May 4, 2023
Eglinton Crosstown LRT
Construction Liaison Meeting
Brentcliffe Road to Victoria Park Avenue
LAND ACKNOWLEDGEMENT
2
Let us take a moment to acknowledge we are on lands that have been, and continue to be, home to many
Indigenous Peoples including the Anishnabeg, the Haudenosaunee and the Huron-Wendat peoples.
We are all Treaty people. Many of us have come here as settlers, as immigrants or involuntarily as part of the
trans-Atlantic slave trade, in this generation, or generations past.
We acknowledge the historic and continued impacts of colonization and the need to work towards meaningful
reconciliation with the original caretakers of this land.
We acknowledge that Metrolinx operates on territories and lands covered by many treaties that affirm and value
the rights of Indigenous communities, Nations and Peoples.
We understand the importance of working towards reconciliation with the original caretakers of this land. At
Metrolinx, we will conduct business in a manner that is built on a foundation of trust, respect and collaboration.
Section One At-Grade:
Brentcliffe Portal to Sunnybrook Park Stop
SECTION ONE AT-GRADE UPDATE
4
Activity Location Approx. Date & Duration
Vehicle Testing Brentcliffe – Kennedy Ongoing
Noise Barrier and Soil Nail Wall
removal
Brentcliffe intersection – SE side
As early as Monday, May 1, 2023, for
approximately two (2) months
Landscaping along Eglinton Brentcliffe – Kennedy Ongoing through Summer 2023
Brentcliffe Retaining Wall: Landscape
Restoration Works
North side of Eglinton Ave, east of
Brentcliffe Rd
Ongoing through Summer 2023
Multi-use path construction:
Landscaping works
Serena Gundy Park – West of Leslie St. Ongoing through late-Spring 2023
Architectural and Electrical Finishes Sunnybrook Park Stop Ongoing through Spring 2023
EAST TESTING & COMMISSIONING
5
• On May 25, 26, 27, 31 and June 1 and 2, 6 light
rail vehicles (LRVs) were delivered to the east end
of the alignment.
• Testing and commissioning activities will be
conducted between Brentcliffe Road and Kennedy
Road through 2023.
• Dynamic Testing began August 24, 2021, and will
last through 2023.
• The LRVs will run mainly on the surface along a
track in the center of Eglinton Avenue.
NOISE BARRIER AND SOIL NAIL WALL REMOVAL ON EGLINTON AVE EAST, EAST OF BRENTCLIFFE RD
6
As early as Monday, May 1, 2023, for approximately two (2) months
• As early as Monday, May 1, 2023,
crews will begin removing the
temporary noise barrier wall and soil
nail wall located on the south side of
Eglinton Ave E, east of Brentcliffe Rd.
• The temporary walls were erected in
2014 to facilitate the construction of
the east portal.
• Eastbound traffic on Eglinton Ave E will
be reduced to one lane between
Brentcliffe Rd and Leslie St.
• The sidewalk on the south side of
Eglinton Ave E between Brentcliffe Rd
and Leslie St will be restricted.
Pedestrians will be directed to use the
north sidewalk.
• Noise from construction activities can
be expected.
• Work will take place between 6am and
7pm.
LESLIE TRAFFIC CONFIGURATION
7
Through early 2023
• Periodic short-term lane closures will be required during this traffic stage to facilitate specific activities
• Fencing will remain in place around the Station Entrances for security purposes
CONSTRUCTION PROGRESS PHOTOS
8
INSTALLATION OF BENCHES AT
LESLIE WALL (COMPLETED)
TRAFFIC SIGNAGE INSTALLATION
ALONG EGLINTON (ONGOING)
Science Centre Station
SCIENCE CENTRE STATION UPDATE
10
Activity Location Approx. Date & Duration
Vehicle Testing Brentcliffe – Kennedy Ongoing
Utility Work
Don Mills Road and Eglinton
Avenue East
As early as Monday, May 1, 2023, for
approximately two (2) weeks
Landscaping along Eglinton Brentcliffe – Kennedy Ongoing through Spring 2023
Finishing Activities:
• Electrical, mechanical, and
architectural finishes. Systems testing
and inspections, and station cleaning.
Station Box Underway through 2023
Finishing Activities:
• Ceiling tiling, cladding, sign band
installations, electrical and
architectural finishes, and station
cleaning.
Bus Terminal
Underway through 2023
Finishing Activities:
• Ceiling tiling, cladding, sign band
installations, and electrical and
architectural finishes. Station testing
