SlideShare une entreprise Scribd logo
1  sur  18
PHARE: A Compilation
Notes from the PHARE Program Reports
“Programme for Harmonised ATM
Research in EUROCONTROL (PHARE)”
• Future Air Traffic Management (ATM) concept:
– Organize, co-ordinate and conduct studies and
experiments to demonstrate the feasibility and benefits of
a future air-ground integrated air traffic management
system
– Started in 1989 and completed in 1999
• Objective -- to prove that an integrated air/ground
environment using advanced ATM tools and Human
Machine Interfaces would provide increased airspace
capacity
Program Design
PHARE comprised:
• Initial concept definition and elaboration studies,
• Development of tools (airborne, ground, communication and
supporting tools), and
• Large scale real-time simulations (PDs)
Three PDs were planned:
• PHARE Demonstration 1 addressing En-route issues
• PHARE Demonstration 2 focusing on the Extended Terminal
Maneuvering Area (ETMA)
• PHARE Demonstration 3 providing a multi-site integrated
experiment addressing flights from departure to arrival
Topics Addressed (1)
• Capabilities of aircraft with advanced navigation and
flight management equipment
• Advanced automation support for air traffic
controllers
• Modification of controller roles including new
concepts of task sharing within groups of controllers
and multi-sector planning
• Ground Human Machine Interface for efficient and
effective use of the automation support
Topics Addressed (2)
• Use of data-link for air ground-ground information
exchange, in particular for trajectory negotiation
• Better meteorological forecasting to improve
trajectory prediction
• A common integration environment
• A common methodology and standard set of tools
and procedures for experimental validation.
Concept-level (Evolutionary)
Requirements
• Aircraft to have progressively more accurate
navigational performance in space (2D, 3D) and
ultimately in space and time (4D)
• ATM ground system to be continuously informed of
each aircraft’s current position and its intentions
• ATC to exploit this high quality information through
more optimal decision-making
Concept Summary
• The trajectory used by the ground system shall
whenever possible be the trajectory generated by the
aircraft systems
• The trajectory for an aircraft shall be chosen by the pilot
and shall only be constrained by ATC when necessary for
de-confliction or to follow defined procedures
• Flight trajectories shall be predicted taking into account
constraints for the entire flight allowing management of
the flight for greatest efficiency and economy
• Decision making shall not be automated to the extent
that the human is out of the picture; automation shall
assist, not take over
Concepts (1)
• Trajectory Prediction
• Advanced Planning
• Multi-Sector Planning
• Tactical Load Smoother
• Arrival Management
• Departure Management
Concepts (2)
• Conflict Solving Assistance
• Co-operative Tools
• Flight Path Monitoring
• Air/Ground Negotiation
• Ground/Ground Negotiation
• Meteo
Key Notes (1)
• Trajectory Predictor provides the following services:
– Calculating optimal 4D trajectories, from aircraft current
position to last position on planned route.
– Flight Path Monitor to confirm an aircraft is following the
agreed trajectory.
• Advanced Planning
– Conflict detection has to be provided which supports the
optimization of traffic throughput and early conflict
resolution.
• Multi-Sector Planner is responsible for the medium-
term planning of the trajectories that enter the
Multi-Sector Area (MSA)
Key Notes (2)
• Tactical Load Smoother provides the Multi-Sector
Planner with information regarding the future
“complexity” of the Multi-Sector Area:
– Predict and analyze the air-traffic situation that will evolve
some 10 to 40 minutes later.
• Total number of aircraft
• Number of conflicts
• Complexity of the trajectories as assessed by number of vector
changes
– If one (or more) of the values passes the threshold level,
an alarm can be generated to the Multi-Sector Planner.
Key Notes (3)
• Arrival Manager is a ground based planning tool,
used to:
– Support ATC in automatically establishing an optimal
arrival sequence
– Enables ATC to manually edit the computed sequence
– Provides for “what if” sequence generation
• Departure Manager is a ground based planning tool,
used to:
– Allocating departure runways and providing takeoff
schedules
– Optimizing conflict-free climbing trajectories
– ATC able to modify computed sequences
– Includes a “what-if” mode
Key Notes (4)
• Conflict Probe executes every time a new trajectory
is generated, searching the flight database to see if
any other trajectory conflicted
• Co-operative Tools not only displays the conflicting
aircraft but also aircraft that are close enough to the
conflict for ATC to consider
• Problem Solver does not provide solutions
independent of ATC, but allows them to model de-
conflictions (simple mouse “drag-and-draw”
function) and then issue the trajectory constraints to
apply solutions
Key Notes (5)
• Flight Path Monitoring compares 4D tracked
positions of aircraft against their 4D planned
positions so as to detect deviations between
them.
– Deviations are calculated in three dimensions:
• Laterally
• Longitudinally
• Vertically
– For each direction, deviations are characterized as being
insignificant, medium, or large (determined by Trajectory
Predictor) and represent region of permissible error
Key Notes (6)
• Trajectory Negotiation (TN) is the heart of air/ground
integration
– Air and ground systems interchanged detailed information
about their requirements and come to an agreed contract
for the execution of a flight (or the next segment of it)
– Aircraft down links full details of its preferred trajectory
– Ground ATM assesses this for possible conflict and
responds with any necessary time or altitude constraints
to prevent loss of separation
– Constraints are then applied from the preferred trajectory
leaving the final agreement as close as possible to it
Key Notes (7)
• Negotiation Manager (NM) tool developed to handle
trajectory passing between the ground sectors for
ground/ground negotiation process
– Studies found the NM was not compatible with the
prevailing methods of control, i.e. with Letters of
Agreement (LOAs) for sector transfer etc.
– More work needed in future studies
• Meteo portion of project studied the accuracy of
meteorological forecasting and wind forecasting and
the effect on modeling and implementation of
aircraft trajectories
Outcomes & Conclusions (1)
• ATC who participated in the experiments clearly
recognized the potential of the PHARE concept
• Also realized that it would lead to considerable
changes in their roles
– Tends to reinforce planning rather than executive tasks
• Real-time trials on a variety of sectors showed:
– Increasing traffic throughput (2X traffic load over 1989
baseline)
– Maintaining an acceptable level of controller workload
• Study could not conclusively demonstrate increased
capacity
Outcomes & Conclusions (2)
• Successfully demonstrated that the concept of
trajectory control and trajectory negotiation could be
conducted over a data link
• Reliability and performance of air/ground data link
based on SATCOM proved insufficient to
demonstrate the full capability of PHARE concept
• Ground ATM system tools appeared to achieve their
aim of providing assistance to ATC
• PHARE concept works well in en-route control when
there is sufficient time to exercise advanced planning
– Sectors must be large enough to profit from a 20-minute
or more look-ahead
• Significant reduction of ATC workload with 4D FMS
and data link equipped aircraft

