© 2015 Contech Engineered Solutions LLC
Raising the Bar North of the Border:
The Ins and Outs of Canada’s New
Evaluation Process for Oil-Grit Separators
Presented by:
Derek Berg
StormCon Austin
August, 5th 2015
1
© 2015 Contech Engineered Solutions LLC
 Stakeholder driven protocol development and regulatory
overview
 CETV protocol specifics
 CETV protocol in practice, testing a full scale CDS®
 Discussion
Presentation Overview
2
© 2015 Contech Engineered Solutions LLC
 BMP evaluation has come a long way but remains imperfect
 Equipment, methods and best practices continue to be refined
 Merits of lab vs. field still debated
 Resource constraints straining existing programs
 Consistent implementation is essential
BMP Evaluation
3
© 2015 Contech Engineered Solutions LLC
 Canadian regulatory framework requires predominantly local
decision making and vetting of MTDs
 Historically no Canadian specific protocols or evaluation
programs for MTDs
 Local decision makers often lack resources and/or expertise to
complete evaluations
 Some regions relying on programs such as NJCAT/NJDEP but
data from those programs not always well suited for direct
adoption
Drivers for a CETV Protocol
4
© 2015 Contech Engineered Solutions LLC
 In 2013 Toronto and Region Conservation Authority (TRCA)
convened a diverse stakeholder group to gauge interest and
establish goals for a national protocol
 Group agreed to use 2013 NJDEP protocol as a foundation for
the process
 Changes needed to make resulting data applicable to diverse
local regulations
 Stakeholders wanted a protocol that yielded a flexible data set
 After initial stakeholder meeting TRCA took lead on drafting
protocol with several rounds of stakeholder review
CETV Development
5
© 2015 Contech Engineered Solutions LLC
 Mandatory performance trials at 7 operating rates ranging from
40 l/min/m2 to 1400 l/min/m2 of sedimentation area
o Additional tests optional
o All testing using modified mass balance with target influent of 200mg/l
 PSD analysis on source sediment as well as sediment
captured during each test run
 Scour test component with system filled to 50% sediment
capacity
o Uses 1-1000um PSD for scour
o 5 target loading rates between 200-2600 l/min/m2 of sedimentation area
o Duplicate effluent and PSD samples collected at each operating rate
 Voluntary light liquid re-entrainment test
o A scour test for floatables
o Low density polyethylene beads used to simulate oils
CETV Protocol Specifics
6
© 2015 Contech Engineered Solutions LLC
 All testing, reporting and data submission must be completed
by 3rd party facility
 SSC method specified for all solids analysis
 Specifies NJDEP 1-1000um PSD
o D50 ~65 microns
o ~20% of material less than 8 microns
CETV Protocol Specifics
7
© 2015 Contech Engineered Solutions LLC
CETV Process Overview
8
Application
Test at 3rd
Party Facility
Submission
of Results
Establish
Performance
Claim
Review by
Verification
Entity
CETV
Verification
Environment Canada
Globe Performance Solutions
Manufacturer/3rd Party Lab
Toronto and Region Conservation Authority
Regional/Local Regulatory Authority
Stakeholders:
© 2015 Contech Engineered Solutions LLC
2014: CDS-4 tested at Alden Research Labs in Holden, MA
CETV in Practice
9
© 2015 Contech Engineered Solutions LLC
 Initial PSD tolerances and sampling requirements made
sediment compliance difficult
o + or – 3% tolerances changed to + or – 6%
 Mass balance approach results in lengthy run times at low
operating rates
o Min 11.3kg sediment per trial
o CDS trial at 40 l/min/m2 was 21.4 hours
o Test run in 3 chunks over 3 days
 PSD sampling before each test run adds appreciable cost and
increases likelihood of non compliance
Lessons Learned
10
© 2015 Contech Engineered Solutions LLC
 Protocol is robust and has been proven feasible to implement
 Protocol and process require substantial financial investment
 Protocol implementation could be improved with tweaks to test
requirements
 CDS in early stages of CETV verification process
 Process creates a substantial amount of data but there is little
guidance for using data at local level
o Ideally policy or guidance on use of results should be created to aid
local users and drive consistency
 Consistent implementation of verification process and local
regulatory policy will be critical to success of program
Discussion
11
© 2015 Contech Engineered Solutions LLC
Questions
Derek Berg
dberg@conteches.com
207-885-6174
Thank You!!
12

Contenu connexe

Tendances

General_ENTRION_Presentation_December2015
General_ENTRION_Presentation_December2015General_ENTRION_Presentation_December2015
General_ENTRION_Presentation_December2015Arun Jothilingam
 
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...All4 Inc.
 
