SlideShare une entreprise Scribd logo
1  sur  33
Washington Twp. Fire & Rescue
 Provides information on NFPA 1001, Standards
for Fire Fighter Professional Qualifications
Objectives
 Describe the effects of fire and suppression
activities on the common building materials.
 Describe items to be observed during size-up of
a building.
 Describe dangerous building conditions
created by a fire or by actions taken while
trying to extinguish a fire.
Objectives Continued
 Identify indicators of building collapse.
 Describe actions to take when imminent
building collapse is suspected.
 Describe building conditions that create
additional risk in construction, renovation, and
demolition.
IC's, fire officers, and firefighters must be able
to identify the buildings in which they fight
fires. Fire behavior, fire travel, and the
potential for structural failure are critical pieces
of information that can be gained simply by
reading a building and understanding
construction characteristics for each
classification or type of building.
 The stability of a structure is dependent on the
structural elements designed, engineered, and
installed to support the total weight of the
structure and its contents.
 Every ounce of the structure's weight and the
weight of its contents is applying pressure, and
gravity is constantly trying to pull it to the
ground.
Review
Type I
Know as fire-resistive construction,
it maintains its structural integrity
during a fire. Intended to allow
occupants time to exit a building.
This construction consists mainly of
reinforced concrete with structural
members that retard the spread of
fire through the building. The
primary fire hazard in this
construction is the interior finishes.
Strengths
 Resists direct flame impingement
 Confines fire well
 Little collapse potential from the
effects of fire alone
 Impervious to water damage.
Weaknesses
 Difficult to breach for escape/access
 Difficult to ventilate
 Massive debris following collapse
 Floors, ceilings, and walls retain
heat
Type II
Known as noncombustible
construction, it is made up of the
same materials as fire-resistive
construction except that the
components lack the insulation or
other protection of a type I. It has a
rating on all parts of the structure.
Materials like wood can only be
used in limited quantities. Heat
build up can cause members to fail.
Fire extension to the roof can lead to
eventual roof involve and fail.
Strengths
 Almost as resistive to fire as Type I
 Confines fire well
 Almost as structurally stable as
Type I
 Easier to vertically vent than Type I
Weaknesses
 Difficult to breach for access/escape
 Unprotected steel can fail due to
heat
 Roof less stable than Type I
 Steel components subject to
weakening by rust and corrosion
 Massive debris following collapse
Type III
Know as ordinary
construction, it requires that
the exterior walls and
structural members be made
of noncombustible or limited
combustible materials such
as concrete, clay, and brick.
The primary fire concern
specific to this construction
is the problem with fire and
smoke spreading through
concealed spaces. Fire stops
can help reduce with this
spread.
Strengths
 Resists fire spread from
outside
 Relatively easy to vertically
ventilate
Weaknesses
 Interior structural members
vulnerable to fire
involvement
 Fire spread potential through
concealed spaces
 Susceptible to water damage
Type IV
Known as heavy-timber
construction, it requires that exterior
and interior walls and associated
members be made of
noncombustible or limited
combustible materials. Type IV was
used extensively in old factories,
mills, churches; but is rarely used
today. Primary fire hazard is the
massive amount of combustible
contents from the members as well
as content. Although Type IV
remains stable for long periods of
time under a fire condition, they
give off tremendous amounts of
heat.
Strengths
 Resists collapse due to flame
impingement
 Stable
 Relatively easy to ventilate
 Relatively easy to breach for
access/escape
 Manageable debris following collapse
Weaknesses
 Susceptible to fire spread from the
outside
 Potential for fire spread to other
structures
 Susceptible to rapid interior flame spread
 Susceptible to water damage
Type V
Know as wood-frame construction,
its walls, floors, roofs, and other
supports are made completely or
partially of wood or materials of
smaller dimension than Type IV.
