Eglinton Crosstown LRT
Leaside-Laird CLC
LAND ACKNOWLEDGEMENT
2
Let us take a moment to acknowledge we are on lands that have been, and continue to be, home to many
Indigenous Peoples including the Anishnabeg, the Haudenosaunee and the Huron-Wendat peoples.
We are all Treaty people. Many of us have come here as settlers, as immigrants or involuntarily as part of the
trans-Atlantic slave trade, in this generation, or generations past.
We acknowledge the historic and continued impacts of colonization and the need to work towards
meaningful reconciliation with the original caretakers of this land.
We acknowledge that Metrolinx operates on territories and lands covered by many treaties that affirm and
value the rights of Indigenous communities, Nations and Peoples.
We understand the importance of working towards reconciliation with the original caretakers of this land. At
Metrolinx, we will conduct business in a manner that is built on a foundation of trust, respect and
collaboration.
Leaside Station
LEASIDE STATION UPDATE
4
Activity Location Approx. Date & Duration
Station Box Construction
Architectural finishes, mechanical electrical works,
and testing and commissioning
Underneath Eglinton Avenue within the
Station Box
Underway through Spring 2023
Main Entrance Construction
Architectural works, mechanical electrical
installations, and landscaping
South east corner of Bayview Ave and
Eglinton Ave
Underway through Spring 2023
Secondary Entrance Construction
Architectural works, mechanical electrical
installations, and landscaping
North west corner of Bayview Ave and
Eglinton Ave
Underway through Spring 2023
Final Paving and Traffic Line Painting Eglinton Ave and Bayview Ave Spring 2023
CURRENT TRAFFIC CONFIGURATION
5
Expected through Spring 2023
CONSTRUCTION PROGRESS PHOTOS
6
CLADDING WORKS ONGOING
WASTE BIN INSTALLATION COMPLETED
Laird Station
LAIRD STATION UPDATE
8
Activity Location Approx. Date & Duration
Main Entrance Construction
Electrical, mechanical, and architectural
finishes. Sidewalk pours and station
cleaning.
South-west corner of Laird Drive and
Eglinton Avenue East
Underway through early 2023
Secondary Entrance Construction
Electrical, mechanical, and architectural
finishes. Landscaping restoration works, and
station cleaning.
South-east corner of Laird Drive and
Eglinton Avenue East
Underway through early 2023
Station Box Construction
Electrical, mechanical, and architectural
finishes. Station and systems testing and
inspections, and station cleaning.
Beneath Eglinton Avenue East Underway through early 2023
Utility Works
Lane and Crosswalk Reductions at Eglinton
Ave East and Laird Dr
Southeast corner of Eglinton and Laird
As early as Tuesday, May 2, and ongoing for
approx. one (1) week
Periodic Lane Reductions
Asphalt Restoration Works
Eglinton Avenue East between Sutherland
Drive and Brentcliffe Road
Ongoing until approx. late-June 2023
TRAFFIC CONFIGURATION FOR UTILITY WORKS
9
As early as Tuesday, May 2, and ongoing for approximately one (1) week
PERIODIC LANE REDUCTIONS FOR ASPHALT RESTORATION WORKS
10
Ongoing until approximately late-June 2023
• Rolling lane closures are required in the
eastbound lanes on Eglinton Avenue
East to complete this work.
• Periodically, Eglinton Ave East and Laird
Dr will be reduced to one lane in each
direction, while this work takes place.
• Noise from construction activities can be
expected.
• Affected properties have been notified
directly.
• Work is expected to take place between
7:00 a.m. and 6:00 p.m.
TRAFFIC CONFIGURATION AT LAIRD STATION – CROSSWALK REMOVAL
11
Through 2023
• Periodic short-term lane closures will be required during this traffic stage to facilitate specific activities
• Fencing will remain in place around the Station Entrances for security purposes
CONSTRUCTION PROGRESS PHOTOS
12
CLEANING ONGOING AT THE
STATION
BOLLARD INSTALLATION COMPLETED
AT PLATFORM
EAST OF LAIRD ONGOING WORKS
13
• Vehicle and systems testing
• Landscaping between Brentfliffe Road and Kennedy Road – Ongoing through early-Summer 2023
• Brentcliffe retaining wall landscaping restoration works – Ongoing through early-Summer 2023
• Multi-use path construction and landscaping restoration works – Ongoing through late-Spring 2023
• Watermain restoration work on Eglinton at Gervais Drive – Ongoing until approximately mid-May 2023
• Soil nail and noise barrier wall removal – Ongoing until approximately late June 2023
GUARDRAIL INSTALLATION COMPLETED
EAST OF LESLIE STREET
PRESTO MACHINE INSTALLATION
COMPLETED
RETAINING WALL LOCATIONS
14
Leaside-Laird CLC - May 8, 2023.pdf

