MAY 2016 PROPOSED SERVICE CHANGES
Public Comment Meetings
January 21 & 26, 2016
2
MEETING PURPOSE
Thank you for joining us and participating in this community
discussion.
The purpose of this meeting is to take public comments on
proposed service changes that will be effective on Monday,
May 2, 2016. No final decisions have been made.
3
MEETING POLICIES
Be considerate of meeting attendees and COTA staff – please
silence cell phones and other technology
When it is your turn to make a comment or ask a question,
please remain at your seat and we will call on you
Ask one question at a time so the appropriate COTA staff
member may address your comment
Comments and questions are limited to two (2) minutes per
person
Participants are encouraged to complete comment cards
4
TIMELINES
COTA modifies service three times per year – the first
Monday of:
• January
• May
• September
May 2016 changes will begin on Monday, May 2
TRAVEL TIMES
May 2016 Proposed Service Changes
6
TRAVEL TIME ADJUSTMENTS
Travel times are proposed to be adjusted to improve on-time
service on the following lines:
Local
• 2 E Main/N High (Weekday)
• 6 Mt Vernon/Sullivant (All Days)
• 7 Neil (Weekday)
• 15 Grove City (All Days)
• 19 Arlington/Grandview
(Weekday)
Crosstown
• 2L Crosswoods/Polaris (All Days)
• 81 Hudson St (All Days)
• 83 Oakland/Weber (All Days)
All travel time adjustments are tentative
IMPROVED AND NEW SERVICE
May 2016 Proposed Service Changes
8
PROPOSED NEW SERVICE: DOWNTOWN-PORT COLUMBUS AIRPORT
Goal: Provide direct
service between the Airport
and Downtown hotels and
convention center
30 minute service,
7 days a week, approximately 6am-9pm
9
PROPOSED IMPROVED SERVICE: INCREASED
FREQUENCY ON 2L
Goal: Increase
frequency on 2L
Crosswoods/Polaris
Frequency
Improvement:
Increase from 60 minutes
to 30 minutes
10
SEASONAL SERVICE: 98 ZOO BUS
Goal: Provide direct service between the Columbus Zoo & Aquarium and
Downtown, in order to ease access to this regional asset for families in our
community
Seasonal Service: Saturday, May 7 – Monday, September 5
• Weekend service proposed to begin on Saturday, May 7
• Weekday Zoo service proposed to begin on Monday, May 30
(Memorial Day)
• Service runs through Monday, September 5 (Labor Day)
11
MAY 2016 PROPOSED SERVICE CHANGES
Questions about proposed
May 2016 Service Changes?
TEMPORARY CONSTRUCTION-
RELATED REROUTES
May 2016 Proposed Service Changes
13
TEMPORARY STOP CHANGE: 6 MT VERNON & 92
JAMES/STELZER
Goal: Maintain access to VA Ambulatory Care Center during facility
construction at VA Ambulatory Care Center
Proposed Stop Change: Starting in April, Line 6 (Local) and Line 92
(Crosstown) will have a temporary stop location on the northeast side of
the hospital for approximately 8 months
Current Stop Location
Temporary Stop Location
RELATED COTA INITIATIVES &
PROJECTS
May 2016 Proposed Service Changes
15
CMAX CLEVELAND AVENUE BRT / ENHANCED BUS SERVICE
Goal: Provide rapid transit service along Cleveland Avenue, the second
busiest transit corridor in the system
Update:
• Congress has approved 80% grant funding of capital cost (approximately
$38 million in funding)
• Negotiating grant agreement with Federal Transit Administration
• Conducting real estate acquisitions
• Pre-construction outreach begins in March
• Implement service in September 2017
Project information sheet available at today’s sign-in desk
For more information visit COTABRT.com
16
Update:
• Not restrained by mode or funding
• Project and initiatives identified and prioritized by
the public (you!)
• Final Report will recommend implementation
strategies for community – COTA, public
agencies, private sector
• Phase 3 Outreach will begin in March with
community forums held in early April
We are here
NEXTGEN
Goal: Vision for the future of transit – 2025, 2040 & 2050
17
THANK YOU!
General Questions?

