SlideShare une entreprise Scribd logo
1  sur  2
Télécharger pour lire hors ligne
Resin Bolting Problems?
Resin bolting has traditionally been an in-exact science where pull testing is typically the only means to verify installation quality. Variables
such as: Bolter Operator, spinning time, age of resin and storage conditions, viscosity of resin, hole diameter consistency and temperatures
can affect the resin mix.
These and other variables can lead to issues such as: under mixed resin, over spinning of resin, gloving of the resin cartridge, non-centered
bolts, voids in resin anchorages, and resin pumping when using all thread bolts.
When pull testing a fully grouted bolt, the mine engineer cannot be certain that the entire resin column is properly mixed…especially the last
18” of the bolt - which is the most critical part of the bolting system because it is anchored in competent rock.
This, of course, begs the question: How safe and secure is your resin bolting program?
Are you truly satisfied with your resin bolting looking like this? Is it worth risking lives and revenue?
Sigma DG Corporation 360.859.3170 www.mateenfrp.com
The Solution Is The Mixing
Sleeve
The Sigma DG Mixing Sleeve is the ONLY Solution to ELIMINATING Resin Bolting Problems and
Uncertainty
Eliminates Gloving - Completely
Centers the Bolt in the hole
Eliminates Resin Auguring out of the hole
Insures safety when hole diameters are larger than standard
Slips on over the bolt - installation is simple
Perfect Resin Mix EVERY TIME!
Sigma DG Corporation: 360.859.3170 www.mateenfrp.com

Contenu connexe

En vedette

Quantitative Verification of Some Standard Support Patterns in Japanese Tunne...
Quantitative Verification of Some Standard Support Patterns in Japanese Tunne...Quantitative Verification of Some Standard Support Patterns in Japanese Tunne...
Quantitative Verification of Some Standard Support Patterns in Japanese Tunne...Desh Sonyok
 
Power New Bolting Technology
Power New Bolting TechnologyPower New Bolting Technology
Power New Bolting TechnologyTitannortheast123
 
Ch rockfall protection_works_along_konkan_railway_route_maharashtra_and_goa
Ch rockfall protection_works_along_konkan_railway_route_maharashtra_and_goaCh rockfall protection_works_along_konkan_railway_route_maharashtra_and_goa
Ch rockfall protection_works_along_konkan_railway_route_maharashtra_and_goamaccaferriindia
 
Chapter 5 rock_slope_stabilization
Chapter 5 rock_slope_stabilizationChapter 5 rock_slope_stabilization
Chapter 5 rock_slope_stabilizationSunil Nepal
 
Site Remediation And Mitigation Plan
Site Remediation And Mitigation PlanSite Remediation And Mitigation Plan
Site Remediation And Mitigation Plandanlstout
 
1 presentación general-rde
1 presentación general-rde1 presentación general-rde
1 presentación general-rdenohearenales
 
Abs hytorc ppt (for mail)
Abs hytorc ppt (for mail) Abs hytorc ppt (for mail)
Abs hytorc ppt (for mail) advancedbolting
 
Landslide Control Measures at Jumja Slide,Bhutan
 Landslide Control Measures at Jumja Slide,Bhutan Landslide Control Measures at Jumja Slide,Bhutan
Landslide Control Measures at Jumja Slide,Bhutanskpradhan
 
8. lvrm ch11 ukraine slope stabilization 60 min
8. lvrm ch11 ukraine slope stabilization 60 min8. lvrm ch11 ukraine slope stabilization 60 min
8. lvrm ch11 ukraine slope stabilization 60 minRadmila Ustych
 
Mechanisms and mitigation of highway landslide collapse in indiana by by Male...
Mechanisms and mitigation of highway landslide collapse in indiana by by Male...Mechanisms and mitigation of highway landslide collapse in indiana by by Male...
Mechanisms and mitigation of highway landslide collapse in indiana by by Male...Dr. Malek Smadi
 
Mass movement lesson 9
Mass movement   lesson 9Mass movement   lesson 9
Mass movement lesson 9Ms Geoflake
 
Introduction to Geotechnical Engineering SU - Fall 2015
Introduction to Geotechnical Engineering   SU - Fall 2015Introduction to Geotechnical Engineering   SU - Fall 2015
Introduction to Geotechnical Engineering SU - Fall 2015bhaladog
 
Slope stabilty
Slope stabiltySlope stabilty
Slope stabiltyRiyaz Bhat
 

En vedette (20)

1 Macro Intro 2008
1  Macro Intro 20081  Macro Intro 2008
1 Macro Intro 2008
 
Chapter6
Chapter6Chapter6
Chapter6
 
Quantitative Verification of Some Standard Support Patterns in Japanese Tunne...
Quantitative Verification of Some Standard Support Patterns in Japanese Tunne...Quantitative Verification of Some Standard Support Patterns in Japanese Tunne...
Quantitative Verification of Some Standard Support Patterns in Japanese Tunne...
 
