Federal Register / Vol. 74, No. 183 / Wednesday, September 23, 2009 / Notices                                         48525

                                                  consultation, pursuant to section 7 of                  Agriculture, Rural Development,                       Office, 1617 Cole Boulevard, Golden,
                                                  the Endangered Species Act, section 305                 (USDA–RD) is a cooperating agency in                  Colorado 80401, or submitted via e-mail
                                                  of the Magnuson-Stevens Fishery                         preparation of the Draft Abengoa                      to: kristin.kerwin@go.doe.gov.
                                                  Conservation and Management Act, and                    Biorefinery EIS.                                      Envelopes and the subject line of e-
                                                  section 106 of the National Historic                       DOE’s Proposed Action in the Draft                 mails and faxes should be labeled ‘‘Draft
                                                  Preservation Act.                                       Abengoa Biorefinery EIS is to provide                 Abengoa Biorefinery EIS Comments.’’
                                                     m. Kenai Hydro, L.L.C. filed a Pre-                  federal funding to Abengoa Bioenergy                  Comments or requests for information
                                                  Application Document (PAD, including                    Biomass of Kansas, LLC (ABBK) to                      may also be submitted via the EIS Web
                                                  a proposed process plan and schedule)                   support the final design, construction,               site at http://www.biorefineryprojecteis-
                                                  with the Commission, pursuant to 18                     and startup of a commercial-scale                     abengoa.com.
                                                  CFR 5.5 of the Commission’s                             integrated biorefinery to be located near             FOR FURTHER INFORMATION CONTACT: For
                                                  regulations.                                            the city of Hugoton, Stevens County,                  information on the Draft Abengoa
                                                     n. A copy of the PAD is available for                Kansas (hereafter referred to as the                  Biorefinery EIS, or information on how
                                                  review at the Commission in the Public                  Abengoa Biorefinery Project). The                     to comment, contact Ms. Kristin Kerwin
                                                  Reference Room or may be viewed on                      Abengoa Biorefinery Project would use                 by any of the means described above
                                                  the Commission’s Web site (http://                      lignocellulosic biomass as feedstock to               under ADDRESSES, or access the Abengoa
                                                  www.ferc.gov), using the ‘‘eLibrary’’                   produce ethanol and biopower                          Biorefinery Project EIS Web site at:
                                                  link. Enter the docket number,                          (electricity) sufficient to meet the needs            http://www.biorefineryprojecteis-
                                                  excluding the last three digits in the                  of the biorefinery and to sell to the                 abengoa.com.
                                                  docket number field to access the                       regional power grid. In the Draft EIS,                   For further information on the DOE
                                                  document. For assistance, contact FERC                  DOE also evaluates an Action                          Office of Energy Efficiency and
                                                  Online Support at                                       Alternative, under which the biorefinery              Renewable Energy Integrated
                                                  FERCOnlineSupport@ferc.gov or toll                      would not produce electricity for sale to             Biorefinery Program, contact Mr. John
                                                  free at 1–866–208–3676, or for TTY,                     the regional grid, and a No-Action                    Ferrell, Biomass Program Manager
                                                  (202) 502–8659. A copy is also available                Alternative, under which the biorefinery              (Acting), U.S. Department of Energy,
                                                  for inspection and reproduction at the                  would not be constructed. The Draft                   1000 Independence Avenue, SW., EE–
                                                  address in paragraph h.                                 Abengoa Biorefinery Project EIS                       2E, 5H–021, Washington, DC 20585,
                                                     o. Register online at http://                        evaluates the potential direct, indirect,             telephone: 202–586–6745, facsimile:
                                                  www.ferc.gov/docs-filing/                               and cumulative environmental impacts                  202–586–1640, e-mail:
                                                  esubscription.asp to be notified via e-                 from the construction and operation of                eere_biomass@ee.doe.gov.
                                                  mail of new filing and issuances related                the Abengoa Biorefinery Project. DOE’s                   For further information on the U.S.
                                                  to this or other pending projects. For                  preferred alternative is the Proposed                 Department of Agriculture Rural
                                                  assistance, contact FERC Online                         Action.                                               Business-Cooperative Service
                                                  Support.                                                DATES: The public is invited to comment               Biorefinery Assistance Program contact:
                                                  Kimberly D. Bose,                                       on the Draft EIS, and all comments                    Energy Branch, Attention: Biorefinery
                                                  Secretary.                                              received no later than November 9, 2009               Assistance Program, 1400 Independence
                                                  [FR Doc. E9–22856 Filed 9–22–09; 8:45 am]               will be addressed in preparing the Final              Avenue, SW., Mail Stop 3225,
                                                  BILLING CODE 6717–01–P
                                                                                                          EIS. Comments received after the end of               Washington, DC 20250–3225; telephone:
                                                                                                          the public comment period will be                     202–720–1400.
                                                                                                          considered to the extent practicable. A                  For general information regarding the
                                                  DEPARTMENT OF ENERGY                                    public hearing on the Draft EIS will be               DOE National Environmental Policy Act
                                                                                                          held at the Stevens County Courthouse,                (NEPA) process contact: Ms. Carol M.
                                                  Office of Energy Efficiency and                         200 East 6th St., Hugoton, Kansas                     Borgstrom, Director, Office of NEPA
                                                  Renewable Energy                                        67951–2606, on October 21 2009, from                  Policy and Compliance, U.S.
                                                                                                          6 p.m. to 8 p.m. Written and oral                     Department of Energy, 1000
                                                  Draft Environmental Impact Statement                    comments will be accepted and given                   Independence Avenue, SW., GC–20,
                                                  for the Abengoa Biorefinery Project                     equal weight.                                         Washington, DC 20585; e-mail
                                                  Near Hugoton, Stevens County, KS                        ADDRESSES: Copies of this Draft EIS are               AskNEPA@hq.doe.gov; telephone 202–
                                                  (DOE/EIS–0407D)                                         available for review at The Stevens                   586–4600; or leave a message at 1–800–
                                                  AGENCY: Office of Energy Efficiency and                 County Library, 501 S. Monroe Street,                 472–2756.
                                                  Renewable Energy, DOE.                                  Hugoton, KS 67951, 620–544–2301, and                  SUPPLEMENTARY INFORMATION:
                                                  ACTION: Notice of Availability.                         the U.S. Department of Energy, FOIA                   Background: In September 2007,
                                                                                                          Reading Room, 1E–190, Forrestal Bldg.,                pursuant to the Energy Policy Act of
                                                  SUMMARY: The U.S. Department of                         1000 Independence Avenue, SW.,                        2005 (EPAct 2005) Section 932, DOE
                                                  Energy (DOE) announces the availability                 Washington, DC 20585, 202–586–3142.                   granted an initial award of
                                                  of the Draft Environmental Impact                       The Draft EIS is also available on the                approximately $15 million to ABBK to
                                                  Statement for the Abengoa Biorefinery                   Golden Field Office On-line FOIA                      advance the conceptual design, initiate
                                                  Project near Hugoton, Stevens County,                   Public Reading Room: http://                          the permitting process, and support an
                                                  KS (DOE/EIS–0407D) (referred to as the                  www.eere.energy.gov/golden/                           environmental review under NEPA for a
                                                  ‘‘Draft Abengoa Biorefinery EIS’’ or                    Reading_Room.aspx, at: http://                        proposed biomass-to-ethanol and energy
mstockstill on DSKH9S0YB1PROD with NOTICES




