Riyadh metro project
• 178 km
• 6 Lines
• 85 Stations
• 22 Billion dollar
First Viaduct Installed by Governor of Riyadh
FAST Line 4
Current Works Locations – Line 4
4G3
4G2
4G1
4E1
4D1
4C2
4C1
4B1
4A1
FSLM Precast ProductionFSLM Precast Production
Viaducts and Elevated stations
Line 5
North TBM Launching
Shaft/Depot
5C4 /
2C4
5C2
5C1
5B4
5B3
5B2
5B1
5A4
5A3
5A5
5A2
5A6
5A1 /
1F4
Central TBM Launching Shaft / Station
5B3
1st TBM assembling at Central Launching
Shaft
1st TBM assembling at Central Launching
Shaft
TBM – Line 5
5B2
5B1
5A4
5A3
5A2
5A6
Line 6
6D1/4C
2
6D2
6E1
6F1/2E1
6G1
6G2
6H1
6H2/3J1
FSLM / BCM Precast Yard
Viaduct Section 6.1.2
Viaduct Section 6.1.3
Station 6E1
Cut & Cover Section 6.2
Viaduct Section 6.2
Steel Cage for Pile – Viaduct 6.1.3Steel Cage for Pile – Viaduct 6.1.3
At Grade
Section 6.1
Cut & Cover Section 6.3 -
Barriers
At Grade
Section 6.2
Cut & Cover Section 6.4 -
Barriers
Line 6 Construction sites
Total length line 6 : 21.043 m
C&C Tunnel : 7.202 m
Viaduct : 12.419 m
At grade : 1.422 m
Elevated Stations (ELS)
C&C Tunnel Construction
Construction of pile cap
Creation of Permanent Reference Markers
Specifications:
Primary network:
• Spacing > 1000 meter
• Horizontal error between two points >
10mm
• Vertical error between two points 2.0
mm (loop misclosure)
15
Creation of Permanent Reference Markers
16
Installation of GNSS reference stations
17
Construction surveying
Requirements:
• High accuracy
• Proven technology
• Reliable supplier
• Reliable after sales organisation
• Quick response time in case of emergency
18
Construction surveying
19
Monitoring
20
Kumonos
21
Riyadh Metro Project – Questions ?
22
Thank You!

Contenu connexe

Tendances

Design of Sanitary Sewer System
Design of Sanitary Sewer SystemDesign of Sanitary Sewer System
Design of Sanitary Sewer SystemBahzad5
 
Makkah Metro - Makkah Mass Rail Project (MMRP)
Makkah Metro - Makkah Mass Rail Project (MMRP)Makkah Metro - Makkah Mass Rail Project (MMRP)
Makkah Metro - Makkah Mass Rail Project (MMRP)Ibrahim Al-Hudhaif
 
Track work presentation
Track work presentationTrack work presentation
Track work presentationKumar M.
 
Presentation on Underground metro.
Presentation on Underground metro.Presentation on Underground metro.
Presentation on Underground metro.YusufRampurawala1
 
Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.Axay Sharma
 
Dam outlet works lecture 1
Dam outlet works lecture 1Dam outlet works lecture 1
Dam outlet works lecture 1Vidhi Khokhani
 
Sarita Vihar Depot, Delhi Metro training report
Sarita Vihar Depot, Delhi Metro training reportSarita Vihar Depot, Delhi Metro training report
Sarita Vihar Depot, Delhi Metro training reportGAURAV KUMAR CHAUBEY
 
Hyderabad metro rail L&T | Construction sequence and procedure
Hyderabad metro rail L&T | Construction sequence and procedureHyderabad metro rail L&T | Construction sequence and procedure
Hyderabad metro rail L&T | Construction sequence and procedureAravind Samala
 
Introduction to intersection
Introduction to intersectionIntroduction to intersection
Introduction to intersectionYasirKhan357
 
Rsa for rural road
Rsa for rural roadRsa for rural road
Rsa for rural roadPawan Kumar
 
TFL Presentation
TFL Presentation TFL Presentation
TFL Presentation Sandra Idio
 
Bangkok river port case study
Bangkok river port case studyBangkok river port case study
Bangkok river port case studySem9AD
 
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS ReddyHyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS ReddyIPPAI
 
Ahmedabad Metro Project
Ahmedabad Metro ProjectAhmedabad Metro Project
Ahmedabad Metro ProjectASHISH SINGH
 
MultiModal Transportation in New DElhi
MultiModal Transportation in New DElhiMultiModal Transportation in New DElhi
MultiModal Transportation in New DElhiHamza Hashmi
 
Dr. shahid khan saudi binladin group
Dr. shahid khan  saudi binladin groupDr. shahid khan  saudi binladin group
Dr. shahid khan saudi binladin groupIbrahim Al-Hudhaif
 
Basics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBasics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBhaskar Kumar Dan
 

Tendances (20)

Design of Sanitary Sewer System
Design of Sanitary Sewer SystemDesign of Sanitary Sewer System
Design of Sanitary Sewer System
 
Makkah Metro - Makkah Mass Rail Project (MMRP)
Makkah Metro - Makkah Mass Rail Project (MMRP)Makkah Metro - Makkah Mass Rail Project (MMRP)
Makkah Metro - Makkah Mass Rail Project (MMRP)
 
Track work presentation
Track work presentationTrack work presentation
Track work presentation
 
Presentation on Underground metro.
Presentation on Underground metro.Presentation on Underground metro.
Presentation on Underground metro.
 
Railway station
Railway stationRailway station
Railway station
 
Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.
 
