Nolan Creek Flood Protection
Plan – TWDB Grant Opportunity
December 6, 2016
Nolan Creek Watershed
2012 Drainage Master Plan
Nolan Creek Flood Protection Plan
Benefits
• Coordinate additional monitoring
stations along Nolan Creek and its
the tributaries.
• Develop early warning software.
• Update/amend Special Flood
Hazard Area (SFHA) maps.
Nolan Creek Flood Protection Plan
Benefits
• Positions each entity and the watershed for
participation in other grant programs to fund
some of the projects identified.
• Identify construction projects within each entity
that could lead to increased storage capacity &
water quality. These projects may assist the City
in avoiding issuance of a regulated Total
Maximum Daily Load (TMDL) by the TCEQ.
Nolan Creek Watershed
38th
2012 Drainage Master Plan
Nolan Creek Flood Protection Plan
• Regional Support of Grant Project:
▫ Bell County WCID #6
▫ Belton
▫ Brazos River Authority
▫ Harker Heights
▫ Nolanville
▫ Killeen
Nolan Creek Flood Protection Plan
Cost of Participation
• CTCOG provided a preliminary cost breakdown
for the $462,038 project based on four areas:
▫ Hydrology
▫ Hydraulics
▫ Field survey
▫ Population
• Based on those areas, the City of Killeen’s
identified portion is $146,599, which is
approximately 63.5% of the required grant
match ($231,019).
Nolan Creek Flood Protection Plan
Cost of Killeen’s Participation
• Cash Contribution: $54,227.67
• In-Kind Services: $92,371.33
Hours Expenses
GIS 489.00 $ 9,914.97
Engineering 449.00 $ 18,515.86
Environmental Services 59.00 $ 3,214.02
Drainage Engineering 364.00 $ 9,823.37
Drainage Maintenance 1,559.00 $ 29,966.74
Transportation/CIP 614.00 $ 20,936.36
Totals 3,534.00 $ 92,371.33
Nolan Creek Flood Protection Plan
Questions?

Contenu connexe

Tendances

Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...
Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...
Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...
San Diego County Water Authority
 
2016 FMA-presentation-Collaborateve FRR Projects (REV8)
2016 FMA-presentation-Collaborateve FRR Projects (REV8)2016 FMA-presentation-Collaborateve FRR Projects (REV8)
2016 FMA-presentation-Collaborateve FRR Projects (REV8)
Jason Brabec, PE, CFM
 

Tendances (20)

Wp [final]master plan may 16 workshop summary
Wp   [final]master plan may 16 workshop summaryWp   [final]master plan may 16 workshop summary
Wp [final]master plan may 16 workshop summary
 
Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...
Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...
Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...
 
Master Plan Public Hearing Presentation - January 9, 2014
Master Plan Public Hearing Presentation - January 9, 2014Master Plan Public Hearing Presentation - January 9, 2014
Master Plan Public Hearing Presentation - January 9, 2014
 
WHCRWA APWA Presentation on CIP
WHCRWA APWA Presentation on CIPWHCRWA APWA Presentation on CIP
WHCRWA APWA Presentation on CIP
 
WHCRWA Town Hall Meeting 11-10-2014
WHCRWA Town Hall Meeting 11-10-2014WHCRWA Town Hall Meeting 11-10-2014
WHCRWA Town Hall Meeting 11-10-2014
 
Bay Delta Overview - March 28, 2013
Bay Delta Overview - March 28, 2013Bay Delta Overview - March 28, 2013
Bay Delta Overview - March 28, 2013
 
Cingsa commonwealth north energy action coalition 11012012
Cingsa   commonwealth north energy action coalition 11012012Cingsa   commonwealth north energy action coalition 11012012
Cingsa commonwealth north energy action coalition 11012012
 
Delta Policy Principles - Feb. 23, 2012
Delta Policy Principles - Feb. 23, 2012Delta Policy Principles - Feb. 23, 2012
Delta Policy Principles - Feb. 23, 2012
 
Bay-Delta Conservation Plan (BDCP) Supply and Demand Risk Assessment - Jan. 9...
Bay-Delta Conservation Plan (BDCP) Supply and Demand Risk Assessment - Jan. 9...Bay-Delta Conservation Plan (BDCP) Supply and Demand Risk Assessment - Jan. 9...
Bay-Delta Conservation Plan (BDCP) Supply and Demand Risk Assessment - Jan. 9...
 
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
 
Land cover change analysis
Land cover change analysisLand cover change analysis
Land cover change analysis
 
Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...
Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...
Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...
 