and inspections and station cleaning.
Main Entrance
Underway through 2023
LANE CLOSURES AT SCIENCE CENTRE STATION FOR UTILITY WORKS
11
As early as Monday, May 1, 2023, for approximately two (2) weeks
• Crews at Science Centre Station are performing utility works on Don Mills Rd, north of Eglinton Ave E
• Southbound traffic on Don Mills Rd will be reduced to three lanes at Eglinton Ave E
• The crosswalk on the north side of the intersection will be restricted; all other crosswalks will be
maintained.
• The TTC bus stop located at the northwest corner will be temporarily relocated approximately 15
metres north.
• This work is expected to take place between 7:00 a.m. and 5:30 p.m.
SCIENCE CENTRE TRAFFIC CONFIGURATION
12
Through early 2023
• Periodic short-term lane closures will be required during this traffic stage to facilitate specific activities
• Fencing will remain in place around the Station Entrances for security purposes
CONSTRUCTION PROGRESS PHOTOS
13
STATION BOX
STATION BOX
Section Two At-Grade
Aga Khan Park & Museum Stop to O’Connor Stop
SECTION TWO AT-GRADE UPDATE
15
Activity Location Approx. Date & Duration
Vehicle Testing Brentcliffe – Kennedy Ongoing
Landscaping along Eglinton Brentcliffe – Kennedy Ongoing through Summer 2023
Architectural and electrical finishes
Aga Khan Park & Museum Stop
Wynford Stop
Sloane Stop
O’Connor Stop
Underway through early 2023
Utility Works
Eglinton Avenue East and Wynford
Drive
As early as Monday, April 24, 2023, for
approximately two (2) weeks
Utility Works
Eglinton Avenue East, between
Wynford Drive and Credit Union
Drive
As early as Friday, March 27, 2023, for
approximately six (6) weeks
Platform Works Sloane Stop
As early as Friday, April 21, 2023, for approximately
one (1) month
Watermain Restoration Works Eglinton at Gervais Drive Ongoing until mid-May 2023
RESTRICTED ACCESS TO THE WESTBOUND LANES ON EGLINTON AVENUE EAST
FROM WYNFORD DRIVE FOR UTILITY WORKS
16
As early as Monday April 24, for approximately two (2) weeks
• Crews are currently
performing utility works on
the westbound ramp of
Wynford Drive at Eglinton
Avenue East.
• The westbound ramp on
Wynford Drive will be closed.
Access to the westbound lanes
on Eglinton Avenue East from
Wynford Drive will be
restricted.
• This work is expected to take
place on Monday – Friday,
between 6:00 a.m. and 7:00
p.m.
• Noise from construction
activities can be expected.
UTILITY WORKS ON EGLINTON AVENUE EAST BETWEEN WYNFORD DRIVE AND
CREDIT UNION DRIVE
17
As early as Monday March 27, for approximately six (6) weeks
• Crews are currently performing utility works on Eglinton Ave E at the Traction Power Substation (TPSS)
9 Building.
• Eastbound traffic on Eglinton Ave E will be reduced to one through lane between Wynford Dr and
Credit Union Dr.
• The sidewalk on the south side of Eglinton Ave E will be closed between the DVP off ramp and Credit
Union Dr. Pedestrians will be redirected to use the north sidewalk.
• This works is expected to take place between 6:00 a.m. to 7:00 p.m.
• Noise from construction activities can be expected.
PLATFORM WORKS AT SLOANE STOP ON EGLINTON AVENUE EAST
18
As early as Friday, April 21, 2023, for approximately one (1) month
• Crews are currently working to
repair an uneven layer of
concrete at the Sloane Stop on
Eglinton Avenue East.
• Noise from construction activities,
including chipping, hammering,
concrete breaking and pouring,
can be expected.
• No changes to the current
traffic or pedestrian routes are
expected.
• This works is expected to take
place on Monday – Friday
between 7:00 a.m. to 5:00
p.m.
WATERMAIN RESTORATION WORKS ON EGLINTON AVENUE EAST AT GERVAIS DRIVE
- CONTINUED
19
Ongoing until approx. mid-May 2023
• Northbound traffic to Gervais Drive
will be restricted.
• One lane of southbound traffic on
Gervais Drive will be maintained.
• The left turn from Gervais Drive
onto Eglinton Avenue East will
remain restricted.
• Work is expected to take place for
approx. 2 weeks
• Work is expected to take place
between 6:00 a.m. and 7:00 p.m.
CONSTRUCTION PROGRESS PHOTOS
20
PRESTO MACHINE INSTALLATIONS
COMPLETED AT ALL AT-GRADE STOPS
AGA KHAN PARK & MUSEUM STOP
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx

Contenu connexe

Similaire à CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx

CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
Crosstown TO
 

Similaire à CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx (20)

Chaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxChaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptx
 
Leaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfLeaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdf
 
Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023 Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023
 
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxPharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
 
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
 
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
 
Brentcliffe to Victoria Park CLC Meeting - Presentation - November 4, 2021
Brentcliffe to Victoria Park CLC Meeting -  Presentation - November 4, 2021 Brentcliffe to Victoria Park CLC Meeting -  Presentation - November 4, 2021
Brentcliffe to Victoria Park CLC Meeting - Presentation - November 4, 2021
 
Eglinton and Mount Pleasant CLC - March 10, 2021
Eglinton and Mount Pleasant CLC - March 10, 2021Eglinton and Mount Pleasant CLC - March 10, 2021
Eglinton and Mount Pleasant CLC - March 10, 2021
 
Western Works CLC - May 16, 2023
 Western Works CLC - May 16, 2023 Western Works CLC - May 16, 2023
Western Works CLC - May 16, 2023
 
Chaplin-Avenue CLC - May 4 2022-compressed.pptx
Chaplin-Avenue CLC - May 4 2022-compressed.pptxChaplin-Avenue CLC - May 4 2022-compressed.pptx
Chaplin-Avenue CLC - May 4 2022-compressed.pptx
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
 
Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020
 
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
 
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
 
Western Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdfWestern Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdf
 
Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee Meeting
 
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
CLC Deck - Brentcliffe to Victoria Park - May 5 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - May 5 2022.pdfCLC Deck - Brentcliffe to Victoria Park - May 5 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - May 5 2022.pdf
 

Plus de Crosstown TO

Plus de Crosstown TO (13)

Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfEglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
 
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfEglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
 
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxChaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
 
Chaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxChaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptx
 
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfEglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
 
Leaside-Laird CLC - Nov 14, 2022.pdf
Leaside-Laird CLC - Nov 14, 2022.pdfLeaside-Laird CLC - Nov 14, 2022.pdf
Leaside-Laird CLC - Nov 14, 2022.pdf
 
Eglinton - Mt Pleasant CLC - November 9, 2022.pdf
Eglinton - Mt Pleasant CLC - November 9, 2022.pdfEglinton - Mt Pleasant CLC - November 9, 2022.pdf
Eglinton - Mt Pleasant CLC - November 9, 2022.pdf
 
Test
TestTest
Test
 
Leaside-Laird CLC - May 9 2022 - Revised.pdf
Leaside-Laird CLC - May 9 2022 - Revised.pdfLeaside-Laird CLC - May 9 2022 - Revised.pdf
Leaside-Laird CLC - May 9 2022 - Revised.pdf
 
Leaside-Laird CLC - March 14 2022 - v2.pdf
Leaside-Laird CLC - March 14 2022 - v2.pdfLeaside-Laird CLC - March 14 2022 - v2.pdf
Leaside-Laird CLC - March 14 2022 - v2.pdf
 
CLC Deck - Brentcliffe to Victoria Park - July 7 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - July 7 2022.pdfCLC Deck - Brentcliffe to Victoria Park - July 7 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - July 7 2022.pdf
 
CLC Pharmacy to Kennedy - July 26, 2022 Compressed.pptx
CLC Pharmacy to Kennedy - July 26, 2022 Compressed.pptxCLC Pharmacy to Kennedy - July 26, 2022 Compressed.pptx
CLC Pharmacy to Kennedy - July 26, 2022 Compressed.pptx
 
Chaplin-Avenue CLC - Sept 14, 2022 compressed .pptx
Chaplin-Avenue CLC - Sept 14, 2022 compressed .pptxChaplin-Avenue CLC - Sept 14, 2022 compressed .pptx
Chaplin-Avenue CLC - Sept 14, 2022 compressed .pptx
 

Dernier

Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi EscortsRussian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Monica Sydney
 
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Menggugurkan Kandungan 087776558899
 
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
HyderabadDolls
 

Dernier (20)

Lorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final PresentationLorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final Presentation
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s education
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
 
Vivek @ Cheap Call Girls In Kamla Nagar | Book 8448380779 Extreme Call Girls ...
Vivek @ Cheap Call Girls In Kamla Nagar | Book 8448380779 Extreme Call Girls ...Vivek @ Cheap Call Girls In Kamla Nagar | Book 8448380779 Extreme Call Girls ...
Vivek @ Cheap Call Girls In Kamla Nagar | Book 8448380779 Extreme Call Girls ...
 
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi EscortsRussian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
 
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32
 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.
 