                                                  ‘‘Draft EIS’’). This Draft EIS was                      www.biorefineryprojecteis-abengoa.com                 facility that would be located adjacent
                                                  prepared in accordance with the                         and at: http://www.gc.energy.gov/NEPA.                to and west of the city of Hugoton,
                                                  Council on Environmental Quality’s                         How to Comment on the Draft EIS:                   Stevens County, Kansas. DOE requires
                                                  National Environmental Policy Act                       Oral and written comments on the Draft                completion of the design, permitting,
                                                  (NEPA) Implementing Regulations (40                     EIS will be accepted at the public                    and environmental review obligations
                                                  CFR parts 1500–1508) and DOE NEPA                       hearing, or written comments may be                   prior to deciding whether to co-fund the
                                                  Implementing Regulations (10 CFR part                   mailed to Ms. Kristin Kerwin at the U.S.              final design, construction and start-up
                                                  1021). The U.S. Department of                           Department of Energy, Golden Field                    phases of the project.


                                             VerDate Nov<24>2008   17:06 Sep 22, 2009   Jkt 217001   PO 00000   Frm 00008   Fmt 4703   Sfmt 4703   E:FRFM23SEN1.SGM   23SEN1
48526                   Federal Register / Vol. 74, No. 183 / Wednesday, September 23, 2009 / Notices

