APMP®
                 Accreditation Programme
                   Planning the Proposal Phase
                   Session 2: Proposal Outline
                          Development
                                          Planning the Proposal Phase



© APMP 2005 and Bid to Win Ltd 2010                      Version: 0v9
Winning Document Design

      In this module, we shall learn about the
    purpose and content of the proposal outline,
       and how it can help us get organised.


                                         Planning the Proposal Phase



2   © Your Company 2003   Confidential
This module will help you to:

• define the purpose and content of a proposal outline
• create an outline
• annotate an outline
• add more structure to an outline
• describe the benefits of using an outline


             Learning objectives
                                         Proposal Guide   124
Some definitions of an outline
An outline could be:

1. a line drawn as a boundary

2. a list of topics

3. a basic project plan
Creating and using an Outline
Simple three step process



            • Follow RFQ                 • Weight by
                                                                    • Allocate Win
              instructions                 customer
 Develop                        Add                      Annotate     Themes to
            • Create top                   priority
Top Level                    detailed                      your       sections
              level                      • Develop
 Outline      headings and   structure     informative    Outline   • Guidance for
                                                                      writers
              numbers                      headings
Creating a proposal outline
Review the bid request and prepare a top-level,
  topical outline that follows the prospect’s:
• Instructions
Creating a proposal outline
Review the bid request and prepare a top-level,
  topical outline that follows the prospect’s:
• Instructions
• Numbering scheme
   – assists in referencing specific topics
Creating a proposal outline
Review the bid request and prepare a top-level,
  topical outline that follows the prospect’s:
• Instructions
• Numbering scheme
   – assists in referencing specific topics
• Priorities
   – which evaluation criteria score highest
Creating a proposal outline
Review the bid request and prepare a top-level,
  topical outline that follows the prospect’s:
• Instructions
• Numbering scheme
   – assists in referencing specific topics
• Priorities
   – which evaluation criteria score highest
• Naming conventions
   – use the prospect’s terminology and language
Develop your proposal outline as the prospect
suggests, either in the bid request or verbally.
Precisely follow the prospects proposal organisational
instructions.
 Mirror prospect’s numbering system and naming conventions

   RFQ SECTION               TOPICAL OUTLINE
   1. ORGANISTION OF RFQ     1. ORGANISATION OF PROPOSAL
   2. REQUIREMENTS           2. RESPONSES TO REQUIREMENTS
   3. TERMS AND CONDITIONS   3. TERMS AND CONSDITIONS
   4. EVALUATION FACTORS     4. COMPLIANCE MATRIX


   For the benefit of evaluators, a common document
   organisation makes comparing proposals easier.
Prepare a top-level, topical outline that follows
the prospect’s organisational priority.
Mimic the numbering system, naming convention and
order listed in the bid request

EXAMPLE



                    Many bid requests are written by
                    different people, with different
                    knowledge and interests, over
                    months or years. Follow the
                    organisational priority set by those
                    who manage the evaluation process.
The top-level,
  topical outline
might start like this


                        Proposal Guide   125
Section                           Typical Contents

  1       Table of Contents

  2       Executive Summary

  3       Technical Responses

  4       Pricing

  5       Delivery Schedule

  6       Terms and Conditions

  7       Compliance Matrix

  8       References and Testimonials
Deviating from the bid request
Sometimes necessary
because you have more to
say or prospect’s intent isn’t
clear.

Whatever the reason, explain
why you deviated. For example,
when describing the structure of
your proposal you might say:

Additional section 3.8 included to
describe environmental considerations

          Make life easy for the evaluator!   Proposal Guide   130
Assign or allocate all other response requirements
within the topical outline.
That is, for all requirements that weren’t dealt with in the top-
level topical outline, consider how they can be incorporated.

When adding structure:
• Confirm compliance with the customer’s instructions
• Do not interfere with the “core” numbering system and/or
  naming conventions
• Announce organisation; then follow it
• Order points in decreasing order of importance
• Group similar ideas

Try to maintain a balance when extending the topical outline.
Develop outlines for unsolicited proposals:
    1) Collaboratively with your prospect

    2) Based on discussions with your prospect, or

    3) Logically.

              Prepare a response checklist.


                                              Proposal Guide   129
To assist evaluators in finding information
quickly, use telegraphic headings
in line with section headings in the bid
request.

Below the level of section headings that the
prospect has instructed you to follow, use
informative headings that link to your proposal
strategy and themes. These help sell your ideas
and make your proposal more compelling to read.

  Use informative headings to convey
            your messages                     Proposal Guide    86
                                              Proposal Guide   128
Use informative headings at section levels below
those specified by the prospect.

Informative headings can impart a positive message.

EXAMPLES


Telegraphic Headings       Informative Headings
Project Team Structure     Proven Team Structure Reduces Risk
Fire Protection Plan       Proactive Fire Risk Management Cuts Losses
Seismic Protection Plan    Earthquake Readiness is a Priority
Allocate pages according to the relative
importance of the topic to the prospect.


