Agenda
• Introductions, Goals &
Context
• Trusted Building Information
Model
• Commercial Building –
Daniel Niziolek
• Technology Academy
Building – Les Carter
• Ask the Experts Q&A
Housekeeping
• Participants are muted
during the presentation
• Ask questions via chat
during the session
• Questions will be taken
during the Q&A session
• The Webinar is being
recorded
• You’ll receive a recording
link after the webinar
Service Provider Perspective
• Produce a quality product
• Deliver in increasingly shorter
timeframes
• Reduce man-hours and cost
• Earn repeat business
Trusted BIM: Accurate As-Builts for Project Coordination
Imperative for Success
Owners Perspective
• Get the project into operation as
fast as possible
• Minimize waste, rework and risk
• Use BIM for ongoing O&M
Accurate and reliable project information is a foundational requirement for project success.
Trusted BIM: Accurate As-Builts for Project Coordination
Introductions
Daniel Niziolek
Assistant Engineer
Ramboll UK
Kevin Williams
Chief Scientist
ClearEdge3D, Inc
• At Ramboll almost 9 years
• Wealth of experience modeling
from pointcloud data
• Founded ClearEdge3D in 2007
• Expert in Automated Feature
from Point Clouds
• Recipient of numerous National
Science Foundation R&D grants
Firm Name
• Global engineering, design
and consultancy company.
• Advanced Engineering team
provides simulation
• Laser scan data used to
build models for well over
10 years
• Processes developed for
analysis and BIM
Ramboll
Commercial Building
Central London
Project Scope: Accurate as-built model for fitting in additional equipment
• Building renovation project
• Client was a Ramboll Building
Services team
• They designed original services,
but was built with major
differences to construction
drawings/models
• Client needed new design to fit
around what was actually built
• Brief was to survey and Revit
model the as-built environment
About the Project
Commercial Building Redevelopment
• Building renovation project
• Client was a Ramboll Building
Services team
• They designed original services,
but was built with major
differences to construction
drawings/models
• Client needed new design to fit
around what was actually built
• Brief was to survey and Revit
model the as-built environment
About the Project
Commercial Building Redevelopment
• Short timeframe – client needed
immediate start and fast
turnaround
• Took over from another survey
company who couldn’t meet the
deadlines
• Getting enough coverage of the
pipes and services in/out of
reach areas
Unique Challenges Faced
Commercial Building Redevelopment
Firm Name
• Z+F Imager 5010c scanner
• Active construction site –
safety and planning issues
• 33 scanner locations
• Over 3 billion points
• 1 day on site for 2 surveyors
• 1 day office post processing
(in Leica Cyclone)
• Target based registration
Field Collection Workflow
• 300 GB of data
• Process locally on SSD drives
• 1 modeler
• Approx. 8 days total modeling
time (6 in Edgewise and 2 in
Revit)
• Edgewise used for modeling
walls, pipes, columns and beams
• Revit used to model floor slab,
ceiling, plant (masses), windows
and doors
Back-office Modeling Workflow
Commercial Building Redevelopment
• Auto wall detection found vast
majority of walls
• Determines wall thickness if scan
data is on both sides, otherwise
default thickness
• Level extraction useful in Revit
• Window detection didn’t work
EdgeWise Building
EdgeWise in Action
• Used Pattern Extract wherever
possible
• Not a perfect structure and not
very repetitive
• Standard tools work great for
bracing / non-vertical / non-
horizontal members
• Biggest time-saving with
Edgewise Structure was sizing
beams and columns
EdgeWise Structure
EdgeWise in Action
• Some beams are fabricated from steel plate
• Model used for clashes/reference, not structural
• Decided to define custom I-Beam in Edgewise
• Tip: You need to include correct k value!
EdgeWise Structure
EdgeWise in Action
Type name d depth (m) b width (m)
tf flange
thickness (m)
tw web
thickness (m)
x neutral axis
(m)
y neutral axis
(m)
k distance from
outer flange
face to toe of
fillet (m)
IBeam B01 0.4 0.35 0.03 0.015 0.035
IBeam B02 0.4 0.3 0.03 0.015 0.035
IBeam B03 0.4 0.3 0.02 0.015 0.025
IBeam B04 0.4 0.2 0.015 0.012 0.02
IBeam B05 0.6 0.4 0.035 0.015 0.04
EdgeWise Structure
EdgeWise in Action
• Auto pipe extraction found majority
of the pipes
• Some manual work needed, but this
is pretty quick and easy
• Needed to manually extract about
25% additional pipes and
extend/connect those that were
found
• Tip: be methodical in moving around
the site – finish an area before
moving on
• Tip: For UK users, make sure you use
the US Metric Systems template
EdgeWise MEP
EdgeWise in Action
EdgeWise MEP
EdgeWise in Action
Firm Name
• As built Revit model in just
10 work days from survey to
model delivery
• Delivered to Ramboll team
for their design work
• A happy client
Final Deliverable
EdgeWise Workflow Time Savings
Commercial Building Redevelopment
Estimated time savings
Old Workflow: 20 days
EdgeWise Workflow: 10 days
At least 50% Savings with EdgeWise
Workflow
EdgeWise Workflow Time Savings
Commercial Building Redevelopment
Automatically detected pipe model Cleaned up final pipe model