Contenu connexe

Tendances

Open House Boards
Open House BoardsOpen House Boards
Open House BoardsCOTA BUS
 
Dec 7 12_2017_public_mtg - final
Dec 7 12_2017_public_mtg - finalDec 7 12_2017_public_mtg - final
Dec 7 12_2017_public_mtg - finalCOTA BUS
 
Public Comment Meeting-January 2018 Proposed Service Change
Public Comment Meeting-January 2018 Proposed Service ChangePublic Comment Meeting-January 2018 Proposed Service Change
Public Comment Meeting-January 2018 Proposed Service ChangeCOTA BUS
 
January 2018 Service Change Public Info Meeting
January 2018 Service Change Public Info MeetingJanuary 2018 Service Change Public Info Meeting
January 2018 Service Change Public Info MeetingCOTA BUS
 
May 2018 Public Comment Meeting Presentation
May 2018 Public Comment Meeting PresentationMay 2018 Public Comment Meeting Presentation
May 2018 Public Comment Meeting PresentationCOTA BUS
 
Public Comment Meeting-September 2017 Proposed Service Changes
Public Comment Meeting-September 2017 Proposed Service ChangesPublic Comment Meeting-September 2017 Proposed Service Changes
Public Comment Meeting-September 2017 Proposed Service ChangesCOTA BUS
 
May 2018 Service Change Public Info Meeting
May 2018 Service Change Public Info MeetingMay 2018 Service Change Public Info Meeting
May 2018 Service Change Public Info MeetingCOTA BUS
 
September Service Change Public Comment Meetings
September Service Change Public Comment MeetingsSeptember Service Change Public Comment Meetings
September Service Change Public Comment MeetingsCOTA BUS
 
Public Information Meeting-August 2017
Public Information Meeting-August 2017Public Information Meeting-August 2017
Public Information Meeting-August 2017COTA BUS
 
Dec 3 10_2013_public_mtg_projects_update final
Dec 3 10_2013_public_mtg_projects_update finalDec 3 10_2013_public_mtg_projects_update final
Dec 3 10_2013_public_mtg_projects_update finalcotabus
 
May 2015 PROPOSED Service Changes
May 2015 PROPOSED Service ChangesMay 2015 PROPOSED Service Changes
May 2015 PROPOSED Service ChangesCOTA BUS
 
January 2015 Public Information Meetings
January 2015 Public Information MeetingsJanuary 2015 Public Information Meetings
January 2015 Public Information MeetingsCOTA BUS
 
Local projects update,
Local projects update,Local projects update,
Local projects update,City of Corona
 
Sept 17 26_2013_public_mtg_v3
Sept 17 26_2013_public_mtg_v3Sept 17 26_2013_public_mtg_v3
Sept 17 26_2013_public_mtg_v3COTA BUS
 
PROPOSED January 2015 Service Change Public Comment Meeting
PROPOSED January 2015 Service Change Public Comment MeetingPROPOSED January 2015 Service Change Public Comment Meeting
PROPOSED January 2015 Service Change Public Comment MeetingCOTA BUS
 
Jasper Downtown/Riverfront Plan Presentation May 21, 2014
Jasper Downtown/Riverfront Plan Presentation May 21, 2014Jasper Downtown/Riverfront Plan Presentation May 21, 2014
Jasper Downtown/Riverfront Plan Presentation May 21, 2014Matthew Crane
 
Winter 2017 Proposed Service Changes
Winter 2017 Proposed Service ChangesWinter 2017 Proposed Service Changes
Winter 2017 Proposed Service ChangesFairfax County
 
Fairfax Connector June 2016 Service Change Proposal
Fairfax Connector June 2016 Service Change ProposalFairfax Connector June 2016 Service Change Proposal
Fairfax Connector June 2016 Service Change ProposalFairfax County
 
Fairfax Connector: January 2015 Proposed Service Changes
Fairfax Connector: January 2015 Proposed Service ChangesFairfax Connector: January 2015 Proposed Service Changes
Fairfax Connector: January 2015 Proposed Service ChangesFairfax County
 

Tendances (20)

Open House Boards
Open House BoardsOpen House Boards
Open House Boards
 
Dec 7 12_2017_public_mtg - final
Dec 7 12_2017_public_mtg - finalDec 7 12_2017_public_mtg - final
Dec 7 12_2017_public_mtg - final
 