Most common type of construction.
Used to construct most single-family
residence. It has the highest
potential for fire extension.
Strengths
 Easy to breach
 Resistant to collapse from
earthquakes due to its light weight
and flexibility
 Collapse debris is relatively easy to
manage
Weaknesses
 Susceptible to fire spread from the
outside
 Susceptible to rapid flame spread
inside
 Susceptible to total collapse due to
fire of explosion
 Susceptible to water damage
Size Up
The size up of a structure is one of the first tasks to
be completed by the first-in company. It allows all
incoming units to have an idea of what they are
about to arrive to. It also has a large roll in giving a
firefighter a “situational awareness” plan. The
incoming companies will arrive and be able to start
their assigned tasks quicker knowing what they
dealing with, and not have to take the extra time
looking at and assessing the situation.
Size Up, continued
Things the firefighters need to take into account in the size up, and may
add to the broadcast are:
 Age of the building (are there signs of weathering or deterioration?)
 Construction materials (is it all metal, concrete, brick with cable tattle-
tails?)
 Roof type (is it arched or lightweight?)
 Renovations or modifications (have rooms or sections been added,
facades or false ceilings?)
 Dead loads (are there large HVAC units, water tanks, or heavy objects on
the roof?)
 Exposures
 Occupancy type
 Other visible hazards
 Building construction information is a key part
of size-up.
 Proper identification of the building and its
occupancy will provide valuable information.
Utilities and building services:
 Plumbing
 Electrical
 Heating
 Air conditioning
 Ventilation for restrooms
 Stair systems
 Elevators
 Fire protection systems
These items should be recorded on a Pre-Fire Plan.
Dangerous Building Conditions
There are two primary types of dangerous
building conditions that may be posed by a
building
 Conditions that contribute to the spread
and/or add to the intensity of the fire
 Conditions that make the building susceptible
to collapse
Other dangerous building conditions
 Fire loading
 Combustible furnishings and finishes
 Roof coverings
 Wooden floors and ceilings
 Large, open spaces
 Water weight
Give examples to each above
Collapse
All firefighter should have knowledge of the indicators of
building collapse. We all know that collapse is possible whenever
there is heavy fire involvement, high heat, and excessive water
usage. Some other indicators are:
 Cracks or separations in walls, floors, ceilings, and roof structures
 Evidence of existing structural instability such as the presence or
tie rods or star that hold walls together
 Loose bricks, blocks, or stones or the debris around the structure
 Deteriorated mortar between masonry
 Walls that appear to be leaning
 Structural members that appear distorted
Collapse, continued
Material that can support/add to collapse:
 Gusset plates/gang nails
 Steel or wooden trusses
 Bowstring construction
 Wooden I-beams
 Glues
*Note*
As units arrive, it is the OIC, truck officer’s and
engineer’s responsibility to insure the
placement of the apparatus is out of the
collapse zone and that the equipment and
personnel are in a safe area.
Construction, Renovation, and Abandoned Hazards
Buildings under construction, renovation or
abandoned are extremely vulnerable to fire due to the
building materials are open and exposed. Dry wall and
other coverings are not yet installed or are just missing.
There are a lack of doors and other barriers that would
normally slow fire spread. Other contributing factors
are the additional fire loads and ignition sources
brought by contractors and their associated equipment.
Voids and concealed spaces are created such as rain
roofs (second roof installed over an old roof) installed
in roofs that are beyond repair, mansard fascias, and
secondary floors.
Summary
Failure to recognize the potential dangers of a type
of construction and effects that fire, heat, and
water play may have on it, can be catastrophic to
firefighters. For everyone's safety we all must have
the basic knowledge of building construction.
Knowledge of methods, materials, and designs and
how anything we do any effect the building
(ventilation, water suppression, breaching, ect).
This information will help promote a safer and
more effective fire attack.