EdgeWise Workflow Time Savings
Commercial Building Redevelopment
Example on different project
Old Workflow: 2 days (incomplete)
EdgeWise Workflow: 0.5 days
(additional post processing required)
At least 75% Savings with EdgeWise
Workflow
Trusted BIM: Accurate As-Built for Project Coordination
Introductions
Zoltan Nagy
Sr. Structural Designer
Revit/BIM Lead
Les Carter
Survey Director
Jason Harless
CADD Manager
• 20 years multi-discipline experience
in design and production
• AutoCAD and REVIT 3D Reality
Capture Lead for Architectural,
Mechanical and Civil
• QA/QC of Point Cloud data and
registration
• Licensed Land Surveyor with 38 years
experience.
• At Cannon for 10 Years.
• Sr. Land Surveyor with City of San
Diego for 26 years.
• Head of 18 member Survey Division.
• 15 Years 3D CADD and Laser Scanning
Experience.
• FARO Scene and Leica Cyclone
Registration expert
• Expert in Automated Feature
Extraction from Point Clouds
• BIM Modeling
Technology Academy Building
Santa Monica, CA
Project Scope: Scan and Revit Model for Phase 1 Construction As-Built
Est. 1976
Cannon
Celebrating 40 years of service. Providing
laser scanning & modeling services since
2008. Surveying/Mapping; Scanning; GIS;
UAV Mapping = “All things 3D”
• Civil, Structural and Mechanical
Engineering
• Instrumentation and Electrical; SCADA
Systems
• Permitting and Construction
Management
• Grant Funding Assistance
• Offices in Los Angeles, Ontario, Santa
Barbara, Bakersfield and
• San Luis Obispo
About the Project
Technology Academy Building
• 2-story Building Expansion and
retro-fit.
• Scan area: 34,000 ft2.
• Client; College District
• Provide point cloud and prepare
a REVIT Model.
• Client needed the updated “As-
Built” conditions of the building
• Required a high level of detail.
• Coordination of scanning during
ongoing construction operations
• Scanner locations obstructed by
equipment and construction
materials
• Dim lighting requiring battery
operated lights
Unique Challenges Faced
Technology Academy Building
• Smaller diameter pipe has to
have sufficient point cloud
coverage so It can be extracted
manually.
• More scans had to be taken due
to the density and size of the
piping.
• Creating the level of detail
needed in REVIT Model was a
key challenge.
Unique Challenges Faced
Technology Academy Building
• Dense structural features interfered
with the scanner line of site for the
piping
• 3D Modeling of unique non-standard
structural features
• Client required the model to show any
blocking and supports added as
additional structural reinforcement
during construction process.
Unique Challenges Faced
Technology Academy Building
Firm Name
• Created scanner location map for
each floor.
• On site field recon to verify site
conditions and access.
• Used FARO x330 Scanner.
• Used battery LED work lights in
some rooms for photo draped
color scans.
• Scans were performed during
ongoing construction. Required
close coordination with GC.
Field Collection Workflow
Pre-Planning
Firm Name
• Number of controlled scans: 134
• Field collection time: 7 days
• Existing multi story building with
drop ceilings, interior walls and
existing rooms.
• Project had to be in contractors
coordinate system.
• Registration software used: FARO
Scene
Field Collection Workflow
Field Operations
• Created Clear View and Recap
point clouds
• Working copies of point clouds
were stored locally on
workstations.
• Extracted walls, structure, and
piping in Edgewise.
• Point cloud and auto extraction
was ran overnight.
• “Minimizes potential errors in
human judgement”.
Back-office Modeling Workflow
Technology Academy Building
• 2 modelers worked together in
parallel.
• One working on mechanical
features and Revit model, and
the other working on Steel and
piping details.
• A great deal of user extraction of
smaller piping and custom
structural details was necessary.
Back-office Modeling Workflow
Technology Academy Building
• REVIT files were updated with
extracted elements.
• Wall openings and Custom
features were modeled in Revit
using a ReCap pointcloud.
• Revit project files were stored
on server location.
Back-office Modeling Workflow
Technology Academy Building
Firm Name
• Our Client needed a Revit
as-built which reflected
detailed “Reality Capture” of
the building.
• Finished Project was 244GB
of data.
• We also provided the full
registered point cloud as
Autodesk ReCap files.
Final Deliverables
Edgewise Workflow Time Savings
Technology Academy Building
• Old Workflow: 160+ hours
• Edgewise Workflow: 80 Hours
• By extracting walls, structure and
piping in Edgewise we achieved a
50% cost savings in the modeling
workflow.
• As for any project, the keys to
success are:
• A well defined scope of work and
a very specific and detailed
description of the level of details
to be shown in the CAD/Revit
Model.
• For this project:
• Highly detailed and “non-
standard” Structural features.
• Small diameter conduits.
• Non-standard HVAC features.
Project Tips & Tricks
Technology Academy Building
“
Ask the Expert Panel
Unique Challenges – Trusted BIM – Accurate As-Builts for Project Coordination
www.ClearEdge3D.com +1 (866) 944-8210sales@clearedge3d.com
Thank You!
A link to the recorded webinar will be sent to you soon.