Public Comment Meeting-January 2018 Proposed Service Change
Public Comment Meeting-January 2018 Proposed Service ChangePublic Comment Meeting-January 2018 Proposed Service Change
Public Comment Meeting-January 2018 Proposed Service Change
 
January 2018 Service Change Public Info Meeting
January 2018 Service Change Public Info MeetingJanuary 2018 Service Change Public Info Meeting
January 2018 Service Change Public Info Meeting
 
May 2018 Public Comment Meeting Presentation
May 2018 Public Comment Meeting PresentationMay 2018 Public Comment Meeting Presentation
May 2018 Public Comment Meeting Presentation
 
Public Comment Meeting-September 2017 Proposed Service Changes
Public Comment Meeting-September 2017 Proposed Service ChangesPublic Comment Meeting-September 2017 Proposed Service Changes
Public Comment Meeting-September 2017 Proposed Service Changes
 
May 2018 Service Change Public Info Meeting
May 2018 Service Change Public Info MeetingMay 2018 Service Change Public Info Meeting
May 2018 Service Change Public Info Meeting
 
September Service Change Public Comment Meetings
September Service Change Public Comment MeetingsSeptember Service Change Public Comment Meetings
September Service Change Public Comment Meetings
 
Public Information Meeting-August 2017
Public Information Meeting-August 2017Public Information Meeting-August 2017
Public Information Meeting-August 2017
 
Dec 3 10_2013_public_mtg_projects_update final
Dec 3 10_2013_public_mtg_projects_update finalDec 3 10_2013_public_mtg_projects_update final
Dec 3 10_2013_public_mtg_projects_update final
 
May 2015 PROPOSED Service Changes
May 2015 PROPOSED Service ChangesMay 2015 PROPOSED Service Changes
May 2015 PROPOSED Service Changes
 
January 2015 Public Information Meetings
January 2015 Public Information MeetingsJanuary 2015 Public Information Meetings
January 2015 Public Information Meetings
 
Local projects update,
Local projects update,Local projects update,
Local projects update,
 
Sept 17 26_2013_public_mtg_v3
Sept 17 26_2013_public_mtg_v3Sept 17 26_2013_public_mtg_v3
Sept 17 26_2013_public_mtg_v3
 
Flagler street-enhanced-bus-service-presentation-2014-12
Flagler street-enhanced-bus-service-presentation-2014-12Flagler street-enhanced-bus-service-presentation-2014-12
Flagler street-enhanced-bus-service-presentation-2014-12
 
PROPOSED January 2015 Service Change Public Comment Meeting
PROPOSED January 2015 Service Change Public Comment MeetingPROPOSED January 2015 Service Change Public Comment Meeting
PROPOSED January 2015 Service Change Public Comment Meeting
 
Jasper Downtown/Riverfront Plan Presentation May 21, 2014
Jasper Downtown/Riverfront Plan Presentation May 21, 2014Jasper Downtown/Riverfront Plan Presentation May 21, 2014
Jasper Downtown/Riverfront Plan Presentation May 21, 2014
 
Winter 2017 Proposed Service Changes
Winter 2017 Proposed Service ChangesWinter 2017 Proposed Service Changes
Winter 2017 Proposed Service Changes
 
Fairfax Connector June 2016 Service Change Proposal
Fairfax Connector June 2016 Service Change ProposalFairfax Connector June 2016 Service Change Proposal
Fairfax Connector June 2016 Service Change Proposal
 
Fairfax Connector: January 2015 Proposed Service Changes
Fairfax Connector: January 2015 Proposed Service ChangesFairfax Connector: January 2015 Proposed Service Changes
Fairfax Connector: January 2015 Proposed Service Changes
 

Similaire à May 2016 Service Change Public Comment Meeting

Proposed May 2014 Service Changes
Proposed May 2014 Service ChangesProposed May 2014 Service Changes
Proposed May 2014 Service Changescotabus
 
Apr8 10 2014_public_mtg_draft3
Apr8 10 2014_public_mtg_draft3Apr8 10 2014_public_mtg_draft3
Apr8 10 2014_public_mtg_draft3cotabus
 
September 2015 Public Information Meeting
September 2015 Public Information MeetingSeptember 2015 Public Information Meeting
September 2015 Public Information MeetingCOTA BUS
 
May 2015 Public Information Meeting
May 2015 Public Information MeetingMay 2015 Public Information Meeting
May 2015 Public Information MeetingCOTA BUS
 