Contenu connexe

Tendances

PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
Sagar Shah
 
Design of Blast resistance structures
Design of Blast resistance structuresDesign of Blast resistance structures
Design of Blast resistance structures
Sneha Kaira
 
Advanced material of construction..ppt24545452
Advanced material of construction..ppt24545452Advanced material of construction..ppt24545452
Advanced material of construction..ppt24545452
SHUBHAM DABHADE
 

Tendances (20)

Introduction to Building Materials
Introduction to Building MaterialsIntroduction to Building Materials
Introduction to Building Materials
 
Blast resistant structure
Blast resistant structureBlast resistant structure
Blast resistant structure
 
Type of structural joints
Type of structural joints Type of structural joints
Type of structural joints
 
Expansion joints
Expansion jointsExpansion joints
Expansion joints
 
Fire resistance of building
Fire resistance of buildingFire resistance of building
Fire resistance of building
 
Structural lightweight concrete
Structural lightweight concreteStructural lightweight concrete
Structural lightweight concrete
 
Topic plastic as building material (flooring & wall finishes)
Topic plastic as building material (flooring & wall finishes)Topic plastic as building material (flooring & wall finishes)
Topic plastic as building material (flooring & wall finishes)
 
walls Construction.ppt
walls Construction.pptwalls Construction.ppt
walls Construction.ppt
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
Building Materials And Construction
Building Materials And ConstructionBuilding Materials And Construction
Building Materials And Construction
 
blast resistant structures
blast resistant structuresblast resistant structures
blast resistant structures
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
 
Steel buildings
Steel buildings  Steel buildings
Steel buildings
 
Design of Blast resistance structures
Design of Blast resistance structuresDesign of Blast resistance structures
Design of Blast resistance structures
 
Brick masonry and stone masonry
Brick masonry and stone masonryBrick masonry and stone masonry
Brick masonry and stone masonry
 
Introduction to Blockwork
Introduction to BlockworkIntroduction to Blockwork
Introduction to Blockwork
 
Timber frame construction presentation`gr
Timber frame construction presentation`grTimber frame construction presentation`gr
Timber frame construction presentation`gr
 
Advanced material of construction..ppt24545452
Advanced material of construction..ppt24545452Advanced material of construction..ppt24545452
Advanced material of construction..ppt24545452
 
Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC)
 
BUILDING CONSTRUCTION PROJECT 1
BUILDING CONSTRUCTION PROJECT 1BUILDING CONSTRUCTION PROJECT 1
BUILDING CONSTRUCTION PROJECT 1
 

En vedette

Ch 12 Specific Occupancy Details and Hazards
Ch 12 Specific Occupancy Details and HazardsCh 12 Specific Occupancy Details and Hazards
Ch 12 Specific Occupancy Details and Hazards
snoshoesam
 
Ch 03 Methods and Materials of Construction, Renovation, and Demolition
Ch 03 Methods and Materials of Construction, Renovation, and DemolitionCh 03 Methods and Materials of Construction, Renovation, and Demolition
Ch 03 Methods and Materials of Construction, Renovation, and Demolition
snoshoesam
 
Ch 9 Noncombustible Construction
Ch 9 Noncombustible ConstructionCh 9 Noncombustible Construction
Ch 9 Noncombustible Construction
snoshoesam
 
Ch 01 Introduction
Ch 01 IntroductionCh 01 Introduction
Ch 01 Introduction
snoshoesam
 
Ch 02 Concepts of Construction
Ch 02 Concepts of ConstructionCh 02 Concepts of Construction
Ch 02 Concepts of Construction
snoshoesam
 
Ch 8 Ordinary Construction
Ch 8 Ordinary ConstructionCh 8 Ordinary Construction
Ch 8 Ordinary Construction
snoshoesam
 
Chapter 04
Chapter 04Chapter 04
Chapter 04
Joe
 

En vedette (16)

Ch 12 Specific Occupancy Details and Hazards
Ch 12 Specific Occupancy Details and HazardsCh 12 Specific Occupancy Details and Hazards
Ch 12 Specific Occupancy Details and Hazards
 