Contenu connexe

En vedette

Archi Cad 14 New Features
Archi Cad 14 New FeaturesArchi Cad 14 New Features
Archi Cad 14 New Features
Angi Izzi
 
Communication & Coordination on a Construction Project Through Building I...
Communication & Coordination on a Construction Project Through Building I...Communication & Coordination on a Construction Project Through Building I...
Communication & Coordination on a Construction Project Through Building I...
muhammad87
 
BIM COORDINATION PORTOFOLIOOO
BIM COORDINATION PORTOFOLIOOOBIM COORDINATION PORTOFOLIOOO
BIM COORDINATION PORTOFOLIOOO
Mohab Magdy,PMP
 
Bim101 Aec
Bim101 AecBim101 Aec
Bim101 Aec
marybk
 
Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01
saed saffarini
 
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process PresentationBIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
Indranath Sinha
 

En vedette (20)

Bim Presentation
Bim PresentationBim Presentation
Bim Presentation
 
Emrah Ulas & Richard Crampton
Emrah Ulas & Richard CramptonEmrah Ulas & Richard Crampton
Emrah Ulas & Richard Crampton
 
Bronwyn Roper
Bronwyn RoperBronwyn Roper
Bronwyn Roper
 
Bimas 2015 presentation integration of bim course
Bimas 2015 presentation   integration of bim courseBimas 2015 presentation   integration of bim course
Bimas 2015 presentation integration of bim course
 
Archi Cad 14 New Features
Archi Cad 14 New FeaturesArchi Cad 14 New Features
Archi Cad 14 New Features
 
Introduction of nr bim consultant
Introduction of nr bim consultantIntroduction of nr bim consultant
Introduction of nr bim consultant
 