Aug12 19 2014_public_mtg_draft_v4
Aug12 19 2014_public_mtg_draft_v4Aug12 19 2014_public_mtg_draft_v4
Aug12 19 2014_public_mtg_draft_v4COTA BUS
 
PROPOSED September Service Change Meetings
PROPOSED September Service Change MeetingsPROPOSED September Service Change Meetings
PROPOSED September Service Change MeetingsCOTA BUS
 
COTA Public Comment Meeting-Jan. 17
COTA Public Comment Meeting-Jan. 17COTA Public Comment Meeting-Jan. 17
COTA Public Comment Meeting-Jan. 17COTA BUS
 
January service change final page spread
January service change final page spreadJanuary service change final page spread
January service change final page spreadcotabus
 
September Proposed Service Changes June13, 2013
September Proposed Service Changes June13, 2013September Proposed Service Changes June13, 2013
September Proposed Service Changes June13, 2013COTA BUS
 
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...Fairfax County
 
Planning for operations in Queensland
Planning for operations in QueenslandPlanning for operations in Queensland
Planning for operations in QueenslandJumpingJaq
 
Lafayette Elementary School Community Meeting Presentation (March 9, 2016)
Lafayette Elementary School Community Meeting Presentation (March 9, 2016)Lafayette Elementary School Community Meeting Presentation (March 9, 2016)
Lafayette Elementary School Community Meeting Presentation (March 9, 2016)DC Department of General Services
 
4.20.16 Corona City Council 91 Project Update
4.20.16 Corona City Council 91 Project Update4.20.16 Corona City Council 91 Project Update
4.20.16 Corona City Council 91 Project UpdateCity of Corona
 

Similaire à May 2016 Service Change Public Comment Meeting (13)

Proposed May 2014 Service Changes
Proposed May 2014 Service ChangesProposed May 2014 Service Changes
Proposed May 2014 Service Changes
 
Apr8 10 2014_public_mtg_draft3
Apr8 10 2014_public_mtg_draft3Apr8 10 2014_public_mtg_draft3
Apr8 10 2014_public_mtg_draft3
 
September 2015 Public Information Meeting
September 2015 Public Information MeetingSeptember 2015 Public Information Meeting
September 2015 Public Information Meeting
 
May 2015 Public Information Meeting
May 2015 Public Information MeetingMay 2015 Public Information Meeting
May 2015 Public Information Meeting
 
Aug12 19 2014_public_mtg_draft_v4
Aug12 19 2014_public_mtg_draft_v4Aug12 19 2014_public_mtg_draft_v4
Aug12 19 2014_public_mtg_draft_v4
 
PROPOSED September Service Change Meetings
PROPOSED September Service Change MeetingsPROPOSED September Service Change Meetings
PROPOSED September Service Change Meetings
 
COTA Public Comment Meeting-Jan. 17
COTA Public Comment Meeting-Jan. 17COTA Public Comment Meeting-Jan. 17
COTA Public Comment Meeting-Jan. 17
 
January service change final page spread
January service change final page spreadJanuary service change final page spread
January service change final page spread
 
September Proposed Service Changes June13, 2013
September Proposed Service Changes June13, 2013September Proposed Service Changes June13, 2013
September Proposed Service Changes June13, 2013
 
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...
 
Planning for operations in Queensland
Planning for operations in QueenslandPlanning for operations in Queensland
Planning for operations in Queensland
 
Lafayette Elementary School Community Meeting Presentation (March 9, 2016)
Lafayette Elementary School Community Meeting Presentation (March 9, 2016)Lafayette Elementary School Community Meeting Presentation (March 9, 2016)
Lafayette Elementary School Community Meeting Presentation (March 9, 2016)
 
4.20.16 Corona City Council 91 Project Update
4.20.16 Corona City Council 91 Project Update4.20.16 Corona City Council 91 Project Update
4.20.16 Corona City Council 91 Project Update
 

Plus de COTA BUS

Fare Adjustment Public Meeting
Fare Adjustment Public MeetingFare Adjustment Public Meeting
Fare Adjustment Public MeetingCOTA BUS
 
COTA NextGen-Executive Summary
COTA NextGen-Executive SummaryCOTA NextGen-Executive Summary
COTA NextGen-Executive SummaryCOTA BUS
 