Determine relative importance, based on:
Evaluation criteria

Discussion with the prospect
Judgement
Example of priorities
    Technical Evaluation Criteria    Priority

            Power Consumption           4

                    Heat Output         6

               Physical Footprint       5

                       Reliability      3

                    Repairability       2

                   Performance          1




                                     Proposal Guide   125
Technical Evaluation Criteria    Priority   Pages



             Power Consumption           4        8

                     Heat Output         6        4

                Physical Footprint       5        6

                        Reliability      3        12

                     Repairability       2        12

                    Performance          1        16

Add more detail (and pages) for
higher priority topics                                 Proposal Guide   128
Technical Evaluation Criteria    Priority   Pages            Effort



           Power Consumption           4        8                     2

                   Heat Output         6        4                     1

              Physical Footprint       5        6                     2

                      Reliability      3        12                    3

                   Repairability       2        12                    3

                  Performance          1        16                    4


Estimating page budget and effort
                                                     Proposal Guide       128
Time for some ‘Top Tips’
Indicate who does what and when




    Use the outline for planning
                                  Proposal Guide   130
Proposal responsibilities matrix




                        Proposal Guide   130
Annotate outlines to guide writers to
•   include success stories
•   state assumptions
•   recommend writing styles
•   ensure the prospect’s words are understood and
    used




                                    Proposal Guide   129
Example of annotations
Evaluation Criteria   Additional Information

Power Consumption     Under loads not exceeding xxx

Heat Output           See environmental papers

Physical Footprint    Data Centre cost savings white papers

Reliability           Under normal operating conditions/air conditioned
                      environment/controlled temperature and humidity

Repairability         Refer to prior case studies

Performance           Review boilerplate statements
Re-using Material from Previous Proposals

                                BOILERPLATE

 Answer the question directly         Use boilerplate to support your answer
 Update boilerplate frequently        Maintain to ensure currency
 Incorporate client names and terms   Use specific information and references
 Avoid overuse                        Use only relevant boilerplate




        Beware the dangers of indiscriminate Cut&Paste
Check for completeness
• Cross-reference the Outline to the bid request,
  the Requirements Checklist and the Compliance
  Matrix

• Update the Bid Structure based on the Outline

• Add supplementary information such as:
  – Deviations
  – Explanatory comments Further requests for
    clarifications
  – Assumptions
Review
• Make sure everyone in the team
  understands the outline and the part
  that they will be writing.                        Outlines should be
                                                    team reviewed
                                                    before writing
• Check for consistency, completeness,              starts to assure a
  overlaps and underlaps.                           consistent and
                         No! We agreed
                         that was in your
                                                    logical structure.
                         part.

       I thought
       you were
       doing that.

                                            Sigh!
Useful checklists
A compliance checklist is list of specific
customer requirements. The list is often
generated by splitting complex questions
into separate requirements.

A requirements checklist is similar to a
compliance checklist, but can be self
generated when there is no written
customer requirement. It is often used as a
tool to monitor progress.
                                             Proposal Guide   41
Some Benefits of outlining
Outlines help ensure that your proposals:

• follow the prospect’s instructions

• mirror the prospect’s numbering system and/or
  naming conventions
• make responses easy to find
• through annotations, identify key points to highlight
• are well planned
Quick Quiz Question:
When developing an outline, which of the
following would you say is NOT best practice?
a. Your response should mirror the RFP numbering
   system
b. You should maintain the same order in your
   response even if this does not seem logical
c. You should allocate page count according to
   your competitive advantages
d. Your response should keep the same naming
   convention
Let’s consider our options …
From this session on outlining, we have seen that we should endeavour to
make it easy for the evaluators to make their decision in our favour.

This means that a) our response should mirror the RFP numbering system and
b) we should maintain the same order in your response even if this does not
seem logical and d) we should use the prospect’s terminology by adopting
their naming conventions.

Answer c) which states that we should allocate page count according to your
competitive advantages is incorrect, as best practice suggests that we should
make the page count allocation according to the relative importance of the
topic to the prospect.


                                                       Proposal Guide    128
Summary: Outlining
• Essential for understanding the structure of the proposal
• Follow the Bid or Tendering Instructions to produce the
  outline
• Use the outline to estimate page count and effort
• Can be annotated to provide additional information to
  contributors
• Use outline to identify cross-references from proposal to
  the requirements checklist and compliance matrix
e-torial preparation
                     ManCo issues RFP!

                     Responses required.
• Read Case Study Exercise Five (includes RFP)
http://bid-to-win.ning.com/group/apmp-
foundation-distance-learning-
2012/forum/topics/planning-the-proposal-phase
• Prepare an outline for your ManCo proposal
• Upload you work into the class space

Contenu connexe

Tendances

APMP Foundation: Establishing Requirements
APMP Foundation: Establishing RequirementsAPMP Foundation: Establishing Requirements
APMP Foundation: Establishing RequirementsBid to Win Ltd
 
APMP Foundation: Developing Proposal Strategy
APMP Foundation: Developing Proposal StrategyAPMP Foundation: Developing Proposal Strategy
APMP Foundation: Developing Proposal StrategyBid to Win Ltd
 
APMP Foundation: Proposal Process Management
APMP Foundation: Proposal Process ManagementAPMP Foundation: Proposal Process Management
APMP Foundation: Proposal Process ManagementBid to Win Ltd
 
Demystifying the APMP Foundation Certification
Demystifying the APMP  Foundation Certification Demystifying the APMP  Foundation Certification
Demystifying the APMP Foundation Certification Abhijit Majumdar CP.APMP
 
APMP Foundation: Storyboard Development
APMP Foundation: Storyboard DevelopmentAPMP Foundation: Storyboard Development
APMP Foundation: Storyboard DevelopmentBid to Win Ltd
 
APMP Foundation: Opportunity Qualification
APMP Foundation: Opportunity QualificationAPMP Foundation: Opportunity Qualification
APMP Foundation: Opportunity QualificationBid to Win Ltd
 
APMP Foundation Certification Training - Qualifying the right opportunity
APMP Foundation Certification Training - Qualifying the right opportunityAPMP Foundation Certification Training - Qualifying the right opportunity
APMP Foundation Certification Training - Qualifying the right opportunityAbhijit Majumdar CP.APMP
 
Capture Management Overview
Capture Management OverviewCapture Management Overview
Capture Management OverviewPatricia Sego
 