Au 09 Bi Mmeans Business.1.05.10
Au 09 Bi Mmeans Business.1.05.10Au 09 Bi Mmeans Business.1.05.10
Au 09 Bi Mmeans Business.1.05.10
 
Anthony N Dauginas
Anthony N DauginasAnthony N Dauginas
Anthony N Dauginas
 
Flevy.com - Collaborative Process Mapping
Flevy.com - Collaborative Process MappingFlevy.com - Collaborative Process Mapping
Flevy.com - Collaborative Process Mapping
 
Bim Facades.Final
Bim Facades.FinalBim Facades.Final
Bim Facades.Final
 
Communication & Coordination on a Construction Project Through Building I...
Communication & Coordination on a Construction Project Through Building I...Communication & Coordination on a Construction Project Through Building I...
Communication & Coordination on a Construction Project Through Building I...
 
Reducing Risk with BIM
Reducing Risk with BIMReducing Risk with BIM
Reducing Risk with BIM
 
BIM COORDINATION PORTOFOLIOOO
BIM COORDINATION PORTOFOLIOOOBIM COORDINATION PORTOFOLIOOO
BIM COORDINATION PORTOFOLIOOO
 
Bim101 Aec
Bim101 AecBim101 Aec
Bim101 Aec
 
BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9 BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9
 
A Team Plumbing and Drainage Systems
A Team Plumbing and Drainage SystemsA Team Plumbing and Drainage Systems
A Team Plumbing and Drainage Systems
 
Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01
 
Revit for Small Projects: Is it worth the effort?
Revit for Small Projects: Is it worth the effort?Revit for Small Projects: Is it worth the effort?
Revit for Small Projects: Is it worth the effort?
 
081204 Virtual Design & Construction
081204 Virtual Design & Construction081204 Virtual Design & Construction
081204 Virtual Design & Construction
 
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process PresentationBIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
 

Similaire à Trusted BIM: Accurate As-Builts for Project Coordination

BIM modeling for Carmel Valley Inn Hotel
BIM modeling for Carmel Valley Inn HotelBIM modeling for Carmel Valley Inn Hotel
BIM modeling for Carmel Valley Inn Hotel
Gaurav Kumar
 
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Sewell Construction
 
BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014
Graham H Stewart
 
BIM- Park in California
BIM- Park in CaliforniaBIM- Park in California
BIM- Park in California
Gaurav Kumar
 

Similaire à Trusted BIM: Accurate As-Builts for Project Coordination (20)

Nathan Hildebrandt
Nathan HildebrandtNathan Hildebrandt
Nathan Hildebrandt
 
SCAN to BIM services, documenting existing building for digital planning
SCAN to BIM services, documenting existing building for digital planningSCAN to BIM services, documenting existing building for digital planning
SCAN to BIM services, documenting existing building for digital planning
 
BIM modeling for Carmel Valley Inn Hotel
BIM modeling for Carmel Valley Inn HotelBIM modeling for Carmel Valley Inn Hotel
BIM modeling for Carmel Valley Inn Hotel
 
Design & Construction Presentation on the New Putnam Vocational Technical Aca...
Design & Construction Presentation on the New Putnam Vocational Technical Aca...Design & Construction Presentation on the New Putnam Vocational Technical Aca...
Design & Construction Presentation on the New Putnam Vocational Technical Aca...
 
MelBIM 190619
MelBIM 190619MelBIM 190619
MelBIM 190619
 
ETDP 2015 D1 The Digitally Enabling Electrification Project - Atkins & Laing ...
ETDP 2015 D1 The Digitally Enabling Electrification Project - Atkins & Laing ...ETDP 2015 D1 The Digitally Enabling Electrification Project - Atkins & Laing ...
ETDP 2015 D1 The Digitally Enabling Electrification Project - Atkins & Laing ...
 