TWDB Regional Planning Updates - Sarah Backhouse
TWDB Regional Planning Updates - Sarah BackhouseTWDB Regional Planning Updates - Sarah Backhouse
TWDB Regional Planning Updates - Sarah Backhouse
 
Bay Delta Conservation Plan/California WaterFix
Bay Delta Conservation Plan/California WaterFixBay Delta Conservation Plan/California WaterFix
Bay Delta Conservation Plan/California WaterFix
 
WHCRWA Town Hall and Open House 2015
WHCRWA Town Hall and Open House 2015WHCRWA Town Hall and Open House 2015
WHCRWA Town Hall and Open House 2015
 
DSD-INT 2020 Lake Turnover Assessments using Delft3D and SOBEK - van Megchelen
DSD-INT 2020 Lake Turnover Assessments using Delft3D and SOBEK - van MegchelenDSD-INT 2020 Lake Turnover Assessments using Delft3D and SOBEK - van Megchelen
DSD-INT 2020 Lake Turnover Assessments using Delft3D and SOBEK - van Megchelen
 
Bay-Delta Activities Update
Bay-Delta Activities UpdateBay-Delta Activities Update
Bay-Delta Activities Update
 
2015-2016 Bay-Delta Workplan - February 26, 2015
2015-2016 Bay-Delta Workplan - February 26, 20152015-2016 Bay-Delta Workplan - February 26, 2015
2015-2016 Bay-Delta Workplan - February 26, 2015
 
2016 FMA-presentation-Collaborateve FRR Projects (REV8)
2016 FMA-presentation-Collaborateve FRR Projects (REV8)2016 FMA-presentation-Collaborateve FRR Projects (REV8)
2016 FMA-presentation-Collaborateve FRR Projects (REV8)
 
Equivalent Grain Size Method for Sealing Capacity Assessment in CCS
Equivalent Grain Size Method for Sealing Capacity Assessment in CCSEquivalent Grain Size Method for Sealing Capacity Assessment in CCS
Equivalent Grain Size Method for Sealing Capacity Assessment in CCS
 

Similaire à RS-16-154 Nolan Creek Flood Protection Plan

Part 490 Presentation
Part 490 PresentationPart 490 Presentation
Part 490 Presentation
Amanda Post
 
Presentation_to_PMI-Calumet_Northwestern_Indiana_Region
Presentation_to_PMI-Calumet_Northwestern_Indiana_RegionPresentation_to_PMI-Calumet_Northwestern_Indiana_Region
Presentation_to_PMI-Calumet_Northwestern_Indiana_Region
Kevin Lovell, PMP
 
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
Graeme Donaldson
 

Similaire à RS-16-154 Nolan Creek Flood Protection Plan (20)

Part 490 Presentation
Part 490 PresentationPart 490 Presentation
Part 490 Presentation
 
NYC Green Infrastructure Program
NYC Green Infrastructure ProgramNYC Green Infrastructure Program
NYC Green Infrastructure Program
 
Future Watershed by Frank M. Piorko , Dir., Div. of Watershed Stewardship, DE...
Future Watershed by Frank M. Piorko , Dir., Div. of Watershed Stewardship, DE...Future Watershed by Frank M. Piorko , Dir., Div. of Watershed Stewardship, DE...
Future Watershed by Frank M. Piorko , Dir., Div. of Watershed Stewardship, DE...
 
Climate smart planning: Kingston Waterfront Flooding Task Force
Climate smart planning: Kingston Waterfront Flooding Task ForceClimate smart planning: Kingston Waterfront Flooding Task Force
Climate smart planning: Kingston Waterfront Flooding Task Force
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptx
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptx
 
Mark Cowin Same 10282009
Mark Cowin Same 10282009Mark Cowin Same 10282009
Mark Cowin Same 10282009
 
KEYNOTE: Director Kathleen Jackson, Water for Texas
KEYNOTE: Director Kathleen Jackson, Water for TexasKEYNOTE: Director Kathleen Jackson, Water for Texas
KEYNOTE: Director Kathleen Jackson, Water for Texas
 
Three Transformational Projects in Atlanta's Proctor Creek
Three Transformational Projects in Atlanta's Proctor CreekThree Transformational Projects in Atlanta's Proctor Creek
Three Transformational Projects in Atlanta's Proctor Creek
 
Presentation_to_PMI-Calumet_Northwestern_Indiana_Region
Presentation_to_PMI-Calumet_Northwestern_Indiana_RegionPresentation_to_PMI-Calumet_Northwestern_Indiana_Region
Presentation_to_PMI-Calumet_Northwestern_Indiana_Region
 
Lauren Fahnestock: One Water: Challenges and Opportunities for Water Infrastr...
Lauren Fahnestock: One Water: Challenges and Opportunities for Water Infrastr...Lauren Fahnestock: One Water: Challenges and Opportunities for Water Infrastr...
Lauren Fahnestock: One Water: Challenges and Opportunities for Water Infrastr...
 
