BOTTLE BLOWER INSTALLATION
BOTTLEBLOWERINSTALLATION
Location
Yangon, My.
Duration
5 Days
Project value
25,000 USD
Weights
Bottle blower 12 Tonnes
Oven 4.9 Tonnes
Compressor 4 Tonnes
Conveyor  feed unit 2 Tonnes
Chiller unit 2 Tonnes
Air handling unit x2 1.5 Tonnes
Equipment Used
10t City crane
3.7t Telehandler
5t Forklift
30t Toejacks x6
12t Skates x6
8 Inch steel form work
4 Axle low bed trailer
6 Man installation team
SCOPE
CEA Project Logistics Myanmar were employed for
the transportation, customs process and installation
of a pre-formed bottle blowing machine and it’s
auxiliary parts at the Loi Hein soft drinks factory in
Yangon, Myanmar. This was the completion of a
three-part project that CEA had been conducting.
	
CASE STUDY		 CS020
Bottle Blower Installation 1/2
MAIN BLOWER MACHINE LOWERED ON TO 12T SKATES READY TO MOVE INTO THE FACTORY
BOTTLEBLOWERINSTALLATION
CEA PROJECT LOGISTICS
G-18 PEARL CONDO
KABAR AYE PAGODA ROAD
BAHAN TOWNSHIP
YANGON
MYANMAR
+959 421 031 286
www.ceaprojects.com
CEA service teams took charge of the cargo as it arrived at the port
and used escort vehicles throughout the transportation of the
oversized cargo to the factory site. The equipment with a value
of over 500,000 USD was carefully unloaded and unpacked and
lifted on to 15 tonne multi-wheel skates to ease the manoeuvring
through and across the factory to the installation site.
Due to the complexity of the factory layout, a 10-Tonne city
crane was used inside to facilitate the movement of some of the
machinery, modifications to several of the factory’s walls were
also made. When all the bottle blower machinery parts were in
place, each one was jacked down from its skates and final levelling
commenced. The whole project was completed within the five-day
time frame and under budget.
CASE STUDY		 CS020
Bottle Blower Installation 2/2
STANDARDIZED CARGO AWAITS UNOADING
TELEHANDLER UNLOADING CONTAINERS
OVERSIZED CARGO ARRIVAL AT FACTORY
CEA TEAMS UNPACK THE CARGO
MAIN PARTS ASSEMBLED IN OPERATIONAL LOCATION AND AWAITING FINAL INSTALLATION
BLOWER BEING SKATED ACROSS FACTORY5T FORKLIFT ASSISTS IN SKATING
BLOWER AND OTHER MACHINERY IN PLACEAUXILIARY MACHINERY IN PLACE

Contenu connexe

Similaire à Bottle Blower Installation

Ronald smith resume queensland.doc (2)
Ronald smith resume queensland.doc (2)Ronald smith resume queensland.doc (2)
Ronald smith resume queensland.doc (2)Ron Smith
 
Ronald Smith resume Queensland.doc (2)
Ronald Smith resume Queensland.doc (2)Ronald Smith resume Queensland.doc (2)
Ronald Smith resume Queensland.doc (2)Ron Smith
 
Corporate Profile | Ärk Global
Corporate Profile | Ärk Global Corporate Profile | Ärk Global
Corporate Profile | Ärk Global Ärk Global
 
01. company profile 2018 (wooil)
01. company profile 2018 (wooil)01. company profile 2018 (wooil)
01. company profile 2018 (wooil)wooil indonesia
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016Mujahid Ali Akhtar
 
KONA Hub Master Planning Report.ppt
KONA Hub Master Planning Report.pptKONA Hub Master Planning Report.ppt
KONA Hub Master Planning Report.pptudayRavi10
 
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerPortfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerTheodoros Dragonas
 
