7. Brief History
1975 - Civic Car park opened
1979 - Aotea Square Opened
2000 - Competition for complete redesign of Aotea
2004 - Damage to car park roof was discovered
Structure temporarily stabilised
Proposal to redo completely
Proposal abandoned due to cost.
2008 - Old design revised and adopted
Work completed September 2010
8. Scope Of Work
Steel columns extended above existing structure
Steel Beams
Tray deck
Concrete Slab
Membrane System
Drainage media
Hard fill
Concrete slab
Paving
9. Scope of Work
Waterproofing Specification
- Nuplex Membrane Primer
- Sopralene Aerisol Flam Vent Sheet
- Sopralene Flam 180 Base Sheet
- Sopralene Jardin Cap Sheet
- LM3000 for detailing
- Drainage Media and Filter Fabric