1. Document Page 1/13
MINISTRY OF EDUCATION, MALAYSIA
VOCATIONAL COLLEGE STANDARD CURRICULUM
COURSE INFORMATION
PROGRAMME : CONSTRUCTION TECHNOLOGY
COURSE NAME : INTORDUCTION OF SITE PREPARATION
COURSE CODE : WTP 1012
YEAR/SEMESTER : 1 / SEMESTER 1
CREDIT UNIT : 2.0
CONTACT HOUR : FACE TO FACE : 4.0 HOURS / WEEK
NON FACE TO FACE :
COURSE TYPE : VOCATIONAL
PREREQUISITE : -
CORE REQUISITE :
2. Document Page 2/13
COURSE OUTCOMES
At the end of the course, the students should be able to:-
1. Identify land/site preparation requirement
2. Prepare land/site preparation tools, equipment and materials
3. Carry out pegging and setting out work
4. Carry out hoarding installation
COURSE DESCRIPTION
Land/Site Preparation consists of clearing away the trees, debris, rubbish, etc, relocating obstructions and levelling the platform area from
building site, doing whatever rough grading that is necessary, and staking the house location in preparation for installation of the footings and
foundation.
The person who is competent in land/site preparation should be able to identify land/site preparation requirement, prepare land/site preparation
tools, equipment and materials, carry out pegging and setting out work, carry out hoarding installation, perform site clearing work, coordinate
land/site preparation inspection and perform foundation activities.
The outcome of this competency is to ensure the land/site is prepared and qualified for any and all construction works in accordance to the construction
drawing
3. Document Page 3/13
CONTENT AND LEARNING STANDARDS
PROGRAMME : CONSTRUCTION TECHNOLOGY
COURSE NAME : INTORDUCTION OF SITE PREPARATION
CODE NAME : WTP 1012
CONTACT HOURS CONTENT STANDARD LEARNING STANDARD ASSESSMENT CRITERIA
80 HOURS
(20 WEEKS)
1. IDENTIFY LAND /
SITE
PREPARATION
REQUIREMENT
RELATED KNOWLEDGE :
i. Contract documents
ii. Content of contract documents
Drawing
Specification
Bill of Quantities
Cost
Duration
iii. Land / site preparation documents
Land ownership title
o Types of grant
o Land Status
o Caveat
Local authority requirement
Temporary site requirement
ASSESSMENT CRITERIA
i. Types and functions of land / site
document listed and explained
ii. information regarding land/site listed
and explained
iii. Safety requirements on land / site
preparation listed and explained
4. Document Page 4/13
Approved construction drawing
o Infrastructure plan
o Mechanical and Electrical plan
o Building plan
iv. Purpose of land / site preparation
v. Land / site preparation resources such as
Machinery
Manpower
Material
Money
vi. Types of building foundation such as
Piling
Pad footing
Raft Foundation
Strip Footing
vii. Land / site preparation safety
requirements
APPLIED SKILLS:
i. Interpret building construction documents
ii. Finalize approved construction drawing
details
iii. Identify types of land / site preparation
foundation
iv. Determine information of land / site
5. Document Page 5/13
2. PREPARE LAND /
SITE PREPARATION
TOOLS, EQUIPMENT
AND MATERIALS
preparation requirement
v. Determine safety requirements
ATTITUDE/ SAFETY/ ENVIRONMENTAL :
Attitude:
Meticulous and detail in
interpreting contract and land / site
preparation documents
Honesty in the privacy and
confidentiality of the contract
documents
RELATED KNOWLEDGE :
i. Purpose of method statement
ii. Types and functions of land / site
preparation tools such as
Hand tools
Power tools
Chainsaw
Drill
iii. Types and functions of land / site
preparation equipment such as
Back Hoe
Excavator
Back Pusher
Lorry
Compactor
ASSESSMENT CRITERIA
i. Types and functions of land/site preparation
tools and equipment listed and explained
(hand tools, power tools, back hoe,
excavator, back pusher, lorry) determined
ii. Types and functions of land/site preparation
materials listed and explained (metal, timber,
cement, nails/screws) determined
iii. Land / site preparation tools, equipment and
materials condition checked in good
condition and ready for used according to
approved method statement
6. Document Page 6/13
iv. Types and functions of land / site
preparation materials
Hoarding
Metal
Timber
Timber post/frame
Cement
Nails/Screws
v. Land / site preparation tools, equipment
and materials acquisition arrangement
Outsourcing
In house
APPLIED SKILLS:
Determine types and functions of
land / site preparation tools and
equipment
Determine types and functions of
land / site preparation materials
Coordinate and arrange land / site
preparation tools, equipment and
materials
ATTITUDE/ SAFETY/ ENVIRONMENTAL :
Attitude:
- Meticulous in preparing tools, equipment
and materials
7. Document Page 7/13
3. CARRY OUT
PEGGING AND
SETTING OUT
WORK
RELATED KNOWLEDGE :
i. Land / site area survey work
Boundary
Bearing
Distance
Coordinate
Levelling
ii. Types and function of survey equipment
such as
Compass
Theodolite
Stuff
Tripod
Prism
Dumpy level
Pole
Measuring tape/laser meter
iii. Survey work coordination
iv. Proposed pegging and setting out
v. Pegging method
vi. Temporary/ establish offset setting point
vii. Pegging tools and materials such as
Hammer
Nails
Timber peg
String
Concrete peg
Paint
ASSESSMENT CRITERIA
i. Land / site preparation area and location
confirmed according to approved drawing
ii. Land / site area survey work properly done
according to land ownership grant
iii. Land / site /construction area pegging
properly done and quality checked
according to industrial practices.