LOGISTIC SOLUTIONS FOR ITC
LOGISTIC SOLUTIONS FOR ITCLOGISTIC SOLUTIONS FOR ITC
LOGISTIC SOLUTIONS FOR ITCSaurav Mann
 
Mud Mixing plant installed onboard Trinity Supporter for NIKO
Mud Mixing plant installed onboard Trinity Supporter for NIKOMud Mixing plant installed onboard Trinity Supporter for NIKO
Mud Mixing plant installed onboard Trinity Supporter for NIKORoy Catto
 
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerPortfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerTheodoros Dragonas
 
CV 杨文超英文版
CV 杨文超英文版CV 杨文超英文版
CV 杨文超英文版wenchao yang
 
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15Aaron Lian Kian Hoe
 

Similaire à Bottle Blower Installation (20)

Ronald smith resume queensland.doc (2)
Ronald smith resume queensland.doc (2)Ronald smith resume queensland.doc (2)
Ronald smith resume queensland.doc (2)
 
Ronald Smith resume Queensland.doc (2)
Ronald Smith resume Queensland.doc (2)Ronald Smith resume Queensland.doc (2)
Ronald Smith resume Queensland.doc (2)
 
Injection Mould Demob & Export
Injection Mould Demob & ExportInjection Mould Demob & Export
Injection Mould Demob & Export
 
Corporate Profile | Ärk Global
Corporate Profile | Ärk Global Corporate Profile | Ärk Global
Corporate Profile | Ärk Global
 
01. company profile 2018 (wooil)
01. company profile 2018 (wooil)01. company profile 2018 (wooil)
01. company profile 2018 (wooil)
 
Technical Installation
Technical InstallationTechnical Installation
Technical Installation
 
AMOD CV CHINA 2017 - Copy
AMOD CV CHINA 2017 - CopyAMOD CV CHINA 2017 - Copy
AMOD CV CHINA 2017 - Copy
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 
KONA Hub Master Planning Report.ppt
KONA Hub Master Planning Report.pptKONA Hub Master Planning Report.ppt
KONA Hub Master Planning Report.ppt
 
jahangir
jahangirjahangir
jahangir
 
CV Wawan Setiawan
CV Wawan SetiawanCV Wawan Setiawan
CV Wawan Setiawan
 
Ong-Art CV 170208
Ong-Art CV 170208Ong-Art CV 170208
Ong-Art CV 170208
 
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerPortfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
 
LOGISTIC SOLUTIONS FOR ITC
LOGISTIC SOLUTIONS FOR ITCLOGISTIC SOLUTIONS FOR ITC
LOGISTIC SOLUTIONS FOR ITC
 
Mud Mixing plant installed onboard Trinity Supporter for NIKO
Mud Mixing plant installed onboard Trinity Supporter for NIKOMud Mixing plant installed onboard Trinity Supporter for NIKO
Mud Mixing plant installed onboard Trinity Supporter for NIKO
 
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerPortfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
 
resume
resumeresume
resume
 
CV 杨文超英文版
CV 杨文超英文版CV 杨文超英文版
CV 杨文超英文版
 
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
 
01_HVAC-R5_Tecni
01_HVAC-R5_Tecni01_HVAC-R5_Tecni
01_HVAC-R5_Tecni
 

Plus de CEA Project Logistics

Plus de CEA Project Logistics (20)

Catamaran Transport & Export
Catamaran Transport & ExportCatamaran Transport & Export
Catamaran Transport & Export
 
CEA & Fagioli Italy
CEA & Fagioli ItalyCEA & Fagioli Italy
CEA & Fagioli Italy
 
CEA Project Logistics Brochure 2016
CEA Project Logistics Brochure 2016CEA Project Logistics Brochure 2016
CEA Project Logistics Brochure 2016
 
Drill Pipe Storage & Transportation
Drill Pipe Storage & TransportationDrill Pipe Storage & Transportation
Drill Pipe Storage & Transportation
 
CEA Ao-Udom Facility
CEA Ao-Udom FacilityCEA Ao-Udom Facility
CEA Ao-Udom Facility
 
Steel Handling & Consolidation
Steel Handling & ConsolidationSteel Handling & Consolidation
Steel Handling & Consolidation
 