                                                     On August 25, 2008, DOE initiated the                day of feedstock, which would be                        Issued in Golden, CO on September 15,
                                                  environmental review process by                         obtained from producers within 50                     2009.
                                                  publishing a Notice of Intent in the                    miles of the Abengoa Biorefinery Project              Steve Blazek,
                                                  Federal Register (‘‘Notice of Intent to                 site. The biorefinery would produce up                NEPA Compliance Officer, Golden Field
                                                  Prepare an Environmental Impact                         to 18 million gallons of denatured                    Office.
                                                  Statement and Notice of Wetlands                        ethanol per year using a one-step                     [FR Doc. E9–22920 Filed 9–22–09; 8:45 am]
                                                  Involvement for the Abengoa                             feedstock hydrolysis and fermentation                 BILLING CODE 6450–01–P
                                                  Biorefinery Project Near Hugoton, KS,’’                 process. The biorefinery also would
                                                  73 FR 50001). However, based on                         produce 92 megawatts of electricity, and
                                                  changes in the scope of the project                     117,000 dry short tons per year of                    DEPARTMENT OF ENERGY
                                                  proposed by ABBK and also ABBK’s                        lignin-rich stillage cake. Electricity
                                                  decision to solicit loan guarantees from                would be produced via a high-pressure,                Federal Energy Regulatory
                                                  DOE’s Loan Guarantee Program                            steam-condensing turbine generator.                   Commission
                                                  pursuant to Title XVII of EPAct 2005                    Seventy megawatts of electricity would                [Docket No. NJ08–5–003]
                                                  and from USDA–RD Biorefinery                            be sold commercially. The lignin-rich
                                                  Assistance Program, DOE published an                    stillage cake could be sold to a lignin               Bonneville Power Administration;
                                                  Amended Notice of Intent in the                         producer, processed and lignin-poor                   Transmission Service Terms and
                                                  Federal Register on April 29, 2009                      stillage cake would be returned to the                Conditions; Notice of Filing
                                                  (‘‘Amended Notice of Intent To Modify                   biorefinery and burned in the solid fuel
                                                  the Scope of the Environmental Impact                                                                         September 16, 2009.
                                                                                                          boiler.                                                  Take notice that on September 14,
                                                  Statement for the Abengoa Biorefinery                      Action Alternative: For the Action
                                                  Project Near Hugoton, KS’’, 74 FR                                                                             2009, Bonneville Power Administration
                                                                                                          Alternative, DOE would provide Federal                (BPA), pursuant to 18 CFR 35.28(e) and
                                                  19543). Public comments were accepted                   funding for an integrated biorefinery
                                                  on the original scope of the EIS from                                                                         18 CFR 385.207, filed certain
                                                                                                          that would produce approximately 12                   amendments to Attachment K to its
                                                  August 25 through October 9, 2008, and                  million gallons per year of denatured
                                                  then on the revised scope from April 29                                                                       Open Access Transmission Tariff in
                                                                                                          ethanol, 45,000 dry short tons per year               response to the Commission’s July 16,
                                                  through May 29, 2009. An initial public                 of lignin-rich stillage cake, and 20
                                                  scoping meeting was held in Hugoton,                                                                          2009 Order, United States Department
                                                                                                          megawatts of electricity for use at the               of Energy—Bonneville Power
                                                  KS on September 10, 2008, and an                        facility (none sold commercially).
                                                  additional public scoping meeting was                                                                         Administration, 128 FERC ¶ 61,065
                                                                                                             Under the Action Alternative, the                  (2009). BPA also request a declaratory
                                                  held on May 19, 2009 to address the                     integrated biorefinery would use a two-
                                                  revised scope. DOE received both oral                                                                         order accepting their proposed
                                                                                                          stage process to pretreat, hydrolyze and              Attachment K as revised, finding that it
                                                  and written scoping comments. DOE                       ferment sugars for ethanol production,
                                                  identified 16 scoping comments and                                                                            satisfies the Commission’s standards for
                                                                                                          and would produce syngas using a                      reciprocity.
                                                  grouped them into three categories                      gasification system. A syngas boiler as
                                                  reflecting the nature of the individual                                                                          Any person desiring to intervene or to
                                                                                                          well as the biomass boilers would                     protest this filing must file in
                                                  comments: (1) Support for the project,                  produce steam. Steam would be used for
                                                  (2) requests for specific information or                                                                      accordance with Rules 211 and 214 of
                                                                                                          ethanol production processes and                      the Commission’s Rules of Practice and
                                                  analyses and (3) statements of no
                                                                                                          electricity production. The biomass                   Procedure (18 CFR 385.211, 385.214).
                                                  negative environmental impacts. All
                                                                                                          boilers and the turbines would be used                Protests will be considered by the
                                                  requests for specific information are
                                                                                                          to generate electricity solely to operate             Commission in determining the
                                                  addressed in the Draft EIS.
                                                     Proposed Action: DOE’s Proposed                      the plant (no electricity would be sold               appropriate action to be taken, but will
                                                  Action analyzed in the Draft EIS is to                  commercially) and would be smaller                    not serve to make protestants parties to
                                                  provide Federal funding to support the                  than those for the Proposed Action.                   the proceeding. Any person wishing to
                                                  design, construction, and start up of the                  No Action Alternative: Under the No                become a party must file a notice of
                                                  integrated biorefinery proposed by                      Action Alternative, DOE would not                     intervention or motion to intervene, as
                                                  ABBK. DOE would negotiate an                            provide Federal funding to ABBK to                    appropriate. Such notices, motions, or
                                                  agreement with ABBK to provide                          support the final design, construction,               protests must be filed on or before the
                                                  approximately $85 million (2008                         and start-up of the Abengoa Biorefinery               comment date. Anyone filing a motion
                                                  dollars) for the final design,                          Project. Under the No Action                          to intervene or protest must serve a copy
                                                  construction and start up of the                        Alternative, the Draft EIS presumes that              of that document on the Applicant and
                                                  biorefinery. The estimated total project                ABBK would not build a biorefinery.                   all the parties in this proceeding.
                                                  cost is approximately $300 million                      The Department recognizes, however,                      The Commission encourages
                                                  (2008 dollars). At this time, DOE is not                that ABBK could pursue alternative                    electronic submission of protests and
                                                  considering issuing a loan guarantee for                sources of capital for development of                 interventions in lieu of paper using the
                                                  the proposed project. The Abengoa                       the biorefinery.                                      ‘‘eFiling’’ link at http://www.ferc.gov.
                                                  Biorefinery facility would use                             Preferred Alternative: The Proposed                Persons unable to file electronically
                                                  lignocellulosic biomass (biomass) as                    Action is DOE’s Preferred Alternative.                should submit an original and 14 copies
                                                  feedstock to produce biofuels. Biomass                     Following the end of the public                    of the protest or intervention to the
                                                  such as corn stover, wheat straw, milo                  comment period, November 9, 2009,                     Federal Energy Regulatory Commission,
mstockstill on DSKH9S0YB1PROD with NOTICES