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
 
Practical Scanning Uses for Construction Applications by Tim Schubert
Practical Scanning Uses for Construction Applications by Tim SchubertPractical Scanning Uses for Construction Applications by Tim Schubert
Practical Scanning Uses for Construction Applications by Tim Schubert
 
Rtc 2016 -_landair_surveys_-_laser scanning_-_from_field_to_revit
Rtc 2016 -_landair_surveys_-_laser scanning_-_from_field_to_revitRtc 2016 -_landair_surveys_-_laser scanning_-_from_field_to_revit
Rtc 2016 -_landair_surveys_-_laser scanning_-_from_field_to_revit
 
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle EastO&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
 
Mohamed Salah Ibrahim
Mohamed Salah IbrahimMohamed Salah Ibrahim
Mohamed Salah Ibrahim
 
Fiatech 2014 - Big BIM Implementation, Zuhair Haddad
Fiatech 2014 - Big BIM Implementation, Zuhair HaddadFiatech 2014 - Big BIM Implementation, Zuhair Haddad
Fiatech 2014 - Big BIM Implementation, Zuhair Haddad
 
CAD and BIM Outsourcing Services
CAD and BIM Outsourcing ServicesCAD and BIM Outsourcing Services
CAD and BIM Outsourcing Services
 
Spar2010murphy
Spar2010murphySpar2010murphy
Spar2010murphy
 
BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014
 
11. Jassera Engineering Presentation.pdf
11. Jassera Engineering Presentation.pdf11. Jassera Engineering Presentation.pdf
11. Jassera Engineering Presentation.pdf
 
BIM- Park in California
BIM- Park in CaliforniaBIM- Park in California
BIM- Park in California
 
Scan-to-BIM english
Scan-to-BIM englishScan-to-BIM english
Scan-to-BIM english
 
Andrew Gutteridge
Andrew GutteridgeAndrew Gutteridge
Andrew Gutteridge
 
COMIT Community Day Winter 2018 - Mabey Hire's Presentation
COMIT Community Day Winter 2018 - Mabey Hire's Presentation COMIT Community Day Winter 2018 - Mabey Hire's Presentation
COMIT Community Day Winter 2018 - Mabey Hire's Presentation
 

Dernier

Dernier (20)

Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 

Trusted BIM: Accurate As-Builts for Project Coordination

  • 1. Trusted BIM: Accurate As-Builts for Project Coordination Presenter: Daniel Niziolek, Ramboll UK Presenter: Les Carter Jr., PLS, Cannon Host: Kevin Williams, ClearEdge3D
  • 2. Agenda • Introductions, Goals & Context • Trusted Building Information Model • Commercial Building – Daniel Niziolek • Technology Academy Building – Les Carter • Ask the Experts Q&A
  • 3. Housekeeping • Participants are muted during the presentation • Ask questions via chat during the session • Questions will be taken during the Q&A session • The Webinar is being recorded • You’ll receive a recording link after the webinar
  • 4. Service Provider Perspective • Produce a quality product • Deliver in increasingly shorter timeframes • Reduce man-hours and cost • Earn repeat business Trusted BIM: Accurate As-Builts for Project Coordination Imperative for Success Owners Perspective • Get the project into operation as fast as possible • Minimize waste, rework and risk • Use BIM for ongoing O&M Accurate and reliable project information is a foundational requirement for project success.
  • 5. Trusted BIM: Accurate As-Builts for Project Coordination Introductions Daniel Niziolek Assistant Engineer Ramboll UK Kevin Williams Chief Scientist ClearEdge3D, Inc • At Ramboll almost 9 years • Wealth of experience modeling from pointcloud data • Founded ClearEdge3D in 2007 • Expert in Automated Feature from Point Clouds • Recipient of numerous National Science Foundation R&D grants
  • 6. Firm Name • Global engineering, design and consultancy company. • Advanced Engineering team provides simulation • Laser scan data used to build models for well over 10 years • Processes developed for analysis and BIM Ramboll
  • 7. Commercial Building Central London Project Scope: Accurate as-built model for fitting in additional equipment
  • 8. • Building renovation project • Client was a Ramboll Building Services team • They designed original services, but was built with major differences to construction drawings/models • Client needed new design to fit around what was actually built • Brief was to survey and Revit model the as-built environment About the Project Commercial Building Redevelopment
  • 9. • Building renovation project • Client was a Ramboll Building Services team • They designed original services, but was built with major differences to construction drawings/models • Client needed new design to fit around what was actually built • Brief was to survey and Revit model the as-built environment About the Project Commercial Building Redevelopment
  • 10. • Short timeframe – client needed immediate start and fast turnaround • Took over from another survey company who couldn’t meet the deadlines • Getting enough coverage of the pipes and services in/out of reach areas Unique Challenges Faced Commercial Building Redevelopment
  • 11. Firm Name • Z+F Imager 5010c scanner • Active construction site – safety and planning issues • 33 scanner locations • Over 3 billion points • 1 day on site for 2 surveyors • 1 day office post processing (in Leica Cyclone) • Target based registration Field Collection Workflow
  • 12. • 300 GB of data • Process locally on SSD drives • 1 modeler • Approx. 8 days total modeling time (6 in Edgewise and 2 in Revit) • Edgewise used for modeling walls, pipes, columns and beams • Revit used to model floor slab, ceiling, plant (masses), windows and doors Back-office Modeling Workflow Commercial Building Redevelopment
  • 13. • Auto wall detection found vast majority of walls • Determines wall thickness if scan data is on both sides, otherwise default thickness • Level extraction useful in Revit • Window detection didn’t work EdgeWise Building EdgeWise in Action
  • 14. • Used Pattern Extract wherever possible • Not a perfect structure and not very repetitive • Standard tools work great for bracing / non-vertical / non- horizontal members • Biggest time-saving with Edgewise Structure was sizing beams and columns EdgeWise Structure EdgeWise in Action
  • 15. • Some beams are fabricated from steel plate • Model used for clashes/reference, not structural • Decided to define custom I-Beam in Edgewise • Tip: You need to include correct k value! EdgeWise Structure EdgeWise in Action Type name d depth (m) b width (m) tf flange thickness (m) tw web thickness (m) x neutral axis (m) y neutral axis (m) k distance from outer flange face to toe of fillet (m) IBeam B01 0.4 0.35 0.03 0.015 0.035 IBeam B02 0.4 0.3 0.03 0.015 0.035 IBeam B03 0.4 0.3 0.02 0.015 0.025 IBeam B04 0.4 0.2 0.015 0.012 0.02 IBeam B05 0.6 0.4 0.035 0.015 0.04
  • 17. • Auto pipe extraction found majority of the pipes • Some manual work needed, but this is pretty quick and easy • Needed to manually extract about 25% additional pipes and extend/connect those that were found • Tip: be methodical in moving around the site – finish an area before moving on • Tip: For UK users, make sure you use the US Metric Systems template EdgeWise MEP EdgeWise in Action
  • 19. Firm Name • As built Revit model in just 10 work days from survey to model delivery • Delivered to Ramboll team for their design work • A happy client Final Deliverable
  • 20. EdgeWise Workflow Time Savings Commercial Building Redevelopment Estimated time savings Old Workflow: 20 days EdgeWise Workflow: 10 days At least 50% Savings with EdgeWise Workflow