Wastewater Capital Improvement Program
Wastewater Capital Improvement ProgramWastewater Capital Improvement Program
Wastewater Capital Improvement Program
 
Storm Water Utility Dev. and Master Plans
Storm Water Utility Dev. and Master PlansStorm Water Utility Dev. and Master Plans
Storm Water Utility Dev. and Master Plans
 
September 1 - 0939 - Matt Lechtenberg and Shane Wulf
September 1 - 0939 - Matt Lechtenberg and Shane WulfSeptember 1 - 0939 - Matt Lechtenberg and Shane Wulf
September 1 - 0939 - Matt Lechtenberg and Shane Wulf
 
Efficient Use of Water - Drew Beckwith, Western Resources Associates
Efficient Use of Water - Drew Beckwith, Western Resources AssociatesEfficient Use of Water - Drew Beckwith, Western Resources Associates
Efficient Use of Water - Drew Beckwith, Western Resources Associates
 
A Regulatory Update Of Stormwater Requirements.Km
A Regulatory Update Of Stormwater Requirements.KmA Regulatory Update Of Stormwater Requirements.Km
A Regulatory Update Of Stormwater Requirements.Km
 
Climate Smart Resiliency Planning tool
Climate Smart Resiliency Planning toolClimate Smart Resiliency Planning tool
Climate Smart Resiliency Planning tool
 
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
 
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
 
Sea Level Rise and Storm Surge Plans
Sea Level Rise and Storm Surge Plans Sea Level Rise and Storm Surge Plans
Sea Level Rise and Storm Surge Plans
 

Plus de CityofKilleen

Plus de CityofKilleen (20)

RS-17-047 - Committee Membership
RS-17-047 - Committee MembershipRS-17-047 - Committee Membership
RS-17-047 - Committee Membership
 
RS-17-035 - Sale of Real Property
RS-17-035 - Sale of Real PropertyRS-17-035 - Sale of Real Property
RS-17-035 - Sale of Real Property
 
RS-17-031 - Quarterly Investment Report Presentation
RS-17-031 - Quarterly Investment Report PresentationRS-17-031 - Quarterly Investment Report Presentation
RS-17-031 - Quarterly Investment Report Presentation
 
RS-17-030 - Annual Audit Report
RS-17-030 - Annual Audit ReportRS-17-030 - Annual Audit Report
RS-17-030 - Annual Audit Report
 
PH-17-021 - Auditing Services Budget Amendment
PH-17-021 - Auditing Services Budget AmendmentPH-17-021 - Auditing Services Budget Amendment
PH-17-021 - Auditing Services Budget Amendment
 
DS-17-048 - Killeen Visioning Session
DS-17-048 - Killeen Visioning SessionDS-17-048 - Killeen Visioning Session
DS-17-048 - Killeen Visioning Session
 
DS-17-046 - Policy for Citizen Appointments
DS-17-046 - Policy for Citizen AppointmentsDS-17-046 - Policy for Citizen Appointments
DS-17-046 - Policy for Citizen Appointments
 
DS-17-043 - Parks Master Plan
DS-17-043 - Parks Master PlanDS-17-043 - Parks Master Plan
DS-17-043 - Parks Master Plan
 
DS-17-044 - Quarterly Finance Report
DS-17-044 - Quarterly Finance ReportDS-17-044 - Quarterly Finance Report
DS-17-044 - Quarterly Finance Report
 
DS-17-038 Election Signs on City Property
DS-17-038 Election Signs on City PropertyDS-17-038 Election Signs on City Property
DS-17-038 Election Signs on City Property
 
DS-17-037 Red Light Program
DS-17-037 Red Light ProgramDS-17-037 Red Light Program
DS-17-037 Red Light Program
 
DS-17-041 Process for Making Recommendations for Citizen Appointments
DS-17-041 Process for Making Recommendations for Citizen AppointmentsDS-17-041 Process for Making Recommendations for Citizen Appointments
DS-17-041 Process for Making Recommendations for Citizen Appointments
 