                                                  stubble, switchgrass, and other available               DOE will consider and respond to the                  888 First Street, NE., Washington, DC
                                                  materials would be harvested as                         comments received, and issue the Final                20426.
                                                  feedstock and fermented to produce                      Abengoa Biorefinery EIS. DOE will issue                  This filing is accessible on-line at
                                                  ethanol. The biorefinery would also                     a Record of Decision no sooner than 30                http://www.ferc.gov, using the
                                                  produce electricity.                                    days after the U.S. Environmental                     ‘‘eLibrary’’ link and is available for
                                                     Under the Proposed Action, the                       Protection Agency issues a Notice of                  review in the Commission’s Public
                                                  Abengoa Biorefinery would process                       Availability of the Final EIS in the                  Reference Room in Washington, DC.
                                                  approximately 2,300 dry metric tons per                 Federal Register.                                     There is an ‘‘eSubscription’’ link on the


                                             VerDate Nov<24>2008   17:06 Sep 22, 2009   Jkt 217001   PO 00000   Frm 00009   Fmt 4703   Sfmt 4703   E:FRFM23SEN1.SGM   23SEN1

Contenu connexe

En vedette (16)

The Du'aa of Qunoot
The Du'aa of QunootThe Du'aa of Qunoot
The Du'aa of Qunoot
 
Erin breelaceyhannahmicateam resistance52marx
Erin breelaceyhannahmicateam resistance52marxErin breelaceyhannahmicateam resistance52marx
Erin breelaceyhannahmicateam resistance52marx
 
TOV
TOVTOV
TOV
 
Nancy kim, habin an, hyuk joo kwon, gene lee technology presentation
Nancy kim, habin an, hyuk joo kwon, gene lee technology presentationNancy kim, habin an, hyuk joo kwon, gene lee technology presentation
Nancy kim, habin an, hyuk joo kwon, gene lee technology presentation
 
The Holy Spirit
The Holy SpiritThe Holy Spirit
The Holy Spirit
 
The Military Evangelical Christianity And The Constitution
The  Military  Evangelical  Christianity And The  ConstitutionThe  Military  Evangelical  Christianity And The  Constitution
The Military Evangelical Christianity And The Constitution
 
XEL_Q305_10Q
XEL_Q305_10QXEL_Q305_10Q
XEL_Q305_10Q
 
Captive Insurance Agencies
Captive Insurance AgenciesCaptive Insurance Agencies
Captive Insurance Agencies
 
xcel energy 1108Mid-Atlantic_Presentation
xcel energy  1108Mid-Atlantic_Presentationxcel energy  1108Mid-Atlantic_Presentation
xcel energy 1108Mid-Atlantic_Presentation
 
Never Give Up
Never Give UpNever Give Up
Never Give Up
 
Private equity q1_supplement sample
Private equity q1_supplement samplePrivate equity q1_supplement sample
Private equity q1_supplement sample
 
xcel energy 4_25_2007InvestorReport2007Q1Final
xcel energy 4_25_2007InvestorReport2007Q1Finalxcel energy 4_25_2007InvestorReport2007Q1Final
xcel energy 4_25_2007InvestorReport2007Q1Final
 
Grupo 9 trabajo final
Grupo 9 trabajo finalGrupo 9 trabajo final
Grupo 9 trabajo final
 
Perspectives On Ideology
Perspectives On IdeologyPerspectives On Ideology
Perspectives On Ideology
 