CEA SURELIFT Brochure 2015
CEA SURELIFT Brochure 2015CEA SURELIFT Brochure 2015
CEA SURELIFT Brochure 2015
 
CEA Project Logistics News Articles
CEA Project Logistics News ArticlesCEA Project Logistics News Articles
CEA Project Logistics News Articles
 
Technical Lifting
Technical LiftingTechnical Lifting
Technical Lifting
 
Warehousing & Storage
Warehousing & StorageWarehousing & Storage
Warehousing & Storage
 
Fleet & Equipment
Fleet & EquipmentFleet & Equipment
Fleet & Equipment
 
Specialized Lifting
Specialized LiftingSpecialized Lifting
Specialized Lifting
 
Break Bulk Consolidation
Break Bulk ConsolidationBreak Bulk Consolidation
Break Bulk Consolidation
 
DAFF/AQIS Quarantine Project
DAFF/AQIS Quarantine ProjectDAFF/AQIS Quarantine Project
DAFF/AQIS Quarantine Project
 
CEA Project Logistics Myanmar
CEA Project Logistics MyanmarCEA Project Logistics Myanmar
CEA Project Logistics Myanmar
 
VpCI Cortec Preservation
VpCI Cortec PreservationVpCI Cortec Preservation
VpCI Cortec Preservation
 
Crane Demobilization
Crane DemobilizationCrane Demobilization
Crane Demobilization
 
Seahawk Helicopter Transportation
Seahawk Helicopter TransportationSeahawk Helicopter Transportation
Seahawk Helicopter Transportation
 
Heliotrope 65 Catamaran Launch
Heliotrope 65 Catamaran LaunchHeliotrope 65 Catamaran Launch
Heliotrope 65 Catamaran Launch
 
Dual Penetrator Catamaran Launch
Dual Penetrator Catamaran LaunchDual Penetrator Catamaran Launch
Dual Penetrator Catamaran Launch
 

Dernier

internship exam ppt.pptx on embedded system and IOT
internship exam ppt.pptx on embedded system and IOTinternship exam ppt.pptx on embedded system and IOT
internship exam ppt.pptx on embedded system and IOTNavyashreeS6
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringDr. Radhey Shyam
 
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...Roi Lipman
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamDr. Radhey Shyam
 
retail automation billing system ppt.pptx
retail automation billing system ppt.pptxretail automation billing system ppt.pptx
retail automation billing system ppt.pptxfaamieahmd
 
Supermarket billing system project report..pdf
Supermarket billing system project report..pdfSupermarket billing system project report..pdf
Supermarket billing system project report..pdfKamal Acharya
 
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单tuuww
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationDr. Radhey Shyam
 
Lect 2 - Design of slender column-2.pptx
Lect 2 - Design of slender column-2.pptxLect 2 - Design of slender column-2.pptx
Lect 2 - Design of slender column-2.pptxHamzaKhawar4
 
1. Henrich Triangle Safety and Fire Presentation
1. Henrich Triangle Safety and Fire Presentation1. Henrich Triangle Safety and Fire Presentation
1. Henrich Triangle Safety and Fire PresentationBhuwanAgrawal8
 
Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdfKamal Acharya
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
Teachers record management system project report..pdf
Teachers record management system project report..pdfTeachers record management system project report..pdf
Teachers record management system project report..pdfKamal Acharya
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Lovely Professional University
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientistgettygaming1
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfKamal Acharya
 
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5T.D. Shashikala
 
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...Amil baba
 
RM&IPR M4.pdfResearch Methodolgy & Intellectual Property Rights Series 4
RM&IPR M4.pdfResearch Methodolgy & Intellectual Property Rights Series 4RM&IPR M4.pdfResearch Methodolgy & Intellectual Property Rights Series 4
RM&IPR M4.pdfResearch Methodolgy & Intellectual Property Rights Series 4T.D. Shashikala
 