Railway Station Design 251115
Railway Station Design 251115Railway Station Design 251115
Railway Station Design 251115
 
Dam outlet works lecture 1
Dam outlet works lecture 1Dam outlet works lecture 1
Dam outlet works lecture 1
 
Sarita Vihar Depot, Delhi Metro training report
Sarita Vihar Depot, Delhi Metro training reportSarita Vihar Depot, Delhi Metro training report
Sarita Vihar Depot, Delhi Metro training report
 
Hyderabad metro rail L&T | Construction sequence and procedure
Hyderabad metro rail L&T | Construction sequence and procedureHyderabad metro rail L&T | Construction sequence and procedure
Hyderabad metro rail L&T | Construction sequence and procedure
 
Introduction to intersection
Introduction to intersectionIntroduction to intersection
Introduction to intersection
 
Makkah Metro Presentation
Makkah Metro Presentation Makkah Metro Presentation
Makkah Metro Presentation
 
Rsa for rural road
Rsa for rural roadRsa for rural road
Rsa for rural road
 
TFL Presentation
TFL Presentation TFL Presentation
TFL Presentation
 
Bangkok river port case study
Bangkok river port case studyBangkok river port case study
Bangkok river port case study
 
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS ReddyHyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
 
Ahmedabad Metro Project
Ahmedabad Metro ProjectAhmedabad Metro Project
Ahmedabad Metro Project
 
MultiModal Transportation in New DElhi
MultiModal Transportation in New DElhiMultiModal Transportation in New DElhi
MultiModal Transportation in New DElhi
 
Dr. shahid khan saudi binladin group
Dr. shahid khan  saudi binladin groupDr. shahid khan  saudi binladin group
Dr. shahid khan saudi binladin group
 
Basics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBasics of Metro Railway Signalling system
Basics of Metro Railway Signalling system
 

Similaire à Riyadh metro project presentation 06052015 Final

DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2Ian Kelly
 
DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2Ian Kelly
 
Blastless track construction in tunnel and elavated metro station constructio...
Blastless track construction in tunnel and elavated metro station constructio...Blastless track construction in tunnel and elavated metro station constructio...
Blastless track construction in tunnel and elavated metro station constructio...Multan Prajapat
 
HIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case StudyHIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case Studyknowledge stuff
 
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.144.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14Kristipoom R-khubut
 
The expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demandThe expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demandTransnet Port Terminals
 
C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last updateMomen Mohamed
 
A change in Rly perspective - SC Stn.pptx
A change in Rly perspective - SC Stn.pptxA change in Rly perspective - SC Stn.pptx
A change in Rly perspective - SC Stn.pptxRajaramKulapaka1
 
Benjamin colbrandt | C-Power offshore windmolenpark
Benjamin colbrandt  | C-Power offshore windmolenparkBenjamin colbrandt  | C-Power offshore windmolenpark
Benjamin colbrandt | C-Power offshore windmolenparkGreenbridge nv
 
QP_Safety_executive_procedure_final
QP_Safety_executive_procedure_finalQP_Safety_executive_procedure_final
QP_Safety_executive_procedure_finalIan Kelly
 
Rejith complete cv
Rejith complete cvRejith complete cv
Rejith complete cvrejith raman
 
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...Egyptian Engineers Association
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)Pablo Miguel Jurado
 
CLW VOCATIONAL TRAINING REPORT- 2018
CLW VOCATIONAL TRAINING REPORT- 2018CLW VOCATIONAL TRAINING REPORT- 2018
CLW VOCATIONAL TRAINING REPORT- 2018SohagSarkar2
 
6 weeks it on ntpc
6 weeks it on ntpc 6 weeks it on ntpc
6 weeks it on ntpc Uttam Kumar
 
Rail Grinding Machine:A Basic approach
Rail Grinding Machine:A Basic approachRail Grinding Machine:A Basic approach
Rail Grinding Machine:A Basic approachPrem Prakash Kumar
 

Similaire à Riyadh metro project presentation 06052015 Final (19)

DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2
 
DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2
 
Blastless track construction in tunnel and elavated metro station constructio...
Blastless track construction in tunnel and elavated metro station constructio...Blastless track construction in tunnel and elavated metro station constructio...
Blastless track construction in tunnel and elavated metro station constructio...
 
HIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case StudyHIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case Study
 
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.144.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
 
The expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demandThe expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demand
 
C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last update
 
A change in Rly perspective - SC Stn.pptx
A change in Rly perspective - SC Stn.pptxA change in Rly perspective - SC Stn.pptx
A change in Rly perspective - SC Stn.pptx
 
Benjamin colbrandt | C-Power offshore windmolenpark
Benjamin colbrandt  | C-Power offshore windmolenparkBenjamin colbrandt  | C-Power offshore windmolenpark
Benjamin colbrandt | C-Power offshore windmolenpark
 
QP_Safety_executive_procedure_final
QP_Safety_executive_procedure_finalQP_Safety_executive_procedure_final
QP_Safety_executive_procedure_final
 
Rejith complete cv
Rejith complete cvRejith complete cv
Rejith complete cv
 
Nitin
NitinNitin
Nitin
 
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)
 
CLW VOCATIONAL TRAINING REPORT- 2018
CLW VOCATIONAL TRAINING REPORT- 2018CLW VOCATIONAL TRAINING REPORT- 2018
CLW VOCATIONAL TRAINING REPORT- 2018
 
6 weeks it on ntpc
6 weeks it on ntpc 6 weeks it on ntpc
6 weeks it on ntpc
 
Cpcl
CpclCpcl
Cpcl
 
Rail Grinding Machine:A Basic approach
Rail Grinding Machine:A Basic approachRail Grinding Machine:A Basic approach
Rail Grinding Machine:A Basic approach
 
jahangir
jahangirjahangir
jahangir
 

Riyadh metro project presentation 06052015 Final