Ch11 ppt
Ch11 pptCh11 ppt
Ch11 ppt
 
Chapter 01-American Fire Service: Past, Present, and Future
Chapter 01-American Fire Service: Past, Present, and FutureChapter 01-American Fire Service: Past, Present, and Future
Chapter 01-American Fire Service: Past, Present, and Future
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Ch 03 Methods and Materials of Construction, Renovation, and Demolition
Ch 03 Methods and Materials of Construction, Renovation, and DemolitionCh 03 Methods and Materials of Construction, Renovation, and Demolition
Ch 03 Methods and Materials of Construction, Renovation, and Demolition
 
Ch 9 Noncombustible Construction
Ch 9 Noncombustible ConstructionCh 9 Noncombustible Construction
Ch 9 Noncombustible Construction
 
Ch 01 Introduction
Ch 01 IntroductionCh 01 Introduction
Ch 01 Introduction
 
Chapter 2 pp
Chapter 2 ppChapter 2 pp
Chapter 2 pp
 
Ch 02 Concepts of Construction
Ch 02 Concepts of ConstructionCh 02 Concepts of Construction
Ch 02 Concepts of Construction
 
Ch 8 Ordinary Construction
Ch 8 Ordinary ConstructionCh 8 Ordinary Construction
Ch 8 Ordinary Construction
 
Chapter 04
Chapter 04Chapter 04
Chapter 04
 
Chapter 14
Chapter 14Chapter 14
Chapter 14
 
Ch12 ppt
Ch12 pptCh12 ppt
Ch12 ppt
 
Chapter 14
Chapter 14Chapter 14
Chapter 14
 
Rapid intervention teams 1 08
Rapid intervention teams 1 08Rapid intervention teams 1 08
Rapid intervention teams 1 08
 
Building construction
Building constructionBuilding construction
Building construction
 

Similaire à Building construction

Construction types
Construction typesConstruction types
Construction types
Tala Jazzy
 
fire resistive construction
fire resistive constructionfire resistive construction
fire resistive construction
aman kumar
 
Chapter 6
Chapter 6Chapter 6
Chapter 6
Est
 

Similaire à Building construction (20)

Construction types
Construction typesConstruction types
Construction types
 
fire resistive construction
fire resistive constructionfire resistive construction
fire resistive construction
 
Fire guidelines by nbc part 2
Fire guidelines by nbc part 2Fire guidelines by nbc part 2
Fire guidelines by nbc part 2
 
BCT - Module 5 special treatment part 3
BCT - Module 5 special treatment part 3BCT - Module 5 special treatment part 3
BCT - Module 5 special treatment part 3
 
Building Construction and the Fire Service
Building Construction and the Fire ServiceBuilding Construction and the Fire Service
Building Construction and the Fire Service
 
Free video lectures for b.tech
Free video lectures for b.techFree video lectures for b.tech
Free video lectures for b.tech
 
types of Building & components of building.pptx
types of Building & components of building.pptxtypes of Building & components of building.pptx
types of Building & components of building.pptx
 
Classification and components of building.pptx
Classification and components of building.pptxClassification and components of building.pptx
Classification and components of building.pptx
 
Building construction ppt
Building construction pptBuilding construction ppt
Building construction ppt
 
buildingconstructionppt-160831195359.pdf
buildingconstructionppt-160831195359.pdfbuildingconstructionppt-160831195359.pdf
buildingconstructionppt-160831195359.pdf
 
Strip Mall Fire Tactics & Strategies
Strip Mall Fire Tactics & StrategiesStrip Mall Fire Tactics & Strategies
Strip Mall Fire Tactics & Strategies
 
Fire resistive construction
Fire resistive constructionFire resistive construction
Fire resistive construction
 
MDC.pptx
MDC.pptxMDC.pptx
MDC.pptx
 
Chapter 06
Chapter 06Chapter 06
Chapter 06
 
Fire resistant material
Fire resistant materialFire resistant material
Fire resistant material
 
Lecture 1 Building types and components of building.pptx
Lecture 1 Building types and components of building.pptxLecture 1 Building types and components of building.pptx
Lecture 1 Building types and components of building.pptx
 