Surface Casing Vent Testing - Surface Solutions Inc.
Surface Casing Vent Testing - Surface Solutions Inc.Surface Casing Vent Testing - Surface Solutions Inc.
Surface Casing Vent Testing - Surface Solutions Inc.Mike Beck
 
Surface casing vent testing nov 13-2013
Surface casing vent testing nov 13-2013Surface casing vent testing nov 13-2013
Surface casing vent testing nov 13-2013Mike Beck
 
Automation of the Drilling System: What has been done, what is being done, an...
Automation of the Drilling System: What has been done, what is being done, an...Automation of the Drilling System: What has been done, what is being done, an...
Automation of the Drilling System: What has been done, what is being done, an...Society of Petroleum Engineers
 
Scheme for the construction of water channels
Scheme for the construction of water channelsScheme for the construction of water channels
Scheme for the construction of water channelsmirzaqadeer
 
Green Vehicles Workshop - Port Washington Police Department Presentation
Green Vehicles Workshop - Port Washington Police Department PresentationGreen Vehicles Workshop - Port Washington Police Department Presentation
Green Vehicles Workshop - Port Washington Police Department PresentationWisconsin Clean Cities
 

Tendances (9)

General_ENTRION_Presentation_December2015
General_ENTRION_Presentation_December2015General_ENTRION_Presentation_December2015
General_ENTRION_Presentation_December2015
 
Mark Van Domelen
Mark Van DomelenMark Van Domelen
Mark Van Domelen
 
Los Angeles County's Sustainable Roadway Improvement Program
Los Angeles County's Sustainable Roadway Improvement ProgramLos Angeles County's Sustainable Roadway Improvement Program
Los Angeles County's Sustainable Roadway Improvement Program
 
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...
 
Surface Casing Vent Testing - Surface Solutions Inc.
Surface Casing Vent Testing - Surface Solutions Inc.Surface Casing Vent Testing - Surface Solutions Inc.
Surface Casing Vent Testing - Surface Solutions Inc.
 
Surface casing vent testing nov 13-2013
Surface casing vent testing nov 13-2013Surface casing vent testing nov 13-2013
Surface casing vent testing nov 13-2013
 
Automation of the Drilling System: What has been done, what is being done, an...
Automation of the Drilling System: What has been done, what is being done, an...Automation of the Drilling System: What has been done, what is being done, an...
Automation of the Drilling System: What has been done, what is being done, an...
 
Scheme for the construction of water channels
Scheme for the construction of water channelsScheme for the construction of water channels
Scheme for the construction of water channels
 
Green Vehicles Workshop - Port Washington Police Department Presentation
Green Vehicles Workshop - Port Washington Police Department PresentationGreen Vehicles Workshop - Port Washington Police Department Presentation
Green Vehicles Workshop - Port Washington Police Department Presentation
 

Similaire à Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluation Process for Oil-Grit Separators

Eelco Kruizinga: A Matchmaking Assistant to support developing countries in b...
Eelco Kruizinga: A Matchmaking Assistant to support developing countries in b...Eelco Kruizinga: A Matchmaking Assistant to support developing countries in b...
Eelco Kruizinga: A Matchmaking Assistant to support developing countries in b...Semantic Web Company
 
RE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delaysRE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delaysIEA_RETD
 
EEP Mekong: 6th Call for Proposals Meeting in Vientiane, 22 June 2016
EEP Mekong: 6th Call for Proposals Meeting in Vientiane, 22 June 2016EEP Mekong: 6th Call for Proposals Meeting in Vientiane, 22 June 2016
EEP Mekong: 6th Call for Proposals Meeting in Vientiane, 22 June 2016EEP Mekong
 
Landfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term EfficiencyLandfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term EfficiencyHydroTerra Pty Ltd
 
Bridging the Gap in Flow Measurement
Bridging the Gap in Flow MeasurementBridging the Gap in Flow Measurement
Bridging the Gap in Flow MeasurementBailey LeRoux
 
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and CompliancePotential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and ComplianceAll4 Inc.
 