4 Barrier Design 2008
4   Barrier Design 20084   Barrier Design 2008
4 Barrier Design 2008
 
Power New Bolting Technology
Power New Bolting TechnologyPower New Bolting Technology
Power New Bolting Technology
 
Ch rockfall protection_works_along_konkan_railway_route_maharashtra_and_goa
Ch rockfall protection_works_along_konkan_railway_route_maharashtra_and_goaCh rockfall protection_works_along_konkan_railway_route_maharashtra_and_goa
Ch rockfall protection_works_along_konkan_railway_route_maharashtra_and_goa
 
Chapter 5 rock_slope_stabilization
Chapter 5 rock_slope_stabilizationChapter 5 rock_slope_stabilization
Chapter 5 rock_slope_stabilization
 
Site Remediation And Mitigation Plan
Site Remediation And Mitigation PlanSite Remediation And Mitigation Plan
Site Remediation And Mitigation Plan
 
NATM-Time cycle presentation (2)
NATM-Time cycle presentation (2)NATM-Time cycle presentation (2)
NATM-Time cycle presentation (2)
 
1 presentación general-rde
1 presentación general-rde1 presentación general-rde
1 presentación general-rde
 
Abs hytorc ppt (for mail)
Abs hytorc ppt (for mail) Abs hytorc ppt (for mail)
Abs hytorc ppt (for mail)
 
Slope Movement
Slope MovementSlope Movement
Slope Movement
 
spar iso
spar isospar iso
spar iso
 
Landslide Control Measures at Jumja Slide,Bhutan
 Landslide Control Measures at Jumja Slide,Bhutan Landslide Control Measures at Jumja Slide,Bhutan
Landslide Control Measures at Jumja Slide,Bhutan
 
8. lvrm ch11 ukraine slope stabilization 60 min
8. lvrm ch11 ukraine slope stabilization 60 min8. lvrm ch11 ukraine slope stabilization 60 min
8. lvrm ch11 ukraine slope stabilization 60 min
 
Mechanisms and mitigation of highway landslide collapse in indiana by by Male...
Mechanisms and mitigation of highway landslide collapse in indiana by by Male...Mechanisms and mitigation of highway landslide collapse in indiana by by Male...
Mechanisms and mitigation of highway landslide collapse in indiana by by Male...
 
Mass movement lesson 9
Mass movement   lesson 9Mass movement   lesson 9
Mass movement lesson 9
 
LANDSLIDE HAZARDS: LEARNING FROM GLOBAL DISASTER LABORATORIES
LANDSLIDE HAZARDS: LEARNING FROM GLOBAL DISASTER LABORATORIESLANDSLIDE HAZARDS: LEARNING FROM GLOBAL DISASTER LABORATORIES
LANDSLIDE HAZARDS: LEARNING FROM GLOBAL DISASTER LABORATORIES
 
Introduction to Geotechnical Engineering SU - Fall 2015
Introduction to Geotechnical Engineering   SU - Fall 2015Introduction to Geotechnical Engineering   SU - Fall 2015
Introduction to Geotechnical Engineering SU - Fall 2015
 
Slope stabilty
Slope stabiltySlope stabilty
Slope stabilty
 

Mixing Sleeve Info.

  • 1. Resin Bolting Problems? Resin bolting has traditionally been an in-exact science where pull testing is typically the only means to verify installation quality. Variables such as: Bolter Operator, spinning time, age of resin and storage conditions, viscosity of resin, hole diameter consistency and temperatures can affect the resin mix. These and other variables can lead to issues such as: under mixed resin, over spinning of resin, gloving of the resin cartridge, non-centered bolts, voids in resin anchorages, and resin pumping when using all thread bolts. When pull testing a fully grouted bolt, the mine engineer cannot be certain that the entire resin column is properly mixed…especially the last 18” of the bolt - which is the most critical part of the bolting system because it is anchored in competent rock. This, of course, begs the question: How safe and secure is your resin bolting program? Are you truly satisfied with your resin bolting looking like this? Is it worth risking lives and revenue? Sigma DG Corporation 360.859.3170 www.mateenfrp.com
  • 2. The Solution Is The Mixing Sleeve The Sigma DG Mixing Sleeve is the ONLY Solution to ELIMINATING Resin Bolting Problems and Uncertainty Eliminates Gloving - Completely Centers the Bolt in the hole Eliminates Resin Auguring out of the hole Insures safety when hole diameters are larger than standard Slips on over the bolt - installation is simple Perfect Resin Mix EVERY TIME! Sigma DG Corporation: 360.859.3170 www.mateenfrp.com