Class Issues in Music
Class Issues in MusicClass Issues in Music
Class Issues in Music
 
xel_05/25/01b
xel_05/25/01bxel_05/25/01b
xel_05/25/01b
 

Similaire à NOA DEIS (DOE) - Abengoa Biorefinery

Similaire à NOA DEIS (DOE) - Abengoa Biorefinery (7)

NOA DEIS (DOE) - Mesaba Energy Project
NOA DEIS (DOE) - Mesaba Energy ProjectNOA DEIS (DOE) - Mesaba Energy Project
NOA DEIS (DOE) - Mesaba Energy Project
 
NOI - Texas Clean Energy
NOI - Texas Clean EnergyNOI - Texas Clean Energy
NOI - Texas Clean Energy
 
Biomass energy data book
Biomass energy data bookBiomass energy data book
Biomass energy data book
 
NOI - Mountaineer Commercial Scale Carbon Capture
NOI - Mountaineer Commercial Scale Carbon CaptureNOI - Mountaineer Commercial Scale Carbon Capture
NOI - Mountaineer Commercial Scale Carbon Capture
 
Notice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC ProjectNotice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC Project
 
Notice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC ProjectNotice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC Project
 
From Algae to Biofuels: An Integrated System Approach to Renewable Energy
From Algae to Biofuels: An Integrated System Approach to Renewable Energy  From Algae to Biofuels: An Integrated System Approach to Renewable Energy
From Algae to Biofuels: An Integrated System Approach to Renewable Energy
 

Plus de DOE Office of NEPA Policy & Compliance

Plus de DOE Office of NEPA Policy & Compliance (20)

Dec. 2009 - DOE-NEPA Lessons Learned
Dec. 2009 - DOE-NEPA Lessons LearnedDec. 2009 - DOE-NEPA Lessons Learned
Dec. 2009 - DOE-NEPA Lessons Learned
 
March 2010 - DOE-NEPA Lessons Learned
March 2010 - DOE-NEPA Lessons LearnedMarch 2010 - DOE-NEPA Lessons Learned
March 2010 - DOE-NEPA Lessons Learned
 
June 2010 - DOE-NEPA Lessons Learned
June 2010 - DOE-NEPA Lessons LearnedJune 2010 - DOE-NEPA Lessons Learned
June 2010 - DOE-NEPA Lessons Learned
 
Sept. 2010 - DOE-NEPA Lessons Learned
Sept. 2010 - DOE-NEPA Lessons LearnedSept. 2010 - DOE-NEPA Lessons Learned
Sept. 2010 - DOE-NEPA Lessons Learned
 
NOI - Hydrogen Energy California, LLC
NOI - Hydrogen Energy California, LLCNOI - Hydrogen Energy California, LLC
NOI - Hydrogen Energy California, LLC
 
NOA FEIS (EPA) - Kemper County IGCC Project
NOA FEIS (EPA) - Kemper County IGCC ProjectNOA FEIS (EPA) - Kemper County IGCC Project
NOA FEIS (EPA) - Kemper County IGCC Project
 
NOA DEIS (EPA) - Kemper County IGCC Project
NOA DEIS (EPA) - Kemper County IGCC ProjectNOA DEIS (EPA) - Kemper County IGCC Project
NOA DEIS (EPA) - Kemper County IGCC Project
 
NOA DEIS (EPA) - Mesaba Energy Project
NOA DEIS (EPA) - Mesaba Energy ProjectNOA DEIS (EPA) - Mesaba Energy Project
NOA DEIS (EPA) - Mesaba Energy Project
 
NOI - Mesaba Energy Project
NOI - Mesaba Energy ProjectNOI - Mesaba Energy Project
NOI - Mesaba Energy Project
 
NOA DEIS (DOE) - Mercury
NOA DEIS (DOE) - MercuryNOA DEIS (DOE) - Mercury
NOA DEIS (DOE) - Mercury
 
NOI - Santa Susana
NOI - Santa SusanaNOI - Santa Susana
NOI - Santa Susana
 
ANOI - Santa Susana
ANOI - Santa SusanaANOI - Santa Susana
ANOI - Santa Susana
 
NOI - GTCC Low Level Radioactive Waste
NOI - GTCC Low Level Radioactive WasteNOI - GTCC Low Level Radioactive Waste
NOI - GTCC Low Level Radioactive Waste
 
ANOI - GTCC Low-Level Radioactive Waste
ANOI - GTCC Low-Level Radioactive WasteANOI - GTCC Low-Level Radioactive Waste
ANOI - GTCC Low-Level Radioactive Waste
 
NOI - Tank Closure and Waste Management (Hanford)
NOI - Tank Closure and Waste Management (Hanford)NOI - Tank Closure and Waste Management (Hanford)
NOI - Tank Closure and Waste Management (Hanford)
 