Contenu connexe

Tendances

Game-theoretic Patrol Strategies for Transit Systems (Slideshow deck)
Game-theoretic Patrol Strategies for Transit Systems (Slideshow deck)Game-theoretic Patrol Strategies for Transit Systems (Slideshow deck)
Game-theoretic Patrol Strategies for Transit Systems (Slideshow deck)
Samantha Luber
 
Cmmi hm experiences with leveraging six sigma to implement cmmi l4 yl5 2003
Cmmi hm experiences with leveraging six sigma to implement cmmi l4 yl5 2003Cmmi hm experiences with leveraging six sigma to implement cmmi l4 yl5 2003
Cmmi hm experiences with leveraging six sigma to implement cmmi l4 yl5 2003
JULIO GONZALEZ SANZ
 

Tendances (13)

Game-theoretic Patrol Strategies for Transit Systems (Slideshow deck)
Game-theoretic Patrol Strategies for Transit Systems (Slideshow deck)Game-theoretic Patrol Strategies for Transit Systems (Slideshow deck)
Game-theoretic Patrol Strategies for Transit Systems (Slideshow deck)
 
Brandon Signals Council Presentation
Brandon Signals Council PresentationBrandon Signals Council Presentation
Brandon Signals Council Presentation
 
Aos Diploma 3
Aos Diploma 3Aos Diploma 3
Aos Diploma 3
 
Survey Procedures
Survey ProceduresSurvey Procedures
Survey Procedures
 
muhammad zahid is the verry nice engineer in indus university...
muhammad zahid is the verry nice engineer in indus university...muhammad zahid is the verry nice engineer in indus university...
muhammad zahid is the verry nice engineer in indus university...
 