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmFERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmDNVGLEnergy
 
CCXG Workshop, February 2021, Key takeaways
CCXG Workshop, February 2021, Key takeawaysCCXG Workshop, February 2021, Key takeaways
CCXG Workshop, February 2021, Key takeawaysOECD Environment
 
White paper on Quality by Design
White paper on Quality by DesignWhite paper on Quality by Design
White paper on Quality by DesignBir Gujral PhD, MBA
 
1._BWMS_commissioning_post_webinar_doc.pdf
1._BWMS_commissioning_post_webinar_doc.pdf1._BWMS_commissioning_post_webinar_doc.pdf
1._BWMS_commissioning_post_webinar_doc.pdfrafael442748
 
"Building the Single Market for Green Products" | Michele Galatola
"Building the Single Market for Green Products" | Michele Galatola"Building the Single Market for Green Products" | Michele Galatola
"Building the Single Market for Green Products" | Michele GalatolaCerame-Unie
 
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...Kevin Perry
 
Reduce Release Cycle Time: Nine Months to a Week - Nice!
Reduce Release Cycle Time: Nine Months to a Week - Nice!Reduce Release Cycle Time: Nine Months to a Week - Nice!
Reduce Release Cycle Time: Nine Months to a Week - Nice!TechWell
 
Q & A session on the Kyoto Protocol's clean development mechanism
Q & A session on the Kyoto Protocol's clean development mechanismQ & A session on the Kyoto Protocol's clean development mechanism
Q & A session on the Kyoto Protocol's clean development mechanismUNFCCC
 
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...International Hydropower Association
 

Similaire à Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluation Process for Oil-Grit Separators (20)

Eelco Kruizinga: A Matchmaking Assistant to support developing countries in b...
Eelco Kruizinga: A Matchmaking Assistant to support developing countries in b...Eelco Kruizinga: A Matchmaking Assistant to support developing countries in b...
Eelco Kruizinga: A Matchmaking Assistant to support developing countries in b...
 
RE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delaysRE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delays
 
EEP Mekong: 6th Call for Proposals Meeting in Vientiane, 22 June 2016
EEP Mekong: 6th Call for Proposals Meeting in Vientiane, 22 June 2016EEP Mekong: 6th Call for Proposals Meeting in Vientiane, 22 June 2016
EEP Mekong: 6th Call for Proposals Meeting in Vientiane, 22 June 2016
 
Landfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term EfficiencyLandfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term Efficiency
 
Challenges for EPD implementation
Challenges for EPD implementationChallenges for EPD implementation
Challenges for EPD implementation
 
Bridging the Gap in Flow Measurement
Bridging the Gap in Flow MeasurementBridging the Gap in Flow Measurement
Bridging the Gap in Flow Measurement
 
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and CompliancePotential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
 
Code Blue Implementation
Code Blue ImplementationCode Blue Implementation
Code Blue Implementation
 
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmFERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
 
Environmental Product Declarations: the Who, What, Why, and How
Environmental Product Declarations: the Who, What, Why, and HowEnvironmental Product Declarations: the Who, What, Why, and How
Environmental Product Declarations: the Who, What, Why, and How
 
CCXG Workshop, February 2021, Key takeaways
CCXG Workshop, February 2021, Key takeawaysCCXG Workshop, February 2021, Key takeaways
CCXG Workshop, February 2021, Key takeaways
 
Joint Training & Certification Program
Joint Training & Certification ProgramJoint Training & Certification Program
Joint Training & Certification Program
 
White paper on Quality by Design
White paper on Quality by DesignWhite paper on Quality by Design
White paper on Quality by Design
 
1._BWMS_commissioning_post_webinar_doc.pdf
1._BWMS_commissioning_post_webinar_doc.pdf1._BWMS_commissioning_post_webinar_doc.pdf
1._BWMS_commissioning_post_webinar_doc.pdf
 
"Building the Single Market for Green Products" | Michele Galatola
"Building the Single Market for Green Products" | Michele Galatola"Building the Single Market for Green Products" | Michele Galatola
"Building the Single Market for Green Products" | Michele Galatola
 
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
 
Reduce Release Cycle Time: Nine Months to a Week - Nice!
Reduce Release Cycle Time: Nine Months to a Week - Nice!Reduce Release Cycle Time: Nine Months to a Week - Nice!
Reduce Release Cycle Time: Nine Months to a Week - Nice!
 