DS-17-035 Audit Process
DS-17-035 Audit ProcessDS-17-035 Audit Process
DS-17-035 Audit Process
 
DS-17-031 Discuss Impact Fees
DS-17-031 Discuss Impact FeesDS-17-031 Discuss Impact Fees
DS-17-031 Discuss Impact Fees
 
DS-17-030 CDBG Priorities
DS-17-030 CDBG PrioritiesDS-17-030 CDBG Priorities
DS-17-030 CDBG Priorities
 
DS-17-021 Animal Shelter
DS-17-021 Animal ShelterDS-17-021 Animal Shelter
DS-17-021 Animal Shelter
 
DS-17-020 Vision 2030 2.0
DS-17-020 Vision 2030 2.0DS-17-020 Vision 2030 2.0
DS-17-020 Vision 2030 2.0
 
Killeen Parks Master Plan
Killeen Parks Master PlanKilleen Parks Master Plan
Killeen Parks Master Plan
 
DS-17-014 City Council Chambers Concept
DS-17-014 City Council Chambers ConceptDS-17-014 City Council Chambers Concept
DS-17-014 City Council Chambers Concept
 
DS-17-012 MUD Update
DS-17-012 MUD UpdateDS-17-012 MUD Update
DS-17-012 MUD Update
 

Dernier

Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdf
ScottMeyers35
 

Dernier (20)

Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
 
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In MumbaiVasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
 
Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218
 
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
 
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
 
Vivek @ Cheap Call Girls In Kamla Nagar | Book 8448380779 Extreme Call Girls ...
Vivek @ Cheap Call Girls In Kamla Nagar | Book 8448380779 Extreme Call Girls ...Vivek @ Cheap Call Girls In Kamla Nagar | Book 8448380779 Extreme Call Girls ...
Vivek @ Cheap Call Girls In Kamla Nagar | Book 8448380779 Extreme Call Girls ...
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
tOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTRtOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTR
 
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdf
 
Private Call Girls Bidar 9332606886Call Girls Advance Cash On Delivery Service
Private Call Girls Bidar  9332606886Call Girls Advance Cash On Delivery ServicePrivate Call Girls Bidar  9332606886Call Girls Advance Cash On Delivery Service
Private Call Girls Bidar 9332606886Call Girls Advance Cash On Delivery Service
 
NAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptxNAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptx
 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32
 
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfPeace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
 
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
 
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girlsPakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
 

RS-16-154 Nolan Creek Flood Protection Plan

  • 1. Nolan Creek Flood Protection Plan – TWDB Grant Opportunity December 6, 2016
  • 4. Nolan Creek Flood Protection Plan Benefits • Coordinate additional monitoring stations along Nolan Creek and its the tributaries. • Develop early warning software. • Update/amend Special Flood Hazard Area (SFHA) maps.
  • 5. Nolan Creek Flood Protection Plan Benefits • Positions each entity and the watershed for participation in other grant programs to fund some of the projects identified. • Identify construction projects within each entity that could lead to increased storage capacity & water quality. These projects may assist the City in avoiding issuance of a regulated Total Maximum Daily Load (TMDL) by the TCEQ.
  • 8. Nolan Creek Flood Protection Plan • Regional Support of Grant Project: ▫ Bell County WCID #6 ▫ Belton ▫ Brazos River Authority ▫ Harker Heights ▫ Nolanville ▫ Killeen
  • 9. Nolan Creek Flood Protection Plan Cost of Participation • CTCOG provided a preliminary cost breakdown for the $462,038 project based on four areas: ▫ Hydrology ▫ Hydraulics ▫ Field survey ▫ Population • Based on those areas, the City of Killeen’s identified portion is $146,599, which is approximately 63.5% of the required grant match ($231,019).
  • 10. Nolan Creek Flood Protection Plan Cost of Killeen’s Participation • Cash Contribution: $54,227.67 • In-Kind Services: $92,371.33 Hours Expenses GIS 489.00 $ 9,914.97 Engineering 449.00 $ 18,515.86 Environmental Services 59.00 $ 3,214.02 Drainage Engineering 364.00 $ 9,823.37 Drainage Maintenance 1,559.00 $ 29,966.74 Transportation/CIP 614.00 $ 20,936.36 Totals 3,534.00 $ 92,371.33
  • 11. Nolan Creek Flood Protection Plan Questions?