Chapter 6
Chapter 6Chapter 6
Chapter 6
 
Defects in buildings & remedies
Defects in buildings & remediesDefects in buildings & remedies
Defects in buildings & remedies
 
Basic requirements of building as a whole
Basic requirements of building as a whole Basic requirements of building as a whole
Basic requirements of building as a whole
 
Chapter 12 special treatments
Chapter 12 special treatmentsChapter 12 special treatments
Chapter 12 special treatments
 

Dernier

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 

Dernier (20)

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 

Building construction

  • 2.  Provides information on NFPA 1001, Standards for Fire Fighter Professional Qualifications
  • 3. Objectives  Describe the effects of fire and suppression activities on the common building materials.  Describe items to be observed during size-up of a building.  Describe dangerous building conditions created by a fire or by actions taken while trying to extinguish a fire.
  • 4. Objectives Continued  Identify indicators of building collapse.  Describe actions to take when imminent building collapse is suspected.  Describe building conditions that create additional risk in construction, renovation, and demolition.
  • 5. IC's, fire officers, and firefighters must be able to identify the buildings in which they fight fires. Fire behavior, fire travel, and the potential for structural failure are critical pieces of information that can be gained simply by reading a building and understanding construction characteristics for each classification or type of building.
  • 6.  The stability of a structure is dependent on the structural elements designed, engineered, and installed to support the total weight of the structure and its contents.  Every ounce of the structure's weight and the weight of its contents is applying pressure, and gravity is constantly trying to pull it to the ground.
  • 7. Review Type I Know as fire-resistive construction, it maintains its structural integrity during a fire. Intended to allow occupants time to exit a building. This construction consists mainly of reinforced concrete with structural members that retard the spread of fire through the building. The primary fire hazard in this construction is the interior finishes. Strengths  Resists direct flame impingement  Confines fire well  Little collapse potential from the effects of fire alone  Impervious to water damage. Weaknesses  Difficult to breach for escape/access  Difficult to ventilate  Massive debris following collapse  Floors, ceilings, and walls retain heat
  • 8.
  • 9. Type II Known as noncombustible construction, it is made up of the same materials as fire-resistive construction except that the components lack the insulation or other protection of a type I. It has a rating on all parts of the structure. Materials like wood can only be used in limited quantities. Heat build up can cause members to fail. Fire extension to the roof can lead to eventual roof involve and fail. Strengths  Almost as resistive to fire as Type I  Confines fire well  Almost as structurally stable as Type I  Easier to vertically vent than Type I Weaknesses  Difficult to breach for access/escape  Unprotected steel can fail due to heat  Roof less stable than Type I  Steel components subject to weakening by rust and corrosion  Massive debris following collapse
  • 10.
  • 11. Type III Know as ordinary construction, it requires that the exterior walls and structural members be made of noncombustible or limited combustible materials such as concrete, clay, and brick. The primary fire concern specific to this construction is the problem with fire and smoke spreading through concealed spaces. Fire stops can help reduce with this spread. Strengths  Resists fire spread from outside  Relatively easy to vertically ventilate Weaknesses  Interior structural members vulnerable to fire involvement  Fire spread potential through concealed spaces  Susceptible to water damage
  • 12.
  • 13. Type IV Known as heavy-timber construction, it requires that exterior and interior walls and associated members be made of noncombustible or limited combustible materials. Type IV was used extensively in old factories, mills, churches; but is rarely used today. Primary fire hazard is the massive amount of combustible contents from the members as well as content. Although Type IV remains stable for long periods of time under a fire condition, they give off tremendous amounts of heat. Strengths  Resists collapse due to flame impingement  Stable  Relatively easy to ventilate  Relatively easy to breach for access/escape  Manageable debris following collapse Weaknesses  Susceptible to fire spread from the outside  Potential for fire spread to other structures  Susceptible to rapid interior flame spread  Susceptible to water damage