NOA DEIS (EPA) - Abengoa Biorefinery
NOA DEIS (EPA) - Abengoa BiorefineryNOA DEIS (EPA) - Abengoa Biorefinery
NOA DEIS (EPA) - Abengoa Biorefinery
 
NOI - Solar Energy Development
NOI - Solar Energy DevelopmentNOI - Solar Energy Development
NOI - Solar Energy Development
 
NOI - Energia Sierra Juarez
NOI - Energia Sierra JuarezNOI - Energia Sierra Juarez
NOI - Energia Sierra Juarez
 
NOI - Hooper Springs EIS
NOI - Hooper Springs EISNOI - Hooper Springs EIS
NOI - Hooper Springs EIS
 
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
 

NOA DEIS (DOE) - Abengoa Biorefinery

  • 1. Federal Register / Vol. 74, No. 183 / Wednesday, September 23, 2009 / Notices 48525 consultation, pursuant to section 7 of Agriculture, Rural Development, Office, 1617 Cole Boulevard, Golden, the Endangered Species Act, section 305 (USDA–RD) is a cooperating agency in Colorado 80401, or submitted via e-mail of the Magnuson-Stevens Fishery preparation of the Draft Abengoa to: kristin.kerwin@go.doe.gov. Conservation and Management Act, and Biorefinery EIS. Envelopes and the subject line of e- section 106 of the National Historic DOE’s Proposed Action in the Draft mails and faxes should be labeled ‘‘Draft Preservation Act. Abengoa Biorefinery EIS is to provide Abengoa Biorefinery EIS Comments.’’ m. Kenai Hydro, L.L.C. filed a Pre- federal funding to Abengoa Bioenergy Comments or requests for information Application Document (PAD, including Biomass of Kansas, LLC (ABBK) to may also be submitted via the EIS Web a proposed process plan and schedule) support the final design, construction, site at http://www.biorefineryprojecteis- with the Commission, pursuant to 18 and startup of a commercial-scale abengoa.com. CFR 5.5 of the Commission’s integrated biorefinery to be located near FOR FURTHER INFORMATION CONTACT: For regulations. the city of Hugoton, Stevens County, information on the Draft Abengoa n. A copy of the PAD is available for Kansas (hereafter referred to as the Biorefinery EIS, or information on how review at the Commission in the Public Abengoa Biorefinery Project). The to comment, contact Ms. Kristin Kerwin Reference Room or may be viewed on Abengoa Biorefinery Project would use by any of the means described above the Commission’s Web site (http:// lignocellulosic biomass as feedstock to under ADDRESSES, or access the Abengoa www.ferc.gov), using the ‘‘eLibrary’’ produce ethanol and biopower Biorefinery Project EIS Web site at: link. Enter the docket number, (electricity) sufficient to meet the needs http://www.biorefineryprojecteis- excluding the last three digits in the of the biorefinery and to sell to the abengoa.com. docket number field to access the regional power grid. In the Draft EIS, For further information on the DOE document. For assistance, contact FERC DOE also evaluates an Action Office of Energy Efficiency and Online Support at Alternative, under which the biorefinery Renewable Energy Integrated FERCOnlineSupport@ferc.gov or toll would not produce electricity for sale to Biorefinery Program, contact Mr. John free at 1–866–208–3676, or for TTY, the regional grid, and a No-Action Ferrell, Biomass Program Manager (202) 502–8659. A copy is also available Alternative, under which the biorefinery (Acting), U.S. Department of Energy, for inspection and reproduction at the would not be constructed. The Draft 1000 Independence Avenue, SW., EE– address in paragraph h. Abengoa Biorefinery Project EIS 2E, 5H–021, Washington, DC 20585, o. Register online at http:// evaluates the potential direct, indirect, telephone: 202–586–6745, facsimile: www.ferc.gov/docs-filing/ and cumulative environmental impacts 202–586–1640, e-mail: esubscription.asp to be notified via e- from the construction and operation of eere_biomass@ee.doe.gov. mail of new filing and issuances related the Abengoa Biorefinery Project. DOE’s For further information on the U.S. to this or other pending projects. For preferred alternative is the Proposed Department of Agriculture Rural assistance, contact FERC Online Action. Business-Cooperative Service Support. DATES: The public is invited to comment Biorefinery Assistance Program contact: Kimberly D. Bose, on the Draft EIS, and all comments Energy Branch, Attention: Biorefinery Secretary. received no later than November 9, 2009 Assistance Program, 1400 Independence [FR Doc. E9–22856 Filed 9–22–09; 8:45 am] will be addressed in preparing the Final Avenue, SW., Mail Stop 3225, BILLING CODE 6717–01–P EIS. Comments received after the end of Washington, DC 20250–3225; telephone: the public comment period will be 202–720–1400. considered to the extent practicable. A For general information regarding the DEPARTMENT OF ENERGY public hearing on the Draft EIS will be DOE National Environmental Policy Act held at the Stevens County Courthouse, (NEPA) process contact: Ms. Carol M. Office of Energy Efficiency and 200 East 6th St., Hugoton, Kansas Borgstrom, Director, Office of