Dernier (20)

internship exam ppt.pptx on embedded system and IOT
internship exam ppt.pptx on embedded system and IOTinternship exam ppt.pptx on embedded system and IOT
internship exam ppt.pptx on embedded system and IOT
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
 
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
retail automation billing system ppt.pptx
retail automation billing system ppt.pptxretail automation billing system ppt.pptx
retail automation billing system ppt.pptx
 
Supermarket billing system project report..pdf
Supermarket billing system project report..pdfSupermarket billing system project report..pdf
Supermarket billing system project report..pdf
 
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
 
Lect 2 - Design of slender column-2.pptx
Lect 2 - Design of slender column-2.pptxLect 2 - Design of slender column-2.pptx
Lect 2 - Design of slender column-2.pptx
 
1. Henrich Triangle Safety and Fire Presentation
1. Henrich Triangle Safety and Fire Presentation1. Henrich Triangle Safety and Fire Presentation
1. Henrich Triangle Safety and Fire Presentation
 
Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdf
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
Teachers record management system project report..pdf
Teachers record management system project report..pdfTeachers record management system project report..pdf
Teachers record management system project report..pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
 
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
 
RM&IPR M4.pdfResearch Methodolgy & Intellectual Property Rights Series 4
RM&IPR M4.pdfResearch Methodolgy & Intellectual Property Rights Series 4RM&IPR M4.pdfResearch Methodolgy & Intellectual Property Rights Series 4
RM&IPR M4.pdfResearch Methodolgy & Intellectual Property Rights Series 4
 

Bottle Blower Installation

  • 1. BOTTLE BLOWER INSTALLATION BOTTLEBLOWERINSTALLATION Location Yangon, My. Duration 5 Days Project value 25,000 USD Weights Bottle blower 12 Tonnes Oven 4.9 Tonnes Compressor 4 Tonnes Conveyor feed unit 2 Tonnes Chiller unit 2 Tonnes Air handling unit x2 1.5 Tonnes Equipment Used 10t City crane 3.7t Telehandler 5t Forklift 30t Toejacks x6 12t Skates x6 8 Inch steel form work 4 Axle low bed trailer 6 Man installation team SCOPE CEA Project Logistics Myanmar were employed for the transportation, customs process and installation of a pre-formed bottle blowing machine and it’s auxiliary parts at the Loi Hein soft drinks factory in Yangon, Myanmar. This was the completion of a three-part project that CEA had been conducting. CASE STUDY CS020 Bottle Blower Installation 1/2 MAIN BLOWER MACHINE LOWERED ON TO 12T SKATES READY TO MOVE INTO THE FACTORY
  • 2. BOTTLEBLOWERINSTALLATION CEA PROJECT LOGISTICS G-18 PEARL CONDO KABAR AYE PAGODA ROAD BAHAN TOWNSHIP YANGON MYANMAR +959 421 031 286 www.ceaprojects.com CEA service teams took charge of the cargo as it arrived at the port and used escort vehicles throughout the transportation of the oversized cargo to the factory site. The equipment with a value of over 500,000 USD was carefully unloaded and unpacked and lifted on to 15 tonne multi-wheel skates to ease the manoeuvring through and across the factory to the installation site. Due to the complexity of the factory layout, a 10-Tonne city crane was used inside to facilitate the movement of some of the machinery, modifications to several of the factory’s walls were also made. When all the bottle blower machinery parts were in place, each one was jacked down from its skates and final levelling commenced. The whole project was completed within the five-day time frame and under budget. CASE STUDY CS020 Bottle Blower Installation 2/2 STANDARDIZED CARGO AWAITS UNOADING TELEHANDLER UNLOADING CONTAINERS OVERSIZED CARGO ARRIVAL AT FACTORY CEA TEAMS UNPACK THE CARGO MAIN PARTS ASSEMBLED IN OPERATIONAL LOCATION AND AWAITING FINAL INSTALLATION BLOWER BEING SKATED ACROSS FACTORY5T FORKLIFT ASSISTS IN SKATING BLOWER AND OTHER MACHINERY IN PLACEAUXILIARY MACHINERY IN PLACE