8. Document Page 8/13
APPLIED SKILLS:
Identify land / site preparation area
and location
Survey land / site area
Peg land / site/
Construction area
ATTITUDE/ SAFETY/ ENVIRONMENTAL:
Attitude:
- Diligent, patient and meticulous in carrying
out work
Safety:
- Adhere to safety requirement
- Wear proper PPE
9. Document Page 9/13
4. CARRY OUT
HOARDING
INSTALLATION
RELATED KNOWLEDGE :
i. Type of hoarding such as
Metal
Timber
Plywood
ii. Authority bodies requirements on hoarding
installation
Size
Height
Position/ location
iii. Hoarding installation sequence
Measure
Mark post distance
Excavate/Dig hole
Erect post
Assemble frame members
Install panels
iv. Hoarding installation quality such as
Verticality
Alignment
Strengthens
Durability
Jointing
ASSESSMENT CRITERIA
i. Types of hoarding listed and explained
according to approved budget and
construction period.
ii. Size and height of hoarding confirmed
according to authority bodies requirement
iii. Hoarding post erected and quality checked
according to engineering construction
practices
iv. Frame and hoarding installed and quality
checked according to engineering
construction practices
10. Document Page 10/13
APPLIED SKILLS:
i. Determine types of hoarding
ii. Determine size and height of hoarding
iii. Install hoarding post
iv. Install frame hoarding
ATTITUDE/ SAFETY/ ENVIRONMENTAL :
Attitude:
- Diligent, patient and meticulous in carrying
out work
Safety:
- Adhere to safety requirement
- Wear proper PPE
.
11. Document Page 11/13
EMPLOYABILITY SKILLS
TOOLS, EQUIPMENT AND MATERIALS (TEM)
ITEMS RATIO (TEM : Trainees)
Wall chart
Photo
Slide projector
Tools and equipment manual
Various types of fire extinguisher
Audio-visual-aid
First Aid box
All related building hand tools
List of machine tools
Catalogues
Brochures
Safety attire
All related building power tools
Safety attire
All related building equipment/ plant
Materials
Tools
1:5
1:5
1:5
1:5
1:5
1 :30
1:5
1:5
1:5
1:10
1:1
1:5
1:1
1:5
1:5
1:5
1:5
1:5
Core Abilities
SILA RUJUK LAMPIRAN A : JADUAL PEMETAAN NOSS DAN KSKV
SILA RUJUK LAMPIRAN B : JADUAL PEMETAAN NOSS DAN CORE ABILITY TAHAP 1, 2, 3
12. Document Page 12/13
Equipment
Manuals
Storage facilities
1:5
REFERENCES
References
Misnan M Saidin,M Yusof Zakaria, Mohamed A,Hakim & Dalib A Rahman, Pengurusan Keselamatan Projek Pembinaan
:UniversitiTeknologi Malaysia.
Salleh, NurulAzita & Hussin AbdAziz, Penggunaan Alat Keselamatan di Tapak Bina :Dewan Bahasa Pustaka.
Construction Technology : Pearson Prentice Hall.
R. Barry (2001). KursusSeni Bina Jilid2 :IBS Buku Sdn. Bhd.
Mohamed Abd Hakim & Wan MatWan Min. Teknologi Penyelenggaraan Bangunan : Dewan Bahasa Pustaka.