APMP Foundation: Preparing for the APMP Foundation Exam
APMP Foundation: Preparing for the APMP Foundation ExamAPMP Foundation: Preparing for the APMP Foundation Exam
APMP Foundation: Preparing for the APMP Foundation ExamBid to Win Ltd
 
Capture management
Capture managementCapture management
Capture managementnirosuganya
 
How to get noticed and recognised as a presales, bid and proposal management ...
How to get noticed and recognised as a presales, bid and proposal management ...How to get noticed and recognised as a presales, bid and proposal management ...
How to get noticed and recognised as a presales, bid and proposal management ...Abhijit Majumdar CP.APMP
 
Session 5: Shipley Associates - 7 Pillars of Effective Proposals
Session 5: Shipley Associates - 7 Pillars of Effective ProposalsSession 5: Shipley Associates - 7 Pillars of Effective Proposals
Session 5: Shipley Associates - 7 Pillars of Effective ProposalsVisibleThread
 
Mastering negotiation skills
Mastering negotiation skillsMastering negotiation skills
Mastering negotiation skillsgihan aboueleish
 
Writing Winning Proposals
Writing Winning ProposalsWriting Winning Proposals
Writing Winning ProposalsMohamed Shaaban
 
PMO Managed Service Introduction
PMO Managed Service IntroductionPMO Managed Service Introduction
PMO Managed Service IntroductionKeith Rackley
 

Tendances (20)

APMP Foundation: Establishing Requirements
APMP Foundation: Establishing RequirementsAPMP Foundation: Establishing Requirements
APMP Foundation: Establishing Requirements
 
APMP Foundation: Developing Proposal Strategy
APMP Foundation: Developing Proposal StrategyAPMP Foundation: Developing Proposal Strategy
APMP Foundation: Developing Proposal Strategy
 
APMP Foundation: Proposal Process Management
APMP Foundation: Proposal Process ManagementAPMP Foundation: Proposal Process Management
APMP Foundation: Proposal Process Management
 
Demystifying the APMP Foundation Certification
Demystifying the APMP  Foundation Certification Demystifying the APMP  Foundation Certification
Demystifying the APMP Foundation Certification
 
APMP Foundation: Storyboard Development
APMP Foundation: Storyboard DevelopmentAPMP Foundation: Storyboard Development
APMP Foundation: Storyboard Development
 
APMP Foundation: Opportunity Qualification
APMP Foundation: Opportunity QualificationAPMP Foundation: Opportunity Qualification
APMP Foundation: Opportunity Qualification
 
Pursuit Bid Process Map
Pursuit Bid Process MapPursuit Bid Process Map
Pursuit Bid Process Map
 
APMP Foundation Certification Training - Qualifying the right opportunity
APMP Foundation Certification Training - Qualifying the right opportunityAPMP Foundation Certification Training - Qualifying the right opportunity
APMP Foundation Certification Training - Qualifying the right opportunity
 
Capture Management Overview
Capture Management OverviewCapture Management Overview
Capture Management Overview
 
APMP Foundation: Preparing for the APMP Foundation Exam
APMP Foundation: Preparing for the APMP Foundation ExamAPMP Foundation: Preparing for the APMP Foundation Exam
APMP Foundation: Preparing for the APMP Foundation Exam
 
Proposal Management Process
Proposal  Management  ProcessProposal  Management  Process
Proposal Management Process
 
Capture management
Capture managementCapture management
Capture management
 
How to get noticed and recognised as a presales, bid and proposal management ...
How to get noticed and recognised as a presales, bid and proposal management ...How to get noticed and recognised as a presales, bid and proposal management ...
How to get noticed and recognised as a presales, bid and proposal management ...
 
Session 5: Shipley Associates - 7 Pillars of Effective Proposals
Session 5: Shipley Associates - 7 Pillars of Effective ProposalsSession 5: Shipley Associates - 7 Pillars of Effective Proposals
Session 5: Shipley Associates - 7 Pillars of Effective Proposals
 
Business case a_caponera
Business case a_caponeraBusiness case a_caponera
Business case a_caponera
 
Mastering negotiation skills
Mastering negotiation skillsMastering negotiation skills
Mastering negotiation skills
 
Procurement negotiation tips and phases
Procurement negotiation tips and phasesProcurement negotiation tips and phases
Procurement negotiation tips and phases
 
PMP Exam Notes
PMP Exam NotesPMP Exam Notes
PMP Exam Notes
 
Writing Winning Proposals
Writing Winning ProposalsWriting Winning Proposals
Writing Winning Proposals
 
PMO Managed Service Introduction
PMO Managed Service IntroductionPMO Managed Service Introduction
PMO Managed Service Introduction
 

En vedette

APMP Foundation Level Certification Webinar Series - Season 2
APMP Foundation Level Certification Webinar Series - Season 2APMP Foundation Level Certification Webinar Series - Season 2
APMP Foundation Level Certification Webinar Series - Season 2Abhijit Majumdar CP.APMP
 
APMP Foundation Study Group Session 7 - Pricing and Commercial proposal
APMP Foundation Study Group Session 7 - Pricing and Commercial proposalAPMP Foundation Study Group Session 7 - Pricing and Commercial proposal
APMP Foundation Study Group Session 7 - Pricing and Commercial proposalAbhijit Majumdar CP.APMP
 
APMP Foundation Certification Session 2 - Proposal Planning
APMP Foundation Certification Session 2  - Proposal PlanningAPMP Foundation Certification Session 2  - Proposal Planning
APMP Foundation Certification Session 2 - Proposal PlanningAbhijit Majumdar CP.APMP
 
