estimate, will enable them to strategize how major capital projects Scope | Master Planning Cost Model are deployed. A/E | Freese & Nichols Cost Consultant | Apex Cost Consultants Completion Date | June 2011 *Client Contact Information Can Be Provided Beck Technology, Ltd. | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201 | p.214.303.6297 f.214.303.6300 | www.beck-technology.com
  • 11. Project Example: South Texas College Master Plan McAllen, Texas South Texas College has five campuses in McAllen. These five campuses each serve a different aspect of academia. Freese & Nichols was hired to help the college deal with their growth expectations and to tie each of the campuses together through effective planning. Working with the College and Freese & Nichols, Beck Technology facilitated a Cost Estimating Workshop prior to starting the process to discuss the Master Plan. In the workshop, each new proposed construction project was discussed to capture high level assumptions about occupancy, use, and typical finishes. This data was stored in Project Data Sheets. Traditionally, historical $/SF for similar building types are utilized to develop budget estimates for projects at the master planning phase of design. At this stage there simply is not enough design documentation to develop reliable, traditional cost estimates. However, because DProfiler is assumption driven and is effective in communicating and documenting these assumptions, accurate detailed cost estimating can occur at this stage and provide valuable planning information to the team. By integrating cost knowledge with the massing models, the DProfiler Name | South Texas College model also enables the team to better visualize the phasing and Scope | Master Planning Cost Model sequencing impacts caused by major master planning decisions such as A/E | Freese & Nichols infrastructure and utility upgrades and installations. Cost Consultant | Beck Technology, Ltd. Completion Date | December 2009 *Client Contact Information Can Be Provided Beck Technology, Ltd. | 1807 Ross Avenue, Suite 500, Dallas, Texas 75201 | p.214.303.6297 f.214.303.6300 | www.beck-technology.com