Cmmi hm experiences with leveraging six sigma to implement cmmi l4 yl5 2003
Cmmi hm experiences with leveraging six sigma to implement cmmi l4 yl5 2003Cmmi hm experiences with leveraging six sigma to implement cmmi l4 yl5 2003
Cmmi hm experiences with leveraging six sigma to implement cmmi l4 yl5 2003
 
AIAA-2013-4399
AIAA-2013-4399AIAA-2013-4399
AIAA-2013-4399
 
Traffic Signal Re-timing Studies to Reduce Congestion and Emissions
Traffic Signal Re-timing Studies to Reduce Congestion and EmissionsTraffic Signal Re-timing Studies to Reduce Congestion and Emissions
Traffic Signal Re-timing Studies to Reduce Congestion and Emissions
 
Final pres EN
Final pres ENFinal pres EN
Final pres EN
 
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
 
Matlab
MatlabMatlab
Matlab
 
L11 Signal Timing Design
L11 Signal Timing Design L11 Signal Timing Design
L11 Signal Timing Design
 
Spot speed studies.ppt .mylan nejyar
Spot speed studies.ppt .mylan nejyarSpot speed studies.ppt .mylan nejyar
Spot speed studies.ppt .mylan nejyar
 

En vedette (7)

Digital logic mohammed salim ch4
Digital logic mohammed salim ch4Digital logic mohammed salim ch4
Digital logic mohammed salim ch4
 
Compilation process
Compilation processCompilation process
Compilation process
 
Compilation of c
Compilation of cCompilation of c
Compilation of c
 
G++ & GCC
G++ & GCCG++ & GCC
G++ & GCC
 
Theorems in DE
Theorems in DETheorems in DE
Theorems in DE
 
Boolean algebra
Boolean algebraBoolean algebra
Boolean algebra
 
Embedded C - Lecture 1
Embedded C - Lecture 1Embedded C - Lecture 1
Embedded C - Lecture 1
 

Similaire à PHARE - Compilation

THE INDUSTRY PERSPECTIVE ON RPAS by Luc Lallouette
THE INDUSTRY PERSPECTIVE ON RPAS by Luc LallouetteTHE INDUSTRY PERSPECTIVE ON RPAS by Luc Lallouette
THE INDUSTRY PERSPECTIVE ON RPAS by Luc Lallouette
ALIAS Network
 
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAMCONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
iQHub
 

Similaire à PHARE - Compilation (20)

ATM Concept 4D ASAS and TFM
ATM Concept 4D ASAS and TFMATM Concept 4D ASAS and TFM
ATM Concept 4D ASAS and TFM
 
Appointment system tru x_usc_hackathon
Appointment system tru x_usc_hackathonAppointment system tru x_usc_hackathon
Appointment system tru x_usc_hackathon
 
chris guidice RESUME Ver2
chris guidice RESUME Ver2chris guidice RESUME Ver2
chris guidice RESUME Ver2
 
Air Traffic Control And Management System
Air Traffic Control And Management SystemAir Traffic Control And Management System
Air Traffic Control And Management System
 
THE INDUSTRY PERSPECTIVE ON RPAS by Luc Lallouette
THE INDUSTRY PERSPECTIVE ON RPAS by Luc LallouetteTHE INDUSTRY PERSPECTIVE ON RPAS by Luc Lallouette
THE INDUSTRY PERSPECTIVE ON RPAS by Luc Lallouette
 
B0 frto
B0 frtoB0 frto
B0 frto
 
Karl Hedrick
Karl HedrickKarl Hedrick
Karl Hedrick
 
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAMCONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
 
Industrial Facility Design
Industrial Facility DesignIndustrial Facility Design
Industrial Facility Design
 
Airline Fleet Assignment And Schedule Planning
Airline Fleet Assignment And Schedule PlanningAirline Fleet Assignment And Schedule Planning
Airline Fleet Assignment And Schedule Planning
 
Avionics
AvionicsAvionics
Avionics
 
Management of I/O request & Communication among devices
Management of I/O request & Communication among devicesManagement of I/O request & Communication among devices
Management of I/O request & Communication among devices
 
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
 
ATCM presentation
ATCM presentationATCM presentation
ATCM presentation
 
Michele Merkle - AIR TRAFFIC CONTROL WORKSHOP - Panel 3: Air traffic control ...
Michele Merkle - AIR TRAFFIC CONTROL WORKSHOP - Panel 3: Air traffic control ...Michele Merkle - AIR TRAFFIC CONTROL WORKSHOP - Panel 3: Air traffic control ...
Michele Merkle - AIR TRAFFIC CONTROL WORKSHOP - Panel 3: Air traffic control ...
 