Contenu connexe

Similaire à Leaside-Laird CLC - May 8, 2023.pdf

Similaire à Leaside-Laird CLC - May 8, 2023.pdf (20)

CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
 
Chaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxChaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptx
 
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfEglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
 
Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023 Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023
 
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfEglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
 
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdfCLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
 
Western Works CLC - May 16, 2023
 Western Works CLC - May 16, 2023 Western Works CLC - May 16, 2023
Western Works CLC - May 16, 2023
 
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
 
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxPharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
 
Western Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdfWestern Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdf
 
Eglinton - Mt Pleasant CLC - September 14, 2022
Eglinton - Mt Pleasant CLC - September 14, 2022Eglinton - Mt Pleasant CLC - September 14, 2022
Eglinton - Mt Pleasant CLC - September 14, 2022
 
CLC Deck - Brentcliffe to Victoria Park - March 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - March 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - March 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - March 3 2022.pdf
 
Chaplin-Avenue CLC - Sept 14, 2022 compressed .pptx
Chaplin-Avenue CLC - Sept 14, 2022 compressed .pptxChaplin-Avenue CLC - Sept 14, 2022 compressed .pptx
Chaplin-Avenue CLC - Sept 14, 2022 compressed .pptx
 
Chaplin-Avenue CLC - Presentation Deck - July 6, 2022.pdf
Chaplin-Avenue CLC - Presentation Deck - July 6, 2022.pdfChaplin-Avenue CLC - Presentation Deck - July 6, 2022.pdf
Chaplin-Avenue CLC - Presentation Deck - July 6, 2022.pdf
 
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
 
Leaside-Laird CLC - Nov 14, 2022.pdf
Leaside-Laird CLC - Nov 14, 2022.pdfLeaside-Laird CLC - Nov 14, 2022.pdf
Leaside-Laird CLC - Nov 14, 2022.pdf
 
Chaplin-Avenue CLC - May 4 2022-compressed.pptx
Chaplin-Avenue CLC - May 4 2022-compressed.pptxChaplin-Avenue CLC - May 4 2022-compressed.pptx
Chaplin-Avenue CLC - May 4 2022-compressed.pptx
 
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxChaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
 
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxChaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
 
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
 

Plus de Crosstown TO (7)

Eglinton - Mt Pleasant CLC - November 9, 2022.pdf
Eglinton - Mt Pleasant CLC - November 9, 2022.pdfEglinton - Mt Pleasant CLC - November 9, 2022.pdf
Eglinton - Mt Pleasant CLC - November 9, 2022.pdf
 
Test
TestTest
Test
 
Leaside-Laird CLC - May 9 2022 - Revised.pdf
Leaside-Laird CLC - May 9 2022 - Revised.pdfLeaside-Laird CLC - May 9 2022 - Revised.pdf
Leaside-Laird CLC - May 9 2022 - Revised.pdf
 
Leaside-Laird CLC - March 14 2022 - v2.pdf
Leaside-Laird CLC - March 14 2022 - v2.pdfLeaside-Laird CLC - March 14 2022 - v2.pdf
Leaside-Laird CLC - March 14 2022 - v2.pdf
 
CLC Deck - Brentcliffe to Victoria Park - July 7 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - July 7 2022.pdfCLC Deck - Brentcliffe to Victoria Park - July 7 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - July 7 2022.pdf
 
CLC Deck - Brentcliffe to Victoria Park - May 5 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - May 5 2022.pdfCLC Deck - Brentcliffe to Victoria Park - May 5 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - May 5 2022.pdf
 
CLC Pharmacy to Kennedy - July 26, 2022 Compressed.pptx
CLC Pharmacy to Kennedy - July 26, 2022 Compressed.pptxCLC Pharmacy to Kennedy - July 26, 2022 Compressed.pptx
CLC Pharmacy to Kennedy - July 26, 2022 Compressed.pptx
 

Dernier

VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
sonatiwari757
 
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
sonatiwari757
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
CedZabala
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Call Girls In Delhi Whatsup 9873940964 Enjoy Unlimited Pleasure
 

Dernier (20)

Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
 
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
 
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
 
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
 
Top Rated Pune Call Girls Wadgaon Sheri ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Wadgaon Sheri ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Wadgaon Sheri ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Wadgaon Sheri ⟟ 6297143586 ⟟ Call Me For Genuine S...
 