Apmp Foundation Study group session 4 Proposal Development
Apmp Foundation Study group session 4   Proposal DevelopmentApmp Foundation Study group session 4   Proposal Development
Apmp Foundation Study group session 4 Proposal DevelopmentAbhijit Majumdar CP.APMP
 
APMP Foundation Certification Study Group Session 6 - Proposal Writing
APMP Foundation Certification Study Group Session 6 - Proposal WritingAPMP Foundation Certification Study Group Session 6 - Proposal Writing
APMP Foundation Certification Study Group Session 6 - Proposal WritingAbhijit Majumdar CP.APMP
 
Proposal Development Process
Proposal Development ProcessProposal Development Process
Proposal Development ProcessCIAT
 
Social Media/Online Community Outline Proposal
Social Media/Online Community Outline ProposalSocial Media/Online Community Outline Proposal
Social Media/Online Community Outline ProposalEGSocial
 
Business proposal outline : Buffalo Wild Wings
Business proposal outline : Buffalo Wild WingsBusiness proposal outline : Buffalo Wild Wings
Business proposal outline : Buffalo Wild WingsGabrielleSPC
 
THE WHEEL Overview of services & Marketing Plan Proposal
THE WHEEL  Overview of services & Marketing Plan ProposalTHE WHEEL  Overview of services & Marketing Plan Proposal
THE WHEEL Overview of services & Marketing Plan ProposalTHE WHEEL
 

En vedette (10)

APMP Foundation Level Certification Webinar Series - Season 2
APMP Foundation Level Certification Webinar Series - Season 2APMP Foundation Level Certification Webinar Series - Season 2
APMP Foundation Level Certification Webinar Series - Season 2
 
APMP Foundation Study Group Session 7 - Pricing and Commercial proposal
APMP Foundation Study Group Session 7 - Pricing and Commercial proposalAPMP Foundation Study Group Session 7 - Pricing and Commercial proposal
APMP Foundation Study Group Session 7 - Pricing and Commercial proposal
 
APMP Foundation Certification Session 2 - Proposal Planning
APMP Foundation Certification Session 2  - Proposal PlanningAPMP Foundation Certification Session 2  - Proposal Planning
APMP Foundation Certification Session 2 - Proposal Planning
 
Apmp Foundation Study group session 4 Proposal Development
Apmp Foundation Study group session 4   Proposal DevelopmentApmp Foundation Study group session 4   Proposal Development
Apmp Foundation Study group session 4 Proposal Development
 
APMP Foundation Certification Study Group Session 6 - Proposal Writing
APMP Foundation Certification Study Group Session 6 - Proposal WritingAPMP Foundation Certification Study Group Session 6 - Proposal Writing
APMP Foundation Certification Study Group Session 6 - Proposal Writing
 
Proposal Development Process
Proposal Development ProcessProposal Development Process
Proposal Development Process
 
Unit plan Proposal
Unit plan ProposalUnit plan Proposal
Unit plan Proposal
 
Social Media/Online Community Outline Proposal
Social Media/Online Community Outline ProposalSocial Media/Online Community Outline Proposal
Social Media/Online Community Outline Proposal
 
Business proposal outline : Buffalo Wild Wings
Business proposal outline : Buffalo Wild WingsBusiness proposal outline : Buffalo Wild Wings
Business proposal outline : Buffalo Wild Wings
 
THE WHEEL Overview of services & Marketing Plan Proposal
THE WHEEL  Overview of services & Marketing Plan ProposalTHE WHEEL  Overview of services & Marketing Plan Proposal
THE WHEEL Overview of services & Marketing Plan Proposal
 

Similaire à APMP Foundation: Proposal Outline Development

Improve Product Design with High Quality Requirements
Improve Product Design with High Quality RequirementsImprove Product Design with High Quality Requirements
Improve Product Design with High Quality RequirementsElizabeth Steiner
 
2.1 Product_Specifications.ppt
2.1 Product_Specifications.ppt2.1 Product_Specifications.ppt
2.1 Product_Specifications.pptgirilogu2
 
This course requires use of the Microsoft Project 2010 (or later.docx
This course requires use of the Microsoft Project 2010 (or later.docxThis course requires use of the Microsoft Project 2010 (or later.docx
This course requires use of the Microsoft Project 2010 (or later.docxchristalgrieg
 
Enterprise integration - Naming Convention and Standards
Enterprise integration - Naming Convention and StandardsEnterprise integration - Naming Convention and Standards
Enterprise integration - Naming Convention and StandardsPraveen Pandey
 
Apqp+english+version[1]
Apqp+english+version[1]Apqp+english+version[1]
Apqp+english+version[1]Murat Terzi
 
Proper Product Backlog Prioritization
Proper Product Backlog PrioritizationProper Product Backlog Prioritization
Proper Product Backlog PrioritizationCognizant
 
Matinée PMI-Montréal - Quotation model deployment
Matinée PMI-Montréal - Quotation model deploymentMatinée PMI-Montréal - Quotation model deployment
Matinée PMI-Montréal - Quotation model deploymentPMI-Montréal
 
Trends in software testing by Eka TechServ
Trends in software testing  by Eka TechServTrends in software testing  by Eka TechServ
Trends in software testing by Eka TechServekatechserv
 
BSG tackling the fallacy of "Agile"
BSG tackling the fallacy of "Agile"BSG tackling the fallacy of "Agile"
BSG tackling the fallacy of "Agile"BSGAfrica
 
B Plan Basics
B Plan BasicsB Plan Basics
B Plan Basicsrishi_pp
 
Product Design.pptx
Product Design.pptxProduct Design.pptx
Product Design.pptxRiadHasan25
 