COTA NextGen-Executive Summary
COTA NextGen-Executive SummaryCOTA NextGen-Executive Summary
COTA NextGen-Executive SummaryCOTA BUS
 
COTA NextGen-Phase II Public Forum
COTA NextGen-Phase II Public ForumCOTA NextGen-Phase II Public Forum
COTA NextGen-Phase II Public ForumCOTA BUS
 
CMAX Public Art
CMAX Public ArtCMAX Public Art
CMAX Public ArtCOTA BUS
 
COTA NextGen Evaluation Framework
COTA NextGen Evaluation FrameworkCOTA NextGen Evaluation Framework
COTA NextGen Evaluation FrameworkCOTA BUS
 
TSR Fall Meetings Presentation
TSR Fall Meetings PresentationTSR Fall Meetings Presentation
TSR Fall Meetings PresentationCOTA BUS
 
COTA NextGen Online Public Meeting
COTA NextGen Online Public MeetingCOTA NextGen Online Public Meeting
COTA NextGen Online Public MeetingCOTA BUS
 
CMAX Cleveland Avenue BRT Public Meeting
CMAX Cleveland Avenue BRT Public MeetingCMAX Cleveland Avenue BRT Public Meeting
CMAX Cleveland Avenue BRT Public MeetingCOTA BUS
 
NextGen Project Advisory Group Meeting 2 - May 20, 2015
NextGen Project Advisory Group Meeting 2 - May 20, 2015NextGen Project Advisory Group Meeting 2 - May 20, 2015
NextGen Project Advisory Group Meeting 2 - May 20, 2015COTA BUS
 
COTA Transit System Review - Final Report
COTA Transit System Review - Final ReportCOTA Transit System Review - Final Report
COTA Transit System Review - Final ReportCOTA BUS
 

Plus de COTA BUS (11)

Fare Adjustment Public Meeting
Fare Adjustment Public MeetingFare Adjustment Public Meeting
Fare Adjustment Public Meeting
 
COTA NextGen-Executive Summary
COTA NextGen-Executive SummaryCOTA NextGen-Executive Summary
COTA NextGen-Executive Summary
 
COTA NextGen-Executive Summary
COTA NextGen-Executive SummaryCOTA NextGen-Executive Summary
COTA NextGen-Executive Summary
 
COTA NextGen-Phase II Public Forum
COTA NextGen-Phase II Public ForumCOTA NextGen-Phase II Public Forum
COTA NextGen-Phase II Public Forum
 
CMAX Public Art
CMAX Public ArtCMAX Public Art
CMAX Public Art
 
COTA NextGen Evaluation Framework
COTA NextGen Evaluation FrameworkCOTA NextGen Evaluation Framework
COTA NextGen Evaluation Framework
 
TSR Fall Meetings Presentation
TSR Fall Meetings PresentationTSR Fall Meetings Presentation
TSR Fall Meetings Presentation
 
COTA NextGen Online Public Meeting
COTA NextGen Online Public MeetingCOTA NextGen Online Public Meeting
COTA NextGen Online Public Meeting
 
CMAX Cleveland Avenue BRT Public Meeting
CMAX Cleveland Avenue BRT Public MeetingCMAX Cleveland Avenue BRT Public Meeting
CMAX Cleveland Avenue BRT Public Meeting
 
NextGen Project Advisory Group Meeting 2 - May 20, 2015
NextGen Project Advisory Group Meeting 2 - May 20, 2015NextGen Project Advisory Group Meeting 2 - May 20, 2015
NextGen Project Advisory Group Meeting 2 - May 20, 2015
 
COTA Transit System Review - Final Report
COTA Transit System Review - Final ReportCOTA Transit System Review - Final Report
COTA Transit System Review - Final Report
 

Dernier

Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Chameera Dedduwage
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024eCommerce Institute
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...Sheetaleventcompany
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxraffaeleoman
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxmohammadalnahdi22
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Delhi Call girls
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesPooja Nehwal
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfSenaatti-kiinteistöt
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsaqsarehman5055
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024eCommerce Institute
 
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyPooja Nehwal
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMoumonDas2
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar TrainingKylaCullinane
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AITatiana Gurgel
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxNikitaBankoti2
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaKayode Fayemi
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardsticksaastr
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Kayode Fayemi
 