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
 
Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218
 
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
 
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
 
Private Call Girls Bidar 9332606886Call Girls Advance Cash On Delivery Service
Private Call Girls Bidar  9332606886Call Girls Advance Cash On Delivery ServicePrivate Call Girls Bidar  9332606886Call Girls Advance Cash On Delivery Service
Private Call Girls Bidar 9332606886Call Girls Advance Cash On Delivery Service
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 

CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx

  • 1. May 4, 2023 Eglinton Crosstown LRT Construction Liaison Meeting Brentcliffe Road to Victoria Park Avenue
  • 2. LAND ACKNOWLEDGEMENT 2 Let us take a moment to acknowledge we are on lands that have been, and continue to be, home to many Indigenous Peoples including the Anishnabeg, the Haudenosaunee and the Huron-Wendat peoples. We are all Treaty people. Many of us have come here as settlers, as immigrants or involuntarily as part of the trans-Atlantic slave trade, in this generation, or generations past. We acknowledge the historic and continued impacts of colonization and the need to work towards meaningful reconciliation with the original caretakers of this land. We acknowledge that Metrolinx operates on territories and lands covered by many treaties that affirm and value the rights of Indigenous communities, Nations and Peoples. We understand the importance of working towards reconciliation with the original caretakers of this land. At Metrolinx, we will conduct business in a manner that is built on a foundation of trust, respect and collaboration.
  • 3. Section One At-Grade: Brentcliffe Portal to Sunnybrook Park Stop
  • 4. SECTION ONE AT-GRADE UPDATE 4 Activity Location Approx. Date & Duration Vehicle Testing Brentcliffe – Kennedy Ongoing Noise Barrier and Soil Nail Wall removal Brentcliffe intersection – SE side As early as Monday, May 1, 2023, for approximately two (2) months Landscaping along Eglinton Brentcliffe – Kennedy Ongoing through Summer 2023 Brentcliffe Retaining Wall: Landscape Restoration Works North side of Eglinton Ave, east of Brentcliffe Rd Ongoing through Summer 2023 Multi-use path construction: Landscaping works Serena Gundy Park – West of Leslie St. Ongoing through late-Spring 2023 Architectural and Electrical Finishes Sunnybrook Park Stop Ongoing through Spring 2023
  • 5. EAST TESTING & COMMISSIONING 5 • On May 25, 26, 27, 31 and June 1 and 2, 6 light rail vehicles (LRVs) were delivered to the east end of the alignment. • Testing and commissioning activities will be conducted between Brentcliffe Road and Kennedy Road through 2023. • Dynamic Testing began August 24, 2021, and will last through 2023. • The LRVs will run mainly on the surface along a track in the center of Eglinton Avenue.
  • 6. NOISE BARRIER AND SOIL NAIL WALL REMOVAL ON EGLINTON AVE EAST, EAST OF BRENTCLIFFE RD 6 As early as Monday, May 1, 2023, for approximately two (2) months • As early as Monday, May 1, 2023, crews will begin removing the temporary noise barrier wall and soil nail wall located on the south side of Eglinton Ave E, east of Brentcliffe Rd. • The temporary walls were erected in 2014 to facilitate the construction of the east portal. • Eastbound traffic on Eglinton Ave E will be reduced to one lane between Brentcliffe Rd and Leslie St. • The sidewalk on the south side of Eglinton Ave E between Brentcliffe Rd and Leslie St will be restricted. Pedestrians will be directed to use the north sidewalk. • Noise from construction activities can be expected. • Work will take place between 6am and 7pm.
  • 7. LESLIE TRAFFIC CONFIGURATION 7 Through early 2023 • Periodic short-term lane closures will be required during this traffic stage to facilitate specific activities • Fencing will remain in place around the Station Entrances for security purposes
  • 8. CONSTRUCTION PROGRESS PHOTOS 8 INSTALLATION OF BENCHES AT LESLIE WALL (COMPLETED) TRAFFIC SIGNAGE INSTALLATION ALONG EGLINTON (ONGOING)