Agile ncr pramila hitachi consulting_future_coaching
Agile ncr pramila hitachi consulting_future_coachingAgile ncr pramila hitachi consulting_future_coaching
Agile ncr pramila hitachi consulting_future_coachingAgileNCR2016
 
Day 1 Review Industrial Codes and Standards.pptx
Day 1 Review Industrial Codes and Standards.pptxDay 1 Review Industrial Codes and Standards.pptx
Day 1 Review Industrial Codes and Standards.pptxmusaabdalla3
 
IIT Academy: 204 User stories and acceptance criteria
IIT Academy: 204 User stories and acceptance criteriaIIT Academy: 204 User stories and acceptance criteria
IIT Academy: 204 User stories and acceptance criteriaSteven HK Ma | 馬國豪
 
[WSO2 API Day Chicago 2019] Pace Layering to Prioritize Business Initiatives ...
[WSO2 API Day Chicago 2019] Pace Layering to Prioritize Business Initiatives ...[WSO2 API Day Chicago 2019] Pace Layering to Prioritize Business Initiatives ...
[WSO2 API Day Chicago 2019] Pace Layering to Prioritize Business Initiatives ...WSO2
 
Cat user guide cloud assesment tool
Cat user guide cloud assesment toolCat user guide cloud assesment tool
Cat user guide cloud assesment toolfrl_pyme
 
Agile 2014-cmf-pub
Agile 2014-cmf-pubAgile 2014-cmf-pub
Agile 2014-cmf-pubgamapa
 
Managing an Experimentation Platform by LinkedIn Product Leader
Managing an Experimentation Platform by LinkedIn Product LeaderManaging an Experimentation Platform by LinkedIn Product Leader
Managing an Experimentation Platform by LinkedIn Product LeaderProduct School
 

Similaire à APMP Foundation: Proposal Outline Development (20)

iiBA babok onapage
iiBA babok onapageiiBA babok onapage
iiBA babok onapage
 
Improve Product Design with High Quality Requirements
Improve Product Design with High Quality RequirementsImprove Product Design with High Quality Requirements
Improve Product Design with High Quality Requirements
 
2.1 Product_Specifications.ppt
2.1 Product_Specifications.ppt2.1 Product_Specifications.ppt
2.1 Product_Specifications.ppt
 
This course requires use of the Microsoft Project 2010 (or later.docx
This course requires use of the Microsoft Project 2010 (or later.docxThis course requires use of the Microsoft Project 2010 (or later.docx
This course requires use of the Microsoft Project 2010 (or later.docx
 
Enterprise integration - Naming Convention and Standards
Enterprise integration - Naming Convention and StandardsEnterprise integration - Naming Convention and Standards
Enterprise integration - Naming Convention and Standards
 
Apqp+english+version[1]
Apqp+english+version[1]Apqp+english+version[1]
Apqp+english+version[1]
 
57086 10 business_case
57086 10 business_case57086 10 business_case
57086 10 business_case
 
Proper Product Backlog Prioritization
Proper Product Backlog PrioritizationProper Product Backlog Prioritization
Proper Product Backlog Prioritization
 
Matinée PMI-Montréal - Quotation model deployment
Matinée PMI-Montréal - Quotation model deploymentMatinée PMI-Montréal - Quotation model deployment
Matinée PMI-Montréal - Quotation model deployment
 
Trends in software testing by Eka TechServ
Trends in software testing  by Eka TechServTrends in software testing  by Eka TechServ
Trends in software testing by Eka TechServ
 
BSG tackling the fallacy of "Agile"
BSG tackling the fallacy of "Agile"BSG tackling the fallacy of "Agile"
BSG tackling the fallacy of "Agile"
 
B Plan Basics
B Plan BasicsB Plan Basics
B Plan Basics
 
Product Design.pptx
Product Design.pptxProduct Design.pptx
Product Design.pptx
 
Agile ncr pramila hitachi consulting_future_coaching
Agile ncr pramila hitachi consulting_future_coachingAgile ncr pramila hitachi consulting_future_coaching
Agile ncr pramila hitachi consulting_future_coaching
 
Day 1 Review Industrial Codes and Standards.pptx
Day 1 Review Industrial Codes and Standards.pptxDay 1 Review Industrial Codes and Standards.pptx
Day 1 Review Industrial Codes and Standards.pptx
 
IIT Academy: 204 User stories and acceptance criteria
IIT Academy: 204 User stories and acceptance criteriaIIT Academy: 204 User stories and acceptance criteria
IIT Academy: 204 User stories and acceptance criteria
 
[WSO2 API Day Chicago 2019] Pace Layering to Prioritize Business Initiatives ...
[WSO2 API Day Chicago 2019] Pace Layering to Prioritize Business Initiatives ...[WSO2 API Day Chicago 2019] Pace Layering to Prioritize Business Initiatives ...
[WSO2 API Day Chicago 2019] Pace Layering to Prioritize Business Initiatives ...
 