Leaside-Laird CLC - May 8, 2023.pdf

  • 1. May 8, 2023 Eglinton Crosstown LRT Leaside-Laird CLC
  • 2. LAND ACKNOWLEDGEMENT 2 Let us take a moment to acknowledge we are on lands that have been, and continue to be, home to many Indigenous Peoples including the Anishnabeg, the Haudenosaunee and the Huron-Wendat peoples. We are all Treaty people. Many of us have come here as settlers, as immigrants or involuntarily as part of the trans-Atlantic slave trade, in this generation, or generations past. We acknowledge the historic and continued impacts of colonization and the need to work towards meaningful reconciliation with the original caretakers of this land. We acknowledge that Metrolinx operates on territories and lands covered by many treaties that affirm and value the rights of Indigenous communities, Nations and Peoples. We understand the importance of working towards reconciliation with the original caretakers of this land. At Metrolinx, we will conduct business in a manner that is built on a foundation of trust, respect and collaboration.
  • 4. LEASIDE STATION UPDATE 4 Activity Location Approx. Date & Duration Station Box Construction Architectural finishes, mechanical electrical works, and testing and commissioning Underneath Eglinton Avenue within the Station Box Underway through Spring 2023 Main Entrance Construction Architectural works, mechanical electrical installations, and landscaping South east corner of Bayview Ave and Eglinton Ave Underway through Spring 2023 Secondary Entrance Construction Architectural works, mechanical electrical installations, and landscaping North west corner of Bayview Ave and Eglinton Ave Underway through Spring 2023 Final Paving and Traffic Line Painting Eglinton Ave and Bayview Ave Spring 2023
  • 6. CONSTRUCTION PROGRESS PHOTOS 6 CLADDING WORKS ONGOING WASTE BIN INSTALLATION COMPLETED
  • 8. LAIRD STATION UPDATE 8 Activity Location Approx. Date & Duration Main Entrance Construction Electrical, mechanical, and architectural finishes. Sidewalk pours and station cleaning. South-west corner of Laird Drive and Eglinton Avenue East Underway through early 2023 Secondary Entrance Construction Electrical, mechanical, and architectural finishes. Landscaping restoration works, and station cleaning. South-east corner of Laird Drive and Eglinton Avenue East Underway through early 2023 Station Box Construction Electrical, mechanical, and architectural finishes. Station and systems testing and inspections, and station cleaning. Beneath Eglinton Avenue East Underway through early 2023 Utility Works Lane and Crosswalk Reductions at Eglinton Ave East and Laird Dr Southeast corner of Eglinton and Laird As early as Tuesday, May 2, and ongoing for approx. one (1) week Periodic Lane Reductions Asphalt Restoration Works Eglinton Avenue East between Sutherland Drive and Brentcliffe Road Ongoing until approx. late-June 2023
  • 9. TRAFFIC CONFIGURATION FOR UTILITY WORKS 9 As early as Tuesday, May 2, and ongoing for approximately one (1) week
  • 10. PERIODIC LANE REDUCTIONS FOR ASPHALT RESTORATION WORKS 10 Ongoing until approximately late-June 2023 • Rolling lane closures are required in the eastbound lanes on Eglinton Avenue East to complete this work. • Periodically, Eglinton Ave East and Laird Dr will be reduced to one lane in each direction, while this work takes place. • Noise from construction activities can be expected. • Affected properties have been notified directly. • Work is expected to take place between 7:00 a.m. and 6:00 p.m.
  • 11. TRAFFIC CONFIGURATION AT LAIRD STATION – CROSSWALK REMOVAL 11 Through 2023 • Periodic short-term lane closures will be required during this traffic stage to facilitate specific activities • Fencing will remain in place around the Station Entrances for security purposes
  • 12. CONSTRUCTION PROGRESS PHOTOS 12 CLEANING ONGOING AT THE STATION BOLLARD INSTALLATION COMPLETED AT PLATFORM
  • 13. EAST OF LAIRD ONGOING WORKS 13 • Vehicle and systems testing • Landscaping between Brentfliffe Road and Kennedy Road – Ongoing through early-Summer 2023 • Brentcliffe retaining wall landscaping restoration works – Ongoing through early-Summer 2023 • Multi-use path construction and landscaping restoration works – Ongoing through late-Spring 2023 • Watermain restoration work on Eglinton at Gervais Drive – Ongoing until approximately mid-May 2023 • Soil nail and noise barrier wall removal – Ongoing until approximately late June 2023 GUARDRAIL INSTALLATION COMPLETED EAST OF LESLIE STREET PRESTO MACHINE INSTALLATION COMPLETED