  • 14.
  • 15. Type V Know as wood-frame construction, its walls, floors, roofs, and other supports are made completely or partially of wood or materials of smaller dimension than Type IV. Most common type of construction. Used to construct most single-family residence. It has the highest potential for fire extension. Strengths  Easy to breach  Resistant to collapse from earthquakes due to its light weight and flexibility  Collapse debris is relatively easy to manage Weaknesses  Susceptible to fire spread from the outside  Susceptible to rapid flame spread inside  Susceptible to total collapse due to fire of explosion  Susceptible to water damage
  • 16.
  • 17.
  • 18.
  • 19. Size Up The size up of a structure is one of the first tasks to be completed by the first-in company. It allows all incoming units to have an idea of what they are about to arrive to. It also has a large roll in giving a firefighter a “situational awareness” plan. The incoming companies will arrive and be able to start their assigned tasks quicker knowing what they dealing with, and not have to take the extra time looking at and assessing the situation.
  • 20. Size Up, continued Things the firefighters need to take into account in the size up, and may add to the broadcast are:  Age of the building (are there signs of weathering or deterioration?)  Construction materials (is it all metal, concrete, brick with cable tattle- tails?)  Roof type (is it arched or lightweight?)  Renovations or modifications (have rooms or sections been added, facades or false ceilings?)  Dead loads (are there large HVAC units, water tanks, or heavy objects on the roof?)  Exposures  Occupancy type  Other visible hazards
  • 21.  Building construction information is a key part of size-up.  Proper identification of the building and its occupancy will provide valuable information.
  • 22.
  • 23. Utilities and building services:  Plumbing  Electrical  Heating  Air conditioning  Ventilation for restrooms  Stair systems  Elevators  Fire protection systems These items should be recorded on a Pre-Fire Plan.
  • 24. Dangerous Building Conditions There are two primary types of dangerous building conditions that may be posed by a building  Conditions that contribute to the spread and/or add to the intensity of the fire  Conditions that make the building susceptible to collapse
  • 25. Other dangerous building conditions  Fire loading  Combustible furnishings and finishes  Roof coverings  Wooden floors and ceilings  Large, open spaces  Water weight Give examples to each above
  • 26. Collapse All firefighter should have knowledge of the indicators of building collapse. We all know that collapse is possible whenever there is heavy fire involvement, high heat, and excessive water usage. Some other indicators are:  Cracks or separations in walls, floors, ceilings, and roof structures  Evidence of existing structural instability such as the presence or tie rods or star that hold walls together  Loose bricks, blocks, or stones or the debris around the structure  Deteriorated mortar between masonry  Walls that appear to be leaning  Structural members that appear distorted
  • 27. Collapse, continued Material that can support/add to collapse:  Gusset plates/gang nails  Steel or wooden trusses  Bowstring construction  Wooden I-beams  Glues
  • 28.
  • 29.
  • 30.
  • 31. *Note* As units arrive, it is the OIC, truck officer’s and engineer’s responsibility to insure the placement of the apparatus is out of the collapse zone and that the equipment and personnel are in a safe area.
  • 32. Construction, Renovation, and Abandoned Hazards Buildings under construction, renovation or abandoned are extremely vulnerable to fire due to the building materials are open and exposed. Dry wall and other coverings are not yet installed or are just missing. There are a lack of doors and other barriers that would normally slow fire spread. Other contributing factors are the additional fire loads and ignition sources brought by contractors and their associated equipment. Voids and concealed spaces are created such as rain roofs (second roof installed over an old roof) installed in roofs that are beyond repair, mansard fascias, and secondary floors.
  • 33. Summary Failure to recognize the potential dangers of a type of construction and effects that fire, heat, and water play may have on it, can be catastrophic to firefighters. For everyone's safety we all must have the basic knowledge of building construction. Knowledge of methods, materials, and designs and how anything we do any effect the building (ventilation, water suppression, breaching, ect). This information will help promote a safer and more effective fire attack.