Cat user guide cloud assesment tool
Cat user guide cloud assesment toolCat user guide cloud assesment tool
Cat user guide cloud assesment tool
 
Agile 2014-cmf-pub
Agile 2014-cmf-pubAgile 2014-cmf-pub
Agile 2014-cmf-pub
 
Managing an Experimentation Platform by LinkedIn Product Leader
Managing an Experimentation Platform by LinkedIn Product LeaderManaging an Experimentation Platform by LinkedIn Product Leader
Managing an Experimentation Platform by LinkedIn Product Leader
 

Dernier

Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 

Dernier (20)

Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 

APMP Foundation: Proposal Outline Development

  • 1. APMP® Accreditation Programme Planning the Proposal Phase Session 2: Proposal Outline Development Planning the Proposal Phase © APMP 2005 and Bid to Win Ltd 2010 Version: 0v9
  • 2. Winning Document Design In this module, we shall learn about the purpose and content of the proposal outline, and how it can help us get organised. Planning the Proposal Phase 2 © Your Company 2003 Confidential
  • 3. This module will help you to: • define the purpose and content of a proposal outline • create an outline • annotate an outline • add more structure to an outline • describe the benefits of using an outline Learning objectives Proposal Guide 124
  • 4. Some definitions of an outline An outline could be: 1. a line drawn as a boundary 2. a list of topics 3. a basic project plan
  • 5. Creating and using an Outline
  • 6. Simple three step process • Follow RFQ • Weight by • Allocate Win instructions customer Develop Add Annotate Themes to • Create top priority Top Level detailed your sections level • Develop Outline headings and structure informative Outline • Guidance for writers numbers headings
  • 7. Creating a proposal outline Review the bid request and prepare a top-level, topical outline that follows the prospect’s: • Instructions
  • 8. Creating a proposal outline Review the bid request and prepare a top-level, topical outline that follows the prospect’s: • Instructions • Numbering scheme – assists in referencing specific topics
  • 9. Creating a proposal outline Review the bid request and prepare a top-level, topical outline that follows the prospect’s: • Instructions • Numbering scheme – assists in referencing specific topics • Priorities – which evaluation criteria score highest
  • 10. Creating a proposal outline Review the bid request and prepare a top-level, topical outline that follows the prospect’s: • Instructions • Numbering scheme – assists in referencing specific topics • Priorities – which evaluation criteria score highest • Naming conventions – use the prospect’s terminology and language
  • 11. Develop your proposal outline as the prospect suggests, either in the bid request or verbally. Precisely follow the prospects proposal organisational instructions. Mirror prospect’s numbering system and naming conventions RFQ SECTION TOPICAL OUTLINE 1. ORGANISTION OF RFQ 1. ORGANISATION OF PROPOSAL 2. REQUIREMENTS 2. RESPONSES TO REQUIREMENTS 3. TERMS AND CONDITIONS 3. TERMS AND CONSDITIONS 4. EVALUATION FACTORS 4. COMPLIANCE MATRIX For the benefit of evaluators, a common document organisation makes comparing proposals easier.
  • 12. Prepare a top-level, topical outline that follows the prospect’s organisational priority. Mimic the numbering system, naming convention and order listed in the bid request EXAMPLE Many bid requests are written by different people, with different knowledge and interests, over months or years. Follow the organisational priority set by those who manage the evaluation process.
  • 13. The top-level, topical outline might start like this Proposal Guide 125
  • 14.
  • 15. Section Typical Contents 1 Table of Contents 2 Executive Summary 3 Technical Responses 4 Pricing 5 Delivery Schedule 6 Terms and Conditions 7 Compliance Matrix 8 References and Testimonials
  • 16. Deviating from the bid request Sometimes necessary because you have more to say or prospect’s intent isn’t clear. Whatever the reason, explain why you deviated. For example, when describing the structure of your proposal you might say: Additional section 3.8 included to describe environmental considerations Make life easy for the evaluator! Proposal Guide 130
  • 17. Assign or allocate all other response requirements within the topical outline. That is, for all requirements that weren’t dealt with in the top- level topical outline, consider how they can be incorporated. When adding structure: • Confirm compliance with the customer’s instructions • Do not interfere with the “core” numbering system and/or naming conventions • Announce organisation; then follow it • Order points in decreasing order of importance • Group similar ideas Try to maintain a balance when extending the topical outline.
  • 18. Develop outlines for unsolicited proposals: 1) Collaboratively with your prospect 2) Based on discussions with your prospect, or 3) Logically. Prepare a response checklist. Proposal Guide 129
  • 19. To assist evaluators in finding information quickly, use telegraphic headings in line with section headings in the bid request. Below the level of section headings that the prospect has instructed you to follow, use informative headings that link to your proposal strategy and themes. These help sell your ideas and make your proposal more compelling to read. Use informative headings to convey your messages Proposal Guide 86 Proposal Guide 128