NEPA Renewable Energy 67951–2606, on October 21 2009, from Policy and Compliance, U.S. 6 p.m. to 8 p.m. Written and oral Department of Energy, 1000 Draft Environmental Impact Statement comments will be accepted and given Independence Avenue, SW., GC–20, for the Abengoa Biorefinery Project equal weight. Washington, DC 20585; e-mail Near Hugoton, Stevens County, KS ADDRESSES: Copies of this Draft EIS are AskNEPA@hq.doe.gov; telephone 202– (DOE/EIS–0407D) available for review at The Stevens 586–4600; or leave a message at 1–800– AGENCY: Office of Energy Efficiency and County Library, 501 S. Monroe Street, 472–2756. Renewable Energy, DOE. Hugoton, KS 67951, 620–544–2301, and SUPPLEMENTARY INFORMATION: ACTION: Notice of Availability. the U.S. Department of Energy, FOIA Background: In September 2007, Reading Room, 1E–190, Forrestal Bldg., pursuant to the Energy Policy Act of SUMMARY: The U.S. Department of 1000 Independence Avenue, SW., 2005 (EPAct 2005) Section 932, DOE Energy (DOE) announces the availability Washington, DC 20585, 202–586–3142. granted an initial award of of the Draft Environmental Impact The Draft EIS is also available on the approximately $15 million to ABBK to Statement for the Abengoa Biorefinery Golden Field Office On-line FOIA advance the conceptual design, initiate Project near Hugoton, Stevens County, Public Reading Room: http:// the permitting process, and support an KS (DOE/EIS–0407D) (referred to as the www.eere.energy.gov/golden/ environmental review under NEPA for a ‘‘Draft Abengoa Biorefinery EIS’’ or Reading_Room.aspx, at: http:// proposed biomass-to-ethanol and energy mstockstill on DSKH9S0YB1PROD with NOTICES ‘‘Draft EIS’’). This Draft EIS was www.biorefineryprojecteis-abengoa.com facility that would be located adjacent prepared in accordance with the and at: http://www.gc.energy.gov/NEPA. to and west of the city of Hugoton, Council on Environmental Quality’s How to Comment on the Draft EIS: Stevens County, Kansas. DOE requires National Environmental Policy Act Oral and written comments on the Draft completion of the design, permitting, (NEPA) Implementing Regulations (40 EIS will be accepted at the public and environmental review obligations CFR parts 1500–1508) and DOE NEPA hearing, or written comments may be prior to deciding whether to co-fund the Implementing Regulations (10 CFR part mailed to Ms. Kristin Kerwin at the U.S. final design, construction and start-up 1021). The U.S. Department of Department of Energy, Golden Field phases of the project. VerDate Nov<24>2008 17:06 Sep 22, 2009 Jkt 217001 PO 00000 Frm 00008 Fmt 4703 Sfmt 4703 E:FRFM23SEN1.SGM 23SEN1
  • 2. 48526 Federal Register / Vol. 74, No. 183 / Wednesday, September 23, 2009 / Notices On August 25, 2008, DOE initiated the day of feedstock, which would be Issued in Golden, CO on September 15, environmental review process by obtained from producers within 50 2009. publishing a Notice of Intent in the miles of the Abengoa Biorefinery Project Steve Blazek, Federal Register (‘‘Notice of Intent to site. The biorefinery would produce up NEPA Compliance Officer, Golden Field Prepare an Environmental Impact to 18 million gallons of denatured Office. Statement and Notice of Wetlands ethanol per year using a one-step [FR Doc. E9–22920 Filed 9–22–09; 8:45 am] Involvement for the Abengoa feedstock hydrolysis and fermentation BILLING CODE 6450–01–P Biorefinery Project Near Hugoton, KS,’’ process. The biorefinery also would 73 FR 50001). However, based on produce 92 megawatts of electricity, and changes in the scope of the project 117,000 dry short tons per year of DEPARTMENT OF ENERGY proposed by ABBK and also ABBK’s lignin-rich stillage cake. Electricity decision to solicit loan guarantees from would be produced via a high-pressure, Federal Energy Regulatory DOE’s Loan Guarantee Program steam-condensing turbine generator. Commission pursuant to Title XVII of EPAct 2005 Seventy megawatts of electricity would [Docket No. NJ08–5–003] and from USDA–RD Biorefinery be sold commercially. The lignin-rich Assistance Program, DOE published an stillage cake could be sold to a lignin Bonneville Power Administration; Amended Notice of Intent in the producer, processed and lignin-poor Transmission Service Terms and Federal Register on April 29, 2009 stillage cake would be returned to the Conditions; Notice of Filing (‘‘Amended Notice of Intent To Modify biorefinery and burned in the solid fuel the Scope of the Environmental Impact September 16, 2009. boiler. Take notice that on September 14, Statement for the Abengoa Biorefinery Action Alternative: For the Action Project Near Hugoton, KS’’, 74 FR 2009, Bonneville Power Administration Alternative, DOE would provide Federal (BPA), pursuant to 18 CFR 35.28(e) and 19543). Public comments were accepted funding for an integrated biorefinery on the original scope of the EIS from 18 CFR 385.207, filed certain that would produce approximately 12 amendments