  • 21. EdgeWise Workflow Time Savings Commercial Building Redevelopment Automatically detected pipe model Cleaned up final pipe model
  • 22. EdgeWise Workflow Time Savings Commercial Building Redevelopment Example on different project Old Workflow: 2 days (incomplete) EdgeWise Workflow: 0.5 days (additional post processing required) At least 75% Savings with EdgeWise Workflow
  • 23. Trusted BIM: Accurate As-Built for Project Coordination Introductions Zoltan Nagy Sr. Structural Designer Revit/BIM Lead Les Carter Survey Director Jason Harless CADD Manager • 20 years multi-discipline experience in design and production • AutoCAD and REVIT 3D Reality Capture Lead for Architectural, Mechanical and Civil • QA/QC of Point Cloud data and registration • Licensed Land Surveyor with 38 years experience. • At Cannon for 10 Years. • Sr. Land Surveyor with City of San Diego for 26 years. • Head of 18 member Survey Division. • 15 Years 3D CADD and Laser Scanning Experience. • FARO Scene and Leica Cyclone Registration expert • Expert in Automated Feature Extraction from Point Clouds • BIM Modeling
  • 24. Technology Academy Building Santa Monica, CA Project Scope: Scan and Revit Model for Phase 1 Construction As-Built
  • 25. Est. 1976 Cannon Celebrating 40 years of service. Providing laser scanning & modeling services since 2008. Surveying/Mapping; Scanning; GIS; UAV Mapping = “All things 3D” • Civil, Structural and Mechanical Engineering • Instrumentation and Electrical; SCADA Systems • Permitting and Construction Management • Grant Funding Assistance • Offices in Los Angeles, Ontario, Santa Barbara, Bakersfield and • San Luis Obispo
  • 26. About the Project Technology Academy Building • 2-story Building Expansion and retro-fit. • Scan area: 34,000 ft2. • Client; College District • Provide point cloud and prepare a REVIT Model. • Client needed the updated “As- Built” conditions of the building • Required a high level of detail.
  • 27. • Coordination of scanning during ongoing construction operations • Scanner locations obstructed by equipment and construction materials • Dim lighting requiring battery operated lights Unique Challenges Faced Technology Academy Building
  • 28. • Smaller diameter pipe has to have sufficient point cloud coverage so It can be extracted manually. • More scans had to be taken due to the density and size of the piping. • Creating the level of detail needed in REVIT Model was a key challenge. Unique Challenges Faced Technology Academy Building
  • 29. • Dense structural features interfered with the scanner line of site for the piping • 3D Modeling of unique non-standard structural features • Client required the model to show any blocking and supports added as additional structural reinforcement during construction process. Unique Challenges Faced Technology Academy Building
  • 30. Firm Name • Created scanner location map for each floor. • On site field recon to verify site conditions and access. • Used FARO x330 Scanner. • Used battery LED work lights in some rooms for photo draped color scans. • Scans were performed during ongoing construction. Required close coordination with GC. Field Collection Workflow Pre-Planning
  • 31. Firm Name • Number of controlled scans: 134 • Field collection time: 7 days • Existing multi story building with drop ceilings, interior walls and existing rooms. • Project had to be in contractors coordinate system. • Registration software used: FARO Scene Field Collection Workflow Field Operations
  • 32. • Created Clear View and Recap point clouds • Working copies of point clouds were stored locally on workstations. • Extracted walls, structure, and piping in Edgewise. • Point cloud and auto extraction was ran overnight. • “Minimizes potential errors in human judgement”. Back-office Modeling Workflow Technology Academy Building
  • 33. • 2 modelers worked together in parallel. • One working on mechanical features and Revit model, and the other working on Steel and piping details. • A great deal of user extraction of smaller piping and custom structural details was necessary. Back-office Modeling Workflow Technology Academy Building
  • 34. • REVIT files were updated with extracted elements. • Wall openings and Custom features were modeled in Revit using a ReCap pointcloud. • Revit project files were stored on server location. Back-office Modeling Workflow Technology Academy Building
  • 35. Firm Name • Our Client needed a Revit as-built which reflected detailed “Reality Capture” of the building. • Finished Project was 244GB of data. • We also provided the full registered point cloud as Autodesk ReCap files. Final Deliverables
  • 36. Edgewise Workflow Time Savings Technology Academy Building • Old Workflow: 160+ hours • Edgewise Workflow: 80 Hours • By extracting walls, structure and piping in Edgewise we achieved a 50% cost savings in the modeling workflow.
  • 37. • As for any project, the keys to success are: • A well defined scope of work and a very specific and detailed description of the level of details to be shown in the CAD/Revit Model. • For this project: • Highly detailed and “non- standard” Structural features. • Small diameter conduits. • Non-standard HVAC features. Project Tips & Tricks Technology Academy Building
  • 38. “ Ask the Expert Panel Unique Challenges – Trusted BIM – Accurate As-Builts for Project Coordination
  • 39. www.ClearEdge3D.com +1 (866) 944-8210sales@clearedge3d.com Thank You! A link to the recorded webinar will be sent to you soon.