AAI presentation
AAI presentationAAI presentation
AAI presentation
 
AURA: Aerial Unpaved Roads Assessment System Demonstration - October 20, 2015
AURA: Aerial Unpaved Roads Assessment System Demonstration - October 20, 2015AURA: Aerial Unpaved Roads Assessment System Demonstration - October 20, 2015
AURA: Aerial Unpaved Roads Assessment System Demonstration - October 20, 2015
 
Triton UAS Technical Design Paper 2020-2021
Triton UAS Technical Design Paper 2020-2021Triton UAS Technical Design Paper 2020-2021
Triton UAS Technical Design Paper 2020-2021
 
Advanced UAV Trajectory Generation Planning And Guidance
Advanced UAV Trajectory Generation  Planning And GuidanceAdvanced UAV Trajectory Generation  Planning And Guidance
Advanced UAV Trajectory Generation Planning And Guidance
 
SGD 2016 - Introduction
SGD 2016 - IntroductionSGD 2016 - Introduction
SGD 2016 - Introduction
 

Plus de Bruce Ware, PMI Certified PM Professional

Plus de Bruce Ware, PMI Certified PM Professional (6)

ATM I4D Flight Trial by Chief Pilot
ATM I4D Flight Trial by Chief PilotATM I4D Flight Trial by Chief Pilot
ATM I4D Flight Trial by Chief Pilot
 
ERASMUS Strategic Deconfliction to Benefit SESAR Presentation 2009
ERASMUS Strategic Deconfliction to Benefit SESAR Presentation 2009ERASMUS Strategic Deconfliction to Benefit SESAR Presentation 2009
ERASMUS Strategic Deconfliction to Benefit SESAR Presentation 2009
 
CASSIS Controlled Time of Arrival Flight Trials: Results and Analysis Present...
CASSIS Controlled Time of Arrival Flight Trials: Results and Analysis Present...CASSIS Controlled Time of Arrival Flight Trials: Results and Analysis Present...
CASSIS Controlled Time of Arrival Flight Trials: Results and Analysis Present...
 
4D Trajectories and Automation
4D Trajectories and Automation4D Trajectories and Automation
4D Trajectories and Automation
 
NorthernCross Demo 2009
NorthernCross Demo 2009NorthernCross Demo 2009
NorthernCross Demo 2009
 
CATS Contract of Objectives presentation
CATS Contract of Objectives presentationCATS Contract of Objectives presentation
CATS Contract of Objectives presentation
 

Dernier

EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
Earley Information Science
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 

Dernier (20)

Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 

PHARE - Compilation

  • 1. PHARE: A Compilation Notes from the PHARE Program Reports
  • 2. “Programme for Harmonised ATM Research in EUROCONTROL (PHARE)” • Future Air Traffic Management (ATM) concept: – Organize, co-ordinate and conduct studies and experiments to demonstrate the feasibility and benefits of a future air-ground integrated air traffic management system – Started in 1989 and completed in 1999 • Objective -- to prove that an integrated air/ground environment using advanced ATM tools and Human Machine Interfaces would provide increased airspace capacity
  • 3. Program Design PHARE comprised: • Initial concept definition and elaboration studies, • Development of tools (airborne, ground, communication and supporting tools), and • Large scale real-time simulations (PDs) Three PDs were planned: • PHARE Demonstration 1 addressing En-route issues • PHARE Demonstration 2 focusing on the Extended Terminal Maneuvering Area (ETMA) • PHARE Demonstration 3 providing a multi-site integrated experiment addressing flights from departure to arrival
  • 4. Topics Addressed (1) • Capabilities of aircraft with advanced navigation and flight management equipment • Advanced automation support for air traffic controllers • Modification of controller roles including new concepts of task sharing within groups of controllers and multi-sector planning • Ground Human Machine Interface for efficient and effective use of the automation support
  • 5. Topics Addressed (2) • Use of data-link for air ground-ground information exchange, in particular for trajectory negotiation • Better meteorological forecasting to improve trajectory prediction • A common integration environment • A common methodology and standard set of tools and procedures for experimental validation.
  • 6. Concept-level (Evolutionary) Requirements • Aircraft to have progressively more accurate navigational performance in space (2D, 3D) and ultimately in space and time (4D) • ATM ground system to be continuously informed of each aircraft’s current position and its intentions • ATC to exploit this high quality information through more optimal decision-making
  • 7. Concept Summary • The trajectory used by the ground system shall whenever possible be the trajectory generated by the aircraft systems • The trajectory for an aircraft shall be chosen by the pilot and shall only be constrained by ATC when necessary for de-confliction or to follow defined procedures • Flight trajectories shall be predicted taking into account constraints for the entire flight allowing management of the flight for greatest efficiency and economy • Decision making shall not be automated to the extent that the human is out of the picture; automation shall assist, not take over
  • 8. Concepts (1) • Trajectory Prediction • Advanced Planning • Multi-Sector Planning • Tactical Load Smoother • Arrival Management • Departure Management
  • 9. Concepts (2) • Conflict Solving Assistance • Co-operative Tools • Flight Path Monitoring • Air/Ground Negotiation • Ground/Ground Negotiation • Meteo
  • 10. Key Notes (1) • Trajectory Predictor provides the following services: – Calculating optimal 4D trajectories, from aircraft current position to last position on planned route. – Flight Path Monitor to confirm an aircraft is following the agreed trajectory. • Advanced Planning – Conflict detection has to be provided which supports the optimization of traffic throughput and early conflict resolution. • Multi-Sector Planner is responsible for the medium- term planning of the trajectories that enter the Multi-Sector Area (MSA)
  • 11. Key Notes (2) • Tactical Load Smoother provides the Multi-Sector Planner with information regarding the future “complexity” of the Multi-Sector Area: – Predict and analyze the air-traffic situation that will evolve some 10 to 40 minutes later. • Total number of aircraft • Number of conflicts • Complexity of the trajectories as assessed by number of vector changes – If one (or more) of the values passes the threshold level, an alarm can be generated to the Multi-Sector Planner.
  • 12. Key Notes (3) • Arrival Manager is a ground based planning tool, used to: – Support ATC in automatically establishing an optimal arrival sequence – Enables ATC to manually edit the computed sequence – Provides for “what if” sequence generation • Departure Manager is a ground based planning tool, used to: – Allocating departure runways and providing takeoff schedules – Optimizing conflict-free climbing trajectories – ATC able to modify computed sequences – Includes a “what-if” mode
  • 13. Key Notes (4) • Conflict Probe executes every time a new trajectory is generated, searching the flight database to see if any other trajectory conflicted • Co-operative Tools not only displays the conflicting aircraft but also aircraft that are close enough to the conflict for ATC to consider • Problem Solver does not provide solutions independent of ATC, but allows them to model de- conflictions (simple mouse “drag-and-draw” function) and then issue the trajectory constraints to apply solutions
  • 14. Key Notes (5) • Flight Path Monitoring compares 4D tracked positions of aircraft against their 4D planned positions so as to detect deviations between them. – Deviations are calculated in three dimensions: • Laterally • Longitudinally • Vertically – For each direction, deviations are characterized as being insignificant, medium, or large (determined by Trajectory Predictor) and represent region of permissible error
  • 15. Key Notes (6) • Trajectory Negotiation (TN) is the heart of air/ground integration – Air and ground systems interchanged detailed information about their requirements and come to an agreed contract for the execution of a flight (or the next segment of it) – Aircraft down links full details of its preferred trajectory – Ground ATM assesses this for possible conflict and responds with any necessary time or altitude constraints to prevent loss of separation – Constraints are then applied from the preferred trajectory leaving the final agreement as close as possible to it
  • 16. Key Notes (7) • Negotiation Manager (NM) tool developed to handle trajectory passing between the ground sectors for ground/ground negotiation process – Studies found the NM was not compatible with the prevailing methods of control, i.e. with Letters of Agreement (LOAs) for sector transfer etc. – More work needed in future studies • Meteo portion of project studied the accuracy of meteorological forecasting and wind forecasting and the effect on modeling and implementation of aircraft trajectories
  • 17. Outcomes & Conclusions (1) • ATC who participated in the experiments clearly recognized the potential of the PHARE concept • Also realized that it would lead to considerable changes in their roles – Tends to reinforce planning rather than executive tasks • Real-time trials on a variety of sectors showed: – Increasing traffic throughput (2X traffic load over 1989 baseline) – Maintaining an acceptable level of controller workload • Study could not conclusively demonstrate increased capacity
  • 18. Outcomes & Conclusions (2) • Successfully demonstrated that the concept of trajectory control and trajectory negotiation could be conducted over a data link • Reliability and performance of air/ground data link based on SATCOM proved insufficient to demonstrate the full capability of PHARE concept • Ground ATM system tools appeared to achieve their aim of providing assistance to ATC • PHARE concept works well in en-route control when there is sufficient time to exercise advanced planning – Sectors must be large enough to profit from a 20-minute or more look-ahead • Significant reduction of ATC workload with 4D FMS and data link equipped aircraft