Q & A session on the Kyoto Protocol's clean development mechanism
Q & A session on the Kyoto Protocol's clean development mechanismQ & A session on the Kyoto Protocol's clean development mechanism
Q & A session on the Kyoto Protocol's clean development mechanism
 
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
 
NEERI_N_N_Rao.ppt
NEERI_N_N_Rao.pptNEERI_N_N_Rao.ppt
NEERI_N_N_Rao.ppt
 

Plus de Contech Engineered Solutions

Taking out the Trash: Setting achievable trash discharge reduction goals and ...
Taking out the Trash:Setting achievable trash discharge reduction goals and ...Taking out the Trash:Setting achievable trash discharge reduction goals and ...
Taking out the Trash: Setting achievable trash discharge reduction goals and ...Contech Engineered Solutions
 
Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution Contech Engineered Solutions
 
Underground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinUnderground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinContech Engineered Solutions
 
Enhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP'sEnhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP'sContech Engineered Solutions
 

Plus de Contech Engineered Solutions (18)

Site Solutions by Contech
Site Solutions by ContechSite Solutions by Contech
Site Solutions by Contech
 
CMP Solutions by Contech
CMP Solutions by ContechCMP Solutions by Contech
CMP Solutions by Contech
 
2018 Contech Calendar
2018 Contech Calendar2018 Contech Calendar
2018 Contech Calendar
 
Contech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial MarketsContech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial Markets
 
Contech DuroMaxx Steel Reinforced Polyethylene
Contech DuroMaxx Steel Reinforced PolyethyleneContech DuroMaxx Steel Reinforced Polyethylene
Contech DuroMaxx Steel Reinforced Polyethylene
 
2017 Contech Calendar
2017 Contech Calendar2017 Contech Calendar
2017 Contech Calendar
 
2016 Contech Calendar
2016 Contech Calendar2016 Contech Calendar
2016 Contech Calendar
 
How Stormwater Treatment Trains Work
How Stormwater Treatment Trains WorkHow Stormwater Treatment Trains Work
How Stormwater Treatment Trains Work
 
Taking out the Trash: Setting achievable trash discharge reduction goals and ...
Taking out the Trash:Setting achievable trash discharge reduction goals and ...Taking out the Trash:Setting achievable trash discharge reduction goals and ...
Taking out the Trash: Setting achievable trash discharge reduction goals and ...
 
How Rainwater Harvesting Works
How Rainwater Harvesting WorksHow Rainwater Harvesting Works
How Rainwater Harvesting Works
 
2015 Contech Calendar
2015 Contech Calendar2015 Contech Calendar
2015 Contech Calendar
 
Maximizing Phosphorus Load Reduction
Maximizing Phosphorus Load ReductionMaximizing Phosphorus Load Reduction
Maximizing Phosphorus Load Reduction
 
Low Impact Developement Site Planner
Low Impact Developement Site Planner Low Impact Developement Site Planner
Low Impact Developement Site Planner
 
Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution
 
Underground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinUnderground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in Wisconsin
 
Enhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP'sEnhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP's
 
Rainwater Harvesting Answer Book
Rainwater Harvesting Answer BookRainwater Harvesting Answer Book
Rainwater Harvesting Answer Book
 
Rehab Solutions for Today's Infrastructure
Rehab Solutions for Today's InfrastructureRehab Solutions for Today's Infrastructure
Rehab Solutions for Today's Infrastructure
 

Dernier

VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurSuhani Kapoor
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BHbill846304
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas💥Victoria K. Colangelo
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Tina Ji
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...ranjana rawat
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130Suhani Kapoor
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...Amil baba
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesDr. Salem Baidas
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Servicesdollysharma2066
 

Dernier (20)

VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
 
Green Banking
Green Banking Green Banking
Green Banking
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BH
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable Packaging
 
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and Challenges
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
 

Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluation Process for Oil-Grit Separators

  • 1. © 2015 Contech Engineered Solutions LLC Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluation Process for Oil-Grit Separators Presented by: Derek Berg StormCon Austin August, 5th 2015 1
  • 2. © 2015 Contech Engineered Solutions LLC  Stakeholder driven protocol development and regulatory overview  CETV protocol specifics  CETV protocol in practice, testing a full scale CDS®  Discussion Presentation Overview 2
  • 3. © 2015 Contech Engineered Solutions LLC  BMP evaluation has come a long way but remains imperfect  Equipment, methods and best practices continue to be refined  Merits of lab vs. field still debated  Resource constraints straining existing programs  Consistent implementation is essential BMP Evaluation 3
  • 4. © 2015 Contech Engineered Solutions LLC  Canadian regulatory framework requires predominantly local decision making and vetting of MTDs  Historically no Canadian specific protocols or evaluation programs for MTDs  Local decision makers often lack resources and/or expertise to complete evaluations  Some regions relying on programs such as NJCAT/NJDEP but data from those programs not always well suited for direct adoption Drivers for a CETV Protocol 4
  • 5. © 2015 Contech Engineered Solutions LLC  In 2013 Toronto and Region Conservation Authority (TRCA) convened a diverse stakeholder group to gauge interest and establish goals for a national protocol  Group agreed to use 2013 NJDEP protocol as a foundation for the process  Changes needed to make resulting data applicable to diverse local regulations  Stakeholders wanted a protocol that yielded a flexible data set  After initial stakeholder meeting TRCA took lead on drafting protocol with several rounds of stakeholder review CETV Development 5
  • 6. © 2015 Contech Engineered Solutions LLC  Mandatory performance trials at 7 operating rates ranging from 40 l/min/m2 to 1400 l/min/m2 of sedimentation area o Additional tests optional o All testing using modified mass balance with target influent of 200mg/l  PSD analysis on source sediment as well as sediment captured during each test run  Scour test component with system filled to 50% sediment capacity o Uses 1-1000um PSD for scour o 5 target loading rates between 200-2600 l/min/m2 of sedimentation area o Duplicate effluent and PSD samples collected at each operating rate  Voluntary light liquid re-entrainment test o A scour test for floatables o Low density polyethylene beads used to simulate oils CETV Protocol Specifics 6
  • 7. © 2015 Contech Engineered Solutions LLC  All testing, reporting and data submission must be completed by 3rd party facility  SSC method specified for all solids analysis  Specifies NJDEP 1-1000um PSD o D50 ~65 microns o ~20% of material less than 8 microns CETV Protocol Specifics 7
  • 8. © 2015 Contech Engineered Solutions LLC CETV Process Overview 8 Application Test at 3rd Party Facility Submission of Results Establish Performance Claim Review by Verification Entity CETV Verification Environment Canada Globe Performance Solutions Manufacturer/3rd Party Lab Toronto and Region Conservation Authority Regional/Local Regulatory Authority Stakeholders:
  • 9. © 2015 Contech Engineered Solutions LLC 2014: CDS-4 tested at Alden Research Labs in Holden, MA CETV in Practice 9
  • 10. © 2015 Contech Engineered Solutions LLC  Initial PSD tolerances and sampling requirements made sediment compliance difficult o + or – 3% tolerances changed to + or – 6%  Mass balance approach results in lengthy run times at low operating rates o Min 11.3kg sediment per trial o CDS trial at 40 l/min/m2 was 21.4 hours o Test run in 3 chunks over 3 days  PSD sampling before each test run adds appreciable cost and increases likelihood of non compliance Lessons Learned 10
  • 11. © 2015 Contech Engineered Solutions LLC  Protocol is robust and has been proven feasible to implement  Protocol and process require substantial financial investment  Protocol implementation could be improved with tweaks to test requirements  CDS in early stages of CETV verification process  Process creates a substantial amount of data but there is little guidance for using data at local level o Ideally policy or guidance on use of results should be created to aid local users and drive consistency  Consistent implementation of verification process and local regulatory policy will be critical to success of program Discussion 11
  • 12. © 2015 Contech Engineered Solutions LLC Questions Derek Berg dberg@conteches.com 207-885-6174 Thank You!! 12