Construction projects
are behind schedule
Construction projects
are over budget
http://www.atkearney.co.uk/documents/10192/368290/ExCap_II.PDF/585c1920-b7ce-4966-9fe4-f75f56b21628
15. Asset Mapping
•
•
•
•
•
Single Source of Trusted information
Real Time Asset Mapping
Live Asset Awareness
Platform Interoperability
Open Standards APIs
A Known Problem It can be dangerous to put meeting the schedule above getting the design right.Once the nature of the technical challenges has been properly recognised, history shows how impressively they can be met: working in space, in the North Sea oil fields and the Alaskan wilderness. Projects go wrong when the technical challenges are not adequately understood.
A Known Problem It can be dangerous to put meeting the schedule above getting the design right.Once the nature of the technical challenges has been properly recognised, history shows how impressively they can be met: working in space, in the North Sea oil fields and the Alaskan wilderness. Projects go wrong when the technical challenges are not adequately understood.
The challenge
The challenge
Asset Mapping Design Install operate Open Api’sLive and Historical Data Data from many sourcesVery Early ROI User FocusedHelps the Installer Manager Stakeholders