  • 20. Use informative headings at section levels below those specified by the prospect. Informative headings can impart a positive message. EXAMPLES Telegraphic Headings Informative Headings Project Team Structure Proven Team Structure Reduces Risk Fire Protection Plan Proactive Fire Risk Management Cuts Losses Seismic Protection Plan Earthquake Readiness is a Priority
  • 21. Allocate pages according to the relative importance of the topic to the prospect. Determine relative importance, based on: Evaluation criteria Discussion with the prospect Judgement
  • 22. Example of priorities Technical Evaluation Criteria Priority Power Consumption 4 Heat Output 6 Physical Footprint 5 Reliability 3 Repairability 2 Performance 1 Proposal Guide 125
  • 23. Technical Evaluation Criteria Priority Pages Power Consumption 4 8 Heat Output 6 4 Physical Footprint 5 6 Reliability 3 12 Repairability 2 12 Performance 1 16 Add more detail (and pages) for higher priority topics Proposal Guide 128
  • 24. Technical Evaluation Criteria Priority Pages Effort Power Consumption 4 8 2 Heat Output 6 4 1 Physical Footprint 5 6 2 Reliability 3 12 3 Repairability 2 12 3 Performance 1 16 4 Estimating page budget and effort Proposal Guide 128
  • 25.
  • 26. Time for some ‘Top Tips’
  • 27. Indicate who does what and when Use the outline for planning Proposal Guide 130
  • 28. Proposal responsibilities matrix Proposal Guide 130
  • 29. Annotate outlines to guide writers to • include success stories • state assumptions • recommend writing styles • ensure the prospect’s words are understood and used Proposal Guide 129
  • 30. Example of annotations Evaluation Criteria Additional Information Power Consumption Under loads not exceeding xxx Heat Output See environmental papers Physical Footprint Data Centre cost savings white papers Reliability Under normal operating conditions/air conditioned environment/controlled temperature and humidity Repairability Refer to prior case studies Performance Review boilerplate statements
  • 31. Re-using Material from Previous Proposals BOILERPLATE Answer the question directly Use boilerplate to support your answer Update boilerplate frequently Maintain to ensure currency Incorporate client names and terms Use specific information and references Avoid overuse Use only relevant boilerplate Beware the dangers of indiscriminate Cut&Paste
  • 32. Check for completeness • Cross-reference the Outline to the bid request, the Requirements Checklist and the Compliance Matrix • Update the Bid Structure based on the Outline • Add supplementary information such as: – Deviations – Explanatory comments Further requests for clarifications – Assumptions
  • 33. Review • Make sure everyone in the team understands the outline and the part that they will be writing. Outlines should be team reviewed before writing • Check for consistency, completeness, starts to assure a overlaps and underlaps. consistent and No! We agreed that was in your logical structure. part. I thought you were doing that. Sigh!
  • 34. Useful checklists A compliance checklist is list of specific customer requirements. The list is often generated by splitting complex questions into separate requirements. A requirements checklist is similar to a compliance checklist, but can be self generated when there is no written customer requirement. It is often used as a tool to monitor progress. Proposal Guide 41
  • 35. Some Benefits of outlining Outlines help ensure that your proposals: • follow the prospect’s instructions • mirror the prospect’s numbering system and/or naming conventions • make responses easy to find • through annotations, identify key points to highlight • are well planned
  • 36.
  • 37. Quick Quiz Question: When developing an outline, which of the following would you say is NOT best practice? a. Your response should mirror the RFP numbering system b. You should maintain the same order in your response even if this does not seem logical c. You should allocate page count according to your competitive advantages d. Your response should keep the same naming convention
  • 38. Let’s consider our options … From this session on outlining, we have seen that we should endeavour to make it easy for the evaluators to make their decision in our favour. This means that a) our response should mirror the RFP numbering system and b) we should maintain the same order in your response even if this does not seem logical and d) we should use the prospect’s terminology by adopting their naming conventions. Answer c) which states that we should allocate page count according to your competitive advantages is incorrect, as best practice suggests that we should make the page count allocation according to the relative importance of the topic to the prospect. Proposal Guide 128
  • 39. Summary: Outlining • Essential for understanding the structure of the proposal • Follow the Bid or Tendering Instructions to produce the outline • Use the outline to estimate page count and effort • Can be annotated to provide additional information to contributors • Use outline to identify cross-references from proposal to the requirements checklist and compliance matrix
  • 40. e-torial preparation ManCo issues RFP! Responses required. • Read Case Study Exercise Five (includes RFP) http://bid-to-win.ning.com/group/apmp- foundation-distance-learning- 2012/forum/topics/planning-the-proposal-phase • Prepare an outline for your ManCo proposal • Upload you work into the class space