  • 10. SCIENCE CENTRE STATION UPDATE 10 Activity Location Approx. Date & Duration Vehicle Testing Brentcliffe – Kennedy Ongoing Utility Work Don Mills Road and Eglinton Avenue East As early as Monday, May 1, 2023, for approximately two (2) weeks Landscaping along Eglinton Brentcliffe – Kennedy Ongoing through Spring 2023 Finishing Activities: • Electrical, mechanical, and architectural finishes. Systems testing and inspections, and station cleaning. Station Box Underway through 2023 Finishing Activities: • Ceiling tiling, cladding, sign band installations, electrical and architectural finishes, and station cleaning. Bus Terminal Underway through 2023 Finishing Activities: • Ceiling tiling, cladding, sign band installations, and electrical and architectural finishes. Station testing and inspections and station cleaning. Main Entrance Underway through 2023
  • 11. LANE CLOSURES AT SCIENCE CENTRE STATION FOR UTILITY WORKS 11 As early as Monday, May 1, 2023, for approximately two (2) weeks • Crews at Science Centre Station are performing utility works on Don Mills Rd, north of Eglinton Ave E • Southbound traffic on Don Mills Rd will be reduced to three lanes at Eglinton Ave E • The crosswalk on the north side of the intersection will be restricted; all other crosswalks will be maintained. • The TTC bus stop located at the northwest corner will be temporarily relocated approximately 15 metres north. • This work is expected to take place between 7:00 a.m. and 5:30 p.m.
  • 12. SCIENCE CENTRE TRAFFIC CONFIGURATION 12 Through early 2023 • Periodic short-term lane closures will be required during this traffic stage to facilitate specific activities • Fencing will remain in place around the Station Entrances for security purposes
  • 14. Section Two At-Grade Aga Khan Park & Museum Stop to O’Connor Stop
  • 15. SECTION TWO AT-GRADE UPDATE 15 Activity Location Approx. Date & Duration Vehicle Testing Brentcliffe – Kennedy Ongoing Landscaping along Eglinton Brentcliffe – Kennedy Ongoing through Summer 2023 Architectural and electrical finishes Aga Khan Park & Museum Stop Wynford Stop Sloane Stop O’Connor Stop Underway through early 2023 Utility Works Eglinton Avenue East and Wynford Drive As early as Monday, April 24, 2023, for approximately two (2) weeks Utility Works Eglinton Avenue East, between Wynford Drive and Credit Union Drive As early as Friday, March 27, 2023, for approximately six (6) weeks Platform Works Sloane Stop As early as Friday, April 21, 2023, for approximately one (1) month Watermain Restoration Works Eglinton at Gervais Drive Ongoing until mid-May 2023
  • 16. RESTRICTED ACCESS TO THE WESTBOUND LANES ON EGLINTON AVENUE EAST FROM WYNFORD DRIVE FOR UTILITY WORKS 16 As early as Monday April 24, for approximately two (2) weeks • Crews are currently performing utility works on the westbound ramp of Wynford Drive at Eglinton Avenue East. • The westbound ramp on Wynford Drive will be closed. Access to the westbound lanes on Eglinton Avenue East from Wynford Drive will be restricted. • This work is expected to take place on Monday – Friday, between 6:00 a.m. and 7:00 p.m. • Noise from construction activities can be expected.
  • 17. UTILITY WORKS ON EGLINTON AVENUE EAST BETWEEN WYNFORD DRIVE AND CREDIT UNION DRIVE 17 As early as Monday March 27, for approximately six (6) weeks • Crews are currently performing utility works on Eglinton Ave E at the Traction Power Substation (TPSS) 9 Building. • Eastbound traffic on Eglinton Ave E will be reduced to one through lane between Wynford Dr and Credit Union Dr. • The sidewalk on the south side of Eglinton Ave E will be closed between the DVP off ramp and Credit Union Dr. Pedestrians will be redirected to use the north sidewalk. • This works is expected to take place between 6:00 a.m. to 7:00 p.m. • Noise from construction activities can be expected.
  • 18. PLATFORM WORKS AT SLOANE STOP ON EGLINTON AVENUE EAST 18 As early as Friday, April 21, 2023, for approximately one (1) month • Crews are currently working to repair an uneven layer of concrete at the Sloane Stop on Eglinton Avenue East. • Noise from construction activities, including chipping, hammering, concrete breaking and pouring, can be expected. • No changes to the current traffic or pedestrian routes are expected. • This works is expected to take place on Monday – Friday between 7:00 a.m. to 5:00 p.m.
  • 19. WATERMAIN RESTORATION WORKS ON EGLINTON AVENUE EAST AT GERVAIS DRIVE - CONTINUED 19 Ongoing until approx. mid-May 2023 • Northbound traffic to Gervais Drive will be restricted. • One lane of southbound traffic on Gervais Drive will be maintained. • The left turn from Gervais Drive onto Eglinton Avenue East will remain restricted. • Work is expected to take place for approx. 2 weeks • Work is expected to take place between 6:00 a.m. and 7:00 p.m.
  • 20. CONSTRUCTION PROGRESS PHOTOS 20 PRESTO MACHINE INSTALLATIONS COMPLETED AT ALL AT-GRADE STOPS AGA KHAN PARK & MUSEUM STOP