to Attachment K to its August 25 through October 9, 2008, and million gallons per year of denatured then on the revised scope from April 29 Open Access Transmission Tariff in ethanol, 45,000 dry short tons per year response to the Commission’s July 16, through May 29, 2009. An initial public of lignin-rich stillage cake, and 20 scoping meeting was held in Hugoton, 2009 Order, United States Department megawatts of electricity for use at the of Energy—Bonneville Power KS on September 10, 2008, and an facility (none sold commercially). additional public scoping meeting was Administration, 128 FERC ¶ 61,065 Under the Action Alternative, the (2009). BPA also request a declaratory held on May 19, 2009 to address the integrated biorefinery would use a two- revised scope. DOE received both oral order accepting their proposed stage process to pretreat, hydrolyze and Attachment K as revised, finding that it and written scoping comments. DOE ferment sugars for ethanol production, identified 16 scoping comments and satisfies the Commission’s standards for and would produce syngas using a reciprocity. grouped them into three categories gasification system. A syngas boiler as reflecting the nature of the individual Any person desiring to intervene or to well as the biomass boilers would protest this filing must file in comments: (1) Support for the project, produce steam. Steam would be used for (2) requests for specific information or accordance with Rules 211 and 214 of ethanol production processes and the Commission’s Rules of Practice and analyses and (3) statements of no electricity production. The biomass Procedure (18 CFR 385.211, 385.214). negative environmental impacts. All boilers and the turbines would be used Protests will be considered by the requests for specific information are to generate electricity solely to operate Commission in determining the addressed in the Draft EIS. Proposed Action: DOE’s Proposed the plant (no electricity would be sold appropriate action to be taken, but will Action analyzed in the Draft EIS is to commercially) and would be smaller not serve to make protestants parties to provide Federal funding to support the than those for the Proposed Action. the proceeding. Any person wishing to design, construction, and start up of the No Action Alternative: Under the No become a party must file a notice of integrated biorefinery proposed by Action Alternative, DOE would not intervention or motion to intervene, as ABBK. DOE would negotiate an provide Federal funding to ABBK to appropriate. Such notices, motions, or agreement with ABBK to provide support the final design, construction, protests must be filed on or before the approximately $85 million (2008 and start-up of the Abengoa Biorefinery comment date. Anyone filing a motion dollars) for the final design, Project. Under the No Action to intervene or protest must serve a copy construction and start up of the Alternative, the Draft EIS presumes that of that document on the Applicant and biorefinery. The estimated total project ABBK would not build a biorefinery. all the parties in this proceeding. cost is approximately $300 million The Department recognizes, however, The Commission encourages (2008 dollars). At this time, DOE is not that ABBK could pursue alternative electronic submission of protests and considering issuing a loan guarantee for sources of capital for development of interventions in lieu of paper using the the proposed project. The Abengoa the biorefinery. ‘‘eFiling’’ link at http://www.ferc.gov. Biorefinery facility would use Preferred Alternative: The Proposed Persons unable to file electronically lignocellulosic biomass (biomass) as Action is DOE’s Preferred Alternative. should submit an original and 14 copies feedstock to produce biofuels. Biomass Following the end of the public of the protest or intervention to the such as corn stover, wheat straw, milo comment period, November 9, 2009, Federal Energy Regulatory Commission, mstockstill on DSKH9S0YB1PROD with NOTICES stubble, switchgrass, and other available DOE will consider and respond to the 888 First Street, NE., Washington, DC materials would be harvested as comments received, and issue the Final 20426. feedstock and fermented to produce Abengoa Biorefinery EIS. DOE will issue This filing is accessible on-line at ethanol. The biorefinery would also a Record of Decision no sooner than 30 http://www.ferc.gov, using the produce electricity. days after the U.S. Environmental ‘‘eLibrary’’ link and is available for Under the Proposed Action, the Protection Agency issues a Notice of review in the Commission’s Public Abengoa Biorefinery would process Availability of the Final EIS in the Reference Room in Washington, DC. approximately 2,300 dry metric tons per Federal Register. There is an ‘‘eSubscription’’ link on the VerDate Nov<24>2008 17:06 Sep 22, 2009 Jkt 217001 PO 00000 Frm 00009 Fmt 4703 Sfmt 4703 E:FRFM23SEN1.SGM 23SEN1