Dernier (20)

Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animals
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
 
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptx
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar Training
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AI
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
 

May 2016 Service Change Public Comment Meeting

  • 1. MAY 2016 PROPOSED SERVICE CHANGES Public Comment Meetings January 21 & 26, 2016
  • 2. 2 MEETING PURPOSE Thank you for joining us and participating in this community discussion. The purpose of this meeting is to take public comments on proposed service changes that will be effective on Monday, May 2, 2016. No final decisions have been made.
  • 3. 3 MEETING POLICIES Be considerate of meeting attendees and COTA staff – please silence cell phones and other technology When it is your turn to make a comment or ask a question, please remain at your seat and we will call on you Ask one question at a time so the appropriate COTA staff member may address your comment Comments and questions are limited to two (2) minutes per person Participants are encouraged to complete comment cards
  • 4. 4 TIMELINES COTA modifies service three times per year – the first Monday of: • January • May • September May 2016 changes will begin on Monday, May 2
  • 5. TRAVEL TIMES May 2016 Proposed Service Changes
  • 6. 6 TRAVEL TIME ADJUSTMENTS Travel times are proposed to be adjusted to improve on-time service on the following lines: Local • 2 E Main/N High (Weekday) • 6 Mt Vernon/Sullivant (All Days) • 7 Neil (Weekday) • 15 Grove City (All Days) • 19 Arlington/Grandview (Weekday) Crosstown • 2L Crosswoods/Polaris (All Days) • 81 Hudson St (All Days) • 83 Oakland/Weber (All Days) All travel time adjustments are tentative
  • 7. IMPROVED AND NEW SERVICE May 2016 Proposed Service Changes
  • 8. 8 PROPOSED NEW SERVICE: DOWNTOWN-PORT COLUMBUS AIRPORT Goal: Provide direct service between the Airport and Downtown hotels and convention center 30 minute service, 7 days a week, approximately 6am-9pm
  • 9. 9 PROPOSED IMPROVED SERVICE: INCREASED FREQUENCY ON 2L Goal: Increase frequency on 2L Crosswoods/Polaris Frequency Improvement: Increase from 60 minutes to 30 minutes
  • 10. 10 SEASONAL SERVICE: 98 ZOO BUS Goal: Provide direct service between the Columbus Zoo & Aquarium and Downtown, in order to ease access to this regional asset for families in our community Seasonal Service: Saturday, May 7 – Monday, September 5 • Weekend service proposed to begin on Saturday, May 7 • Weekday Zoo service proposed to begin on Monday, May 30 (Memorial Day) • Service runs through Monday, September 5 (Labor Day)
  • 11. 11 MAY 2016 PROPOSED SERVICE CHANGES Questions about proposed May 2016 Service Changes?
  • 12. TEMPORARY CONSTRUCTION- RELATED REROUTES May 2016 Proposed Service Changes
  • 13. 13 TEMPORARY STOP CHANGE: 6 MT VERNON & 92 JAMES/STELZER Goal: Maintain access to VA Ambulatory Care Center during facility construction at VA Ambulatory Care Center Proposed Stop Change: Starting in April, Line 6 (Local) and Line 92 (Crosstown) will have a temporary stop location on the northeast side of the hospital for approximately 8 months Current Stop Location Temporary Stop Location
  • 14. RELATED COTA INITIATIVES & PROJECTS May 2016 Proposed Service Changes
  • 15. 15 CMAX CLEVELAND AVENUE BRT / ENHANCED BUS SERVICE Goal: Provide rapid transit service along Cleveland Avenue, the second busiest transit corridor in the system Update: • Congress has approved 80% grant funding of capital cost (approximately $38 million in funding) • Negotiating grant agreement with Federal Transit Administration • Conducting real estate acquisitions • Pre-construction outreach begins in March • Implement service in September 2017 Project information sheet available at today’s sign-in desk For more information visit COTABRT.com
  • 16. 16 Update: • Not restrained by mode or funding • Project and initiatives identified and prioritized by the public (you!) • Final Report will recommend implementation strategies for community – COTA, public agencies, private sector • Phase 3 Outreach will begin in March with community forums held in early April We are here NEXTGEN Goal: Vision for the future of transit – 2025, 2040 & 2050