Notes de l'éditeur

  1. Welcome to the second session in the module Planning the Proposal Phase in our APMP Foundation Training webinars.In this module we going to examine a fundamental proposal planning technique: Outline Development
  2. Let’s take a look at what we will learn in this module.First of all, what is an outline for, what does it containNext we will look at some ways of creating an outline and then see just how useful it can be to help us plan, allocate and schedule the authoring work.Then, as we go into more detail, it may be necessary to add more information and structure to our outline.We will wrap up the whole module by summarising some of the benefits of using outlines.You’ll notice in the bottom-right hand corner a reference to the page number in the Proposal Guide. When this prompt appears, refer to your Proposal Guide for more detailed information.
  3. The first definition is about describing what’s in and what’s not in scope.The second definition is about summarizing a proposals main headings and topics.Thirdly, an outline could help us plan the work needed to write and review the proposal.
  4. The Bid Manager reviews the Bid Request and captures structure and with the help of the bid team filters out the requirements. This information contributes toward the outline.When identifying the requirements it will also be useful to create a compliance checklist which can be used in later reviews to check that the proposed solution complies with requirements and that a complete set of responses have been provided.The outline will assist in creating a schedule and assigning team members and authors to particular jobs. The Outline will also help in identifying the storyboards required to assist authors in their work.
  5. There’s a lot going on in that picture.Let’s reduce it to its basics. Creating an outline is a simple 3 step processCreate the top level OutlineStay compliant to the Prospect’s instructions, if anyCreate the signpost headings and numbered outline that will be the bones of your proposalStart adding detailed structureThink about the customer’s evaluation prioritiesCommunicate benefits in Informative HeadingsProvide guidelines to the writers by annotating your outlineMap your win themes to the outline to provide your proposal with strategic and competitive focus
  6. Where the bid request provides specific guidance on the organisation of the proposal we should comply with it.
  7. Similarly, don’t break the Prospect’s numbering scheme.It probably reflects the structure of their marking scheme.Make it easy for the evaluator to map your responses into their evaluation
  8. Think about the Prospect’s evaluation prioritiesThey may even be stated in the Bid RequestPut the important stuff first and allow more detail and structure on the items that have most weight
  9. Customers have their own terms and conventions and we should use them.USE THEIR project names not yoursDON’t alienate the evaluators by ‘correcting’ their ‘mis-use’ of terms like project and programBE CAREFUL with spelling, don’t anglicise spelling if the prospect’s team is used to AmericanAnd vice versa!
  10. Summarising this first part :Be compliantBe responsiveMake your proposal evaluator friendly
  11. Let’s work through that advice following the simple three steps I described earlier
  12. We may start with a hand-written outline like this.If no structure is defined in the instructions copy the bid request structure. If there are Tendering Instructions - this is a good time to CHECK compliance.So far, we’ve talked about following a prospect’s RFQ.Sometimes, a prospect may like the sound of a vendor’s idea and say “can you give me a proposal on that”.In this kind of situation an outline is useful because it helps us to consider how to present our ideas and plan what we need to write.First I’d start with a requirements checklist to make sure all the prospect’s requirements are covered.Then I would either develop it interactively with the prospect or just develop it logically making sure that everything was covered and in the right order. Doing this helps identify section headings and how we might split up the writing work.
  13. Here’s another way of producing an outline. This was created in a mind mapping tool – which makes it easy to edit and move topics around.As for adding more information to an outline, think about including other response requirements within the top-level outline, for example:Statement of WorkTerms and Conditions
  14. Ultimately our outline can be presented more formally. Essentially , it’s still a list but easier to read and edit.
  15. Work out where you’re going to fit all the other stuff that’s necessary but not defined in the Prospect’s rules.Some basic rules of good design here:Be compliantIntroduce an organisation (provide the reader with a mental map)And then follow the organisation you introducedPut the important items firstGroup similar ideas together so you don’t confuse the readerTry to keep your structure ‘balanced’. Keep the depth of numbering consistent across sections and the length appropriate to the importance.
  16. When there is no formal bid request, then get to understand the prospect’s need by with them directly or through your sales teams.In some instances your outline may become the basis for a competitive bid where through your own work you have influenced the content of the bid request. This should give you some competitive advantage.The Proposal Guide shows the logical sequence of steps to develop an outline through to submitting an unsolicited proposal.
  17. To assist evaluators in finding their way around our proposal it is a good idea to use exact and telegraphic headings for the major, expected or standard headings.Informative headings enable an evaluator to immediately understand the contents of a section and the associated benefits.Look in the Proposal Guide for the topic called Headings.
  18. Telegraph Headings get the reader to the right sectionInformative headings communicate the benefits described there
  19. Writing a proposal is a bit like sitting a written examination, you have to focus your efforts on the questions with the most marks and plan your time accordingly.You should allocate an appropriate number of pages and detailed structure to a topic depending on its relative importance to the prospect. We can determine this from the evaluation criteria, discussions and personal and bid team’s judgement.
  20. Evaluators give different weightings to different decision criteria. In this example, Performance is the #1 priority, whereas Heat output is a consideration but less important to the prospect. This means focus on higher priority items!
  21. Using the prioritised outline, you can startputting more in more detail and structure.You won’t want to write more than is necessary, and your prospect won’t want to read it. So it’s a good plan to start setting a page budget. Some times the budget is imposed on you in the bid request.The table shows estimates for the Technical section. In this case it’s a very detailed section with almost 60 pages. The principle still applies on shorter documents.
  22. Setting a page budget for each section will help you estimate the total effort required to create the proposal document (or keep the effort within available resource) For example, by estimating the number of pages to be produced, and understanding whether the responses need to be created or adapted from existing material.Based on the number of pages to be produced, you may be able to estimate the amount of effort it will take to produce them.The table shows estimates for the Technical section.
  23. Let’s take a quick look ahead to what we’ll learn in the next module about effort metrics.The main driver for proposal writing effort is page count.So use these simple metrics to calculate the size of the writing taskThese are the standard answers based on general industry experience.Develop your own metrics based on the experience in your own organisation.
  24. No Bid to Win presentation would be complete without some top tips.For ease of reference use the prospect’s numbering system.Make sure you know what the evaluators are looking for.Make information easy to find.If you have limited time (or imagination) and no guidance from the Prospect then just follow the bid request structure.If that’s all you do, then you’re giving yourself a better chance of at least being considered and you will be tracking the Prospect’s internal evaluation model.
  25. We can take information from our outline and put it into a project planning tool.This helps us in getting an idea for how long it will take to complete the proposal given the resource availability. This is a great tool for understanding that we may need more support to enlist resources or even help in a decision to no-bid or bid differently because of a lack of resource.Roles and responsibility matrix.
  26. Project planning tools are also good at indicating who does what an when.That is, they can produce a basic roles and responsibility matrix which we can then adapt as shown in the proposal guide.
  27. See how constraints, assumptions and references can be added to the outline.One of the most important annotations is WHAT WIN THEMES you want the section author to use and the PROOFS
  28. You can use your annotations to point the authors to useful re-usable content:A great case studyA useful graphic A sample project management planJust take care that boilerplate is adapted to be specific to your Prospect. You don’t want your proposal to read like a brochureBE CAREFUL! Copy Paste is not without it’s dangers.Ideally keep your boilerplate in a well maintained and up to date library.
  29. In the previous session we talked about how to create Requirements Checklists and Compliance Checklists.These tools come to your aid in checking the coverage and completeness of your Outline.Are all the requirements covered? Is your compliance clear? Where in the Outline will it be described?You can now use your numbered Outline to turn your Compliance Checklist into a Response Matrix so that evaluators will find the answers easy to find.
  30. Using an outline brings multiple benefits to your bid team, to your proposal and ultimately can help the evaluators make a decision!
  31. Here’s the Quick Reference Guide entry for OutliningIt covers the essentials that you need to know to in your bid work and to answer exam questions related to Outlines.
  32. 24. When outlining which of the following is NOT best practice?:a) Your response should mirror the RFP numbering systemb) You should maintain the same order in your response even if this does not seem logicalc) You should allocate page count according to your competitive advantages?d) Your response should keep the same naming conventions p125